CN211010777U - Prizing tank - Google Patents
Prizing tank Download PDFInfo
- Publication number
- CN211010777U CN211010777U CN201921857872.4U CN201921857872U CN211010777U CN 211010777 U CN211010777 U CN 211010777U CN 201921857872 U CN201921857872 U CN 201921857872U CN 211010777 U CN211010777 U CN 211010777U
- Authority
- CN
- China
- Prior art keywords
- pipe
- valve
- user
- liquid
- gas
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
The utility model aims at providing a skid-mounted can of safe, convenient, reliable air feed usefulness. In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a sled dress jar, includes a jar body, gaseous phase pipeline and liquid phase pipeline, the gaseous phase pipeline includes the gaseous phase pipe that is linked together with a jar body, be equipped with gaseous phase balance valve on the gaseous phase pipe, gaseous phase union coupling has the admission pipe, be equipped with the air intake valve on the admission pipe, the liquid phase pipeline includes feed liquor pipe and the liquid intaking pipe that is linked together with a jar body, the prefill valve is gone up to the feed liquor pipe, admission pipe and liquid intaking pipe are parallelly connected and link to each other with the user's pipeline, and the user's pipeline includes main user's pipe and a plurality of household pipes, main user's pipe and liquid intaking union coupling, main user's pipe low reaches and a plurality of parallelly connected household union couplings, be equipped with the liquid intaking valve on the liquid intaking.
Description
Technical Field
The utility model relates to a chemical industry gas transportation system, concretely relates to sled dress jar.
Background
Resident's user adopts the steel bottle air feed usually, and the steel bottle only is furnished with and fills the dress valve, and the potential safety hazard is big. The steel cylinder gas station occupies a large area, is difficult to select sites and is not flexible enough; and the steel cylinder is frequently replaced, so that the cost is high and the operation is inconvenient. A safe, convenient, and reliable gas use service is now required by residential users.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a skid-mounted can of safe, convenient, reliable air feed usefulness.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a sled dress jar, includes a jar body, gaseous phase pipeline and liquid phase pipeline, the gaseous phase pipeline includes the gaseous phase pipe that is linked together with a jar body, be equipped with gaseous phase balance valve on the gaseous phase pipe, gaseous phase union coupling has the admission pipe, be equipped with the air intake valve on the admission pipe, the liquid phase pipeline includes feed liquor pipe and the liquid intaking pipe that is linked together with a jar body, the prefill valve is gone up to the feed liquor pipe, admission pipe and liquid intaking pipe are parallelly connected and link to each other with the user's pipeline, and the user's pipeline includes main user's pipe and a plurality of household pipes, main user's pipe and liquid intaking union coupling, main user's pipe low reaches and a plurality of parallelly connected household union couplings, be equipped with the liquid intaking valve on the liquid intaking.
The utility model discloses a aerify all users through the storage tank jar body, do not need frequent change steel bottle, more safe and convenient and reliable. Just the utility model discloses be provided with the heating gasification stove, not only directly get gas from the jar body, still directly get liquid from the jar body, when being not enough to low reaches user's air supply volume, through heating in order to force gasification to satisfy user's needs. Wherein, the air temperature suddenly drops to reduce the air supply pressure so as to reduce the air supply pressure. The air taking valve is used for switching on and off the air taking pipe, the liquid filling valve is used for switching on and off the liquid inlet pipe, and the liquid taking valve is used for switching on and off the liquid taking pipe.
As preferred, be equipped with high-pressure end pressure transmitter on the gas intaking pipe, be equipped with low-pressure end pressure transmitter on the main user pipe, be equipped with first voltage regulator and first stop valve on the gas intaking pipe, be located of liquid intaking pipe and be equipped with second voltage regulator and second stop valve between main user pipe and heating gasification stove, be equipped with parallelly connected third voltage regulator commonly used and reserve third voltage regulator on the main user pipe, the position that the main user pipe is close to the branch user pipe is equipped with the third stop valve, first voltage regulator is located between gas intaking valve and first stop valve, the second voltage regulator is located between liquid intaking valve and second stop valve, and the third stop valve is located between branch user pipe and third voltage regulator commonly used and reserve third voltage regulator. The high-low pressure end pressure transmitter is used for monitoring the change of pressure and ensuring the safety of the storage tank; and when the air pressure at the air taking valve side or the downstream side of the first pressure regulator is lower than a set value, the heating gasification furnace is started so as to avoid the condition of insufficient air supply to downstream users caused by sudden air temperature drop.
Preferably, the tank body side is provided with a gas leakage alarm, the liquid taking pipe is provided with a liquid phase emergency cut-off valve, and the gas taking pipe is provided with a gas phase emergency cut-off valve. The gas leakage alarm gives an alarm to cut off the liquid taking pipe through the liquid phase emergency cut-off valve and the gas taking pipe through the gas phase emergency cut-off valve. The gas leakage alarm is arranged for monitoring the gas leakage condition and ensuring the safety of the storage tank.
Preferably, the main user pipe and the branch user pipe are both provided with user pipeline leakage alarms. The user pipeline leakage alarm gives an alarm to cut off the liquid taking pipe through the liquid phase emergency cut-off valve and cut off the gas taking pipe through the gas phase emergency cut-off valve.
Preferably, a fourth stop valve is arranged on the liquid taking pipe, the heating and gasifying furnace is matched with an electromagnetic valve, the fourth stop valve is positioned between the tank body and the electromagnetic valve, and a safety valve of the gasifying furnace is arranged on the heating and gasifying furnace.
Preferably, a safety valve and a second diffusing pipe are arranged on the gas phase pipe, a first diffusing pipe is arranged on the heating gasification furnace, and the second diffusing pipe and the first diffusing pipe are connected in parallel to the main diffusing pipe. The diffusing pipes are connected in parallel to reduce the arrangement of pipelines.
Preferably, a filter is arranged on the liquid taking pipe and is positioned between the tank body and the heating gasification furnace. Above-mentioned setting is with filtering liquid, prevents that dirty entering gasifier from causing equipment to damage, can set up at the filter bottom and place dirty mouthful with the indefinite period clearance filth.
The utility model has the advantages of safety, convenience and reliability in air supply.
Drawings
Fig. 1 is a connection diagram of the gas-phase pipeline, the liquid-phase pipeline and the user pipeline of the present invention.
Detailed Description
The invention will be further described with reference to the drawings and the specific embodiments.
As shown in figure 1, the skid-mounted storage tank of the utility model comprises a tank body 1, gaseous phase pipeline and liquid phase pipeline, gaseous phase pipeline includes the gaseous phase pipe that is linked together with jar body 1, be equipped with gaseous phase balanced valve 21 on the gaseous phase pipe, gaseous phase union coupling has gas intaking pipe 2, be equipped with gas valve 22 on the gas intaking pipe 2, liquid phase pipeline includes feed liquor pipe 3 and the liquid intaking pipe 4 that is linked together with jar body 1, be equipped with prefill valve 31 on the feed liquor pipe 3, gas intaking pipe and liquid intaking pipe 4 are parallelly connected and link to each other with the user's pipeline, the user's pipeline includes main user's pipe 51 and a plurality of branch user's pipe 52, liquid intaking pipe 4 and gas intaking pipe 2 are connected with main user's pipe 51, main user's pipe 51 low reaches are connected with a plurality of parallelly connected branch user's pipe 52 to main user's pipe 51, be equipped with on the liquid intaking pipe 4 and be used for liquid valve 41, be equipped with heating gasifier 6 on the liquid intaking.
The high-pressure end pressure transmitter 20 is arranged on the gas taking pipe 2, the low-pressure end pressure transmitter 53 is arranged on the main user pipe, the first pressure regulator 24 and the first stop valve 25 are arranged on the gas taking pipe 2, the second pressure regulator 43 and the second stop valve 44 are arranged on the part, located between the main user pipe 51 and the heating and gasifying furnace 6, of the liquid taking pipe 4, the common third pressure regulator 54 and the standby third pressure regulator 55 which are connected in parallel are arranged on the main user pipe 51, the third stop valve 56 is arranged on the part, close to the branch user pipe 52, of the main user pipe 51, the first pressure regulator 24 is located between the gas taking valve 22 and the first stop valve 25, the second pressure regulator 43 is located between the liquid taking valve 41 and the second stop valve 44, the third stop valve 56 is located between the branch user pipe 52 and the common third pressure regulator 54 and the standby third pressure regulator 55, and the gas pressure on the downstream. The liquid taking pipe 4 is provided with a fourth stop valve 45, the heating and gasification furnace 6 is matched with an electromagnetic valve 61, the fourth stop valve 45 is positioned between the filter 40 and the electromagnetic valve 61, the heating and gasification furnace 6 is provided with a gasification furnace safety valve 62, and the control box is used for opening and closing the heating and gasification furnace 6 through the electromagnetic valve 61. The gas phase pipe is provided with a safety valve 27 and a second diffusion pipe 28, the output end of the heating gasification furnace is provided with a first diffusion pipe 26, and the second diffusion pipe 28 and the first diffusion pipe 26 are connected in parallel to the main diffusion pipe.
The side of the bottom of the tank body 1 is provided with a gas leakage alarm 13, the liquid phase emergency cut-off valve 42 is arranged on the liquid taking pipe 4, the gas phase emergency cut-off valve 23 is arranged on the gas taking pipe 2, the side of the main user pipe 51 and the side of the branch user pipe 52 are both provided with user pipeline leakage alarms, when the user pipeline leakage alarms or the gas leakage alarms 13 alarm, the liquid taking pipe 4 is cut off through the liquid phase emergency cut-off valve 42, and the gas taking pipe 2 is cut off through the gas phase emergency cut-.
The utility model has the advantages of safety, convenience and reliability in gas supply, and can be used for promoting the mode of changing rural coal into gas clean energy.
Claims (7)
1. The utility model provides a sled dress jar, its characterized in that includes a jar body, gas phase pipeline and liquid phase pipeline, the gas phase pipeline includes the gas phase pipe that is linked together with a jar body, be equipped with the gaseous phase balance valve on the gas phase pipe, the gas phase union coupling has the admission pipe, be equipped with the air intake valve on the admission pipe, the liquid phase pipeline includes the feed liquor pipe and the liquid intaking pipe that are linked together with a jar body, be equipped with the prefill valve on the feed liquor pipe, admission pipe and liquid intaking pipe are parallelly connected and link to each other with the user's pipeline, and the user's pipeline includes main user's pipe and a plurality of branch user's pipe, main user's pipe and liquid intaking pipe connection, main user's pipe low reaches and a plurality of parallelly connected branch user's union couplings, be.
2. The skid-mounted tank according to claim 1, wherein a high-pressure end pressure transmitter is arranged on the gas taking pipe, a low-pressure end pressure transmitter is arranged on the main user pipe, a first pressure regulator and a first stop valve are arranged on the gas taking pipe, a second pressure regulator and a second stop valve are arranged between the main user pipe and the heating gasification furnace, the main user pipe is provided with a common third pressure regulator and a standby third pressure regulator which are connected in parallel, a third stop valve is arranged at a position of the main user pipe close to the branch user pipe, the first pressure regulator is arranged between the gas taking valve and the first stop valve, the second pressure regulator is arranged between the liquid taking valve and the second stop valve, and the third stop valve is arranged between the branch user pipe and the common third pressure regulator and the standby third pressure regulator.
3. The skid-mounted tank as recited in claim 2, wherein a gas leakage alarm is arranged on the side of the tank body, a liquid phase emergency cut-off valve is arranged on the liquid taking pipe, and a gas phase emergency cut-off valve is arranged on the gas taking pipe.
4. A lever-loaded canister as claimed in claim 3, wherein the primary and secondary user line leak alarms are provided on both sides of the primary user line and secondary user line.
5. The skid-mounted tank of claim 1, wherein a fourth stop valve is arranged on the liquid taking pipe, the heating and gasifying furnace is provided with an electromagnetic valve, the fourth stop valve is arranged between the tank body and the electromagnetic valve, and a safety valve of the heating and gasifying furnace is arranged on the heating and gasifying furnace.
6. The skid-mounted tank as recited in claim 1, wherein the gas phase pipe is provided with a safety valve and a second bleeding pipe, the heating and gasifying furnace is provided with a first bleeding pipe, and the second bleeding pipe and the first bleeding pipe are connected in parallel to the main bleeding pipe.
7. The skid-mounted tank as recited in claim 1, wherein the liquid extraction pipe is provided with a filter, and the filter is located between the tank body and the heating and gasifying furnace.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921857872.4U CN211010777U (en) | 2019-10-31 | 2019-10-31 | Prizing tank |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921857872.4U CN211010777U (en) | 2019-10-31 | 2019-10-31 | Prizing tank |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211010777U true CN211010777U (en) | 2020-07-14 |
Family
ID=71468469
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921857872.4U Active CN211010777U (en) | 2019-10-31 | 2019-10-31 | Prizing tank |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211010777U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110836328A (en) * | 2019-10-31 | 2020-02-25 | 浙江金象科技有限公司 | skid tank |
-
2019
- 2019-10-31 CN CN201921857872.4U patent/CN211010777U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110836328A (en) * | 2019-10-31 | 2020-02-25 | 浙江金象科技有限公司 | skid tank |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102679149B (en) | Gas cylinder integrated valve for automotive liquefied natural gas | |
CN211010777U (en) | Prizing tank | |
CN106838605B (en) | A kind of process and device for LNG receiving stations BOG systems | |
CN102878686A (en) | Leakproof device for water storing container | |
CN209761596U (en) | Fuel oil system with fault diagnosis and detection functions | |
CN202132695U (en) | Mobile liquefied natural gas supply device for drilling well site | |
CN102679561A (en) | Seepage preventing device for water storage container | |
CN205499388U (en) | A separate and proclaim oneself joint that is used for defeated oil line connection of external bellytank of aircraft and main fuel tank | |
CN202598866U (en) | Anti-seepage device for water storage container | |
CN201487547U (en) | Liquefied gas tank and quick connector thereof | |
CN201016404Y (en) | Full-automatic pipe line protector | |
CN201795516U (en) | Alcohol-based fuel combustion device | |
CN110836328A (en) | skid tank | |
CN203892875U (en) | Safety release and recovery system for liquefied coal-bed gas low-temperature pipeline | |
CN218451818U (en) | Novel gas leakage induction fire extinguishing injection system | |
CN209180534U (en) | A kind of steel flange of leakproof jacketed pipe connection | |
CN215642275U (en) | Detection control system of external pipeline of water purifier | |
CN202381315U (en) | Maintenance test platform for oil pump | |
CN201715175U (en) | External plug for plugging pipelines | |
CN202902636U (en) | Water storage container anti-seepage device | |
CN201396530Y (en) | Gas burning appliance connecting pipe | |
CN202812803U (en) | Separate intelligent gas safety device for private residence | |
CN219140116U (en) | Pipeline regulating valve group | |
CN202812791U (en) | Gas cylinder integrated valve for automotive liquefied natural gas | |
CN205504452U (en) | Low -temperature ethylene prestressed concrete holds jar entirely and stores outside pale of civilization defeated system of existing gas |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Skid mounted tank Effective date of registration: 20221223 Granted publication date: 20200714 Pledgee: China CITIC Bank Co.,Ltd. Jinhua Dongyang sub branch Pledgor: ZHEJIANG KIN-SHINE TECHNOLOGY Co.,Ltd. Registration number: Y2022980028964 |