CN202936725U - Double-rectangular columnar pier of high-speed rail - Google Patents

Double-rectangular columnar pier of high-speed rail Download PDF

Info

Publication number
CN202936725U
CN202936725U CN 201220639643 CN201220639643U CN202936725U CN 202936725 U CN202936725 U CN 202936725U CN 201220639643 CN201220639643 CN 201220639643 CN 201220639643 U CN201220639643 U CN 201220639643U CN 202936725 U CN202936725 U CN 202936725U
Authority
CN
China
Prior art keywords
pier
speed rail
double
rectangular columnar
straining beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220639643
Other languages
Chinese (zh)
Inventor
文望青
薛照钧
许三平
雷素敏
康红兵
吴斌
陈裕民
李义发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Construction Engineering Consulting Co ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN 201220639643 priority Critical patent/CN202936725U/en
Application granted granted Critical
Publication of CN202936725U publication Critical patent/CN202936725U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to the technical field bridge structures, in particular to a double-rectangular columnar pier of high-speed rail. The double-rectangular columnar pier of the high-speed rail comprises two pier columns and a straining beam, wherein the two pier columns are fixed on a base, the straining beam is arranged at the upper portions of pier columns and two ends of the straining beam are respectively fixed in the two pier columns. The double-rectangular columnar pier of the high-speed rail is reasonable in structure, simple in construction, rapid and convenient to repair and maintain and good in durability. According to the double-rectangular columnar pier of the high-speed rail, two pier column structures with relatively small size are arranged below a bridge support, stress of the whole structure is explicit, the straining beam is arranged below the top of each pier column, requirements of transverse stiffness of the pier of the high-speed rail can be met, and the straining beam can be used as an operation platform for inspection and maintenance at the same time. The double-rectangular columnar pier of the high-speed rail is explicit in stress, reasonable in structure, economical, capable of well meeting requirements of intensity and stiffness of the pier of the high-speed rail, rapid and convenient to construct, simple in template design, fast in construction period and capable of prolonging the service life of the structure.

Description

High-speed railway double square columnar pier
Technical field
The utility model relates to the bridge construction technical field, is specifically related to a kind of high-speed railway double square columnar pier.
Background technology
The construction problem of high-speed railway bridge pier is the problem that receives much concern always, and the ballastless track bridge design, be generally rectangular solid pier, cylinder pier, rectangular hollow, board-like bridge pier etc. at present.The design of domestic high-speed railway bridge pier is generally adopted nose circle shape solid pier, hollow pier, rectangular solid pier, hollow pier.General solid pier is because the scale of construction is large, and bridge abutment moulding plate requires to adopt punching block from factors such as the bridge pier outward appearance are smoother, and because the bridge pier scale of construction is large, the steel that stencil design needs are many.And hollow pier has enough to meet the need slow, long construction period due to the internal mold constructional difficulties.Hollow pier particularly, due to the structure relative complex, construction quality is difficult to guarantee fully, and long construction period, often affects construction quality and duration of a project.
Thereby for the high speed bridge pier, how to choose rational form of structure, to overcome the high speed bridge pier to the requirement of pier stiffness, again can convenient construction, maintenance, improve the endurance quality of structure, guarantee the application life of structure, this is to demand one of key technology of studying and solving urgently.
Summary of the invention
The purpose of this utility model is for above-mentioned technical problem, provides a kind of and can satisfy high speed bridge pier intensity, rigidity requirement, convenient and quick construction, the high-speed railway double square columnar pier that stencil design is simple, the construction turnover is fast.
The technical solution of the utility model is: high-speed railway double square columnar pier comprises two pier studs that are fixed on base and is positioned at the binder on pier stud top, and it is inner that binder two ends are separately fixed at two pier studs.
Preferably, described pier stud is the solid concrete rectangular configuration, is highly 100-150m, and the pier stud top is provided with supporting seat, and the supporting seat cross section is less than the pier stud cross section.
The utility model provide a kind of rational in infrastructure, construction is simple, maintenance is convenient, fast, the bridge pier structure of good endurance, and the pillarwork of two scale of construction less is set under bridge pad, total is stressed clear and definite.Under pier stud pushes up, binder is set, has both satisfied the requirement of high speed bridge pier lateral stiffness, can take into account the maintenance and inspection operating platform simultaneously.
The high-speed railway double square columnar pier structure that the utility model proposes, stressed clear and definite, structure rationally, good economy performance, can finely satisfy high speed bridge pier intensity, rigidity requirement, convenient and quick construction, stencil design is simple, the construction turnover is fast, the application life of guaranteeing structure.
Description of drawings
Fig. 1 is the utility model front view.
Fig. 2 is the utility model lateral view.
Fig. 3 is the utility model top view.
The specific embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments, be convenient to be well understood to the present invention, but they do not consist of restriction to the present invention.
High-speed railway double square columnar pier as Figure 1-3 comprises the binder 2 that is fixed on two pier studs 1 on base 4 and is positioned at pier stud 1 top, binder 2 two ends are separately fixed at two pier stud 1 inside, the binder 2 that arranges had both satisfied the requirement of high speed bridge pier lateral stiffness, can take into account the maintenance and inspection operating platform simultaneously.Pier stud 1 is the solid concrete rectangular configuration, and the scale of construction is less, is highly 100-150m, and total is stressed clear and definite.Pier stud 1 top is provided with supporting seat 3, and supporting seat 3 can conveniently contact with bearing at the bottom of bridge, and supporting seat 3 cross sections are less than pier stud 1 cross section.
In order to make high-speed railway double square columnar pier structure have necessary strength and stiffness, guarantee its fatigue durability and reasonable economy, consider simultaneously convenient and quick construction, maintenance convenience, two pier stud spacings can be adjusted according to the spacing of bearing at the bottom of bridge, the binder height is 100cm and is positioned at from pier stud top 100cm eminence, and this is capable of regulating highly as required.
The utility model high-speed railway double square columnar pier structure, compare with conventional high speed bridge pier, bridge pier is not all established the top cap, and is simple in structure, and it is consistent with conventional rectangular hollow profile that two columned pier keeps, the concrete scale of construction is little, be very easy to the making of bridge pier external mold, the use of falling, two columned pier internal mold has especially also been economized, can reduce cost, can save the duration again, have good society and economic benefit.The utility model is initiated high-speed railway double square columnar pier structure, and to Railway Bridges And Piers, particularly the design of high-speed railway bridge pier has reference and reference.

Claims (2)

1. high-speed railway double square columnar pier is characterized in that: comprise two pier studs that are fixed on base and be positioned at the binder on pier stud top, it is inner that binder two ends are separately fixed at two pier studs.
2. high-speed railway double square columnar pier according to claim 1, it is characterized in that: described pier stud is the solid concrete rectangular configuration, is highly 100-150m, and the pier stud top is provided with supporting seat, and the supporting seat cross section is less than the pier stud cross section.
CN 201220639643 2012-11-27 2012-11-27 Double-rectangular columnar pier of high-speed rail Expired - Lifetime CN202936725U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220639643 CN202936725U (en) 2012-11-27 2012-11-27 Double-rectangular columnar pier of high-speed rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220639643 CN202936725U (en) 2012-11-27 2012-11-27 Double-rectangular columnar pier of high-speed rail

Publications (1)

Publication Number Publication Date
CN202936725U true CN202936725U (en) 2013-05-15

Family

ID=48320971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220639643 Expired - Lifetime CN202936725U (en) 2012-11-27 2012-11-27 Double-rectangular columnar pier of high-speed rail

Country Status (1)

Country Link
CN (1) CN202936725U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104863045A (en) * 2015-05-29 2015-08-26 重庆大学 Steel tube confinement reinforced concrete bridge pier system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104863045A (en) * 2015-05-29 2015-08-26 重庆大学 Steel tube confinement reinforced concrete bridge pier system
CN104863045B (en) * 2015-05-29 2017-01-11 重庆大学 Steel tube confinement reinforced concrete bridge pier system

Similar Documents

Publication Publication Date Title
CN103835227A (en) Double-rectangular column type pier of high speed railway
CN203462394U (en) Continuous steel box girder for reinforcing soleplate on supporting point
CN202936725U (en) Double-rectangular columnar pier of high-speed rail
CN103669124A (en) Split-type embedded and combined elastic base plate for rail transit fasteners
CN201850508U (en) Non-strut bridge pier template
CN203603018U (en) Highway and railway combined construction double-layer continuous steel structure
CN103132450B (en) Vertical movement horizontal limiting support seat
CN203320399U (en) Six-line double-layer railway bridge pier
CN202530365U (en) Half-through type opening box-shaped section steel-concrete composite beam
CN202030447U (en) Trolley track structure for bridge crane
CN203320361U (en) Railroad sleeper wear-resisting rail bearing platform
CN202945544U (en) Novel ballastless track
CN202967940U (en) Tower crane weight component
CN202991059U (en) Stand column of lateral top arc concrete lining steel model board trolley
CN202831719U (en) Vehicle-loading plate structure
CN106499059A (en) A kind of assembled rolling friction rubber support
CN203603015U (en) Highway and railway combined construction continuous rigid frame bridge
CN202318548U (en) Floating metro track slab die
CN201132933Y (en) Antivibration ball type bearing for bridge
CN202994572U (en) Static load test rack for simply supported prestressed concrete channel beam
CN201172213Y (en) Double-track balancing moving manipulator
CN102953320A (en) Box bridge girder
CN206956463U (en) A kind of backing plate applied to double-deck fastener
CN203125143U (en) Steel structure base of numerical control gantry boring-milling machine
CN202913341U (en) Railway bridge main span and side span structure with unequal transverse pitches

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160420

Address after: 430063 Wuchang, Hubei, Yang Park, Heping Avenue, No. 745

Patentee after: Wuhan Construction Engineering Consulting Co.,Ltd.

Address before: 430063 Wuchang, Hubei, Yang Park, Peace Avenue, No. 745

Patentee before: CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP Co.,Ltd.

CX01 Expiry of patent term

Granted publication date: 20130515

CX01 Expiry of patent term