CN217400519U CN202220689095.2U CN202220689095U CN217400519U CN 217400519 U CN217400519 U CN 217400519U CN 202220689095 U CN202220689095 U CN 202220689095U CN 217400519 U CN217400519 U CN 217400519U
Authority
CN
China
Prior art keywords
construction
cross beam
bracket
gusset plate
water tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220689095.2U
Other languages
Chinese (zh)
Inventor
李孺贵
饶坤荣
韦权
廖智德
邓斌
韦武谁
玉镇熇
何羽玲
唐秀洋
陆飞
莫贤永
蒙雪宁
魏永胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Navigation Construction Engineering Co ltd
Guangxi Road Construction Group Hongjia Steel Structure Engineering Co ltd
Original Assignee
Guangxi Mingjia Steel Structure Engineering Co ltd
Guangxi Navigation Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Mingjia Steel Structure Engineering Co ltd, Guangxi Navigation Construction Engineering Co ltd filed Critical Guangxi Mingjia Steel Structure Engineering Co ltd
Priority to CN202220689095.2U priority Critical patent/CN217400519U/en
Application granted granted Critical
Publication of CN217400519U publication Critical patent/CN217400519U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

An adjustable bracket for inverted cone shell water tower construction is characterized in that a vertical unit piece of the bracket comprises a lower cross beam and an upper cross beam, the end part of the lower cross beam is fixedly connected with the lower end of a vertical connecting rod, and the end part of the upper cross beam is hinged with the upper end of the vertical connecting rod; the middle part of the lower cross beam is provided with a plurality of horizontal lower connecting plates, the middle part of the upper cross beam is provided with a plurality of horizontal upper connecting plates, and the middle part of the lower cross beam is provided with a plurality of horizontal lower connecting plates; the upper and lower beams are connected into a whole through a plurality of adjustable screws. The utility model discloses can be suitable for the water tower construction of different water tank body angles, improve the suitability of bracket greatly, adopt the assembled simultaneously, the bracket structure sets up safe and reliable, provides the maximum safety guarantee for the construction of water tank body, and the assembled bracket can realize that subaerial installation singly organizes the bracket after, and the equipment of hoisting has again improved the efficiency of construction greatly to but have repeatedly usable's characteristics, install and disassemble construction convenience and quickness.

Description

Adjustable bracket is used in construction of back taper shell water tower
Technical Field
The utility model relates to a construction technical field specifically is an adjustable bracket is used in back taper shell water tower construction.
Background
In recent years, as the highway is continuously built and perfected in China, a service area water tower is arranged along the way of the newly built highway for storing water in the service area, and the water tower plays a role in adjusting and supplementing when the water supply amount is insufficient, and is an important component of living supporting facilities in the service area. Water towers are a relatively common and special building. The tower-shaped building is a high-rise tower-shaped building, a large water tank is arranged at the top end, and the higher the water storage tower in the tank is, the higher the water pressure is. The water tower is used to automatically deliver water to make tap water have a certain hydraulic lift. The water tank structure of the water tower is usually in the shape of an inverted conical shell, and the position with the largest diameter is 8 meters. The shell arm of the water tank is made of concrete with the thickness of 12 cm, and the height of the water tower building is 33.75 m. In the construction process of the water tower box body, the water tower box body is high in building height and works aloft, and the water tank is in an inverted cone shell shape, so that the water tank construction is more economic, safe and efficient, and the problem needs to be considered.
At present, in the construction of a water tower, a full-framing method and a prefabricated integral lifting method are generally adopted, and two formwork supporting methods for the construction of a water tank at the top of an actual construction site of the full-framing method are generally adopted, wherein the first method is to directly erect a full-framing in an inverted cone shape, support a cross beam on the top of a bracket and then install a formwork; the second method is to set up a formwork on a full support platform by using a large amount of square wood and bamboo plywood. The prefabricated whole lift method, back taper shell water tower water tank also can adopt ground prefabrication, then the method construction of integral hoisting, back taper shell water tank also adopts fastener or dish to detain the support construction at the prefabricated present way in ground, has following shortcoming when using its construction of above-mentioned method to use:
1. no matter the full hall support method and prefabricated whole lifting method all need adopt the support, generally directly set up the full hall support into the back taper, need increase progressively the height to one row of support in the outside by a batch of support of the most inboard to the water tank circumference, reach the formwork effect of back taper, set up the height that the full hall support needs the manpower that costs very much to adjust each full hall cradling piece like this, and the crossbeam on the top support has the oblique angle, the work such as installation voussoir is loaded down with trivial details, and the workman adjusts the installation in the top, not the operation on the platform, the risk is big.
2. Directly set up the full hall support into the back taper, need hold in the palm altitude mixture control to the top of every full hall cradling piece accurate, adopt the angle that reaches the water tank shell of design, but because the member is high, the time of cost is adjusted to every top support is long. And poor regulation may also affect the angle of the inverted cone of the water tank, affecting the appearance quality.
3. On full hall supporting platform, adopt a large amount of square timbers and bamboo plywood to set up a formwork, the process that adopts the square timbers installation and demolish is comparatively complicated, and the square timbers support moreover, in the work progress, the workman can be in disorder very easily and set up, seems the job site confusion, and construction rate is slow, can not solve simple to operate, swift at all.
Relevant prior documents on adjustable water tower trays were retrieved as follows:
1. a large-tonnage inverted cone water tower water tank lower cone shell template supporting structure; cn201120384007. x; a supporting structure for a lower conical shell template of a large-tonnage inverted cone water tower water tank. Including scaffold frame, template, the scaffold frame constitutes the toper framework by full red scaffold frame, is provided with formwork support skeleton on the scaffold frame, formwork support skeleton comprises the channel-section steel that is radial range arrangement according to the toper framework and the connection screw-thread steel between the channel-section steel, and the welding of channel-section steel lower part has the rivet of being connected with the scaffold frame pole setting, the template is the plank sheathing. The lower part of the template of the utility model adopts the steel bar connecting channel steel as the framework, so that the concrete pouring stress is uniform, the stability of the scaffold is improved, and the construction safety is improved; the wood formwork replaces a steel mould, construction cost is low, formwork lease cost is reduced, the appearance quality of the concrete adopting the wood formwork is good, construction period is short, and labor cost is reduced.
2. A cast-in-situ support structure of a conical shell type water tower; CN 201721199179.3; a cast-in-situ supporting structure of a conical shell type water tower comprises a supporting cylinder, reinforcing steel bars, a ring support, a hanging frame, a suspension frame, a supporting steel beam, a derrick, a water tank template and a ring plate; the ring support is fixed with the top end of the support cylinder through a steel bar, the section of the ring support is in an inverted L shape, a ring plate is fixed on the support cylinder below the ring support, the ring support and the ring plate are fixedly supported through a reinforcing rib, the hanging rack is fixedly welded with the top of the ring support, and the suspension rack is fixedly connected with the hanging rack; the supporting steel beam is fixed with the inner wall of the support cylinder, the bottom of the supporting steel beam is supported and fixed through the reinforcing plate, and the bottom end of the derrick is fixed with the supporting steel beam; the support cylinder comprises an inner steel cylinder, an outer sleeve, rib plates and embedded ribs, and the rib plates are radially and uniformly welded outside the inner steel cylinder; the outer sleeve is vertically assembled by annular steel structures in a layered mode, and the annular steel structures are formed by splicing a plurality of arc-shaped plates. The advantages are that: the method can realize the in-air concrete cast-in-place operation of the water tank, reduce the danger of the high-altitude operation, shorten the construction period and reduce the cost.
3. A template support structure of the inverted cone shell of the water tower; CN 201920641650.2; a formwork support structure for a water tower inverted cone shell, comprising: a barrel body; the lower ring beam is arranged around the cylinder body in a surrounding manner and fixed at the upper part of the cylinder body; the bottom of the water tank is annularly arranged around the cylinder body and is fixed above the lower annular beam; an inner derrick; the first rod pieces are uniformly distributed around the barrel body and are surrounded to form a conical structure matched with the shape of the inverted cone shell, the lower end of each first rod piece is fixedly connected to the bottom of the water tank, and a tie bar is connected between the upper end of each first rod piece and the inner well frame; and the supporting units are uniformly distributed around the cylinder body, and each supporting unit is supported between the first rod piece and the cylinder body. The utility model provides a pair of template bearing structure of water tower inverted cone casing has formed the braced skeleton aloft, is convenient for pour the concrete aloft, has simplified construction process, has shortened construction cycle.
Through retrieval, the method is not described in relevant documents of the construction bracket structure of the inverted cone water tower with the adjustable angle.
Disclosure of Invention
The utility model aims at providing an adjustable bracket is used in back taper shell water tower construction can be suitable for the water tower construction of different water tank body angles, has improved the suitability of bracket greatly, adopts the assembled simultaneously, and the bracket structure sets up safe and reliable, provides the maximum safety guarantee for the construction of water tank body, and after the subaerial installation single group bracket of installation can be realized to the assembled bracket, hoist and mount equipment again has improved the efficiency of construction greatly to but have repeatedly usable's characteristics, install and disassemble construction convenience and quickness.
In order to realize the above purpose of the utility model, the adopted technical scheme is as follows:
an adjustable bracket for inverted cone shell water tower construction is characterized in that a vertical unit piece of the bracket comprises a lower cross beam and an upper cross beam, the end part of the lower cross beam is fixedly connected with the lower end of a vertical connecting rod, and the end part of the upper cross beam is hinged with the upper end of the vertical connecting rod; the middle part of the lower cross beam is provided with a plurality of horizontal lower connecting plates, the middle part of the upper cross beam is provided with a plurality of horizontal upper connecting plates, and the middle part of the lower cross beam is provided with a plurality of horizontal lower connecting plates; the upper and lower beams are connected into a whole through a plurality of adjustable screws.
The middle part of the upper cross beam is provided with a plurality of upper gusset plates, the middle part of the lower cross beam is provided with a plurality of lower gusset plates, bolt holes are reserved in the upper and lower gusset plates, and the bolt holes are hinged with the end parts of the adjustable screws.
The vertical unit pieces and the adjacent vertical unit pieces are connected to the lower connecting plate and the upper connecting plate through angle steel to form a group, and each group of brackets are connected through angle steel to form an annular bracket structure.
The adjustable screw comprises telescopic heads at two ends and a threaded pipe in the middle, the head of each telescopic head is hinged with the upper node plate and the lower node plate, and external threads at the tail of each telescopic head are in threaded engagement with the inner cavity of the threaded pipe.
And a through hole is formed in the middle of the threaded pipe. The through hole can be inserted into a steel pipe to assist in rotating the threaded pipe.
The upper gusset plate comprises an upper gusset plate A, an upper gusset plate B and an upper gusset plate C, and the lower gusset plate comprises a lower gusset plate A, a lower gusset plate B and a lower gusset plate C;
the adjustable screw A is connected with the lower node plate A and the upper node plate A, the adjustable screw B is connected with the lower node plate A and the upper node plate B, the adjustable screw C is connected with the lower node plate B and the upper node plate B, the adjustable screw D is connected with the lower node plate C and the upper node plate B, and the adjustable screw E is connected with the lower node plate C and the upper node plate C. Above connected mode forms stable many triangle-shaped structure with single bracket unit, and rigidity is high, is difficult for taking place deformation.
The tail end of the upper beam is hinged to one end of a platform rod, a platform connecting plate is arranged below the hinged platform rod, an adjustable screw F is connected with a lower node plate C and the platform connecting plate, and a railing is vertically and fixedly installed on the hinged platform rod. The safety protection function is provided for the operating personnel, and the safety of the operating personnel in the construction process is ensured. Because the platform pole is articulated with last horizontal pole, the straightness that hangs down of railing can be adjusted through adjusting adjustable screw F, no matter how the bracket angle changes, still can be with the straightness that hangs down of railing adjust into the vertical state.
Annular steel pipes are fixed above the upper cross beam through steel pipe clamping plates, the steel pipe clamping plates are provided with groove-shaped openings, the size of each opening is matched with the diameter of each annular steel pipe, and the bottoms of the steel pipe clamping plates are connected to the upper cross rods through welding or bolt joint plates.
The annular steel pipe is installed in a segmented or whole circle mode according to the fact that the diameter of the inverted cone shell of the water tower is gradually increased along the height direction.
And the bottom template is fixed above the annular steel pipe through rivets or butterfly buckles.
The construction method of the adjustable bracket for the inverted cone water tower construction comprises the following steps:
A. prefabricating each standard module piece according to the drawing size in a factory, designing and reserving bolt holes according to the drawing, pre-assembling in the factory, and simultaneously welding and fixing the lower cross rod and the vertical connecting rod in advance in a processing factory;
B. all components are processed according to the design requirements and are transported to a construction site after being checked and accepted;
C. the method comprises the following steps of (1) carrying out bracket assembly on a construction site, placing a lower crossbeam on a flat ground, hinging and installing an upper crossbeam on a vertical connecting rod, wherein the hinged part can flexibly rotate the upper crossbeam as a standard;
D. firstly, mounting an adjustable screw at the outermost end, and hinging two ends of the adjustable screw at the outermost end with an upper node plate;
E. after the installation of the adjustable screw at the outermost end is finished, the height of the bracket is adjusted, the angle of the bracket is consistent with that of the water tank body by adjusting the length of the adjustable screw according to the angle of the water tank body designed by a drawing, the height of the bracket is adjusted, and after the angle is accurately retested, the installation of other adjustable screws in the bracket and the installation of the adjustable screws of the railing part are carried out; all bracket units are installed according to the method until the number of the bracket units can be calculated;
F. after the bracket pieces are installed, angle steel of a processing factory is installed in bolt holes of the transverse connecting plate for fixed connection, two bracket units are installed together to form a group, and one bracket group is ensured to be stable;
G. hoisting a bracket group onto an operation platform of a water tower water tank through a crane, finishing the erection of the water tower water tank construction operation platform in advance, sequentially arranging the platform according to the designed circumferential angle by adopting a disc buckle type full-hall bracket, and timely and firmly connecting angle steel between the bracket group and the bracket group in time to ensure that the whole bracket forms a stable whole;
H. finally, rechecking the oblique angle, the height and the like of the bracket after the installation is finished, and rechecking whether the design requirement is met or not, after the installation of the bracket of the integral water tower box body is finished, welding a railing on the platform rod of each bracket, wherein the railing is made of a steel pipe, and the railing are integrally connected by welding two steel pipes; and finally, mounting the annular beam and the template.
I. After the water tower is poured, dismantling the bracket: firstly, the connection between the bottom formwork and the annular steel pipe is loosened, then bolts at one ends of the telescopic screws 31, 32, 33, 34 and 36 are loosened, only the telescopic screws 35 are reserved for supporting the bottom formwork, so that the problem that the adjustable screws 31, 32, 33, 34 and 36 need to be synchronously adjusted does not occur during dismounting, several persons are required to act together during synchronous dismounting, manpower is wasted, finally, the adjustable screws 35 are shortened to a certain height, the connection between each group of brackets is dismounted, the bracket in a single group can be dismounted, and the bottom formwork and the brackets in other groups can be sequentially dismounted.
The utility model has the advantages of outstanding substantive characteristics and remarkable progress:
1. the utility model discloses be different from traditional water tower water tank formwork structure, for pre-assembly formula bracket, can finish in processing factory in advance, reduced the on-the-spot support by a wide margin and built the construction link, reduce the engineering time, improve the efficiency of construction greatly.
2. The utility model discloses broken the worker's method that traditional water tank construction need adopt the fastener to set up the back taper shell water tank, the innovation proposes the third kind worker's method of water tower construction: erecting a lower branch frame to a designed height, enabling the elevation of the top of the upright to be level, erecting a main beam on the top support of the upright, erecting a distribution beam on the main beam, erecting a bamboo rubber plate on the distribution beam, integrally hoisting and combining the assembled adjustable bracket group, realizing high-altitude operation leveling, and realizing the in-situ casting of the water tank on the top. The construction speed of the full framing method and the prefabricated integral lifting method can be increased.
3. The utility model discloses an adjustable screw rod of a plurality of that entablature passes through the middle part connects into whole, forms a plurality of triangle stable structure to being articulated with the last horizontal pole, can realizing the regulation of bracket height and angle through the length of adjusting the basket screw, being suitable for the water tower construction of different water tank body angles, having improved the suitability of bracket greatly.
4. The utility model discloses per two bracket units form a set ofly, assemble into a set ofly at subaerial elder generation, then go on the hoist and mount, and the process is simple, and the construction degree of difficulty is little, the progress is fast, and installation and disassembly construction convenient and fast have improved the efficiency of construction, and have repeatedly usable's characteristics.
5. The water tank adopts this utility model patent at the cast-in-place of top normal position can realize that high altitude construction levelly and smoothly changes, and the work load of the high altitude construction that significantly reduces can be better guarantee operation personnel's life safety simultaneously again.
6. The adjustable bracket for the inverted cone water tower construction is reasonable in design, the balance of horizontal internal force is realized through the annular structure, horizontal component force cannot be generated on a bracket system of a lower structure, the effect that the lower structure is only acted by axial force is guaranteed, the structural stress is more reasonable and safer, the utilization rate of materials is improved, and more materials can be saved under the same condition.
Description of the drawings:
FIG. 1 is a side view schematic view of a single carrier unit (tilted 30) in elevation;
FIG. 2 is a schematic bottom view of a single tray unit;
FIG. 3 is a side view schematic diagram of a single carriage unit (tilted 45);
FIG. 4 is a schematic view of an external structure of a set of brackets;
FIG. 5 is a side view of the structure of a single carrier unit including a railing;
FIG. 6 is a schematic top view of the ring structure of the carrier unit;
FIG. 7 is a schematic view of the overall appearance of the bracket;
FIG. 8 is a schematic view of a connection structure of the annular steel pipe, the steel pipe clamp plate and the upper beam;
the serial numbers and component names in the figures are: 1. a lower cross beam; 11. a lower gusset plate A; 12. a lower gusset plate B; 13. a lower gusset plate C; 14. a lower connecting plate; 2. an upper cross beam; 21. an upper gusset plate A; 22. an upper gusset plate B; 23. an upper gusset plate C; 24. an upper connecting plate; 31. an adjustable screw A; 32. an adjustable screw B; 33. an adjustable screw C; 34. an adjustable screw D; 35. an adjustable screw E; 36. an adjustable screw F; 4. a vertical connecting rod; 5. angle steel; 6. a platform rod; 61. a platform connecting plate; 7. a railing; 8. an annular steel pipe; 9. steel pipe cardboard.
Detailed Description
Example 1
The utility model provides an adjustable bracket is used in construction of back taper shell water tower which characterized in that: one vertical unit piece of the bracket comprises a lower cross beam 1 and an upper cross beam 2, the end part of the lower cross beam 1 is fixedly connected with the lower end of a vertical connecting rod 4, and the end part of the upper cross beam 2 is hinged with the upper end of the vertical connecting rod 4; a plurality of horizontal lower connecting plates 14 are arranged in the middle of the lower cross beam 1, a plurality of transverse upper connecting plates 24 are arranged in the middle of the upper cross beam 2, and a plurality of transverse lower connecting plates 14 are arranged in the middle of the lower cross beam 1; the upper and lower beams are connected into a whole through a plurality of adjustable screws.
A plurality of upper gusset plates are arranged in the middle of the upper cross beam 2, a plurality of lower gusset plates are arranged in the middle of the lower cross beam 1, bolt holes are reserved in the upper and lower gusset plates, and the bolt holes are hinged with the end portions of the adjustable screws.
The vertical unit slices and the adjacent vertical unit slices are connected to the lower connecting plate 14 and the upper connecting plate 24 through angle steel 5 to form a group, and each group of brackets are connected through angle steel to form an annular bracket structure.
The adjustable screw comprises telescopic heads at two ends and a threaded pipe in the middle, the head of each telescopic head is hinged with the upper node plate and the lower node plate, and external threads at the tail of each telescopic head are in threaded engagement with the inner cavity of the threaded pipe.
The middle part of the threaded pipe 37 is provided with a through hole.
The upper gusset plate comprises an upper gusset plate A21, an upper gusset plate B22 and an upper gusset plate C23, and the lower gusset plate comprises a lower gusset plate A11, a lower gusset plate B12 and a lower gusset plate C13;
an adjustable screw A31 is connected with a lower node plate A11 and an upper node plate A21, an adjustable screw B32 is connected with the lower node plate A11 and an upper node plate B22, an adjustable screw C33 is connected with the lower node plate B12 and the upper node plate B22, an adjustable screw D34 is connected with a lower node plate C13 and an upper node plate B22, and an adjustable screw E35 is connected with the lower node plate C13 and the upper node plate C23.
The tail end of the upper cross beam 2 is hinged to one end of a platform rod 6, a platform connecting plate 61 is arranged below the platform rod 6, an adjustable screw F36 is connected with a lower node plate C13 and the platform connecting plate 61, and a rail 7 is vertically and fixedly installed on the platform rod 6 in a hinged mode.
Annular steel pipe 8 is fixed through steel pipe cardboard 9 in the 2 tops of entablature, and steel pipe cardboard 9 is provided with the cell type opening, and the opening size matches with 8 diameters of annular steel pipe, and steel pipe cardboard 9 bottom adopts welding or bolt gusset plate to connect on the last horizontal pole.
The annular steel pipe 8 is gradually enlarged along the height direction according to the inverted cone shell of the water tower, and is installed in a segmented or whole circle mode.
And a bottom template is fixed above the annular steel pipe 8 through rivets or butterfly buckles.

Claims (10)

1. The utility model provides an adjustable bracket is used in construction of back taper shell water tower which characterized in that: one vertical unit piece of the bracket comprises a lower cross beam (1) and an upper cross beam (2), the end part of the lower cross beam (1) is fixedly connected with the lower end of a vertical connecting rod (4), and the end part of the upper cross beam (2) is hinged with the upper end of the vertical connecting rod (4); a plurality of horizontal lower connecting plates (14) are arranged in the middle of the lower cross beam (1), a plurality of transverse upper connecting plates (24) are arranged in the middle of the upper cross beam (2), and a plurality of transverse lower connecting plates (14) are arranged in the middle of the lower cross beam (1); the upper and lower beams are connected into a whole through a plurality of adjustable screws.
2. The adjustable bracket for construction of the inverted cone water tower as claimed in claim 1, wherein: a plurality of upper node plates are arranged in the middle of the upper cross beam (2), a plurality of lower node plates are arranged in the middle of the lower cross beam (1), bolt holes are reserved in the upper and lower node plates, and the bolt holes are hinged to the end portions of the adjustable screws.
3. The adjustable bracket for construction of the inverted cone water tower as claimed in claim 1, wherein: the vertical unit pieces and the adjacent vertical unit pieces are connected to the lower connecting plate (14) and the upper connecting plate (24) through angle steel (5) to form a group, and each group of brackets are connected through angle steel to form an annular bracket structure.
4. The adjustable bracket for construction of the inverted cone water tower as claimed in claim 1, wherein: the adjustable screw comprises telescopic heads at two ends and a threaded pipe in the middle, the head of each telescopic head is hinged with the upper node plate and the lower node plate, and external threads at the tail of each telescopic head are in threaded engagement with the inner cavity of the threaded pipe.
5. The adjustable bracket for construction of the inverted cone water tower as claimed in claim 4, wherein: the middle part of the threaded pipe (37) is provided with a through hole.
6. The adjustable bracket for construction of the inverted cone water tower as claimed in claim 2, wherein: the upper gusset plate comprises an upper gusset plate A (21), an upper gusset plate B (22) and an upper gusset plate C (23), and the lower gusset plate comprises a lower gusset plate A (11), a lower gusset plate B (12) and a lower gusset plate C (13);
adjustable screw A (31) is connected with lower gusset plate A (11) and upper gusset plate A (21), adjustable screw B (32) is connected with lower gusset plate A (11) and upper gusset plate B (22), adjustable screw C (33) is connected with lower gusset plate B (12) and upper gusset plate B (22), adjustable screw D (34) is connected with lower gusset plate C (13) and upper gusset plate B (22), and adjustable screw E (35) is connected with lower gusset plate C (13) and upper gusset plate C (23).
7. The adjustable bracket for inverted cone water tower construction as claimed in claim 1, wherein: the tail end of the upper cross beam (2) is hinged to one end of a platform rod (6), a platform connecting plate (61) is arranged below the platform rod (6), an adjustable screw F (36) is connected with a lower node plate C (13) and the platform connecting plate (61), and a railing (7) is vertically and fixedly mounted on the platform rod (6).
8. The adjustable bracket for construction of the inverted cone water tower as claimed in claim 1, wherein: annular steel pipe (8) are fixed through steel pipe cardboard (9) in entablature (2) top, and steel pipe cardboard (9) are provided with the cell type opening, and the opening size matches with annular steel pipe (8) diameter, and steel pipe cardboard (9) bottom adopts welding or bolted connection board to be connected on the entablature.
9. The adjustable bracket for construction of the inverted cone water tower as claimed in claim 8, wherein: annular steel pipe (8) adopt segmentation or whole circle installation according to water tower back taper shell along direction of height diameter grow gradually.
10. The adjustable bracket for construction of the inverted cone water tower as claimed in claim 8, wherein: and the bottom template is fixed above the annular steel pipe (8) through rivets or butterfly buttons.
CN202220689095.2U 2022-03-28 2022-03-28 Adjustable bracket is used in construction of back taper shell water tower Active CN217400519U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220689095.2U CN217400519U (en) 2022-03-28 2022-03-28 Adjustable bracket is used in construction of back taper shell water tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220689095.2U CN217400519U (en) 2022-03-28 2022-03-28 Adjustable bracket is used in construction of back taper shell water tower

Publications (1)

Publication Number Publication Date
CN217400519U true CN217400519U (en) 2022-09-09

Family

ID=83140693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220689095.2U Active CN217400519U (en) 2022-03-28 2022-03-28 Adjustable bracket is used in construction of back taper shell water tower

Country Status (1)

Country Link
CN (1) CN217400519U (en)

Similar Documents

Publication Publication Date Title
CN107697818B (en) Construction method and special construction equipment for wall of prestressed concrete wind power tower
CN101538936B (en) Hydraulic slip-and-lift construction method for water tower
CN111270852A (en) Construction method of novel formwork support system for reinforced concrete silo dome
CN114873497B (en) Vertical lifting installation device and method for variable-diameter unbalanced load equipment
CN107419746A (en) A kind of mobile formwork system and its construction method
CN111236688A (en) Liftable construction platform for reinforcing circular silo in vitro
CN103104090B (en) Silo concrete whole slip template
CN114856287B (en) Construction method of thin-wall steel cylinder hollow tower column
CN114508233A (en) Construction method of adjustable bracket for inverted cone shell water tower construction
CN217400519U (en) Adjustable bracket is used in construction of back taper shell water tower
CN111926998B (en) Super high-rise structure outer frame steel pipe column construction method
CN202529747U (en) Self-elevating rotating crane mounting device for high tower crane
CN110748156B (en) Sliding positioning top supporting structure of large silo and construction method thereof
CN212562460U (en) Novel template support member for reinforced concrete silo dome
CN214329869U (en) Bracket device for truss support of silo wall
CN112412152B (en) Construction method of underslung derrick-free variable-section rectangular chimney support system
CN210195235U (en) Novel concrete column template device
CN115306152A (en) Large-inclination-angle inclined wall folding and separating jacking type steel platform construction device and method
CN111485887B (en) Construction method of novel working well
CN107700824A (en) Bar type wall-attached frame
CN114753672A (en) Simple inner support device for plastic film shell
CN102642781B (en) Self-elevating rotating crane installation device for tall towers
CN201367335Y (en) Hydraulic lifting device used for hoisting water tank of water tower
CN213174845U (en) Temporary assembling device for roof curved surface # -shaped combined steel truss beam construction
CN220848957U (en) Temporary reinforcing structure for steel structure installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 530025 9th and 10th floors, Xinfa building, No. 39, Yunjing Road, Qingxiu District, Nanning City, Guangxi Zhuang Autonomous Region

Patentee after: Guangxi Navigation Construction Engineering Co.,Ltd.

Country or region after: China

Patentee after: Guangxi Road Construction Group Hongjia Steel Structure Engineering Co.,Ltd.

Address before: 530025 9th and 10th floors, Xinfa building, No. 39, Yunjing Road, Qingxiu District, Nanning City, Guangxi Zhuang Autonomous Region

Patentee before: Guangxi Navigation Construction Engineering Co.,Ltd.

Country or region before: China

Patentee before: GUANGXI MINGJIA STEEL STRUCTURE ENGINEERING Co.,Ltd.