DE20112443U1 - House connection shaft - Google Patents
House connection shaftInfo
- Publication number
- DE20112443U1 DE20112443U1 DE20112443U DE20112443U DE20112443U1 DE 20112443 U1 DE20112443 U1 DE 20112443U1 DE 20112443 U DE20112443 U DE 20112443U DE 20112443 U DE20112443 U DE 20112443U DE 20112443 U1 DE20112443 U1 DE 20112443U1
- Authority
- DE
- Germany
- Prior art keywords
- shaft
- house connection
- supply
- opening
- house
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000007689 inspection Methods 0.000 claims description 8
- 230000035515 penetration Effects 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 2
- 238000009423 ventilation Methods 0.000 claims 1
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 6
- 239000003345 natural gas Substances 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 239000007789 gas Substances 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000005056 compaction Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 239000003651 drinking water Substances 0.000 description 1
- 235000020188 drinking water Nutrition 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000011010 flushing procedure Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 238000010079 rubber tapping Methods 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/12—Manhole shafts; Other inspection or access chambers; Accessories therefor
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G9/00—Installations of electric cables or lines in or on the ground or water
- H02G9/10—Installations of electric cables or lines in or on the ground or water in cable chambers, e.g. in manhole or in handhole
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Tents Or Canopies (AREA)
- Details Of Indoor Wiring (AREA)
Description
BESCHREIBUNG:DESCRIPTION:
Die Erfindung gehört zum Gebiet der Grundstückserschließungen, also zum Tiefbau.The invention belongs to the field of land development, i.e. civil engineering.
1. STAND DER TECHNIK:1. STATE OF THE ART:
Nach dem derzeitigen Stand der Technik werden die Hausanschlußleitungen nach Fertigstellung der Hauptleitungen im Straßenbereich bzw. Gehweg im jeweils eigenen Graben vom vorgesehenen Anschluß in der Straße bis etwa 3 m in das einzelne Grundstück verlegt und provisorisch verschlossen. Das Ende wird jeweils mit einem Holzpfosten zur Wiederfindung markiert.According to the current state of the art, after completion of the main lines in the street area or sidewalk, the house connection lines are laid in their own trench from the intended connection in the street to about 3 m into the individual property and temporarily closed. The end is marked with a wooden post for easy retrieval.
Dabei ergeben sich zahlreiche Leitungsquerungen bei den einzelnen Gräben, mit erneutem Ausbaggern, - Erdabfuhr - Wiederfüilung - und Verdichtung mit hohem Material- und Kostenaufwand.This results in numerous pipe crossings at the individual trenches, with further dredging, earth removal, refilling and compaction involving high material and cost expenditure.
Die Kanalanschlüße für RW und SW liegen etwa in Straßenmitte sowie zwischen den Kontrollschächten und sind nicht direkt, sondern nur über TV-Robotter kontrollierbar. Bis zum Zeitpunkt des Hausanschlußes ist der verlegte Kanal blind und kann zu Ablagerungen führen. Bei späteren Reperaturen durch Inliner müssen die Anschlüße mit Robotter ausgeschnitten und abgedichtet werden. Dies alles wird allerdings auch nicht durch die Verwendung der Hausanschlußschächte abgestellt.The sewer connections for RW and SW are located roughly in the middle of the street and between the inspection shafts and cannot be inspected directly, but only via TV robots. Until the house connection is made, the laid sewer is blind and can lead to deposits. If repairs are carried out later using inliners, the connections must be cut out and sealed with robots. However, all of this is not eliminated by using the house connection shafts.
Zur öffentlichen und privaten Kontrolle der Hausanschlußkanäle muß der Grundeigner auf seinem Grundstück entsprechend zugängliche Hausanschluß-Kontroll-Schächte einbauen und erhalten.For public and private inspection of the house connection sewers, the landowner must install and maintain appropriately accessible house connection inspection shafts on his property.
Für die Anschlüße der Wasserversorgung und Erdgasversorgung müßen Anbohrschieber mit Schiebergestänge und Schieberkappen eingebaut werden. Da nachweislich 90 % der Schäden an diesen Schieberstellen auftreten ist mit erhöhten Reperaturkosten durch Straßenaufbruch usw. zu rechnen. Auch eine Verschmutzung der leeren Anschlußleitungen bis zur Erstellung des Hausanschlußes ist gegeben.For the water and natural gas supply connections, tapping valves with valve rods and valve caps must be installed. Since 90% of damages are proven to occur at these valve locations, increased repair costs due to road excavation, etc. are to be expected. The empty connection lines are also likely to become contaminated until the house connection is made.
Die Kabel für Strom, Telekom und TV werden im Gehwegbereich nachträglich einschließlich der Muffenringe eingegraben, auch die Hausanschlußkabel ca. 3 bis 5 m ins Grundstück eingegraben -mit aufgerollter Mehrlänge- verlegt und mit sichtbarem Kabelende auffindbar gemacht.The cables for electricity, telecommunications and TV are subsequently buried in the sidewalk area, including the sleeve rings. The house connection cables are also buried approx. 3 to 5 m into the property - with the extra length rolled up - and made discoverable with the cable end visible.
2. DASPROBLEM:2. THEPROBLEM:
Der im Patentanspruch 1 angegebenen Erfindung liegt das Problem zugrunde, einen Hausanschlußschacht zu schaffen, in dem alle öffentlichen Ver- und Entsorgungsleitungen für die Hausanschlüsse direkt an der Grundstücksgrenze enden und später bei Bedarf die privaten Anschlüße erfolgen können.The invention specified in patent claim 1 is based on the problem of creating a house connection shaft in which all public supply and disposal lines for the house connections end directly at the property boundary and in which the private connections can be made later if required.
3. LÖSUNG:3. SOLUTION:
Dieses Problem wird durch den Hausanschlußschacht (Figur 1+2) dadurch gelöst, daß der freie Arbeitsraum mind, einen Durchmesser von 100 cm -(DIN EN 476) aufweist,This problem is solved by the house connection shaft (Figure 1+2) in that the free working space has a diameter of at least 100 cm -(DIN EN 476),
die Schachtabdeckung [6] (Figur 1) über eine Einstiegöffnung (a) (Figur 1+2) verfugt und der Schachtraum über eine fest eingebaute Einstiegleiter mit Einstieghilfe (b) (Figur 1) zugänglich ist.the shaft cover [6] (Figure 1) has an access opening (a) (Figures 1+2) and the shaft space is accessible via a permanently installed access ladder with access aid (b) (Figure 1).
und in den Schachtwänden [1-2-3-4-5] (Figur l+2)die dem Bedarf entsprechenden Rohrdurchfuhrungs- Öffnungen (c) (Figur 1) in richtiger Lage und Höhe vorgesehen sind.and in the shaft walls [1-2-3-4-5] (Figure l+2) the pipe penetration openings (c) (Figure 1) are provided in the correct position and height as required.
Der Normalschacht hat keinen festen Boden bzw. wird bis OK. der unteren Rohrleitung (in der Regel der RW.-Kanal) mit Riesel aufgefüllt.The normal shaft has no solid bottom or is filled with gravel up to the level of the lower pipe (usually the sewage sewer).
Schächte für den Grundwasserbereich erhalten einen wasserdichten Betonboden [7] (Fig. 1) Die Rohrdurchführungen in den Schachtwänden werden mit wasserdichten Schachtmuffen hergestellt.Shafts for the groundwater area are provided with a waterproof concrete floor [7] (Fig. 1). The pipe penetrations in the shaft walls are made with waterproof shaft sleeves.
4. VORTEILE:4. ADVANTAGES:
Durch die Entwicklung des Hausanschlußschachtes können alle Ver- u. Entsorgungsleitungs-Anschlüsse -jeweils für 2 Gebäude - in oder am Schacht angeschloßen werden und zwar:Thanks to the development of the house connection shaft, all supply and disposal line connections - each for 2 buildings - can be connected in or on the shaft, namely:
< RW-Kanalanschluß mit Revisionsabzweig im Schacht zugänglich für Spülung - Sicht- u. TV-Kontrolle. < RW sewer connection with inspection branch in the shaft accessible for flushing - visual and TV inspection.
< SW-Kanalanschluß wie vor-< SW channel connection as before
< Die sonst notwendigen Kontrollschächte im Grundstück entfallen dafür! < The inspection shafts on the property that would otherwise be necessary are no longer required!
< Trinkwasserversorgungsanschluß und Absperrungen im Schacht, dadurch kann die Absperrung (Anbohrschieber mit Schiebergestänge und Abdeckkappe in der Straße) direkt an der Hauptleitung entfallen.< Drinking water supply connection and shut-offs in the shaft, thus the shut-off (drilling valve with valve rod and cover cap in the street) directly on the main line can be omitted.
< Erdgasversorgung wie vor!< Natural gas supply as before!
< Telekom- und TV Kabel können im Schacht durchgezogen und die Muffenschlaufen incl. der Hausanschlußkabel in der Kabelboxe gelagert werden. Der Erdeinbau der Hausanschluß-Kabelrolle entfällt also. < Telecom and TV cables can be pulled through the shaft and the sleeve loops including the house connection cables can be stored in the cable box. This means that the house connection cable reel does not need to be installed underground.
< Der Stromversorgungs-Verteilerkasten wird in die vorgesehene Öfffnung in der Schachtdecke eingesetzt und an die Hauptversorgungsleitung mittels angemufften Stichkabel angeschloßen . Die Hausanschlußkabel werden erst bei Bedarf durch den Hausanschlußschacht am Verteiler- bzw. Sicherungskasten angeschloßen, damit ist das einzugrabende Anschlußkabel und die spätere Verlängerungs-Anmuffung hinfällig.< The power supply distribution box is inserted into the opening provided in the shaft ceiling and connected to the main supply line using a socketed branch cable. The house connection cables are only connected to the distribution or fuse box through the house connection shaft when required, which means that the buried connection cable and the subsequent extension socket are no longer necessary.
5. AUSFÜHRUNG:5. EXECUTION:
Im Zuge der Verlegung der Kanal leitungen fur RW. u. SW sind beidseits der Trasse die Hausanschlußschächte einzubauen und die Anschlußleitungen bis in den Schacht bzw. bis zur Schachtaußenseite incl. Revisionsöffnung herzustellen, sodaß der Hausanschluß nach Freilegung der zugeordneten Schachtseite, von außen durchgeführt werden kann.When laying the sewer lines for RW and SW, the house connection shafts must be installed on both sides of the route and the connection lines must be made into the shaft or to the outside of the shaft including an inspection opening so that the house connection can be made from the outside after the assigned side of the shaft has been exposed.
Bei der Verlegung der Wasserversorgungs-Hauptleitung werden rechtwinklig zur Hausanschlußschacht - Achse T-Stücke eingebaut und die Anschlußleitung (1 Leitung für 2 Parzellen) bis zum Schacht geführt, vor dem Schacht ebenfalls durch ein T-Stück geteilt und dann in den Schacht eingeführt sowie mit einem Absperrventil versehen.When laying the main water supply line, T-pieces are installed at right angles to the house connection shaft axis and the connection line (1 line for 2 plots) is led to the shaft, also divided by a T-piece in front of the shaft and then introduced into the shaft and provided with a shut-off valve.
Bei der Verlegung der darüberliegenden Erdgas-Versorgungsleitung wird wie vor verfahren, im Schacht jedoch statt dem Absperrventil, automatische „GAS-Stop-Ventile" eingebaut.When laying the natural gas supply line above, the same procedure is followed as before, but instead of the shut-off valve, automatic "GAS stop valves" are installed in the shaft.
Evtl. Fernwärmeleitungen (statt Gas) werden mit einem Vor-u.Rücklauf bis vor den Schacht geführt, für die 2 Parzellen aufgeteilt und als Hausanschlüsse in den Schacht eingebaut sowie mit einer Absperrung versehen.Any district heating pipes (instead of gas) are led with a supply and return line to the shaft, divided between the two plots and installed in the shaft as house connections and provided with a shut-off.
Alle Anschlußleitungen werden in einem Graben, also direkt übereinander, jeweils von der Hauptleitung bis zum Schacht verlegt. Zur Vermeidung von Mehrfach-Aufgrabungen sind die Querungen für den Baustellenverkehr befahrbar -bis zur Verlegung der oberen Leitungzu überbrückenAll connecting lines are laid in a trench, i.e. directly on top of each other, from the main line to the shaft. To avoid multiple excavations, the crossings are accessible to construction site traffic - to be bridged until the upper line is laid
Die Telekom - und TV-Kabel werden seitlich in den Hausanschlußschacht eingezogen, dort im Bereich der Deckenaussparung eine Schleife mit D= ca. 80 cm gebildet, in die vorhandene Abschottung eingelegt und von dort zum nächsten Schacht geführt. Zum Aufspleisseln und Anmuffen der Hausanschlußkabel wird die Rolle über den Deckenschlitz herausgezogen und dann wieder eingelegt. Die Hausanschlußkabel werden in der ca. erforderlichen Länge vor der Anschluß-Schachtwand geschützt eingelagert bis der Hausanschluß hergestellt werden kann.The telecom and TV cables are pulled into the side of the house connection shaft, where a loop with a diameter of approx. 80 cm is formed in the area of the ceiling recess, inserted into the existing partition and from there led to the next shaft. To splice and connect the house connection cables, the roll is pulled out through the ceiling slot and then inserted again. The house connection cables are stored in the approximate required length in front of the connection shaft wall in a protected manner until the house connection can be made.
Für die Stromversorgung werden bei jedem Schacht -für je 2 Gebäude - ein Hausanschluß-Sicherungskasten in die Deckenöffnung eingesetzt und wie üblich an die Hauptversorgungs-Kabel angeschlossen. Die Hausanschlußkabel können dann bei Bedarf durch den Schachtüber den Hausanschlußkasten-Sockel eingeführt und oben im Verteilerraum angeklemmt.For the power supply, a house connection fuse box is installed in the ceiling opening in each shaft - for every 2 buildings - and connected to the main supply cables as usual. The house connection cables can then be fed through the shaft over the house connection box base and connected at the top in the distribution room if required.
Die in den nachfolgenden Plänen dargestellten Ver- u. Entsorgungsleitungen sind nach Lage Größe - und Zahl spekulativ eingezeichnet und sind selbstverständlich nach tatsächlichem Bedarf anzuordnen.The supply and disposal lines shown in the following plans are speculative in terms of location, size and number and are of course to be arranged according to actual requirements.
-7--7-
[&igr;[&igr;
= Schachtwand= shaft wall
= Schachtwand= shaft wall
= Schachtwand= shaft wall = Schachtwand 4= Shaft wall 4 = Schachtwand 5= Shaft wall 5 = Schachtwand 6= Shaft wall 6
's *■'s *■
< N < N
= EINSTIEGSÖFFNUNG= ENTRY OPENING = EINSTIEGSLEITER= ENTRY LADDER
= ROHRDURCHFÜHRUNGEN= PIPE PASSAGES
= EINBRINGÖFFNUNG TELEKOM / TV-MUFFENSCHLAUFE= INSERTION OPENING TELECOM / TV SLEEVE LOOP
= EINBAUÖFFNUNG FÜR STROMVERTEILERKASTEN= INSTALLATION OPENING FOR POWER DISTRIBUTION BOX
DATUM:
16.07.2001DATE:
16.07.2001
HANS WURMSEHER *-* -*TEL.:<Ä631/93150 - FAX: 08531/32981HANS WURMSEHER *-* -*TEL.:<Ä631/93150 - FAX: 08531/32981
Claims (1)
als Revisions- und Verteilerschacht zur Aufnahme aller Erschließungs- Ver- und Entsorgungsleitungen bestehend aus einem 5-seitigen Unterteil, einer Abdeckplatte, gegebenenfalls einer Bodenplatte
dadurch gekennzeichnet, dass
der freie Arbeitsraum im Schacht mind. 100 cm im Durchmesser (DIN EN 476) aufweist,
in den Seiten 1, 2, 3, 4, 5, des Schachtunterteils für die Ein- u. Ausführung der Ver- u. Entsorgungsleitungen nach Bedarf die entsprechenden Rohrdurchführungen vorgesehen sind und
die Schachtabdeckung mit begehbarer Oberfläche,
eine Einstiegöffnung DN 62,5 cm mit Begu-Abdeckung- (mit Lüftungsschlitzen),
eine fest montierte Einstiegsleiter mit Einstiegshilfe montiert ist
sowie eine Einbringöffnung für die Telekom/TV-Kabelrolle mit den Hausanschlußmuffen und Hausanschlußkabeln,
sowie eine Einbauöffnung für den Strom-Verteilungskastensockel - in erforderlicher Größe - erhält. HOUSE CONNECTION SHAFT to improve conventional ACCESS,
as an inspection and distribution shaft to accommodate all development, supply and disposal lines consisting of a 5-sided lower section, a cover plate, if necessary a base plate
characterized in that
the free working space in the shaft has a diameter of at least 100 cm (DIN EN 476),
in the sides 1, 2, 3, 4, 5 of the shaft base, the appropriate pipe penetrations are provided for the entry and exit of the supply and disposal lines as required and
the manhole cover with walkable surface,
an access opening DN 62.5 cm with Begu cover (with ventilation slots),
a permanently mounted entry ladder with entry aid is installed
as well as an opening for the telecom/TV cable reel with the house connection sleeves and house connection cables,
as well as an installation opening for the power distribution box base - in the required size.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE20112443U DE20112443U1 (en) | 2001-07-27 | 2001-07-27 | House connection shaft |
DE10233981A DE10233981A1 (en) | 2001-07-27 | 2002-07-25 | House service connection box for improving reception of all terminations supply, and disposal lines, has five-sided lower part and cover plate together with pipe entries at sides |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE20112443U DE20112443U1 (en) | 2001-07-27 | 2001-07-27 | House connection shaft |
Publications (1)
Publication Number | Publication Date |
---|---|
DE20112443U1 true DE20112443U1 (en) | 2001-10-18 |
Family
ID=7959808
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE20112443U Expired - Lifetime DE20112443U1 (en) | 2001-07-27 | 2001-07-27 | House connection shaft |
DE10233981A Withdrawn DE10233981A1 (en) | 2001-07-27 | 2002-07-25 | House service connection box for improving reception of all terminations supply, and disposal lines, has five-sided lower part and cover plate together with pipe entries at sides |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE10233981A Withdrawn DE10233981A1 (en) | 2001-07-27 | 2002-07-25 | House service connection box for improving reception of all terminations supply, and disposal lines, has five-sided lower part and cover plate together with pipe entries at sides |
Country Status (1)
Country | Link |
---|---|
DE (2) | DE20112443U1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1662051A3 (en) * | 2004-11-28 | 2007-01-03 | Hans Dipl.-Ing. Würmseher | System for connecting manhole with supply mains to buildung |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6688713B2 (en) * | 2001-07-02 | 2004-02-10 | Mitsubishi Digital Electronics America, Inc. | Television base casting |
DE202010016093U1 (en) | 2010-11-30 | 2011-04-28 | FITR - Forschungsinstitut für Tief- und Rohrleitungsbau gemeinnützige GmbH | Multifunctional, retrofittable curb system with integrated traffic information, telematics, light-guiding and sensor systems for use in road, open-air and tunnel construction |
DE102014007672B4 (en) * | 2014-05-27 | 2017-10-26 | HWR System GmbH | Prefabricated building to form a house connection |
-
2001
- 2001-07-27 DE DE20112443U patent/DE20112443U1/en not_active Expired - Lifetime
-
2002
- 2002-07-25 DE DE10233981A patent/DE10233981A1/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1662051A3 (en) * | 2004-11-28 | 2007-01-03 | Hans Dipl.-Ing. Würmseher | System for connecting manhole with supply mains to buildung |
Also Published As
Publication number | Publication date |
---|---|
DE10233981A1 (en) | 2003-02-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106049530A (en) | Urban comprehensive pipe gallery and construction method | |
CN109695247B (en) | Deep foundation pit temporary pipeline comprehensive arrangement system and construction method | |
CN205776345U (en) | City integrated piping lane | |
EP3660990B1 (en) | Method for providing a data cable connection | |
DE20112443U1 (en) | House connection shaft | |
DE202019001267U1 (en) | Junction box device | |
DE10023399B4 (en) | Access, inspection and distribution shaft with house connection angle plate | |
CN207646753U (en) | Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery | |
CN213782843U (en) | Distribution room cable trench with anti-settling function | |
CN108951702A (en) | A kind of construction method of pipe gallery | |
DE102009010687B4 (en) | Method for laying geothermal heat recovery pipe systems and geothermal heat recovery pipe systems for the operation of heat pumps | |
DE29907378U1 (en) | Multiple sewer pipe system | |
CN106368211A (en) | Rectangular concrete piles used for constructing side wall of pipe gallery | |
DE102005006240B4 (en) | Infrastructure empty pipe system | |
CN106284299A (en) | For building H type concrete-pile and the diaphram wall of piping lane sidewall | |
DE2905146A1 (en) | Buried pipe and conduit laying - using concrete around pipe on trench bottom and fill of bentonite or stopper suspension | |
CN113374936B (en) | Underpinning protection system for top socket pipeline in bottom-through construction and construction method | |
RU136457U1 (en) | REINFORCED CONCRETE COLLECTOR FOR OPERATION OF UNDERGROUND COMMUNICATIONS | |
DE1515669C3 (en) | Cable duct for power supply and / or telephone lines | |
DE202014006416U1 (en) | Single - house connection - box and house connection - angle plate | |
DE202021002749U1 (en) | All-division house connection transfer box | |
KR200175656Y1 (en) | A road boundary block | |
RU2551549C1 (en) | Combined cable gallery and methods of its building (versions) | |
DE202019002446U1 (en) | Junction box device | |
DE102021004322A1 (en) | MONO all-sector HA transfer box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R086 | Non-binding declaration of licensing interest | ||
R207 | Utility model specification |
Effective date: 20011122 |
|
R150 | Utility model maintained after payment of first maintenance fee after three years |
Effective date: 20041019 |
|
R157 | Lapse of ip right after 6 years |
Effective date: 20080201 |