CN203217005U - Converter transformer no-load test schematic wiring diagram - Google Patents
Converter transformer no-load test schematic wiring diagram Download PDFInfo
- Publication number
- CN203217005U CN203217005U CN 201320091237 CN201320091237U CN203217005U CN 203217005 U CN203217005 U CN 203217005U CN 201320091237 CN201320091237 CN 201320091237 CN 201320091237 U CN201320091237 U CN 201320091237U CN 203217005 U CN203217005 U CN 203217005U
- Authority
- CN
- China
- Prior art keywords
- transformer
- power
- converter
- generator
- test
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Ac-Ac Conversion (AREA)
Abstract
The utility model relates to a converter transformer no-load test schematic wiring diagram, which is characterized by comprising a power frequency generator set, a support transformer, a converter transformer, a generator used standard current transformer, a generator used standard voltage transformer, a power analyzer used standard current transformer, a power analyzer used standard voltage transformer and a power analyzer. According to the system provided by the utility model, the support transformer is used to replace an intermediate transformer, and output voltage of the generator is boosted through the support transformer and directly applied to a valve side winding of the converter transformer. A test tap specially designed for test items such as no-load, inductive voltage and the like of the converter transformer in the past is removed, thereby simplifying the structure of the converter transformer, reducing the cost, and improving the running reliability of the converter transformer. The system provided by the utility model is simple in test circuit, convenient to operate and high in accuracy, and can avoid designing a test sleeve on the tested converter transformer.
Description
Technical field
The utility model relates to a kind of converter power transformer no-load test key wiring diagram.
Background technology
Development along with D.C. high voltage transmission, ± 800kV transmission of electricity has now become the main DC transmission system of China, used in ± 800kV the DC transmission system ± 200kV(LD), ± 400kV(LY), ± 600kV(HD) and ± 800kV(HY) converter power transformer of four kinds of specifications, net side winding line end is typically connected to and exchanges the 500kV electrical network, after being connected, two 12 pulse wave current transformers of valve side winding line end and series connection are connected to ± 800kV level dc bus, as shown in Figure 1.As everyone knows, at same institute current conversion station, the interchange rated line voltage of the valve winding in converter transformer of these four kinds of specifications is identical, they be the principle that adopt to support with rectification after output dc voltage be lifted to ± 800kV.By contrasting as can be seen valve winding in converter transformer rated line voltage higher relatively (seeing Table 1) with conventional AC transformer low-pressure side rated line voltage; It is reported current domestic transformer production producer, the intermediate transformer that directly links to each other with genset in the testing station is in order to satisfy the needs of other pilot project or other products test simultaneously, as load test, temperature rise test, conventional AC power transformer pilot project etc., its electric pressure is up to 110kV usually; When the valve side winding of converter power transformer is that D is when connecing, so can not directly carry out zero load, induced voltage test etc. to it.In the past, during the converter power transformer design, from voltage regulation coil, draw a test tap usually, and extract this test problem of solution by test casing from the fuel tank sidewall.But because the existence of test casing, converter power transformer produce, occurred during operation that pin configuration complexity, vacuum oil technology are difficult for guaranteeing, breakthrough increases, easily cause shelf depreciation, a series of accessory problems such as dismounting complex process.
Summary of the invention
In order to remedy the deficiencies in the prior art, the utility model provides that a kind of test circuit is simple, easy to operate, accuracy is high, can avoid the converter power transformer no-load test key wiring diagram of design experiment sleeve pipe on converter power transformer.
The utility model is achieved by the following technical solution:
A kind of converter power transformer no-load test key wiring diagram is characterized in that: comprise power frequency genset, support transformer, converter power transformer, generator standard current transformer, generator standard potential transformer, power analyzer standard current transformer, power analyzer standard potential transformer and power analyzer; The output terminal of described power frequency genset is connected with the support step down side with standard potential transformer with standard current transformer, generator by generator; The high-voltage output end that supports transformer is connected with the valve side winding of converter power transformer with standard potential transformer with standard current transformer, power analyzer by power analyzer, and requires the net side of converter power transformer and the tail end of valve side winding to be connected back ground connection with shell; Again power analyzer is linked together with output terminal and the power analyzer of standard potential transformer with standard current transformer, power analyzer at last.
The beneficial effects of the utility model are: native system replaces intermediate transformer with supporting transformer, and the output voltage of generator is applied directly on the valve side winding of converter power transformer after transformer raises by supporting.Remove special test tap for the design of pilot projects such as converter power transformer zero load, induced voltage in the past, and then simplified the structure of converter power transformer, reduced cost, improved the operational reliability of converter power transformer.The native system test circuit is simple, easy to operate, accuracy is high, can avoid design experiment sleeve pipe on converter power transformer (test specimen).Be applicable to 110kV and above single-phase AC electric power transformer and ± pilot projects such as the single-phase converter power transformer zero load of 800kV, induced voltage.
Description of drawings
Below in conjunction with accompanying drawing the utility model is further described.
Fig. 1 is two 12 pulse wave current transformer cascade systems converter power transformer connection principle synoptic diagram;
Fig. 2 is traditional converter power transformer no-load test wiring diagram;
Fig. 3 is the utility model converter power transformer no-load test key wiring diagram;
Among the figure, 1 power frequency genset, 2 intermediate transformers, 3 converter power transformers, 4 test taps, 5 generator standard current transformers, 6 generator standard potential transformers, 7 power analyzer standard current transformers, 8 power analyzer standard potential transformers, 9 power analyzers, 10 support transformer, 11 500kv AC network, 12+800kv level bus, 13 neutral buses, 14-800kv level bus.
Embodiment
Accompanying drawing 3 is a kind of specific embodiment of the present utility model.This embodiment is a kind of converter power transformer no-load test circuit, it is characterized in that: comprise power frequency genset 1, support transformer 10, converter power transformer 3, generator standard current transformer 5, generator standard potential transformer 6, power analyzer standard current transformer 7, power analyzer standard potential transformer 8 and power analyzer 9; The output terminal of described power frequency genset 1 is connected with support transformer 10 low-voltage outputs with standard potential transformer 6 with standard current transformer 5, generator by generator; The high-voltage output end that supports transformer 10 is connected with the valve side winding of converter power transformer 3 with standard potential transformer 8 with standard current transformer 7, power analyzer by power analyzer, and the tail end of the net side of converter power transformer 3 and valve side winding is connected the back and joins with the earth with shell; Power analyzer links to each other with power analyzer 9 with the output terminal of standard potential transformer 8 with standard current transformer 7, power analyzer.
No-load test system principle wiring diagram of the present utility model, as shown in Figure 3.At first the output terminal with power frequency genset 1 links together with standard potential transformer 6 and the low-pressure side that supports transformer 10 with standard current transformer 5, generator by generator; Then the high-pressure side with converter power transformer 3 links together with the valve side winding of standard potential transformer 8 with standard current transformer 7, power analyzer by power analyzer, and the tail end of net side and valve side winding is connected back ground connection with converter power transformer 3 shells; At last power analyzer is connected with power analyzer 9 with the output terminal of standard potential transformer 8 with standard current transformer 7, power analyzer.
The utility model replaces intermediate transformers 2 with supporting transformer 10, and the output voltage of generator is applied directly on the valve side winding of converter power transformer 3 after transformer 10 raises by supporting.Remove special test tap 4 for the design of pilot projects such as converter power transformer zero load, induced voltage in the past, and then simplified the structure of converter power transformer 3, reduced cost, improved the operational reliability of converter power transformer 3.The utility model converter power transformer no-load test system, test circuit is simple, easy to operate, accuracy of measurement is high, can avoid a kind of converter power transformer no-load test scheme wiring diagram of design experiment sleeve pipe on converter power transformer.Adopt this no-load test key wiring diagram, on ± 800kV converter power transformer product, just needn't design the interim trial sleeve pipe again; Otherwise need to utilize a tap of pressure regulation winding, and make Control of Voltage between this tap and the coil neutral point below 60kV.The test tap comprises test casing, tap is drawn lead-in wire, structure, insulation, web member etc.Be applicable to 110kV and above single-phase AC electric power transformer and ± pilot projects such as the single-phase converter power transformer zero load of 800kV, induced voltage.
Claims (1)
1. a converter power transformer no-load test key wiring diagram is characterized in that: comprise power frequency genset (1), support transformer (10), converter power transformer (3), generator standard current transformer (5), generator standard potential transformer (6), power analyzer standard current transformer (7), power analyzer standard potential transformer (8) and power analyzer (9); The output terminal of described power frequency genset (1) is connected with support transformer (10) low-pressure side with standard potential transformer (6) with standard current transformer (5), generator by generator; The high-voltage output end that supports transformer (10) is connected with the valve side winding of converter power transformer (3) with standard potential transformer (8) with standard current transformer (7), power analyzer by power analyzer, and the tail end of the net side of converter power transformer (3) and valve side winding is connected back ground connection with shell; Power analyzer is connected with power analyzer (9) with the output terminal of standard potential transformer (8) with standard current transformer (7), power analyzer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320091237 CN203217005U (en) | 2013-02-28 | 2013-02-28 | Converter transformer no-load test schematic wiring diagram |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320091237 CN203217005U (en) | 2013-02-28 | 2013-02-28 | Converter transformer no-load test schematic wiring diagram |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203217005U true CN203217005U (en) | 2013-09-25 |
Family
ID=49206530
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320091237 Expired - Lifetime CN203217005U (en) | 2013-02-28 | 2013-02-28 | Converter transformer no-load test schematic wiring diagram |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203217005U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104122467A (en) * | 2014-07-22 | 2014-10-29 | 安徽正果电气技术有限公司 | Transformer simulation no-load testing device |
CN105004954A (en) * | 2015-07-21 | 2015-10-28 | 西南交通大学 | Converting device for no-load loss monitoring of auto transformer specially for AT power supply |
CN105044479A (en) * | 2015-01-30 | 2015-11-11 | 国网河南省电力公司电力科学研究院 | Apparatus for large-scale oil-immersed transformer no-load and on-load comprehensive tests and method |
CN106526433A (en) * | 2016-09-20 | 2017-03-22 | 海南电力技术研究院 | Transformer current waveform feature testing method and device |
CN108169592A (en) * | 2017-12-15 | 2018-06-15 | 成都信息工程大学 | A kind of Intelligent detection circuit and intelligent detecting method |
CN111103516A (en) * | 2019-12-24 | 2020-05-05 | 保定天威保变电气股份有限公司 | Partial discharge test method for single-phase traction transformer |
CN112051525A (en) * | 2020-07-10 | 2020-12-08 | 国家电网有限公司 | Transformer demagnetization analyzer and demagnetization analysis method |
CN113253022A (en) * | 2021-04-30 | 2021-08-13 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Testing device and method for internal transient voltage transmission rule of extra-high voltage converter transformer |
-
2013
- 2013-02-28 CN CN 201320091237 patent/CN203217005U/en not_active Expired - Lifetime
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104122467A (en) * | 2014-07-22 | 2014-10-29 | 安徽正果电气技术有限公司 | Transformer simulation no-load testing device |
CN105044479A (en) * | 2015-01-30 | 2015-11-11 | 国网河南省电力公司电力科学研究院 | Apparatus for large-scale oil-immersed transformer no-load and on-load comprehensive tests and method |
CN105004954A (en) * | 2015-07-21 | 2015-10-28 | 西南交通大学 | Converting device for no-load loss monitoring of auto transformer specially for AT power supply |
CN105004954B (en) * | 2015-07-21 | 2017-11-14 | 西南交通大学 | A kind of conversion equipment of the open circuit loss monitoring of AT power supplies special-purpose autotransformer |
CN106526433A (en) * | 2016-09-20 | 2017-03-22 | 海南电力技术研究院 | Transformer current waveform feature testing method and device |
CN106526433B (en) * | 2016-09-20 | 2019-05-21 | 海南电网有限责任公司电力科学研究院 | Transformer current wave character test method and device |
CN108169592A (en) * | 2017-12-15 | 2018-06-15 | 成都信息工程大学 | A kind of Intelligent detection circuit and intelligent detecting method |
CN108169592B (en) * | 2017-12-15 | 2023-11-24 | 西安智财全技术转移中心有限公司 | Intelligent detection circuit and intelligent detection method |
CN111103516A (en) * | 2019-12-24 | 2020-05-05 | 保定天威保变电气股份有限公司 | Partial discharge test method for single-phase traction transformer |
CN112051525A (en) * | 2020-07-10 | 2020-12-08 | 国家电网有限公司 | Transformer demagnetization analyzer and demagnetization analysis method |
CN113253022A (en) * | 2021-04-30 | 2021-08-13 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | Testing device and method for internal transient voltage transmission rule of extra-high voltage converter transformer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203217005U (en) | Converter transformer no-load test schematic wiring diagram | |
CN101788636B (en) | Resonance voltage resistant test system and voltage resistant test method of sample with large capacitance | |
CN103884933B (en) | A kind of high-power transformer temperature-raising experimental method | |
CN102338844B (en) | Method for performing on-site partial discharge test on ultrahigh voltage converter transformer | |
CN104253412A (en) | YNd11 transformer longitudinal differential protection current phase compensation method | |
CN104808022A (en) | Temperature rise test connection method for three-side combined operation of three-phase three-winding transformer | |
CN204807663U (en) | Be applied to alternating current -direct current conversion equipment of withstand voltage test | |
CN104167715A (en) | YNd5 transformer longitudinal differential protection current phase compensation method | |
CN201464604U (en) | Partial discharge test device for potable dry power transformer | |
CN107037333B (en) | Wiring structure for partial discharge test of low-voltage side double-winding transformer | |
CN107860994B (en) | Offshore full-power water-cooling converter test platform | |
CN206920546U (en) | A kind of wiring construction of low-pressure side two-winding transformer partial discharge test | |
CN104793116A (en) | Voltage withstand test device for large-capacity equipment | |
CN104184121A (en) | YNd9 transformer longitudinal differential protection current phase compensation method | |
CN104242241A (en) | YNd1 transformer longitudinal differential protection current phase compensation method | |
CN204405793U (en) | AC extra high voltage main transformer modulation associating partial discharge test system | |
CN204613387U (en) | For the electric supply installation that current transformer detects | |
CN103258626A (en) | Two-winding testing transformer self-coupling wiring method and application thereof | |
CN202395664U (en) | Frequency-tripling power supply generating device | |
CN201673778U (en) | Multifunctional testing transformer | |
CN203104222U (en) | Single/three phase conversion device for synchronous generator | |
CN204556779U (en) | High capacitance equipment Withstand test device | |
CN203300404U (en) | One-piece three-phase combination standard potential transformer | |
CN204241636U (en) | A kind of industrial frequency AC Withstand test device | |
CN105158618A (en) | Multifunctional test platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PP01 | Preservation of patent right |
Effective date of registration: 20200806 Granted publication date: 20130925 |
|
PP01 | Preservation of patent right | ||
PD01 | Discharge of preservation of patent |
Date of cancellation: 20200821 Granted publication date: 20130925 |
|
PD01 | Discharge of preservation of patent | ||
CX01 | Expiry of patent term |
Granted publication date: 20130925 |
|
CX01 | Expiry of patent term |