Nothing Special   »   [go: up one dir, main page]

CN214616480U - Oil field water injection well water injection layering multitube divides water injection system - Google Patents

Oil field water injection well water injection layering multitube divides water injection system Download PDF

Info

Publication number
CN214616480U
CN214616480U CN202120644397.3U CN202120644397U CN214616480U CN 214616480 U CN214616480 U CN 214616480U CN 202120644397 U CN202120644397 U CN 202120644397U CN 214616480 U CN214616480 U CN 214616480U
Authority
CN
China
Prior art keywords
water injection
pipe
oil
central pipe
injection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120644397.3U
Other languages
Chinese (zh)
Inventor
桂钦民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING DONGSHENG CENTURY TECHNOLOGY CO LTD
Original Assignee
BEIJING DONGSHENG CENTURY TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING DONGSHENG CENTURY TECHNOLOGY CO LTD filed Critical BEIJING DONGSHENG CENTURY TECHNOLOGY CO LTD
Priority to CN202120644397.3U priority Critical patent/CN214616480U/en
Application granted granted Critical
Publication of CN214616480U publication Critical patent/CN214616480U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The utility model relates to an oil field water injection well water injection layering multitube divides the water injection technical field, especially relates to an oil field water injection well water injection layering multitube divides water injection system. The system comprises an oil pipe, a sleeve, a central pipe, a plurality of packers, an underground multi-channel separate injection tool, a fixed pressure sleeve, a water injection well mouth and a ground separate injection system. The layered flow path is formed by annularly injecting an upper layer of a sleeve and an oil pipe, annularly injecting a middle layer of a central pipe, annularly injecting a lower layer of the oil pipe and the central pipe and separating the injected layers of the underground well by a packer. The water injection separate-layer injection allocation system of the oil field water injection well realizes the ground completion of the separate-layer water regulation amount, and saves the separate-layer testing time and cost; secondly, the problem that part of wells (large-slope horizontal wells) cannot be injected in a layered mode is solved; thirdly, the bottom pressure of the stratified injection well does not need to be tested; and fourthly, whether the layered downhole tool fails or not can be directly judged through the injection pressure of the three flow passages.

Description

Oil field water injection well water injection layering multitube divides water injection system
Technical Field
The utility model relates to an oil field water injection well water injection layering multitube divides annotates technical field, especially relates to an oil field water injection well water injection layering injection allocation system.
Background
At present, many oil fields at home and abroad are developed by water injection and enter a high-water-content later-stage subdivision exploitation stage in sequence, and the difficulty of stable exploitation is gradually increased. The conventional main measure is the water injection of the sub-layer, and the energy of the sub-layer is kept not excessive.
At present, the water injection and separate injection of an oil field water well mainly adopts an eccentric and hollow separate injection process, the two separate injection processes and a matched measurement and debugging process have respective advantages, but two common problems exist, namely the difficult allocation, especially for a low-permeability oil field, a large inclination and a horizontal well. The reason is that the fishing tool and the water distributor are difficult to butt joint due to scaling, oil return and flow and well deviation of the water injection well. Aiming at the problems, novel injection allocation and test systems are continuously developed in many domestic oil fields.
Disclosure of Invention
The utility model aims at providing an oil field water injection well water injection layering multitube divides system of annotating utilizes sleeve pipe, oil pipe, center tube and supporting well instrument, packer in the pit, realizes that sleeve pipe and oil pipe, oil pipe and center tube respectively annotate the one deck, and the water yield adjustment is accomplished on ground, has solved well layering test difficulty and some well and can not divide the branch and annotate the problem.
The utility model provides an oil field water injection well water injection layering multitube divides the injection system, including oil pipe, sleeve pipe, center tube, a plurality of packers, center tube insert head, tee bend and level pressure blast valve; the lower part of the central pipe is connected with a central pipe inserting head through screw threads, the central pipe is inserted into the tee joint from the inside of the oil pipe, and the central pipe inserting head is inserted into an inserting hole of the middle tee joint to form inserting seal; the upper end of the central pipe is connected with a central pipe flowmeter through a central pipe control valve; an annular flow passage between the oil pipe and the central pipe is connected with an annular flow passage flowmeter of the oil pipe and the central pipe through an annular flow passage control valve of the oil pipe and the central pipe; an annular flow passage between the casing and the oil pipe is connected with an annular flow passage flowmeter through the oil pipe and a casing annular flow passage control valve, and a plurality of packers are arranged in the casing; the constant pressure blasting valve is arranged at the bottom of the oil pipe.
The utility model provides an oil field water injection well water injection layering multitube divides water injection system, its advantage is:
the utility model discloses a water injection layering multitube separate injection system of oil field water injection well, firstly realized that the layering regulating pondage ground is accomplished, saved layering test time and expense; secondly, the problem that part of wells (large-slope horizontal wells) cannot be injected in a layered mode is solved; thirdly, the bottom pressure of the stratified injection well does not need to be tested; and fourthly, whether the layered downhole tool fails or not can be directly reflected by the ground injection pressure.
Drawings
Fig. 1 is the structure schematic diagram of the layered multi-pipe separate injection system for water injection of the oil field water injection well.
Fig. 2 is a schematic diagram showing the structure of a tee in the dispensing system shown in fig. 1.
Fig. 3 is a sectional view a-a of fig. 2.
In fig. 1-3, 1 is a central tube flowmeter, 2 is an oil tube and central tube annulus flow channel flowmeter, 3 is an oil tube and casing annulus flow channel flowmeter, 4 is a central tube control valve, 5 is an oil tube and central tube annulus flow channel control valve, 6 is an oil tube and casing annulus flow channel control valve, 7 is a water injection well head, 8 is a central tube, 9 is an oil tube, 10 is a casing, 11 is a water well injection layer, 12 is a packer, 13 is a central tube insert head, 13.1 is a seal ring, 14 is a tee, 14.1 is a tee-joint water flow lower layer flow channel, 14.2 is a central tube insert head insert hole, 14.3 is a tee-joint water flow middle layer flow channel, and 15 is a constant pressure blasting valve.
Detailed Description
The utility model provides an oil field water injection well water injection layering multitube divides water system of annotating, as the structure is shown in figure 1. The device is characterized by comprising an oil pipe 9, a casing 10, a central pipe 8, a plurality of packers 12, a central pipe inserting head 13, a tee joint 14 and a constant pressure blasting valve 15; the lower part of the central pipe 8 is connected with a central pipe inserting head 13 through screw threads, the central pipe 8 is descended into a tee 14 from the oil string 9, the central pipe inserting head 13 is inserted into an inserting hole 14.2 of the tee 14 to form inserting seal, and the structure of the tee 14 is shown in figures 2 and 3. The upper end of the central pipe 9 is connected with a central pipe flowmeter through a central pipe control valve 4; an annular flow channel between the oil pipe 9 and the central pipe 8 is connected with the oil pipe and central pipe annular flow channel flowmeter 2 through the oil pipe and central pipe annular flow channel control valve 5; an annular flow channel between the casing 10 and the oil pipe 9 is connected with an annular flow channel flowmeter 3 through an oil pipe and casing annular flow channel control valve 6, and a plurality of packers 12 are arranged in the casing 10; the constant pressure blasting valve 15 is arranged at the bottom of the oil pipe 9.
The following combination of the attached drawings introduces the utility model provides an oil field water injection well water injection layering multitube is divided and is annotated water system working process:
the construction steps are as follows: the oil pipe 9 is respectively connected with a constant pressure blasting valve 15, a plurality of packers 12 and a tee joint 14, and the oil pipe 9 is lowered to a designed and appointed position. The lower part of the central tube 8 is connected with a central tube inserting head 13 through screw threads, a sealing ring 13.1 is arranged in the central tube inserting head 13, the sealing ring 13.1 is used for sealing a movable sealing gap between the central tube inserting head 13 and a central tube inserting head inserting hole 14.2, the central tube 8 is inserted into a tee joint 14 from the inside of the oil tube 9, and the central tube inserting head 13 is inserted into the central tube inserting head inserting hole 14.2 to form insertion sealing. Well heads 7 of the water injection wells are well seated; high-pressure water is connected from an annular flow passage valve 5 between an oil pipe 9 and a central pipe 8 for pressurizing, so that a plurality of packer pipes 12 are sealed in an expanding way, and the purpose of interlayer packing between an upper water well injection layer 11, a middle water well injection layer and a lower water well injection layer 11 is achieved. And increasing the pressure to open the constant pressure blasting valve 15, and injecting the constant pressure blasting valve into the lowest layer flow passage as an annular space between the oil pipe 9 and the central pipe 8.
Firstly, according to the engineering design requirements, according to the construction steps, a downhole tubular column is put into the downhole tubular column, then a high-pressure pipeline for an oil field high-pressure water source is respectively connected into a central tube flow passage valve 4, a central tube control valve 5 of an annular flow passage between an oil tube 9 and a central tube 8 and an annular flow passage control valve 6 between the oil tube column 9 and a sleeve 10, and layered multi-tube separate injection water injection can be realized. The multi-pipe separate injection water flow channel is respectively a sleeve 10 and an upper layer (an upper water well injection layer 11) of annular injection of an oil pipe column 9; the central pipe 9 injects the middle layer, namely the middle well injection layer 11, through a three-way water flow middle layer flow channel 14.3 of a three-way 14; the tubing string 9 and the central tube 8 are injected into the lower water well injection layer 11 through a tee joint water flow lower flow passage 14.1 of a tee joint 14.
The flow meter 1 for layered water injection displays the central pipe 8, the flow meter 2 displays the annular space between the oil pipe column 9 and the central pipe 8, the flow meter 3 displays the flow of the annular flow channel between the oil pipe column 9 and the sleeve 10, and the flow valves 4, 5 and 6 can respectively control the flow of 3 flow channels, so that the precise layered water injection on the ground can be realized.

Claims (1)

1. A water injection layering multi-pipe separate injection system for an oil field water injection well is characterized by comprising an oil pipe, a sleeve, a central pipe, a plurality of packers, a central pipe inserting head, a tee joint and a constant pressure blasting valve; the lower part of the central pipe is connected with a central pipe inserting head through screw threads, the central pipe is inserted into the tee joint from the inside of the oil pipe, and the central pipe inserting head is inserted into an inserting hole of the middle tee joint to form inserting seal; the upper end of the central pipe is connected with a central pipe flowmeter through a central pipe control valve; an annular flow passage between the oil pipe and the central pipe is connected with an annular flow passage flowmeter of the oil pipe and the central pipe through an annular flow passage control valve of the oil pipe and the central pipe; an annular flow passage between the casing and the oil pipe is connected with an annular flow passage flowmeter through the oil pipe and a casing annular flow passage control valve, and a plurality of packers are arranged in the casing; the constant pressure blasting valve is arranged at the bottom of the oil pipe.
CN202120644397.3U 2021-03-30 2021-03-30 Oil field water injection well water injection layering multitube divides water injection system Active CN214616480U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120644397.3U CN214616480U (en) 2021-03-30 2021-03-30 Oil field water injection well water injection layering multitube divides water injection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120644397.3U CN214616480U (en) 2021-03-30 2021-03-30 Oil field water injection well water injection layering multitube divides water injection system

Publications (1)

Publication Number Publication Date
CN214616480U true CN214616480U (en) 2021-11-05

Family

ID=78398056

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120644397.3U Active CN214616480U (en) 2021-03-30 2021-03-30 Oil field water injection well water injection layering multitube divides water injection system

Country Status (1)

Country Link
CN (1) CN214616480U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114109329A (en) * 2021-12-01 2022-03-01 东北石油大学 Injection-production same-well device and injection-production same-well system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114109329A (en) * 2021-12-01 2022-03-01 东北石油大学 Injection-production same-well device and injection-production same-well system
CN114109329B (en) * 2021-12-01 2022-10-04 东北石油大学 Injection-production same-well device and injection-production same-well system

Similar Documents

Publication Publication Date Title
CN110107251B (en) Fracturing filling conversion tool
CN109681159B (en) Oil field multitube layering water injection string
CN202578589U (en) Multifunctional pipe column with well washing, testing and separate-layer profile control and flooding water injection functions
CN205349311U (en) Four tubs of layering water injection technology tubular columns
CN102230377A (en) Multifunctional gas lifting strata testing string
CN107701147A (en) A kind of annular pressure downhole control valve
CN214616480U (en) Oil field water injection well water injection layering multitube divides water injection system
CN102953716A (en) Parallel double-tube separate layer water injection string
CN206111126U (en) Close inserting of independent liquid accuse sliding sleeve formula
CN109707327A (en) Concentric double-tube separate injection pressurized operation string
CN105443092A (en) Four-tube layered water injection technology tubular column
CN103541700A (en) Reverse seal type eccentric water distributor
CN105317410A (en) Eccentric water distributor
CN110017133B (en) Method and device for testing output profile of horizontal well and plugging water
CN209892121U (en) Concentric double-tube separate injection pressurized operation string
CN102337872A (en) One-grade three-section integrated water distribution tubular column of horizontal well
CN202249997U (en) Parallel dual-tube separated layer water injection string
CN109681161B (en) Multi-layer quality-dividing and pressure-dividing water injection method and water injection pipe column
CN206874260U (en) Single tube post multitube separated-zone water infection oil field device
CN210370583U (en) Double-medium fine separate injection pipe column
CN210564497U (en) Horizontal well oil pipe cable-penetrating production and section testing device
CN205558881U (en) Bridge type layering water injection string
CN105672965B (en) A kind of bridge-type separate layer water injection string and its operating procedure
CN114856495A (en) Underground device for testing gas-water output profile of coal bed gas combined production well
CN107100587A (en) For the channeling test of cement sheath in Petroleum Production, water blockoff, test inside back cover unification process pipe string

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant