CN213700513U - Spraying equipment is used in alarm clock production - Google Patents

Spraying equipment is used in alarm clock production Download PDF

Info

Publication number
CN213700513U
CN213700513U CN202022733733.XU CN202022733733U CN213700513U CN 213700513 U CN213700513 U CN 213700513U CN 202022733733 U CN202022733733 U CN 202022733733U CN 213700513 U CN213700513 U CN 213700513U
Authority
CN
China
Prior art keywords
spraying
assembly
telescopic rod
component
piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022733733.XU
Other languages
Chinese (zh)
Inventor
阎婧怡
卫宣汐
杨雅婷
潘越
肖沐阳
黄睿龙
林妮
王梓琦
黄婷
王瀚静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022733733.XU priority Critical patent/CN213700513U/en
Application granted granted Critical
Publication of CN213700513U publication Critical patent/CN213700513U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Spray Control Apparatus (AREA)

Abstract

A spraying device for alarm clock production comprises a rack, a conveying assembly, a lifting assembly, a first spraying assembly, a second spraying assembly, a drying assembly, a cleaning assembly and a feeding assembly; the conveying assembly, the lifting assembly and the feeding assembly are arranged on the rack; the conveying assembly is positioned at the lower end of the lifting assembly; first spraying subassembly, second spraying subassembly, stoving subassembly and clean subassembly setting are on lifting unit. The utility model discloses a set up first spraying subassembly and second spraying subassembly, carry out spraying stage by stage to the material, improve the meticulous degree of spraying, reduce the production at spraying dead angle, improve the finished product efficiency of alarm clock production; the first spraying assembly is provided with the baffle plate, so that the area which does not need to be sprayed is shielded, and diversified alarm clocks can be conveniently produced; the conveying assembly is arranged, so that the production efficiency is improved; through setting up stoving subassembly and clean subassembly, dry and clean the material at the discharge end of frame, make the spraying region drying of the material that the spraying finishes to clean degree is higher.

Description

Spraying equipment is used in alarm clock production
Technical Field
The utility model relates to a spraying equipment technical field especially relates to a spraying equipment is used in alarm clock production.
Background
The spraying equipment is a product in an environment where the development automation of industrial technology is more and more common after the innovation is opened. With the higher degree of automation, the application of the spraying production line is wider and wider, and the spraying production line is deep into multiple fields of national economy. The spraying equipment on the market can be divided into the following according to the degree of automation: manual spraying equipment, semi-automatic spraying equipment and full-automatic spraying equipment.
The existing spraying equipment is simple in structure and single in function, the surface of the material after the spraying is finished is rough, the fineness degree is poor, the area which does not need to be sprayed needs to be manually shielded in the spraying process, the whole working efficiency is reduced, and the labor intensity of workers is improved.
SUMMERY OF THE UTILITY MODEL
Objects of the invention
In order to solve the technical problems in the background art, the utility model provides a spraying device for alarm clock production, which comprises a first spraying component and a second spraying component, wherein the first spraying component and the second spraying component are arranged to spray materials in stages, so that the fineness of spraying is improved, the generation of spraying dead angles is reduced, and the finished product efficiency of alarm clock production is improved; the first spraying assembly is provided with the baffle plate, so that the area which does not need to be sprayed is shielded, and diversified alarm clocks can be conveniently produced; by arranging the conveying assembly, the movement of the materials among the working areas on the rack is realized, the synchronous operation of the work in the working areas on the rack is realized, and the production efficiency of the alarm clock is improved; through setting up stoving subassembly and clean subassembly, dry and clean the material at the discharge end of frame, make the spraying region drying of the material that the spraying finishes to clean degree is higher.
(II) technical scheme
The utility model provides a spraying device for alarm clock production, which comprises a frame, a conveying component, a lifting component, a first spraying component, a second spraying component, a drying component, a cleaning component and a feeding component; the conveying assembly, the lifting assembly and the feeding assembly are arranged on the rack; the conveying assembly is positioned at the lower end of the lifting assembly; the first spraying component, the second spraying component, the drying component and the cleaning component are arranged on the lifting component; the lifting assemblies are arranged in multiple groups, and each group of lifting assemblies comprises a threaded rod, a sliding block and a second driving piece; the threaded rod driven by the second driving piece is rotationally arranged on the rack; the sliding block is in threaded connection with the threaded rod; the first spraying component comprises a first telescopic rod, a first spraying piece, a first spray head, a second telescopic rod and a baffle plate; the first telescopic rod is arranged on the sliding block; the first spraying piece is rotatably arranged on the first telescopic rod; the first spray head is provided with a plurality of groups; the multiple groups of first spray heads and the second telescopic rods are arranged on the first spray-coating piece, and the second telescopic rods are positioned in the middle of the multiple groups of first spray heads; the baffle is rotatably arranged at one end of the second telescopic rod, which is far away from the first spraying piece; the second spraying component comprises a third telescopic rod, a second spraying piece, a spraying opening, an arc-shaped plate and a second spray head; the third telescopic rod is arranged on the sliding block; the second spraying piece is rotatably arranged on the third telescopic rod; the spraying port is communicated with and arranged on the second spraying piece; the arc-shaped plate is arranged on the spraying opening in a sliding manner; the second spray head is arranged on the arc-shaped plate; the feeding assembly comprises a paint spraying box, a pressure pump and a spraying pipe; the feeding end of the spraying pipe is communicated with the spraying box, and the discharging end of the spraying pipe is communicated with the first spraying part and the second spraying part; the pressure pump is communicated with and arranged on the spraying pipe.
Preferably, the conveying assembly comprises a first driving member, a conveying belt, a first rotating shaft and a driving roller; a first rotating shaft driven by a first driving piece is rotationally arranged on the rack; the driving roller is arranged on the first rotating shaft; the conveying belt is sleeved on the driving roller.
Preferably, the lifting assembly further comprises a guide rod; the guide rod is arranged on the frame and is parallel to the threaded rod; the sliding block is connected with the guide rod in a sliding manner.
Preferably, the drying assembly comprises a fourth telescopic rod and a drying piece; the fourth telescopic rod is arranged on the sliding block; the drying piece is rotatably arranged on the fourth telescopic rod.
Preferably, the cleaning assembly comprises a fifth telescopic rod, a third driving piece and a cleaning piece; the fifth telescopic rod is arranged on the sliding block; the cleaning piece driven by the third driving piece is rotatably arranged on the fifth telescopic rod.
Preferably, the first spraying component and the second spraying component are respectively located at two ends of the sliding block and located at the feeding end of the rack.
Preferably, the drying assembly and the cleaning assembly are located at the discharge end of the frame.
Compared with the prior art, the above technical scheme of the utility model following profitable technological effect has:
the first spraying component and the second spraying component are arranged to spray materials in stages, so that the spraying fineness is improved, the generation of spraying dead angles is reduced, and the finished product efficiency of alarm clock production is improved; the first spraying assembly is provided with the baffle plate, so that the area which does not need to be sprayed is shielded, and diversified alarm clocks can be conveniently produced;
secondly, the conveying assembly is arranged, so that the materials can move among the working areas on the rack, the synchronous operation of the work in the working areas on the rack is realized, and the production efficiency of the alarm clock is improved;
and thirdly, by arranging the drying component and the cleaning component, the material is dried and cleaned at the discharge end of the rack, so that the spraying area of the sprayed material is dry, and the cleaning degree is higher.
Drawings
Fig. 1 is the utility model provides an alarm clock production is with spraying equipment's schematic structure view.
Fig. 2 is the utility model provides a cross-sectional view of spraying equipment is used in alarm clock production.
Fig. 3 is a partially enlarged view of a portion a in fig. 2.
Fig. 4 is a partially enlarged view of fig. 2 at B.
Fig. 5 is a partially enlarged view of C in fig. 2.
Fig. 6 is a partially enlarged view of fig. 2 at D.
Fig. 7 is a partial enlarged view at E in fig. 2.
Fig. 8 is the utility model provides an alarm clock production is with conveying assembly's among spraying equipment structural schematic.
Reference numerals: 1. a frame; 2. a transfer assembly; 3. a lifting assembly; 4. a first spray assembly; 5. a second spray assembly; 6. a drying assembly; 7. a cleaning assembly; 8. a feed assembly; 9. material preparation; 10. a first driving member; 11. a conveyor belt; 12. a first rotating shaft; 13. a driving roller; 14. a threaded rod; 15. a guide bar; 16. a slider; 17. a second driving member; 18. a first telescopic rod; 19. a first spray member; 20. a first nozzle; 21. a second telescopic rod; 22. a baffle plate; 23. a third telescopic rod; 24. a second spray member; 25. a spraying port; 26. an arc-shaped plate; 27. a second nozzle; 28. a fourth telescopic rod; 29. drying the workpiece; 30. a fifth telescopic rod; 31. a third driving member; 32. a cleaning member; 33. a paint spraying box; 34. a pressure pump; 35. and (4) spraying a pipe.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in detail with reference to the accompanying drawings. It should be understood that the description is intended to be illustrative only and is not intended to limit the scope of the present invention. Moreover, in the following description, descriptions of well-known structures and techniques are omitted so as to not unnecessarily obscure the concepts of the present invention.
As shown in fig. 1-8, the utility model provides a spraying device for alarm clock production, which comprises a frame 1, a conveying assembly 2, a lifting assembly 3, a first spraying assembly 4, a second spraying assembly 5, a drying assembly 6, a cleaning assembly 7 and a feeding assembly 8; the conveying assembly 2, the lifting assembly 3 and the feeding assembly 8 are arranged on the frame 1; the conveying assembly 2 is positioned at the lower end of the lifting assembly 3; the first spraying component 4, the second spraying component 5, the drying component 6 and the cleaning component 7 are arranged on the lifting component 3; the lifting components 3 are arranged in multiple groups, and each group of lifting components 3 comprises a threaded rod 14, a sliding block 16 and a second driving piece 17; the threaded rod 14 driven by the second driving piece 17 is rotationally arranged on the frame 1; the sliding block 16 is in threaded connection with the threaded rod 14; the first spraying component 4 comprises a first telescopic rod 18, a first spraying piece 19, a first spray head 20, a second telescopic rod 21 and a baffle plate 22; the first telescopic rod 18 is arranged on the sliding block 16; the first spraying piece 19 is rotatably arranged on the first telescopic rod 18; the first spray head 20 is provided with a plurality of groups; a plurality of groups of first spray heads 20 and second telescopic rods 21 are arranged on the first spray-coating piece 19, and the second telescopic rods 21 are positioned in the middle of the plurality of groups of first spray heads 20; the baffle plate 22 is rotatably arranged at one end of the second telescopic rod 21 far away from the first spraying part 19; the second spraying component 5 comprises a third telescopic rod 23, a second spraying piece 24, a spraying opening 25, an arc-shaped plate 26 and a second spray head 27; the third telescopic rod 23 is arranged on the sliding block 16; the second spraying piece 24 is rotatably arranged on the third telescopic rod 23; the spraying port 25 is communicated with the second spraying piece 24; the arc-shaped plate 26 is arranged on the spraying opening 25 in a sliding manner; the second spray head 27 is arranged on the arc plate 26; the feeding assembly 8 comprises a paint spraying box 33, a pressure pump 34 and a spraying pipe 35; the feeding end of the spraying pipe 35 is communicated with the paint spraying box 33, and the discharging end of the spraying pipe 35 is communicated with the first spraying part 19 and the second spraying part 24; the pressure pump 34 is disposed in communication with the spray pipe 35.
In an alternative embodiment, the conveyor assembly 2 comprises a first drive 10, a conveyor belt 11, a first rotation shaft 12 and a drive roller 13; a first rotating shaft 12 driven by a first driving piece 10 is rotatably arranged on the frame 1; the driving roller 13 is arranged on the first rotating shaft 12; the conveyor belt 11 is sleeved on the driving roller 13.
In an alternative embodiment, the lifting assembly 3 further comprises a guide bar 15; the guide rod 15 is arranged on the frame 1 and is parallel to the threaded rod 14; the sliding block 16 is connected with the guide rod 15 in a sliding way; a guide rod 15 is provided to guide the sliding of the slide block 16 on the threaded rod 14.
In an alternative embodiment, drying assembly 6 comprises a fourth telescopic bar 28 and a drying element 29; the fourth telescopic rod 28 is arranged on the sliding block 16; the drying part 29 is rotatably arranged on the fourth telescopic rod 28.
In an alternative embodiment, the cleaning assembly 7 comprises a fifth telescopic rod 30, a third driving member 31 and a cleaning member 32; the fifth telescopic rod 30 is arranged on the sliding block 16; a cleaning member 32 driven by the third driving member 31 is rotatably provided on the fifth telescopic rod 30.
In an alternative embodiment, the first spray assembly 4 and the second spray assembly 5 are respectively positioned at two ends of the sliding block 16 and at the feeding end of the frame 1; facilitating the spraying of the material 9 in different stages of the process.
In an alternative embodiment, the drying assembly 6 and the cleaning assembly 7 are located at the discharge end of the frame 1; it is convenient to clean and dry the material 9.
The utility model discloses a theory of use as follows: the material 9 moves on the frame 1 along the directions of the first spraying component 4, the second spraying component 5, the drying component 6 and the cleaning component 7 under the transmission of the transmission component 2; the second driving piece 17 drives the threaded rod 14 to rotate, so that the sliding block 16 is driven to slide up and down on the threaded rod 14, and the height of the first spraying component 4, the height of the second spraying component 5, the height of the drying component 6 and the height of the cleaning component 7 are adjusted; when the material 9 passes through the first spraying component 5, the baffle 22 is driven by the second telescopic rod 21 to shield the part of the material which does not need to be sprayed with colors, and then the first spraying piece 19 works to spray other parts of the material 9; when the material 9 passes through the second spraying component 6, the second spraying part 24 works, the arc-shaped plate 26 slides on the spraying opening 25 and extends into a gap on the material 9, and the position where the first spraying head 20 is not sprayed is supplemented; the material 9 then passes through drying and cleaning elements 29 and 32, respectively, to complete the drying of the paint and the cleaning of surface impurities.
It is to be understood that the above-described embodiments of the present invention are merely illustrative of or explaining the principles of the invention and are not to be construed as limiting the invention. Therefore, any modification, equivalent replacement, improvement and the like made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. Further, it is intended that the appended claims cover all such variations and modifications as fall within the scope and boundaries of the appended claims or the equivalents of such scope and boundaries.

Claims (7)

1. The spraying equipment for alarm clock production is characterized by comprising a rack (1), a conveying assembly (2), a lifting assembly (3), a first spraying assembly (4), a second spraying assembly (5), a drying assembly (6), a cleaning assembly (7) and a feeding assembly (8); the conveying assembly (2), the lifting assembly (3) and the feeding assembly (8) are arranged on the rack (1); the conveying component (2) is positioned at the lower end of the lifting component (3); the first spraying component (4), the second spraying component (5), the drying component (6) and the cleaning component (7) are arranged on the lifting component (3);
the lifting components (3) are arranged in multiple groups, and each group of lifting components (3) comprises a threaded rod (14), a sliding block (16) and a second driving piece (17); the threaded rod (14) driven by the second driving piece (17) is rotationally arranged on the frame (1); the sliding block (16) is in threaded connection with the threaded rod (14);
the first spraying component (4) comprises a first telescopic rod (18), a first spraying piece (19), a first spray head (20), a second telescopic rod (21) and a baffle plate (22); the first telescopic rod (18) is arranged on the sliding block (16); the first spraying piece (19) is rotatably arranged on the first telescopic rod (18); a plurality of groups of first nozzles (20) are arranged; a plurality of groups of first spray heads (20) and second telescopic rods (21) are arranged on the first spraying piece (19), and the second telescopic rods (21) are positioned in the middle of the plurality of groups of first spray heads (20); the baffle (22) is rotatably arranged at one end, far away from the first spraying piece (19), of the second telescopic rod (21);
the second spraying component (5) comprises a third telescopic rod (23), a second spraying piece (24), a spraying opening (25), an arc-shaped plate (26) and a second spray head (27); the third telescopic rod (23) is arranged on the sliding block (16); the second spraying piece (24) is rotatably arranged on the third telescopic rod (23); the spraying opening (25) is communicated with and arranged on the second spraying piece (24); the arc-shaped plate (26) is arranged on the spraying opening (25) in a sliding manner; the second spray head (27) is arranged on the arc-shaped plate (26);
the feeding assembly (8) comprises a paint spraying box (33), a pressure pump (34) and a spraying pipe (35); the feeding end of the spraying pipe (35) is communicated with the paint spraying box (33), and the discharging end of the spraying pipe (35) is communicated with the first spraying part (19) and the second spraying part (24); the pressure pump (34) is communicated with the spraying pipe (35).
2. Spraying equipment for alarm clock production according to claim 1, characterized in that the conveyor assembly (2) comprises a first driving member (10), a conveyor belt (11), a first rotating shaft (12) and a driving roller (13); a first rotating shaft (12) driven by a first driving piece (10) is rotationally arranged on the rack (1); the driving roller (13) is arranged on the first rotating shaft (12); the conveyor belt (11) is sleeved on the driving roller (13).
3. Spraying equipment for alarm clock production according to claim 1, characterised in that the lifting assembly (3) further comprises a guide bar (15); the guide rod (15) is arranged on the frame (1) and is parallel to the threaded rod (14); the sliding block (16) is connected with the guide rod (15) in a sliding way.
4. The spraying equipment for alarm clock production according to claim 1, wherein the drying assembly (6) comprises a fourth telescopic rod (28) and a drying piece (29); the fourth telescopic rod (28) is arranged on the sliding block (16); the drying piece (29) is rotatably arranged on the fourth telescopic rod (28).
5. Spraying device for alarm clock production according to claim 1, characterised in that the cleaning assembly (7) comprises a fifth telescopic rod (30), a third driving member (31) and a cleaning member (32); the fifth telescopic rod (30) is arranged on the sliding block (16); a cleaning piece (32) driven by the third driving piece (31) is rotatably arranged on the fifth telescopic rod (30).
6. Spraying equipment for alarm clock production according to claim 1, wherein the first spraying component (4) and the second spraying component (5) are respectively located at two ends of the sliding block (16) and at the feeding end of the frame (1).
7. Spraying equipment for alarm clock production according to claim 1, characterized in that the drying component (6) and the cleaning component (7) are located at the discharge end of the frame (1).
CN202022733733.XU 2020-11-24 2020-11-24 Spraying equipment is used in alarm clock production Expired - Fee Related CN213700513U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022733733.XU CN213700513U (en) 2020-11-24 2020-11-24 Spraying equipment is used in alarm clock production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022733733.XU CN213700513U (en) 2020-11-24 2020-11-24 Spraying equipment is used in alarm clock production

Publications (1)

Publication Number Publication Date
CN213700513U true CN213700513U (en) 2021-07-16

Family

ID=76783767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022733733.XU Expired - Fee Related CN213700513U (en) 2020-11-24 2020-11-24 Spraying equipment is used in alarm clock production

Country Status (1)

Country Link
CN (1) CN213700513U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113731675A (en) * 2021-08-26 2021-12-03 武汉船用机械有限责任公司 Spray coating device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113731675A (en) * 2021-08-26 2021-12-03 武汉船用机械有限责任公司 Spray coating device

Similar Documents

Publication Publication Date Title
CN213700513U (en) Spraying equipment is used in alarm clock production
CN205673118U (en) Spraying reciprocating machine
CN211945181U (en) Spreading device of aquatic product processing machine
CN111085378B (en) Oil spout mold cleaning all-in-one
CN209597493U (en) A kind of cable guardrail spray-painting plant
CN110639741A (en) Spraying device is used in production and processing of unmanned aerial vehicle wing
CN213222869U (en) Novel forging aftertreatment device
CN110605208A (en) Intelligent coating processing equipment with automatic cleaning spray head
CN209613346U (en) A kind of reciprocating spraying machine tool hand
CN107756195B (en) Environment-friendly edging and gluing automatic production line for plywood
CN218902360U (en) Be provided with flush coater that two group symmetry was used in coordination
CN212215938U (en) Vertical spraying device is used in processing of photovoltaic module frame
CN207521351U (en) A kind of cleaning device of paint line
CN117244737A (en) Multi-station spraying mechanism with integrated cooling and spraying functions
CN210847336U (en) Energy-saving stainless steel cleaning machine
CN204912161U (en) Cleaning device
CN212426195U (en) Metal hose joint cleaning device
CN211247090U (en) Powder spraying production line for file cabinet
CN211275178U (en) Intelligent coating processing equipment with automatic cleaning spray head
CN208771947U (en) It is a kind of the five colours bubble green pepper production processing use cleaning device
CN209873335U (en) Production device of double-color stripe type flexible decorative fabric
CN207857202U (en) A kind of automatic paint-spraying machine
CN209647127U (en) Automatic dust remover
CN220611001U (en) Manual powder spraying line
CN215313376U (en) Production line equipment for spraying of bent piece

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210716