CN203795315U - High pier cable-stayed bridge No.0 block non-bracket construction structure - Google Patents
High pier cable-stayed bridge No.0 block non-bracket construction structure Download PDFInfo
- Publication number
- CN203795315U CN203795315U CN201420074988.1U CN201420074988U CN203795315U CN 203795315 U CN203795315 U CN 203795315U CN 201420074988 U CN201420074988 U CN 201420074988U CN 203795315 U CN203795315 U CN 203795315U
- Authority
- CN
- China
- Prior art keywords
- anchor
- spandrel girder
- bridge
- bearing
- stayed bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420074988.1U CN203795315U (en) | 2014-02-21 | 2014-02-21 | High pier cable-stayed bridge No.0 block non-bracket construction structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420074988.1U CN203795315U (en) | 2014-02-21 | 2014-02-21 | High pier cable-stayed bridge No.0 block non-bracket construction structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203795315U true CN203795315U (en) | 2014-08-27 |
Family
ID=51377544
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420074988.1U Withdrawn - After Issue CN203795315U (en) | 2014-02-21 | 2014-02-21 | High pier cable-stayed bridge No.0 block non-bracket construction structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203795315U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103835238A (en) * | 2014-02-21 | 2014-06-04 | 中铁大桥局股份有限公司 | High-pier cable-stayed bridge zero-number block non-bracket construction method and structure in construction process |
CN105839541A (en) * | 2016-04-29 | 2016-08-10 | 贵州桥梁建设集团有限责任公司 | Construction method for rigid frame bridge No.0 section non-welding support and structure |
CN105839538A (en) * | 2016-04-29 | 2016-08-10 | 贵州桥梁建设集团有限责任公司 | Construction method and structure for rigid frame bridge cast-in-situ section non-welded support |
CN111663379A (en) * | 2020-06-08 | 2020-09-15 | 中国五冶集团有限公司 | Track beam mounting device and mounting method thereof |
CN118186909A (en) * | 2024-01-04 | 2024-06-14 | 中铁广州工程局集团有限公司 | Cable-stayed bridge section construction device adopting temporary cables and construction method thereof |
-
2014
- 2014-02-21 CN CN201420074988.1U patent/CN203795315U/en not_active Withdrawn - After Issue
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103835238A (en) * | 2014-02-21 | 2014-06-04 | 中铁大桥局股份有限公司 | High-pier cable-stayed bridge zero-number block non-bracket construction method and structure in construction process |
CN103835238B (en) * | 2014-02-21 | 2015-11-18 | 中铁大桥局集团有限公司 | A kind of high pier cable stayed bridge No. 0 block non-stand construction method and the structure in constructing |
CN105839541A (en) * | 2016-04-29 | 2016-08-10 | 贵州桥梁建设集团有限责任公司 | Construction method for rigid frame bridge No.0 section non-welding support and structure |
CN105839538A (en) * | 2016-04-29 | 2016-08-10 | 贵州桥梁建设集团有限责任公司 | Construction method and structure for rigid frame bridge cast-in-situ section non-welded support |
CN111663379A (en) * | 2020-06-08 | 2020-09-15 | 中国五冶集团有限公司 | Track beam mounting device and mounting method thereof |
CN118186909A (en) * | 2024-01-04 | 2024-06-14 | 中铁广州工程局集团有限公司 | Cable-stayed bridge section construction device adopting temporary cables and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102108676B (en) | Arch bridge construction method for combined beam-steel arch combined system | |
CN203904851U (en) | Continuous beam side span straight section hanger support system | |
CN106702910A (en) | Main girder construction process for extradosed cable-stayed bridge with double towers and double cable planes | |
CN203795315U (en) | High pier cable-stayed bridge No.0 block non-bracket construction structure | |
CN103669226B (en) | River-crossing prestressed concrete continuous beam bridge box girder 0# block support construction method | |
KR20140084107A (en) | Self-Launching Movable Scaffolding System | |
CN104005338A (en) | Three-directional temporary tower and girder consolidation structure of large-span cable-stayed bridge | |
CN101781878A (en) | Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof | |
CN106522112A (en) | Cable-stayed bridge side span beam section erecting system and method thereof | |
CN107905114A (en) | A kind of construction method of large span Successive interference cancellation | |
CN105568870A (en) | Triangle hanging basket suspended casting device used for overpass bridge construction and construction method thereof | |
CN104805769B (en) | A kind of self-balancing arc beam cast-in-place support and construction method thereof | |
CN105714692A (en) | Cast-in-cantilever beam concrete filled steel tube temporary concretion system | |
CN112726411B (en) | Integral dragging construction method for single-hole large cantilever steel truss girder | |
CN103835238B (en) | A kind of high pier cable stayed bridge No. 0 block non-stand construction method and the structure in constructing | |
CN211472207U (en) | Suspension beam system for hoisting prefabricated section box girder | |
CN103306206A (en) | Reinforcing steel formwork supporting rack for thin-walled hollow high pier and construction method | |
CN207998792U (en) | A kind of Hanging Basket rack mounting structure | |
CN110983987B (en) | Construction method of steel-concrete combined beam | |
CN205242278U (en) | A triangle string basket method is hanged and is watered device for deck bridge construction | |
CN203866711U (en) | Large span cable-stayed bridge tower beam three-way temporary consolidation structure | |
CN110820565A (en) | Suspended casting method for corrugated steel web hanging basket | |
CN207987749U (en) | Ride cable-styled erection crane | |
CN102926330B (en) | Installation method of hanging basket suitable for bridge construction | |
CN203654200U (en) | No. 0 block support for box girder of river-crossing prestressed concrete continuous beam bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD. Effective date: 20150302 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 430074 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE |
|
TR01 | Transfer of patent right |
Effective date of registration: 20150302 Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No. Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau Address before: 430074 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road SBI Venture Street No. 6 Building 12 layer Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd. |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20140827 Effective date of abandoning: 20151118 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |