CN212507373U - Easy-to-dismount type superimposed sheet seam hanging die assembly - Google Patents

Easy-to-dismount type superimposed sheet seam hanging die assembly Download PDF

Info

Publication number
CN212507373U
CN212507373U CN202020554442.1U CN202020554442U CN212507373U CN 212507373 U CN212507373 U CN 212507373U CN 202020554442 U CN202020554442 U CN 202020554442U CN 212507373 U CN212507373 U CN 212507373U
Authority
CN
China
Prior art keywords
screw rod
nut
detachable
pouring
threads
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020554442.1U
Other languages
Chinese (zh)
Inventor
王浩
梁宁
龙存林
李超慧
秦润民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Fifth Construction Engineering Group Co ltd
Original Assignee
Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Construction Engineering Co of Guangxi Construction Engineering Group filed Critical Fifth Construction Engineering Co of Guangxi Construction Engineering Group
Priority to CN202020554442.1U priority Critical patent/CN212507373U/en
Application granted granted Critical
Publication of CN212507373U publication Critical patent/CN212507373U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to the technical field of building pouring molds, in particular to an easily-disassembled type superimposed sheet seam hanging mold assembly, which comprises a hanging pouring mold, a counter-pulling assembly and a supporting beam, wherein the hanging pouring mold is connected with the supporting beam through the counter-pulling assembly; the split component comprises a connecting screw rod, a first nut, a detachable connecting piece, a detachable screw rod and a second nut, the first nut is connected to the upper end of the connecting screw rod through threads, the first nut is arranged above the supporting beam, one end of the detachable connecting piece is connected to the lower end of the connecting screw rod through threads, the upper end of the detachable screw rod is connected to the other end of the detachable connecting piece through threads, the second nut is connected to the lower end of the detachable screw rod through threads, and the second nut is arranged below the hoisting pouring die. The utility model discloses a die assembly is hung to readily removable formula superimposed sheet seam can avoid or reduce the phenomenon that the concrete leaks to appear in prefabricated superimposed sheet seam position, and readily removable removes hoist and mount pouring mould.

Description

Easy-to-dismount type superimposed sheet seam hanging die assembly
Technical Field
The utility model relates to a building pouring mould technical field especially relates to a die assembly is hung to readily removable formula superimposed sheet seam.
Background
The prefabricated composite slab is a development trend of future buildings, the prefabricated composite slab components are necessary components for each prefabricated building, and the splicing among the composite slabs mostly adopts a form of pouring after seams, so that the purpose of effectively ensuring the stable connection between the two composite slabs is achieved. The construction form that the seam between superimposed sheet adopted is at present to establish pouring mould and braced system in the superimposed sheet bottom more, because the superimposed sheet is at concrete placement's in-process, can produce certain buoyancy on along with the pouring of concrete, make the superimposed sheet rebound, thereby make to produce certain gap between superimposed sheet and the bottom sprag template, lead to superimposed sheet seam position concrete to leak thick liquid, cause superimposed sheet seam position concrete unqualifiedly, can't reach the effect of exempting from to plaster with the superimposed sheet is the same. In order to solve the above problems, a pouring mold is connected to a prefabricated composite slab member by providing a connecting member, but how to remove the pouring mold after pouring is a problem, and therefore, it is necessary to provide a detachable composite slab joint hanging mold assembly which can remove the pouring mold from a pouring body after pouring.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an easy removable formula superimposed sheet seam hangs mould subassembly to prior art's not enough, can avoid or reduce the phenomenon that concrete leaks thick liquid appears in prefabricated superimposed sheet seam position, and easy dismouting removes hoist and mount pouring mould.
In order to achieve the purpose, the easy-to-detach type composite slab seam hanging die assembly comprises a hanging and pouring die, a counter-pull assembly and a supporting beam, wherein the supporting beam is used for being erected above a gap between two prefabricated composite slabs; the split component comprises a connecting screw rod, a first nut, a detachable connecting piece, a detachable screw rod and a second nut, the first nut is connected to the upper end portion of the connecting screw rod through threads, the first nut is arranged above the supporting beam, one end of the detachable connecting piece is connected to the lower end portion of the connecting screw rod through threads, the upper end portion of the detachable screw rod is connected to the other end of the detachable connecting piece through threads, the second nut is connected to the lower end portion of the detachable screw rod through threads, and the lower surface of the detachable connecting piece is attached to the hoisting pouring mold; and the second screw cap is arranged below the hoisting pouring die.
Furthermore, the upper surface of the hoisting pouring die is provided with a double faced adhesive tape used for being bonded with the prefabricated composite slab.
Furthermore, the prefabricated composite slab further comprises two concrete supporting blocks arranged between the supporting cross beam and the prefabricated composite slab, and the two concrete supporting blocks are detachably connected with the two end parts of the supporting cross beam respectively.
Furthermore, iron wires are arranged on the upper surfaces of the concrete supporting blocks, and the concrete supporting blocks are connected with the supporting cross beams in a binding mode through the iron wires.
Furthermore, the opposite-pulling component also comprises a sleeve which is sleeved outside the connecting screw rod.
Further, the detachable connecting piece is a connecting nut.
The utility model has the advantages that: the utility model discloses an easy removable formula superimposed sheet seam hangs mould subassembly can avoid or reduce the phenomenon that the concrete leaks thick liquid to appear in prefabricated superimposed sheet seam position, waters to the gap between two prefabricated superimposed sheets and smashes the concrete after, can unscrew detachable screw rod from detachable connections spare to pour the mould with hoist and mount and demolish from pouring the body after pouring, realize having enough to meet the need the use. The utility model discloses a die assembly is hung to readily removable formula superimposed sheet seam, easily dismouting.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic structural diagram of the split component of the present invention.
The reference numerals include:
1-hoisting pouring die 2-supporting beam
3-opposite pulling assembly
31-connecting screw 32-first nut 33-sleeve 34-second nut
35-Detachable connecting piece 36-detachable screw
4-concrete supporting block 5-prefabricated laminated slab.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1 and fig. 2, the easy-to-detach type composite slab joint lifting die assembly of the present invention comprises a lifting pouring die 1, a counter-pulling assembly 3 and a supporting beam 2 for erecting above a gap between two prefabricated composite slabs 5, wherein the lifting pouring die 1 is connected with the supporting beam 2 through the counter-pulling assembly 3; the split component 3 comprises a connecting screw rod 31, a first screw cap 32, a detachable connecting piece 35, a detachable screw rod 36 and a second screw cap 34, wherein the first screw cap 32 is connected to the upper end of the connecting screw rod 31 through threads, the first screw cap 32 is arranged above the supporting cross beam 2, one end of the detachable connecting piece 35 is connected to the lower end of the connecting screw rod 31 through threads, the upper end of the detachable screw rod 36 is connected to the other end of the detachable connecting piece 35 through threads, the second screw cap 34 is connected to the lower end of the detachable screw rod 36 through threads, and the lower surface of the detachable connecting piece 35 is attached to the hoisting pouring mold 1; the second nuts 34 are arranged below the hoisting and pouring die 1.
The utility model discloses a readily removable formula superimposed sheet seam hangs mould subassembly, supporting beam 2 is used for setting up the top in the gap between two prefabricated superimposed sheets 5, second nut 34 fixes hoist and mount pouring mould 1 in the below of two prefabricated superimposed sheets 5, hoist and mount pouring mould 1 and be connected through split subassembly 3 and supporting beam 2 and can make hoist and mount pouring mould 1 hug closely, be fixed in the lower surface of two prefabricated superimposed sheets 5, avoid hoisting pouring mould 1 and prefabricated superimposed sheet 5 and take place relative movement in the process of pouring and tamping, thereby avoid or reduce the phenomenon that appears leaking the thick liquid in the prefabricated superimposed sheet 5 seam position concrete; after pouring concrete into the gap between two prefabricated superimposed sheets 5, can unscrew removable screw rod 36 from detachable connector 35 to pour mould 1 and demolish from the body of pouring after pouring, realize having enough to meet the need the use. The utility model discloses a die assembly is hung to readily removable formula superimposed sheet seam, easily dismouting.
The utility model discloses a die assembly is hung to readily removable formula superimposed sheet seam, the upper surface of hoist and mount pouring mould 1 is provided with the double faced adhesive tape that is used for bonding with prefabricated superimposed sheet 5. The utility model discloses a die assembly is hung to readily removable formula superimposed sheet seam, hoist and mount pouring mould 1 and prefabricated superimposed sheet 5 are connected firmly, have further reduced the phenomenon that appears leaking the thick liquid at 5 seam position concrete of prefabricated superimposed sheet.
The utility model discloses an easy disassembly formula superimposed sheet seam hangs mould subassembly still includes two concrete supporting shoes 4 that are used for setting up between supporting beam 2 and prefabricated superimposed sheet 5, and two concrete supporting shoes 4 can be dismantled with supporting beam 2's both ends respectively and be connected. The utility model discloses a die assembly is hung to readily removable formula superimposed sheet seam can avoid pouring supporting beam 2 in the concrete.
The utility model discloses an easy disassembly formula superimposed sheet seam hangs mould subassembly, the upper surface of concrete supporting shoe 4 is provided with the iron wire, and concrete supporting shoe 4 binds with supporting beam 2 through the iron wire and is connected. The utility model discloses a die assembly is hung to easy disconnect-type superimposed sheet seam, supporting beam 2 easily breaks away from concrete supporting shoe 4.
The utility model discloses an easy disconnect-type superimposed sheet seam hangs mould subassembly, to drawing subassembly 3 still includes sleeve pipe 33, and the sleeve pipe 33 cover is established connecting screw 31's outside for connecting screw 31 can be taken out from the concrete of pouring the shaping.
The utility model discloses a die assembly is hung to readily removable formula superimposed sheet seam, detachable connections 35 is coupling nut, and is with low costs, easily realizes.
In conclusion, the present invention has the above-mentioned excellent characteristics, so that it can be used to enhance the effectiveness of the prior art and has practicability, and thus it is a product with practical value.
The above description is only for the preferred embodiment of the present invention, and for those skilled in the art, there are variations on the detailed description and the application scope according to the idea of the present invention, and the content of the description should not be construed as a limitation to the present invention.

Claims (6)

1. The utility model provides a mould subassembly is hung to easy disconnect-type superimposed sheet seam, pours the mould, its characterized in that including the hoist and mount: the hoisting and pouring mold is connected with the supporting beam through the split components;
the split component comprises a connecting screw rod, a first nut, a detachable connecting piece, a detachable screw rod and a second nut, the first nut is connected to the upper end portion of the connecting screw rod through threads, the first nut is arranged above the supporting beam, one end of the detachable connecting piece is connected to the lower end portion of the connecting screw rod through threads, the upper end portion of the detachable screw rod is connected to the other end of the detachable connecting piece through threads, the second nut is connected to the lower end portion of the detachable screw rod through threads, and the lower surface of the detachable connecting piece is attached to the hoisting pouring mold;
and the second screw cap is arranged below the hoisting pouring die.
2. The knockdown form hanging assembly for a plywood seam of claim 1, wherein: and the upper surface of the hoisting pouring die is provided with a double faced adhesive tape used for being bonded with the prefabricated laminated slab.
3. The knockdown form hanging assembly for a plywood seam of claim 1, wherein: the prefabricated composite slab is characterized by further comprising two concrete supporting blocks arranged between the supporting cross beam and the prefabricated composite slab, and the two concrete supporting blocks are detachably connected with the two end portions of the supporting cross beam respectively.
4. The knockdown form hanging assembly for a plywood seam as claimed in claim 3, wherein: and iron wires are arranged on the upper surfaces of the concrete supporting blocks, and the concrete supporting blocks are bound and connected with the supporting cross beams through the iron wires.
5. The knockdown form hanging assembly for a plywood seam of claim 1, wherein: the split component further comprises a sleeve, and the sleeve is sleeved outside the connecting screw rod.
6. The knockdown form hanging assembly for a plywood seam of claim 1, wherein: the detachable connecting piece is a connecting nut.
CN202020554442.1U 2020-04-15 2020-04-15 Easy-to-dismount type superimposed sheet seam hanging die assembly Active CN212507373U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020554442.1U CN212507373U (en) 2020-04-15 2020-04-15 Easy-to-dismount type superimposed sheet seam hanging die assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020554442.1U CN212507373U (en) 2020-04-15 2020-04-15 Easy-to-dismount type superimposed sheet seam hanging die assembly

Publications (1)

Publication Number Publication Date
CN212507373U true CN212507373U (en) 2021-02-09

Family

ID=74430833

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020554442.1U Active CN212507373U (en) 2020-04-15 2020-04-15 Easy-to-dismount type superimposed sheet seam hanging die assembly

Country Status (1)

Country Link
CN (1) CN212507373U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502257A (en) * 2020-04-15 2020-08-07 广西建工集团第五建筑工程有限责任公司 Easy-to-dismount type superimposed sheet seam hanging die assembly

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502257A (en) * 2020-04-15 2020-08-07 广西建工集团第五建筑工程有限责任公司 Easy-to-dismount type superimposed sheet seam hanging die assembly

Similar Documents

Publication Publication Date Title
CN111502255A (en) Fabricated building laminated slab joint pouring body, pouring hanging die and construction method thereof
CN207453459U (en) A kind of laminated floor slab post-cast strip formwork erecting structure
CN212507370U (en) Pouring body and pouring hanging die for joint of assembled building laminated slab
CN212507373U (en) Easy-to-dismount type superimposed sheet seam hanging die assembly
CN111502042A (en) Assembly laminated slab joint pouring body, breakable pouring mold and construction method thereof
CN110424534A (en) A kind of prefabricated assembled non-reinforced concrete frame and its construction method
CN214696357U (en) Post-cast strip construction structure of coincide floor
CN207582946U (en) Plate typified form drops in a kind of assembled toilet structure
CN212507371U (en) Laminated slab and seam hanging die breakable split assembly
CN109797902A (en) Prefabrication ash wall body plate
CN212897560U (en) Superimposed sheet seam hangs mould subassembly
CN213448927U (en) Cast-in-place crossbeam component of interlock formula superimposed sheet, pour mould
CN108582426A (en) A kind of producing device and production method of stiffened column
CN111502257A (en) Easy-to-dismount type superimposed sheet seam hanging die assembly
CN212507372U (en) Superimposed sheet pours mould split subassembly with seam hoist and mount
CN205875737U (en) Adopt single side wall body construction of flexible pull rod to use single -side supporting formwork system
CN212897576U (en) Template is pour to assembled building leak protection thick liquid crossbeam
CN213477234U (en) Assembly superimposed sheet seam is poured and is built body, breakable formula and pour mould
CN104712087A (en) Superimposed floor slab connecting method
CN214302871U (en) Cast-in-place crossbeam component of prefabricated building leak protection thick liquid pours mould
CN214402748U (en) Breakable superimposed sheet seam hangs mould subassembly
CN208163928U (en) A kind of producing device of stiffened column
CN209277366U (en) A kind of reinforced concrete slab connection structure with very high strength
CN209082681U (en) A kind of prefabricated assembled bay window constructing structure of residential building
CN206267345U (en) It is spliced between a kind of many boiled water rooms to lead wall construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No. 167, Donghuan Avenue, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee after: Guangxi construction engineering Fifth Construction Engineering Group Co.,Ltd.

Address before: 545006 No. 167, east ring Avenue, Liuzhou City, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee before: THE FIFTH CONSTRUCTION ENGINEERING COMPANY OF GUANGXI CONSTRUCTION ENGINEERING Group

CP03 Change of name, title or address
PP01 Preservation of patent right

Effective date of registration: 20240314

Granted publication date: 20210209

PP01 Preservation of patent right