CN203531348U CN201320660541.8U CN201320660541U CN203531348U CN 203531348 U CN203531348 U CN 203531348U CN 201320660541 U CN201320660541 U CN 201320660541U CN 203531348 U CN203531348 U CN 203531348U
Authority
CN
China
Prior art keywords
elevator
type steel
construction
support beam
support body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320660541.8U
Other languages
Chinese (zh)
Inventor
燕利珍
石立国
祝方平
程俊人
罗淳
马文浩
朱俊成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201320660541.8U priority Critical patent/CN203531348U/en
Application granted granted Critical
Publication of CN203531348U publication Critical patent/CN203531348U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The utility model provides a self-stability elevartor shaft construction handling frame, which comprises a frame body, the bottom sprag of support body, the people's board in the construction on lumber skid and the lumber skid, the bottom sprag is the shaped steel supporting beam of branch locating elevator room portal both sides, shaped steel supporting beam's one end penetrates in the shear force wall of elevator well reserves the hole, and reserve the outside of hole through hugging closely the shear force wall, weld in the horizontal locating part of shaped steel supporting beam both sides and carry out horizontal fixed, the other end is taken and is established on elevator room gate floor, and carry out vertical fixed through pre-buried anchor assembly in elevator room portal floor, there is one row of pole setting limiting reinforcement with the pole setting one-to-one along shaped steel supporting beam's last skin weld, the bottom cover of pole setting is in the outside of pole setting limiting reinforcement, the both ends of horizontal longitudinal beam are through the inner wall fixed connection of adjustable top support with elevator well, the utility model provides a stability and factor of All are low and the like.

Description

Self-stability construction of lift well handling frame
Technical field
The utility model relates to a kind of constructing operation frame of Core Walls Structure elevator shaft.
Background technology
Present stage, all kinds of high residential buildings were all designed to elevator shaft core wall structure, elevator shaft Core Walls Structure needs to set up special operation support body so that workman operates in construction, existing construction of lift well handling frame adopts full scaffolding steel pipe to set up substantially, the springboard of constructing operation layer is laid on operation layer steel pipe, and mobility and the convenience of its bottom stability and safety factor and handling frame integral body are all lower.
Utility model content
The purpose of this utility model is to provide a kind of self-stability construction of lift well handling frame, solve all technical problems such as lower of the stability of existing construction of lift well handling frame bottom and the mobility of safety factor and handling frame integral body and convenience.
For achieving the above object, the utility model adopts following technical scheme:
A kind of self-stability construction of lift well handling frame, be arranged in elevator hoistways, comprise support body, the bottom support of support body and people's plate in a plurality of parallel chock of longitudinally laying on the support body adjacent with construction layer and the construction on chock, described support body is by vertical rod, horizontal longitudinal rod, horizontal cross bar and bridging interconnect and form, doorway, elevator hall floor and the shear wall of elevator hoistways are oppositely arranged, described bottom support is the type steel support beam that is divided into both sides, doorway, elevator hall, one end of described type steel support beam penetrates in the shear wall reserving hole of elevator hoistways, and by being close to the outside of shear wall reserving hole, the Horizontal limiting part that is welded in type steel support beam both sides carries out the fixing of horizontal cross, the other end is set up on the floor of doorway, elevator hall, and carry out vertical fixing by anchoring piece pre-buried in the floor of doorway, elevator hall,
Along the upper surface of type steel support beam, be welded with a row and vertical rod vertical rod limit steel bar one to one, the bottom of vertical rod is enclosed within the outside of vertical rod limit steel bar, support body is stood on type steel support beam, the two ends of described horizontal longitudinal rod are fixedly connected with the inwall of elevator hoistways by adjustable jack, and the height of described scaffold support body is the story height of two to three layers.
Described anchoring piece is the Ω shape being formed by whole bar bending, and its foot anchors in the floor of doorway, elevator hall and is integrated with floor bar colligation, and described type steel support beam penetrates the arch of anchoring piece, and by timber wedge by space jam-pack between the two.
Described type steel support beam is i iron or H shaped steel.
Described Horizontal limiting part is shaped steel or bar dowel.
Compared with prior art the utlity model has following characteristics and beneficial effect:
The utility model adopts type steel support beam as the base of scaffold support body, type steel support beam two ends be individually fixed on doorway, elevator hall and the shear wall reserving hole of elevator hoistways in, by anchoring piece pre-buried in the floor of doorway, elevator hall and the Horizontal limiting part being welded on type steel support beam, limit its displacement, base supporting capacity is strong, and safety factor is high; The bottom of the vertical rod of scaffold support body is enclosed within on the vertical rod limit steel bar of welding in advance, accurate positioning, and horizontal cross bar is fixedly connected with the inwall of elevator hoistways, and the whole accurate positioning of scaffold support body, is connected firmly with type steel support beam base, and overall structure is stable.
The height control of scaffold support body of the present utility model is the story height of two to three layers, facilitates the Integral lifting of tower crane to constructing operation frame, and mobility is higher, and it is convenient to promote.
The utility model is set up process and is drawn materials conveniently, all belong to on-the-spot common general material, cheap, easy to make, easy to use, stability is better, all members all can have enough to meet the need use, cut down expenses, and have effectively solved the unstability of operating platform when construction elevator well Core Walls Structure, safety, can be widely used in the elevator shaft Core Walls Structure construction of similar high residential building.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in more detail.
Fig. 1 is the plan structure schematic diagram of the utility model construction layer.
Fig. 2 is A-A cross-sectional view in Fig. 1.
Fig. 3 is the structure for amplifying schematic diagram of B in Fig. 2.
Fig. 4 is the syndeton schematic diagram of the utility model Shaped Steel brace summer and doorway, elevator hall floor.
Fig. 5 is the syndeton schematic diagram of the utility model Shaped Steel brace summer and shear wall reserving hole.
Fig. 6 is the vertical rod limit steel bar of the utility model Shaped Steel brace summer upside and the structural representation of vertical rod.
Reference numeral: 1-elevator hoistways, 2-support body, 2.1-montant, 2.2-horizontal cross bar, the horizontal longitudinal rod of 2.3-, 2.4-bridging, 3-type steel support beam, 4-shear wall reserving hole, 5-elevator hall doorway floor, 5.1-floor bar, doorway, 6-elevator hall, 7-anchoring piece, 7.1-foot, 7.2-arch, 8-Horizontal limiting part, 9-vertical rod limit steel bar, 10-adjustable jack, 11-timber wedge, 12-chock, people's plate in 13-construction, 14-shear wall, the close order safety net of 15-.
The specific embodiment
Embodiment is referring to shown in Fig. 1~2, and a kind of self-stability construction of lift well handling frame, is arranged in elevator hoistways 1, and construction of lift well handling frame floor map is as follows:
Comprise support body 2, the bottom support of support body and people's plate 13 in a plurality of parallel chock 12 of longitudinally laying on the support body adjacent with construction layer and the construction on chock, described support body 2 is by vertical rod 2.1, horizontal longitudinal rod 2.3, horizontal cross bar 2.2 and bridging 2.4 interconnect and form, doorway, elevator hall floor 5 and the shear wall 14 of elevator hoistways are oppositely arranged, described bottom support is the type steel support beam 3 that is divided into 6 both sides, doorway, elevator hall, shown in Fig. 3 and Fig. 5, one end of described type steel support beam 3 penetrates in the shear wall reserving hole 4 of elevator hoistways, and by being close to the outside of shear wall reserving hole 4, the Horizontal limiting part 8 that is welded in type steel support beam 3 both sides carries out the fixing of horizontal cross, guarantee the resistance to overturning of support body and type steel support beam, shown in Fig. 3~4, the other end is set up on doorway, elevator hall floor 5, and carry out vertical fixing by the interior pre-buried anchoring piece 7 of doorway, elevator hall floor 5,
Shown in Fig. 3 and Fig. 6, along the upper surface of type steel support beam 3, be welded with a row and vertical rod 2.1 vertical rod limit steel bar 9 one to one, the bottom of vertical rod 2.1 is enclosed within the outside of vertical rod limit steel bar 9, support body 2 is stood on type steel support beam 3, shown in Figure 2, the two ends of described horizontal longitudinal rod 2.3 are fixedly connected with the inwall of elevator hoistways 1 by adjustable jack 10, and the height of described scaffold support body 2 is the story height of two to three layers.
Shown in Figure 4, described anchoring piece 7 is the Ω shapes that formed by whole bar bending, its foot 7.1 anchors in doorway, elevator hall floor 5 and is integrated with floor bar 5.1 colligations, described type steel support beam 3 penetrates the arch 7.2 of anchoring piece 7, and passes through timber wedge (11) by space jam-pack between the two.Described type steel support beam 3 is i iron or H shaped steel.Described Horizontal limiting part 8 is shaped steel or bar dowel.
Headroom size 2200mm * 2100mm in elevator hoistways in the present embodiment, doorway, elevator hall is of a size of 1100mm, and typical floor floor height is 3000mm.According to tunnel dimension, vertical pole ' s span is 1000mm to the maximum, and the step pitch of the horizontal longitudinal rod of horizontal direction and horizontal cross bar is 1500mm, and construction layer also adopts the sealing of template flitch hard.Constructing operation support body is set up with structure construction, and scaffolding height must not surpass 10m, the i.e. story height of two to three layers.All material all can have enough to meet the need use.
Type steel support beam can be selected hot rolling i iron No. 16, and the allowable variation of its size, profile and weight should meet the requirement that < < heat is pricked shaped steel > > (GB/T 706-2008).
Support body can adopt design of coupler scaffold, can adopt diameter is Φ 48, wall thickness is that the steel pipe of 3.6mm is set up, step pitch 1.5m, steel pipe material should meet the relevant regulations of < < structural carbon steel > > (GB700-2006), the phenomenons such as steel tube head otch is concordant, nothing bending, distortion, corrosion, crack.Wherein fastener requires to have product certificate and product quality proves, quality must meet the requirements, and the shell of fastener must not have crackle, bubble, and shank of bolt must not have fracture of wire, stripped thread phenomenon, and intensity must meet the requirement of bearing capacity.
In described construction, people's plate thickness can be 50mm, width >=200mm, require the consistency of thickness of the upper people's plate of construction, chock adopts the flitch of 50mm * 100mm, the spacing of flitch is 200mm, in construction, people's plate and chock are all without fracture, warpage, small holes caused by worms, the quality problems such as rot, and the material of marching into the arena should have the related datas such as the quality certification, and should be in the qualified rear use of site acceptance.
Described anchoring piece can adopt the reinforcing bar that one-level steel diameter is 20mm.Described Horizontal limiting part can adopt the limit steel bar head of grade III steel diameter 20mm,
Of the present utility model setting up in process should be noted:
One,, after floorslab concrete reaches intensity, can lay shaped steel brace summer, and then carry out setting up of scaffold on type steel support beam.
Two, bridging is synchronizeed and is set up with vertical rod, the horizontal longitudinal rod of horizontal direction and horizontal cross bar, arranges continuously outside on the whole length of side elevation and height, and with ground angle 45-60 °, per pass bridging is crossed over 2 vertical rods.Lower road bridging and upper track bridging should overlap.
Three, scaffold operation layer should completely spread the upper people's plate of construction, also answers pocket close order safety net 15 together under lower floor's operation layer, and close order safety net should meet instructions for use, must not have the phenomenon of tearing.
Four, after this stages operating frame is finished using, need handling frame be adjusted to top board with tower crane, forward upper strata week to and use.

Claims (4)

1. a self-stability construction of lift well handling frame, be arranged in elevator hoistways (1), comprise support body (2), the bottom support of support body and people's plate (13) in a plurality of parallel chock (12) of longitudinally laying on the support body adjacent with construction layer and the construction on chock, described support body (2) is by vertical rod (2.1), horizontal longitudinal rod (2.3), horizontal cross bar (2.2) and bridging (2.4) interconnect and form, doorway, elevator hall floor (5) and the shear wall (14) of elevator hoistways are oppositely arranged, it is characterized in that: described bottom support is the type steel support beam (3) that is divided into both sides, doorway, elevator hall (6), one end of described type steel support beam (3) penetrates in the shear wall reserving hole (4) of elevator hoistways, and by being close to the outside of shear wall reserving hole (4), the Horizontal limiting part (8) that is welded in type steel support beam (3) both sides carries out the fixing of horizontal cross, the other end is set up on doorway, elevator hall floor (5), and carry out vertical fixing by pre-buried anchoring piece (7) in doorway, elevator hall floor (5),
Along the upper surface of type steel support beam (3), be welded with a row and vertical rod (2.1) vertical rod limit steel bar (9) one to one, the bottom of vertical rod (2.1) is enclosed within the outside of vertical rod limit steel bar (9), support body (2) is stood on type steel support beam (3), the two ends of described horizontal longitudinal rod (2.3) are fixedly connected with the inwall of elevator hoistways (1) by adjustable jack (10), and the height of described support body (2) is the story height of two to three layers.
2. self-stability construction of lift well handling frame according to claim 1, it is characterized in that: described anchoring piece (7) is the Ω shape being formed by whole bar bending, its foot (7.1) anchors in doorway, elevator hall floor (5) and is integrated with floor bar (5.1) colligation, described type steel support beam (3) penetrates the arch (7.2) of anchoring piece (7), and passes through timber wedge (11) by space jam-pack between the two.
3. self-stability construction of lift well handling frame according to claim 1 and 2, is characterized in that: described type steel support beam (3) is i iron or H shaped steel.
4. self-stability construction of lift well handling frame according to claim 1, is characterized in that: described Horizontal limiting part (8) is shaped steel or bar dowel.
CN201320660541.8U 2013-10-25 2013-10-25 Self-stability elevator shaft construction operation frame Expired - Fee Related CN203531348U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320660541.8U CN203531348U (en) 2013-10-25 2013-10-25 Self-stability elevator shaft construction operation frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320660541.8U CN203531348U (en) 2013-10-25 2013-10-25 Self-stability elevator shaft construction operation frame

Publications (1)

Publication Number Publication Date
CN203531348U true CN203531348U (en) 2014-04-09

Family

ID=50417572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320660541.8U Expired - Fee Related CN203531348U (en) 2013-10-25 2013-10-25 Self-stability elevator shaft construction operation frame

Country Status (1)

Country Link
CN (1) CN203531348U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114876174A (en) * 2022-05-29 2022-08-09 中国五冶集团有限公司 Construction method of open-hole-free well way bearing beam
CN114961210A (en) * 2022-05-29 2022-08-30 中国五冶集团有限公司 Detachable elevator well construction and protection platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114876174A (en) * 2022-05-29 2022-08-09 中国五冶集团有限公司 Construction method of open-hole-free well way bearing beam
CN114961210A (en) * 2022-05-29 2022-08-30 中国五冶集团有限公司 Detachable elevator well construction and protection platform

Similar Documents

Publication Publication Date Title
US9016025B2 (en) Constructing method for concrete cylinder of construction steel bar of high-rise steel structure
CN203891443U (en) Shear wall elevator shaftway assembly type operation platform
CN205025074U (en) Elevator well steel bracing promotes double -deck scaffold operation platform of formula
CN201818051U (en) Supporting frame for overhanging mold plate
CN107435335A (en) Brick retaining wall steel bar girder hardened system and method on foundation pit enclosure top beam
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN203531348U (en) Self-stability elevator shaft construction operation frame
CN106284366A (en) External pulling type Larsen steel sheet pile reinforcement means
CN214883827U (en) Construction elevator foundation support system device that encorbelments
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN103967332B (en) The construction method of a kind of building site enclosing
CN205839721U (en) A kind of novel offshore platform
CN112431407A (en) Construction method for formwork of building main body cantilever structure
CN109356190B (en) Lattice column type pier concrete tower crane foundation and construction method thereof
CN208280143U (en) A kind of Two bors d&#39;s oeuveres channel steel upright post
CN207244633U (en) Brick retaining wall steel bar girder hardened system on foundation pit enclosure top beam
CN106193101A (en) Tower crane steel platform pile foundation and construction method thereof
CN207686147U (en) Floor and double steel bar protective layer thickness control device
CN206174441U (en) Elevator shaft operation platform
CN212773587U (en) Novel detachable horizontal entrance to a cave protection instrument
CN203924655U (en) Novel elevator shaft operating platform frame
CN114856248A (en) Corridor type safety channel applied to sloping type deep foundation pit and construction method
CN114482624A (en) Back-jacking supporting system for structural slab conversion operation platform and construction method thereof
CN203783108U (en) Movable lifting bracket for elevator shaft
CN206070554U (en) Tower crane steel platform pile foundation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140409

Termination date: 20141025