CN216590266U - A pipeline fixing device for steel construction - Google Patents
A pipeline fixing device for steel construction Download PDFInfo
- Publication number
- CN216590266U CN216590266U CN202220031349.1U CN202220031349U CN216590266U CN 216590266 U CN216590266 U CN 216590266U CN 202220031349 U CN202220031349 U CN 202220031349U CN 216590266 U CN216590266 U CN 216590266U
- Authority
- CN
- China
- Prior art keywords
- steel
- steel structure
- pipeline
- structure column
- fixing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 147
- 239000010959 steel Substances 0.000 title claims abstract description 147
- 238000010276 construction Methods 0.000 title abstract description 12
- 229910000746 Structural steel Inorganic materials 0.000 claims description 3
- 238000003466 welding Methods 0.000 abstract description 8
- 238000009434 installation Methods 0.000 abstract description 6
- 230000007613 environmental effect Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000011900 installation process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model belongs to the technical field of pipeline installation, in particular to a pipeline fixing device for a steel structure, which comprises a pipeline bracket, wherein the pipeline bracket is positioned on one side of a steel structure column; the steel plate assembly is fixedly connected with the pipeline bracket and is bolted with the steel structure column; and the beam clamp is connected with one side of the steel structure column, which is close to the pipeline bracket, and is connected with one end of the pipeline bracket, which is far away from the steel structure column, through the section steel. The utility model provides a pipeline fixing device installation site need not the welding, has guaranteed the mechanical properties of steel construction post.
Description
Technical Field
The utility model belongs to the technical field of the piping erection, concretely relates to pipeline fixing device for steel construction.
Background
In steel structure buildings, related professional equipment and pipelines are required to be installed for meeting the requirements of building functions and process production, and a traditional pipeline support is fixed on a steel structure in a welding mode, so that the mechanical property of a steel structure column is easily reduced. Therefore, it is desirable to provide a pipe fixing device that does not require welding with a steel structure.
SUMMERY OF THE UTILITY MODEL
The utility model discloses adopt welding mode snap-on the steel construction to traditional pipeline fixed bolster, reduce the problem of steel construction mechanical properties, provide a pipeline fixing device for steel construction.
A pipeline fixing device for a steel structure comprises a pipeline bracket, wherein the pipeline bracket is positioned on one side of a steel structure column; also comprises the following steps of (1) preparing,
the steel plate assembly is fixedly connected with the pipeline bracket and is bolted with the steel structure column;
and the beam clamp is connected with one side of the steel structure column, which is close to the pipeline bracket, and is connected with one end of the pipeline bracket, which is far away from the steel structure column, through the section steel.
Further, the steel plate assembly comprises a first steel plate and a second steel plate; the first steel plate is positioned on one side, close to the steel structure column, of the pipeline bracket and fixedly connected with the pipeline bracket; the second steel plate is positioned on one side, away from the pipeline bracket, of the steel structure column; the steel plate assembly is connected with the steel structure column through a first bolt; the first bolt is connected with the second steel plate, the steel structure column and the first steel plate in sequence.
In this structure, the pipeline fixing device adopts mechanical connection with the steel structure column, need not the welding, does not influence the mechanical properties of steel structure column.
Further, a nut is connected to the first bolt; the nut is located the one side that steel construction post was kept away from to first steel sheet.
Furthermore, the first steel plate is provided with four first through holes which are arranged in a square shape; the second steel plate is provided with four second through holes, and the four second through holes are opposite to the four first through holes; the four first bolts are respectively inserted into the second through hole, the steel structure column and the first through hole.
Further, the pipeline bracket comprises a bracket supporting plate, a plurality of upright posts and a plurality of cross beams; one side of the support supporting plate, which is close to the steel structure column, is fixedly connected with the first steel plate, and one end of the support supporting plate, which is far away from the steel structure column, is connected with the section steel; the upright posts are connected with the support supporting plate, and the upright posts are opposite in pairs and connected with the lower part of the support supporting plate; and two ends of the cross beam are respectively connected with the two opposite upright posts.
Furthermore, the pipeline is placed on the cross beam and is fixedly connected with the cross beam through a type clamp.
Further, the cross beam comprises a first cross beam and a second cross beam, the first cross beam and the second cross beam are arranged in parallel, and the first cross beam is located above the second cross beam.
Furthermore, the upright post is connected with the support supporting plate through a first angle steel and a second bolt.
Furthermore, the cross beam is connected with the upright post through a second angle steel and a third bolt.
Has the advantages that: the pipeline fixing device provided by the embodiment does not need to be welded during field installation, ensures the mechanical property of the steel structure column, and meets the requirement of environmental protection; the mechanical connection is adopted, so that the construction efficiency is improved, the construction period is effectively shortened, and the project cost is saved; one end of the pipeline support is bolted with the steel structure column through the steel plate assembly, the other end of the pipeline support is tied by the profile steel and the beam clamp, and the steel plate assembly and the beam clamp respectively provide fixed support for the pipeline support, so that the pipeline support is high in connection stability with the steel structure column.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
Fig. 1 illustrates a conventional pipe bracket fixing manner.
FIG. 2 is a schematic cross-sectional view of B-B in FIG. 1.
Fig. 3 is a schematic view of the overall structure of the pipe fixing device according to the preferred embodiment.
Fig. 4 is a schematic cross-sectional view taken along line a-a in fig. 3.
Reference numerals: 1. a pipe support; 11. a bracket pallet; 12. a column; 13. a cross beam; 2. a steel structural column; 31. a first steel plate; 32. a second steel plate; 41. a first bolt; 42. a nut; 5. a beam clamp; 6. section steel; 71. a first angle steel; 72. a second bolt; 81. a second angle steel; 82. a third bolt; 9. a pipeline; 10. a bridge frame; 21. a model card; 22. and (7) welding points.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art. Furthermore, the technical features mentioned in the different embodiments of the invention described below can be combined with each other as long as they do not conflict with each other.
Examples
The traditional fixing mode of the pipeline bracket is welding, and referring to fig. 1 and 2, a welding point 22 between the pipeline bracket and the steel structure column 2 affects the mechanical property of the steel structure column 2. This implementation provides a guarantee steel structure column 2's mechanical properties's pipeline fixing device, and it includes pipeline bracket 1, steel sheet subassembly, first bolt 41, beam clamp 5 and shaped steel 6.
Specifically, as shown in fig. 3, the steel plate assembly includes a first steel plate 31 and a second steel plate 32; the pipeline bracket 1 is positioned at one side of the steel structure column 2, and one side of the pipeline bracket 1 close to the steel structure column 2 is fixedly connected with a first steel plate 31; the first steel plate 31 is provided with four first through holes, and the four first through holes are arranged on the first steel plate 31 in a square shape. The second steel plate 32 is located on one side of the steel structure column 2 far away from the pipeline bracket 1, and the second steel plate 32 is provided with four second through holes corresponding to the first through holes. The first bolt 41 sequentially penetrates through the second through hole, the steel structure column 2 and the first through hole; the first bolt 41 is connected with a nut 42, the nut 42 is located on one side, away from the steel structure column 2, of the first steel plate 31, and the first bolt 41 is a high-strength bolt.
Specifically, the beam clamp 5 is fixed on one side of the steel structure column 2 close to the pipeline bracket 1 and is positioned above the pipeline bracket 1; the two ends of the section steel 6 are respectively connected with the beam clamp 5 and one end of the pipeline bracket 1 far away from the steel structure column 2.
Specifically, the pipeline bracket 1 comprises a bracket supporting plate 11, a plurality of upright posts 12 and a plurality of cross beams 13; one side of the support supporting plate 11, which is close to the steel structural column 2, is connected with a first steel plate 31, and one end, which is far away from the steel structural column 2, is connected with the section steel 6; the upright post 12 is connected with the lower part of the bracket supporting plate 11, and the upright post 12 is connected with the bracket supporting plate 11 through a first angle steel 71 and a second bolt 72; the plurality of upright columns 12 are opposite to each other in pairs, and two ends of the cross beam 13 are respectively connected with the two opposite upright columns 12; the cross beam 13 is connected with the upright 12 through a second angle iron 81 and a third bolt 82. The cross beam 13 comprises a first cross beam and a second cross beam, the first cross beam and the second cross beam are arranged in parallel, and the first cross beam is positioned above the second cross beam; the first beam and the second beam can be used for placing the bridge frame 10 and the pipeline 9; the pipe 9 and the cross beam 13 are fixed through a type clamp 21.
The installation process of the pipeline fixing device comprises the following steps: before the support supporting plate 11 and the first steel plate 31 of the pipeline fixing device are installed, the support supporting plate 11 and the upright post 12 are prefabricated into a whole, the upright post 12 is connected with the support supporting plate 11, and the first cross beam and the second cross beam are connected with the upright post 12; the first steel plate 31 and the second steel plate 32 are respectively arranged at two sides of the steel structure column 2, and the first bolt 41 sequentially penetrates through the second steel plate 32, the steel structure column 2 and the first steel plate 31 and then is connected with the nut 42; a beam clamp 5 is arranged on one side of the steel structure column 2 close to the pipeline bracket 1, and the beam clamp 5 is positioned above the first steel plate 31; adopt the 6 tie-beam of shaped steel to press from both sides 5 and the support layer board 11 one end of keeping away from steel construction post 2 to carry out the slant drawknot to support layer board 11. After the installation is completed, the bridge frame 10 and the pipeline 9 can be placed on the first cross beam and the second cross beam.
The pipeline fixing device provided by the embodiment does not need to be welded during field installation, ensures the mechanical property of the steel structure column 2, and meets the requirement of environmental protection; the mechanical connection is adopted, so that the construction efficiency is improved, the construction period is effectively shortened, and the project cost is saved; one end of the pipeline bracket is bolted with the steel structure column through the steel plate component, the other end of the pipeline bracket is tied by adopting the section steel and the beam clamp, and the steel plate component and the beam clamp respectively provide fixed support for the pipeline bracket, so that the pipeline bracket and the steel structure column are high in connection stability; the steel plate assembly comprises a first steel plate and a second steel plate which are positioned on two sides of the steel structure, and the connection stability of the pipeline bracket and the steel structure column is further improved; a plurality of pipelines 9 can be placed on one beam 13, and the two beams 13 are arranged up and down, so that the space utilization rate of the pipeline fixing device is improved, the installation number of the pipeline fixing device can be reduced, and the cost is reduced; the pipeline 9 is orderly arranged on the pipeline fixing device, and is beautiful and elegant.
It should be understood that the above examples are only for clarity of illustration and are not intended to limit the embodiments. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. And obvious variations or modifications of the invention may be made without departing from the scope of the invention.
Claims (9)
1. A pipeline fixing device for a steel structure comprises a pipeline bracket (1), wherein the pipeline bracket (1) is positioned on one side of a steel structure column (2); it is characterized by also comprising the following steps of,
the steel plate assembly is fixedly connected with the pipeline bracket (1) and is bolted with the steel structure column (2);
and the beam clamp (5) is connected with one side, close to the pipeline support (1), of the steel structure column (2) and is connected with one end, far away from the steel structure column (2), of the pipeline support (1) through the section steel (6).
2. The pipe fixing device for steel structure according to claim 1, wherein the steel plate assembly comprises a first steel plate (31) and a second steel plate (32); the first steel plate (31) is positioned on one side, close to the steel structure column (2), of the pipeline bracket (1) and fixedly connected with the pipeline bracket (1); the second steel plate (32) is positioned on one side, away from the pipeline bracket (1), of the steel structure column (2); the steel plate assembly is connected with the steel structure column (2) through a first bolt (41); the first bolt (41) is sequentially connected with the second steel plate (32), the steel structure column (2) and the first steel plate (31).
3. The pipe fixing device for steel structures according to claim 2, wherein a nut (42) is connected to the first bolt (41); the nut (42) is positioned on one side, away from the steel structure column (2), of the first steel plate (31).
4. The pipe fixing device for steel structures according to claim 2, wherein the first steel plate (31) is provided with four first through holes, and the four first through holes are arranged in a square shape; the second steel plate (32) is provided with four second through holes, and the four second through holes are opposite to the four first through holes; the four first bolts (41) are respectively inserted into the second through hole, the steel structure column (2) and the first through hole.
5. The pipe fixing device for steel structures according to claim 2, wherein the pipe bracket (1) comprises a bracket pallet (11), a plurality of uprights (12) and a plurality of cross beams (13); one side of the support supporting plate (11) close to the steel structure column (2) is fixedly connected with a first steel plate (31), and one end of the support supporting plate far away from the steel structure column (2) is connected with the section steel (6); the upright columns (12) are connected with the support supporting plate (11), and the upright columns (12) are opposite to each other in pairs and are connected with the lower part of the support supporting plate (11); two ends of the cross beam (13) are respectively connected with the two opposite upright posts (12).
6. The pipe fixing device for steel structures as claimed in claim 5, wherein the pipe (9) is placed on the beam (13) and is fixedly connected with the beam (13) by means of a form clamp (21).
7. The pipe fixing device for steel structures according to claim 6, characterized in that the cross beam (13) comprises a first cross beam and a second cross beam, the first cross beam being arranged in parallel with the second cross beam, the first cross beam being located above the second cross beam.
8. The pipe fixing device for steel structures according to claim 7, wherein the upright (12) is connected with the bracket plate (11) through a first angle iron (71) and a second bolt (72).
9. The pipe fixing device for steel structures according to claim 8, wherein the cross beam (13) is connected with the upright (12) by a second angle iron (81) and a third bolt (82).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220031349.1U CN216590266U (en) | 2022-01-07 | 2022-01-07 | A pipeline fixing device for steel construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220031349.1U CN216590266U (en) | 2022-01-07 | 2022-01-07 | A pipeline fixing device for steel construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216590266U true CN216590266U (en) | 2022-05-24 |
Family
ID=81632594
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220031349.1U Active CN216590266U (en) | 2022-01-07 | 2022-01-07 | A pipeline fixing device for steel construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216590266U (en) |
-
2022
- 2022-01-07 CN CN202220031349.1U patent/CN216590266U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104988989A (en) | Movable building structure and making method thereof | |
CN212478126U (en) | Former bamboo beam column connected node based on novel hoop spare | |
CN113202185B (en) | Energy-saving building steel structure system and installation process thereof | |
CN216590266U (en) | A pipeline fixing device for steel construction | |
CN215166524U (en) | Steel structure combined column and beam joint | |
CN211472958U (en) | Integral concrete structure of steel frame shear wall structure | |
CN212427537U (en) | Assembled steel construction building fixed establishment | |
CN212104524U (en) | Horizontal bending-resistant beam joint structure for bolt connection assembly type reinforced concrete wallboard | |
CN211171623U (en) | Steel pipe concrete combined main tower | |
CN210423968U (en) | Assembled support and hanger and building using same | |
CN214302862U (en) | Combined square pipe truss support | |
CN219637911U (en) | Prefabricated tubular pile supporting and connecting device | |
CN221256269U (en) | Protective shed frame | |
CN215859026U (en) | Lightweight aluminum formwork for building | |
CN114658277B (en) | Light steel and light concrete prefabricated assembled steel-concrete structure house system | |
CN211816919U (en) | Steel structure | |
CN221742024U (en) | Shaped large-span concrete beam arched bottom die bracket | |
CN218148874U (en) | Assembly type building connection structure | |
CN218667882U (en) | Install assembled steel house fast | |
CN215406099U (en) | Steel support supporting structure of foundation pit with ultra-large area | |
CN218352429U (en) | Solar photovoltaic support | |
CN221298248U (en) | Assembled steel aluminium component connected node | |
CN218176616U (en) | Movable reusable steel-concrete composite structure | |
CN217782594U (en) | Iron reinforcement braced system on super thick bottom plate that can install fast | |
CN214657709U (en) | Steel structure house capable of being quickly disassembled and assembled |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |