CN210263048U - Novel pile driver for housing construction - Google Patents

Novel pile driver for housing construction Download PDF

Info

Publication number
CN210263048U
CN210263048U CN201920643943.4U CN201920643943U CN210263048U CN 210263048 U CN210263048 U CN 210263048U CN 201920643943 U CN201920643943 U CN 201920643943U CN 210263048 U CN210263048 U CN 210263048U
Authority
CN
China
Prior art keywords
pile
pile driver
track
rod
driver
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920643943.4U
Other languages
Chinese (zh)
Inventor
王荣
卢敏
周亚琴
王成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zheng Wei Technology Group Co ltd
Original Assignee
Zheng Wei Technology Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zheng Wei Technology Group Co ltd filed Critical Zheng Wei Technology Group Co ltd
Priority to CN201920643943.4U priority Critical patent/CN210263048U/en
Application granted granted Critical
Publication of CN210263048U publication Critical patent/CN210263048U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a novel pile driver for housing construction, which comprises a motion wheel and a track, wherein the track is arranged on the periphery of the outer side of the motion wheel, the motion wheel is connected with the track through a sleeve joint, the left end of the upper end of the track is provided with a connecting band, the right side of the connecting band is provided with a connecting piece, the upper end of the connecting piece is provided with a connecting rod, the lower side of the right end of a fixed pulley is provided with a pile hammer, the lower end of the pile hammer is provided with a pile driver, the lower end of the pile driver is provided with a pile head, the utility model discloses a buffer board which can slow down the impact force generated by pile driving is arranged at the working position of the pile driver, when the pile driver is started to drive the pile head to the position of the required pile driving, thereby the impact force generated by pile driving is reduced due to the arrangement of the buffer board in the working process of, while the noise generated in the piling is also reduced.

Description

Novel pile driver for housing construction
Technical Field
The utility model belongs to the technical field of the housing construction is relevant, concretely relates to novel pile driver for housing construction.
Background
The pile driver consists of a pile hammer, a pile frame and accessory equipment, wherein the pile hammer is attached between two parallel vertical guide rods (commonly called a gantry) at the front part of the pile frame and is hoisted by a hoisting hook, and the basic technical parameters of the pile driver are the weight of an impact part, the impact kinetic energy and the impact frequency. The power source of the pile hammer according to the movement can be divided into a drop hammer, a steam hammer, a diesel hammer, a hydraulic hammer and the like.
The existing novel pile driver for the house building has the following problems: the pile driver for the present novel housing construction can produce the vibrations that the pile arouses owing to the in-process that drives the pile at the during operation, leads to the pile driver to produce very big noise, thereby can not reach the skew and lead to the pile to can not accomplish after can leading to the stake to stretch into when the pile simultaneously.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel pile driver for housing construction to the current novel pile driver for housing construction who proposes in solving above-mentioned background art can take place vibrations owing to at the pile in-process that the pile is being squeezed into and lead to the pile to produce the problem of skew.
In order to achieve the above object, the utility model provides a following technical scheme: novel pile driver for housing construction, including motion wheel and track, outside a week of motion wheel is provided with the track, the motion wheel is connected through cup jointing with the track, the upper end left end of track is provided with the connecting band, the right side of connecting band is provided with the connecting piece, the upper end of connecting piece is provided with the connecting rod, the right side upper end of connecting rod is provided with the fixed pulley, the right-hand member downside of fixed pulley is provided with the pile hammer, the lower extreme of pile hammer is provided with the pile driver, the lower extreme of pile driver is provided with the pile head.
Preferably, the pile driver comprises a connecting end, a fixing part, a fixing column and a fixing plate, the fixing part is arranged at the lower end of the connecting end, the connecting end is rotatably connected with the fixing part through threads, the fixing column is arranged at the lower end of the fixing part, the fixing plate is arranged at the lower end of the fixing column, and the pile driver is rotatably connected with the pile head through the fixing plate and the threads.
Preferably, the fixing part comprises a first buffer plate, a shock absorption rod and a second buffer plate, the upper end and the lower end of the first buffer plate are respectively provided with the shock absorption rod, one side of the right end of the shock absorption rod is provided with the second buffer plate, and the fixing part is welded and fixed with the connecting end through the first buffer plate.
Preferably, the pile head comprises a fixed end, a fixed rod, a clamping piece and a clamping hook, the fixed end is provided with the fixed rod, the clamping piece is arranged at the lower end of the fixed rod, the clamping hook is arranged at one circle of the lower end of the fixed rod, and the pile head is rotatably connected with the pile driver through the fixed end and threads.
Preferably, the moving wheels are arranged at two ends of the inner side of the crawler belt, the number of the moving wheels is four, and the cross-sectional diameters of the four moving wheels are forty-five centimeters.
Preferably, the first buffer plate is a rectangular structure, the thickness of the first buffer plate is five centimeters, and the width of the first buffer plate is fifteen centimeters.
Preferably, the shock-absorbing rod is a cylindrical structure, the diameter of the cross section of the shock-absorbing rod is eight centimeters, and the length of the shock-absorbing rod is twelve centimeters.
Preferably, the number of the clamping hooks is three, the inner part of the lower end of each clamping hook is of a V-shaped structure, and the upper ends of the clamping hooks are connected through round rods.
Compared with the prior art, the utility model provides a novel pile driver for housing construction possesses following beneficial effect:
(1) the utility model discloses a position setting that the pile driver is worked has the buffer board that slows down the pile and produce the impact force, can start when the pile driver carries out the pile, make the pile head accomplish to squeeze into the position that needs the pile perpendicularly in the process of beating, thus make in the process of pile driver work, because the setting of buffer board reduces the impact force that the pile driver produced, the noise that produces in the pile driver also can reduce simultaneously;
(2) the utility model discloses a position setting at pile driver work has the buffer board that slows down the pile impact force, compares current pile driver and can accomplish to reduce the produced noise of vibrations in the course of the work, can accomplish to reduce the produced impact force of vibrations simultaneously.
Drawings
Fig. 1 is a schematic structural view of a pile driver of the present invention;
FIG. 2 is a schematic structural view of a pile driver of the present invention;
FIG. 3 is a schematic view of the fixing member of the present invention;
fig. 4 is a schematic view of the pile head structure of the present invention;
in the figure: 1. a motion wheel; 2. a crawler belt; 3. a connecting belt; 4. lifting a lifting hook; 5. a connecting rod; 6. a fixed pulley; 7. a pile hammer; 8. a pile driver; 81. a connecting end; 82. a fixing member; 821. a first buffer plate; 822. a shock-absorbing lever; 823. a second buffer plate; 83. fixing a column; 84. a fixing plate; 9. pile head; 91. a fixed end; 92. fixing the rod; 93. a fastener; 94. and (4) clamping a hook.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: novel pile driver for housing construction, including motion wheel 1 and track 2, the outside a week of motion wheel 1 is provided with track 2, and motion wheel 1 sets up the inboard both ends position department at track 2, and the position that can pile as required removes, and motion wheel 1 is provided with four altogether, and four motion wheel 1's cross-sectional diameter is forty-five centimetres. The moving wheel 1 is connected with the crawler 2 through a sleeve joint, the left end of the upper end of the crawler 2 is provided with a connecting belt 3, the right side of the connecting belt 3 is provided with a connecting piece 4, the upper end of the connecting piece 4 is provided with a connecting rod 5, the upper end of the right side of the connecting rod 5 is provided with a fixed pulley 6, the lower side of the right end of the fixed pulley 6 is provided with a pile hammer 7,
novel pile driver for housing construction, the lower extreme including pile hammer 7 is provided with pile driver 8, pile driver 8's constitution is including the link 81, the mounting 82, fixed column 83 and fixed plate 84, the lower extreme of link 81 is provided with mounting 82, link 81 passes through screw thread swivelling joint with mounting 82, the constitution of mounting 82 is including first buffer board 821, shock attenuation pole 822 and second buffer board 823, the upper end and the lower extreme of first buffer board 821 respectively are provided with a shock attenuation pole 822, shock attenuation pole 822 is the structure of a cylinder, can be when the pile driving because the production of the impact force and the skew that leads to the pile, the cross-sectional diameter of shock attenuation pole 822 is eight centimetres, the length of shock attenuation pole 822 is twelve centimetres. The first cushion plate 821 is a rectangular structure to reduce the impact force generated by piling, and the thickness of the first cushion plate 821 is five centimeters and the width of the first cushion plate 821 is fifteen centimeters.
Novel pile driver for housing construction, including shock-absorbing bar 822 right-hand member one side be provided with second buffer plate 823, such setting can accomplish when carrying out work and the in-process slows down the impact force that produces owing to the pile, and mounting 82 is through first buffer plate 821 and link 81 welded fastening. The lower end of the fixing member 82 is provided with a fixing column 83, the pile driving operation is performed by fixing the pile head 9, the lower end of the fixing column 83 is provided with a fixing plate 84, and the pile driver 8 is rotatably connected with the pile head 9 through the fixing plate 84 by screw threads. Pile head 9 is arranged at the lower end of pile driver 8, pile head 9 comprises a fixed end 91, a fixed rod 92, clamping pieces 93 and clamping hooks 94, the fixed rod 92 is arranged at the lower end of the fixed end 91, the clamping pieces 93 are arranged at the lower end of the fixed rod 92, the clamping hooks 94 are arranged on the periphery of the lower end of the fixed rod 92, the clamping hooks 94 are arranged in three numbers, the inner portion of the lower end of each clamping hook 94 is of a V-shaped structure, and the upper ends of the clamping hooks 94 are connected through round rods. The pile head 9 is connected with the pile driver 8 through the fixed end 91 in a threaded rotating mode. The pile can be vertically driven in the process of driving the pile.
The utility model discloses a theory of operation and use flow: after the utility model is installed, whether the machine can work normally or not is firstly checked, whether the connection between the plug and the socket on the electric wire is finished or not is checked, if abnormal noise occurs, the machine is closed immediately to wait for the maintenance of a professional, whether the pile head 9 is installed or not is firstly checked before piling, then piling is carried out, because the pile is not required to be piled in the same position, when one pile is moved to the next piling position, the pile is moved through the moving wheels 1 arranged at the positions at the two ends of the inner side of the crawler belt 2, the pile driver 8 is driven by the power device to carry out piling work during piling, the pile driver 8 is a piling machine which utilizes impact force to drive the pile into the stratum, the pile hammer 7 is attached between two parallel vertical guide rods at the front part of the pile frame and is hoisted by the hoisting hook 4, the pile frame is a steel structure tower, the rear part of the pile driving device is provided with a winch for hoisting the pile driver 8 and the pile hammer 7, and the front part of the pile frame is provided with a guide frame consisting of two guide rods for controlling the pile driving direction so that the pile can accurately penetrate into the stratum according to the designed direction. The tower and the guide frame can be inclined together to form an inclined pile, the guide frame can also extend downwards along the tower to form an underwater pile along a bank or a wharf, the pile frame can rotate and can also move, and the pile driver 8 can reduce the impact force generated by pile driving by using the first buffer plate 821 and the second buffer plate 823 which are arranged in the fixing part 82 during pile driving.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. Novel pile driver for housing construction, including moving wheel (1) and track (2), its characterized in that: the outside a week of motion wheel (1) is provided with track (2), motion wheel (1) is connected through cup jointing with track (2), the upper end left end of track (2) is provided with connecting band (3), the right side of connecting band (3) is provided with promotion lifting hook (4), the upper end of promotion lifting hook (4) is provided with connecting rod (5), the right side upper end of connecting rod (5) is provided with fixed pulley (6), the right-hand member downside of fixed pulley (6) is provided with pile hammer (7), the lower extreme of pile hammer (7) is provided with pile driver (8), the lower extreme of pile driver (8) is provided with pile head (9).
2. The novel piling machine for house building of claim 1, wherein: the pile driver (8) comprises a connecting end (81), a fixing piece (82), a fixing column (83) and a fixing plate (84), wherein the fixing piece (82) is arranged at the lower end of the connecting end (81), the connecting end (81) is in threaded rotary connection with the fixing piece (82), the fixing column (83) is arranged at the lower end of the fixing piece (82), the fixing plate (84) is arranged at the lower end of the fixing column (83), and the pile driver (8) is in threaded rotary connection with a pile head (9) through the fixing plate (84).
3. The novel piling machine for house building of claim 2, wherein: the utility model discloses a damping device, including connecting end (81) welded fastening, the constitution of mounting (82) including first buffer board (821), shock attenuation pole (822) and second buffer board (823), the upper end and the lower extreme of first buffer board (821) respectively are provided with one shock attenuation pole (822), shock attenuation pole (822) right-hand member one side is provided with second buffer board (823), mounting (82) are through first buffer board (821) and connecting end (81) welded fastening.
4. The novel piling machine for house building of claim 1, wherein: the pile head is characterized in that the pile head (9) comprises a fixed end (91), a fixed rod (92), clamping pieces (93) and clamping hooks (94), the lower end of the fixed end (91) is provided with the fixed rod (92), the lower end of the fixed rod (92) is provided with the clamping pieces (93), the clamping hooks (94) are arranged on the periphery of the lower end of the fixed rod (92), and the pile head (9) is connected with a pile driver (8) through the fixed end (91) in a threaded rotation mode.
5. The novel piling machine for house building of claim 1, wherein: the moving wheels (1) are arranged at the left end and the right end of the crawler belt (2), the number of the moving wheels (1) is two, and the diameter of the section of the circle of each moving wheel (1) is forty-five centimeters.
6. The novel piling machine for house building of claim 3, wherein: the first buffer plate (821) is a rectangular structure, the thickness of the first buffer plate (821) is five centimeters, and the width of the first buffer plate (821) is fifteen centimeters.
7. The novel piling machine for house building of claim 3, wherein: the shock absorption rod (822) is of a cylindrical structure, the diameter of the cross section of the circle of the shock absorption rod (822) is eight centimeters, and the length of the shock absorption rod (822) is twelve centimeters.
8. The novel piling machine for house building of claim 4, wherein: the number of the clamping hooks (94) is three, the inner part of the lower end of each clamping hook (94) is of a V-shaped structure, and the upper ends of the clamping hooks (94) are connected through round rods.
CN201920643943.4U 2019-05-04 2019-05-04 Novel pile driver for housing construction Active CN210263048U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920643943.4U CN210263048U (en) 2019-05-04 2019-05-04 Novel pile driver for housing construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920643943.4U CN210263048U (en) 2019-05-04 2019-05-04 Novel pile driver for housing construction

Publications (1)

Publication Number Publication Date
CN210263048U true CN210263048U (en) 2020-04-07

Family

ID=70024053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920643943.4U Active CN210263048U (en) 2019-05-04 2019-05-04 Novel pile driver for housing construction

Country Status (1)

Country Link
CN (1) CN210263048U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113266009A (en) * 2021-05-31 2021-08-17 张永刚 Automatic pile driver for H-shaped steel combined steel sheet pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113266009A (en) * 2021-05-31 2021-08-17 张永刚 Automatic pile driver for H-shaped steel combined steel sheet pile

Similar Documents

Publication Publication Date Title
CN109277484B (en) Road construction reinforcing bar straightening device
CN210263048U (en) Novel pile driver for housing construction
CN206110133U (en) A device for cutting underwater concrete steel -pipe pile
CN112340532A (en) Rope device is received in construction
CN111017773A (en) Winch for hydraulic engineering construction
CN213926405U (en) High strain method foundation pile detects guider
CN110937522B (en) Crane auxiliary hoisting system and hoisting method thereof
CN212248238U (en) Pile driver is used in bridge construction
CN111155671B (en) Anechoic chamber convenient for replacing wave-absorbing material and installation method
CN208455622U (en) A kind of quick pile driving equipment of architectural engineering
CN211950309U (en) Piling drilling machine with adjustable drill bit limit
CN213573841U (en) Set up angle adjustable gin pole formula traffic ladder
CN212336021U (en) Portable pile driver for constructional engineering
CN210210259U (en) Knocking device for civil engineering
CN212316918U (en) Movable punching pile driver
CN205617376U (en) Novel pile driver
CN213387572U (en) Hoist engine for road and bridge engineering
CN214363469U (en) Piling device for building construction
CN207986571U (en) A kind of simple drilling rig boom hoisting
CN203486824U (en) Automatic distance-adjustment mechanism for coupling movable pulley block
CN207738327U (en) A kind of automobile-used boom hoisting in day
CN105970959A (en) Pile driver special for building
CN112727345A (en) High-toughness aluminum alloy section for large wind power tower ladder stand
CN109989400A (en) Novel house piling machine for building
CN214993828U (en) Quick integral lifting pile driving construction machine