CN202065011U - Monitoring system for main fans in mine shaft - Google Patents
Monitoring system for main fans in mine shaft Download PDFInfo
- Publication number
- CN202065011U CN202065011U CN 201120184318 CN201120184318U CN202065011U CN 202065011 U CN202065011 U CN 202065011U CN 201120184318 CN201120184318 CN 201120184318 CN 201120184318 U CN201120184318 U CN 201120184318U CN 202065011 U CN202065011 U CN 202065011U
- Authority
- CN
- China
- Prior art keywords
- fan
- monitoring system
- blower fan
- host computer
- mine main
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Control Of Positive-Displacement Air Blowers (AREA)
Abstract
A monitoring system for main fans in a mine shaft comprises upper computers, a network switch, PLC (programmable logic controller) control cabinets, consoles, field sensors, fan accessory devices and fan starting cabinets, wherein the PLC control cabinets are connected with the upper computers by the network switch respectively, the field sensors, the fan accessory devices and the fan starting cabinets are connected with the PLC control cabinets respectively, and the PLC control cabinets are connected to the consoles respectively. The monitoring system can perform centralized monitoring, real-time access and automatic analysis of information during production, so that an optimal operating scheme is implemented conveniently, operating safety of the mine shaft is ensured, and life safety of miners is guaranteed. Each monitoring upper computer with the design of dual-unit redundancy can monitor two fans simultaneously and is higher in reliability, and an intelligent digital instrument and data acquisition signal loops controlled by the PLC control cabinets are independent from each other, so that detecting accuracy can be improved.
Description
Technical field
The utility model relates to pit gear monitoring technique field, relates in particular to a kind of mine main fan blower fan monitoring system.
Background technology
The mine ventilation machine is to the delivered downhole fresh air, get rid of the mine pernicious gas, keep normal working condition, the healthy fixed equipment of operation and personnel ensures safety, the quality of its operation conditions, be directly connected to personal safety and produce and normally to move, guaranteeing that mine normally plays an important role aspect the safety in production.Simultaneously, along with development of modern science and technology, mining firm improves constantly the requirement of production system automatic controlling level, and control procedure requires more safe and reliable, and function is more complete.Be badly in need of a kind of new modern intelligent monitor system of design,,, guarantee the mine security of operation, ensure the life of miner's preciousness so that implement optimal operation scheme to production process information Centralized Monitoring, real time access, analysis automatically.
The utility model content
The purpose of this utility model is to design a kind of novel mine main fan blower fan monitoring system, overcomes above-mentioned shortcoming of the prior art, addresses the above problem.
To achieve these goals, the technical solution adopted in the utility model is as follows:
A kind of mine main fan blower fan monitoring system, comprise host computer, the network switch, PLC switch board, operating desk, spot sensor, blower fan ancillary service and fan starting cabinet, described PLC switch board is connected with described host computer by the described network switch, described spot sensor, described blower fan ancillary service, described fan starting cabinet all connect described PLC switch board, and described PLC switch board is connected to described operating desk.
Also comprise video server and video monitoring probe, described video monitoring probe connects described video server, and described video server connects described host computer by the described network switch.
Also comprise the ore deposit information network system, described host computer connects described ore deposit information network system by the described network switch.
Described host computer designs for dual-computer redundancy, and every described host computer can be monitored two typhoon machines simultaneously.
Described PLC switch board core is a programmable logic controller, and described programmable logic controller comprises power module, CPU module, analog quantity input module, digital quantity output module, ethernet communication module.
Described operating desk comprises sound, light alarm system and is used to monitor the intelligent digital instrument of fan operation parameter that the data acquisition signal loop of described intelligent digital instrument and the control of described PLC switch board is separate.
Described fan operation parameter comprises fan bearing temperature, motor winding and bearing temperature, working voltage, running current.
Described spot sensor comprises temperature pick up, pressure sensor, differential pressure pickup, vibrating sensor and position sensor.
Also comprise combining and protect communication system, described comprehensive guarantor's communication system is connected with the described network switch.
It is the comprehensive monitoring monitoring system of one that mine main fan monitoring system of the present utility model is based on functions such as equipment control able to programme, intelligent data acquisition, computer monitoring, video monitoring, network communication, can realize capable real time on-line monitoring, control and on-the-spot functions such as video monitor that 2 main fans and ancillary service operational factor and state are advanced reliably.
The so-called PLC switch board of the utility model is used for data acquisition and equipment control.The so-called operating desk of the utility model is meant the centralized Control operating desk.
The so-called host computer of the utility model, be meant the monitoring host computer, the design of employing dual-computer redundancy, every host computer can be monitored two typhoon machines simultaneously, the host computer man-machine interface adopts the industrial control configuration software of three-dimensional force control company to design and develop, the data of reception reduce demonstrations, storage, form form, real-time and history curve etc., data are carried out the analysis and judgement processing, realize host computer equipment control etc., and combined network communication satisfies the data access of other monitor supervision platform.
The so-called centralized Control operating desk of the utility model is mainly finished the hand push button control operation of blower fan and ancillary service, show each equipment run signal and the signal that puts in place by indicator lamp, sound, light warning message are provided, and design intelligent digital instrument monitoring fan bearing temperature, motor winding and the main operational factors of blower fan such as bearing temperature, working voltage electric current, separate with the data acquisition signal loop of PLC, form the double monitoring function.
The so-called spot sensor of the utility model mainly comprises temperature pick up, pressure sensor, vibrating sensor, position sensor etc., is used to measure parameters such as negative pressure, air quantity, lubrication pressure, cooling water pressure.
The data acquisition signal loop of described PLC switch board control is meant the data acquisition signal loop of PLC, that is: plc data acquisition module, and it becomes data signal to send computer to the analog signal conversion of sensor acquisition.
Comprehensive guarantor's communication system described in the utility model is meant mining comprehensive coverage communication system, is the core apparatus of communication, control, can realize the multiple function of controls such as speed, temperature, smog, dedusting cooling and communication.
The beneficial effects of the utility model are as follows:
1, intelligent monitor system of the present utility model can be convenient to implement optimal operation scheme to production process information Centralized Monitoring, real time access, analysis automatically, guarantees the mine security of operation, ensures the life of miner's preciousness.
2, monitoring host computer of the present utility model adopts the dual-computer redundancy design, and every host computer can be monitored two typhoon machines simultaneously, and reliability is higher.
3, the data acquisition signal loop of intelligent digital instrument of the present utility model and the control of PLC switch board is separate, can improve the accuracy of detection.
Description of drawings
Shown in Figure 1 is the structural representation of the utility model specific embodiment.
The specific embodiment
Clearer for technical problem, technical scheme and beneficial effect that the utility model is solved, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explanation the utility model, and be not used in qualification the utility model.
A kind of mine main fan blower fan monitoring system as shown in Figure 1, comprise host computer, the network switch, PLC switch board, operating desk, spot sensor, blower fan ancillary service and fan starting cabinet, described PLC switch board is connected with described host computer by the described network switch, described spot sensor, described blower fan ancillary service, described fan starting cabinet all connect described PLC switch board, and described PLC switch board is connected to described operating desk; Also comprise video server and video monitoring probe, described video monitoring probe connects described video server, and described video server connects described host computer by the described network switch; Also comprise the ore deposit information network system, described host computer connects described ore deposit information network system by the described network switch; Also comprise combining and protect communication system, described comprehensive guarantor's communication system is connected with the described network switch.Described host computer designs for dual-computer redundancy, and every described host computer can be monitored two typhoon machines simultaneously; Described PLC switch board core is a programmable logic controller, and described programmable logic controller comprises power module, CPU module, analog quantity input module, digital quantity output module, ethernet communication module; Described operating desk comprises sound, light alarm system and is used to monitor the intelligent digital instrument of fan operation parameter that the data acquisition signal loop of described intelligent digital instrument and the control of described PLC switch board is separate; Described fan operation parameter comprises fan bearing temperature, motor winding and bearing temperature, working voltage, running current; Described spot sensor comprises temperature pick up, pressure sensor, differential pressure pickup, vibrating sensor and position sensor.
Monitoring host computer basic configuration in the present embodiment:
CPU frequency: P4-3.0G
Internal memory: 1G
Hard-disk capacity: more than the 160G
Display: 19 " LCDs
Operation keyboard: QWERTY keyboard and optical mouse.
PLC switch board core in the present embodiment adopts Siemens S7-300 series Programmable logic Controller (PLC), programmable logic controller comprises power module (PS307), CPU module (CPU313C), analog quantity input module (SM331), digital quantity output module (SM322), ethernet communication module (CP343) etc., respectively blower fan and ancillary service is realized logic control and functions such as operational factor real time on-line monitoring, warning output and external communication in conjunction with spot sensor and other control appliances.
More than by the detailed description of concrete and preferred embodiment the utility model; but those skilled in the art should be understood that; the utility model is not limited to the above embodiment; all within spirit of the present utility model and principle; any modification of being done, be equal to replacement etc., all should be included within the protection domain of the present utility model.
Claims (9)
1. mine main fan blower fan monitoring system, it is characterized in that: comprise host computer, the network switch, PLC switch board, operating desk, spot sensor, blower fan ancillary service and fan starting cabinet, described PLC switch board is connected with described host computer by the described network switch, described spot sensor, described blower fan ancillary service, described fan starting cabinet all connect described PLC switch board, and described PLC switch board is connected to described operating desk.
2. mine main fan blower fan monitoring system according to claim 1, it is characterized in that: also comprise video server and video monitoring probe, described video monitoring probe connects described video server, and described video server connects described host computer by the described network switch.
3. mine main fan blower fan monitoring system according to claim 2 is characterized in that: also comprise the ore deposit information network system, described host computer connects described ore deposit information network system by the described network switch.
4. according to one of any described mine main fan blower fan monitoring system of claim 1 to 3, it is characterized in that: described host computer designs for dual-computer redundancy, and every described host computer can be monitored two typhoon machines simultaneously.
5. according to one of any described mine main fan blower fan monitoring system of claim 1 to 3, it is characterized in that: described PLC switch board core is a programmable logic controller, and described programmable logic controller comprises power module, CPU module, analog quantity input module, digital quantity output module, ethernet communication module.
6. according to one of any described mine main fan blower fan monitoring system of claim 1 to 3, it is characterized in that: described operating desk comprises sound, light alarm system and is used to monitor the intelligent digital instrument of fan operation parameter that the data acquisition signal loop of described intelligent digital instrument and the control of described PLC switch board is separate.
7. mine main fan blower fan monitoring system according to claim 6, it is characterized in that: described fan operation parameter comprises fan bearing temperature, motor winding and bearing temperature, working voltage, running current.
8. according to one of any described mine main fan blower fan monitoring system of claim 1 to 3, it is characterized in that: described spot sensor comprises temperature pick up, pressure sensor, differential pressure pickup, vibrating sensor and position sensor.
9. according to one of any described mine main fan blower fan monitoring system of claim 1 to 3, it is characterized in that: also comprise combining and protect communication system, described comprehensive guarantor's communication system is connected with the described network switch.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120184318 CN202065011U (en) | 2011-06-02 | 2011-06-02 | Monitoring system for main fans in mine shaft |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120184318 CN202065011U (en) | 2011-06-02 | 2011-06-02 | Monitoring system for main fans in mine shaft |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202065011U true CN202065011U (en) | 2011-12-07 |
Family
ID=45058879
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201120184318 Expired - Fee Related CN202065011U (en) | 2011-06-02 | 2011-06-02 | Monitoring system for main fans in mine shaft |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202065011U (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103148007A (en) * | 2012-11-27 | 2013-06-12 | 洛阳源创电气有限公司 | Mine ventilating fan control system capable of automatically adjusting air quantity |
CN103334791A (en) * | 2013-05-11 | 2013-10-02 | 樊铁山 | Substation-based high atmospheric pressure real-time monitoring system for return air shaft of coal mine |
CN103775369A (en) * | 2014-02-12 | 2014-05-07 | 安徽理工大学 | Control cabinet for mining fan test bed |
CN104018884A (en) * | 2014-06-13 | 2014-09-03 | 武汉理工大学 | Intelligent sensing and remote and unified regulating system for deep-mining mine ventilation |
CN104263904A (en) * | 2014-10-07 | 2015-01-07 | 唐山亚捷机械有限公司 | Black box system used for recording and managing heat treatment industrial furnace process |
CN104765326A (en) * | 2014-01-08 | 2015-07-08 | 北大方正集团有限公司 | Air discharge monitoring system |
CN105223881A (en) * | 2015-09-17 | 2016-01-06 | 中国神华能源股份有限公司 | Connect mining face equipment telemonitoring and control system |
CN105275488A (en) * | 2015-10-30 | 2016-01-27 | 滨州学院 | Mine auxiliary ventilation control system and mine auxiliary ventilation method |
CN105782098A (en) * | 2016-04-07 | 2016-07-20 | 安徽理工大学 | Display control device for touch screen of mine fan testbed |
CN105864082A (en) * | 2016-04-07 | 2016-08-17 | 安徽理工大学 | Display control device of industrial control computer for mining fan test table |
TWI586896B (en) * | 2015-12-29 | 2017-06-11 | 英業達股份有限公司 | Air-exhausting monitoring system |
CN111541167A (en) * | 2020-05-08 | 2020-08-14 | 中煤第五建设有限公司 | Integral movable wellhead power distribution and centralized control device |
CN112947284A (en) * | 2021-03-09 | 2021-06-11 | 深圳奇点穿越数据科技有限公司 | Data center monitoring system |
CN114415584A (en) * | 2021-12-24 | 2022-04-29 | 辽阳市弓长岭区瀚声矿业有限公司 | Remote centralized control unmanned control system and method for mining fan |
-
2011
- 2011-06-02 CN CN 201120184318 patent/CN202065011U/en not_active Expired - Fee Related
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103148007A (en) * | 2012-11-27 | 2013-06-12 | 洛阳源创电气有限公司 | Mine ventilating fan control system capable of automatically adjusting air quantity |
CN103334791A (en) * | 2013-05-11 | 2013-10-02 | 樊铁山 | Substation-based high atmospheric pressure real-time monitoring system for return air shaft of coal mine |
CN103334791B (en) * | 2013-05-11 | 2015-11-25 | 樊铁山 | A kind of coal mine return air well hyperbar real-time monitoring system based on point standing posture |
CN104765326A (en) * | 2014-01-08 | 2015-07-08 | 北大方正集团有限公司 | Air discharge monitoring system |
CN103775369A (en) * | 2014-02-12 | 2014-05-07 | 安徽理工大学 | Control cabinet for mining fan test bed |
CN103775369B (en) * | 2014-02-12 | 2016-06-01 | 安徽理工大学 | Mining blower fan testing table housing |
CN104018884A (en) * | 2014-06-13 | 2014-09-03 | 武汉理工大学 | Intelligent sensing and remote and unified regulating system for deep-mining mine ventilation |
CN104018884B (en) * | 2014-06-13 | 2017-02-01 | 武汉理工大学 | Intelligent sensing and remote and unified regulating system for deep-mining mine ventilation |
CN104263904B (en) * | 2014-10-07 | 2016-07-27 | 唐山亚捷机械有限公司 | Black box subsystem for heat treatment industrial furnace process record and management |
CN104263904A (en) * | 2014-10-07 | 2015-01-07 | 唐山亚捷机械有限公司 | Black box system used for recording and managing heat treatment industrial furnace process |
CN105223881A (en) * | 2015-09-17 | 2016-01-06 | 中国神华能源股份有限公司 | Connect mining face equipment telemonitoring and control system |
CN105275488A (en) * | 2015-10-30 | 2016-01-27 | 滨州学院 | Mine auxiliary ventilation control system and mine auxiliary ventilation method |
TWI586896B (en) * | 2015-12-29 | 2017-06-11 | 英業達股份有限公司 | Air-exhausting monitoring system |
CN105864082A (en) * | 2016-04-07 | 2016-08-17 | 安徽理工大学 | Display control device of industrial control computer for mining fan test table |
CN105782098A (en) * | 2016-04-07 | 2016-07-20 | 安徽理工大学 | Display control device for touch screen of mine fan testbed |
CN111541167A (en) * | 2020-05-08 | 2020-08-14 | 中煤第五建设有限公司 | Integral movable wellhead power distribution and centralized control device |
CN112947284A (en) * | 2021-03-09 | 2021-06-11 | 深圳奇点穿越数据科技有限公司 | Data center monitoring system |
CN114415584A (en) * | 2021-12-24 | 2022-04-29 | 辽阳市弓长岭区瀚声矿业有限公司 | Remote centralized control unmanned control system and method for mining fan |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202065011U (en) | Monitoring system for main fans in mine shaft | |
CN108684010B (en) | Cable well running state online monitoring device and monitoring method based on Internet of things | |
CN201936155U (en) | Online monitoring system for bus ventilator based on MODBUS-RTU (remote terminal unit) | |
CN103592880A (en) | Intelligent controller system for large engineering equipment | |
CN202330019U (en) | State monitoring system of wind turbine | |
CN102087511A (en) | Method for executing remote monitoring of electronic system by utilizing power supply | |
CN104179529A (en) | Internet-of-things and cloud computing based intelligent monitoring and fault diagnosis system for mine ventilators | |
CN104331943A (en) | Intelligent inspection management system for power equipment | |
CN204371405U (en) | A kind of main fan monitoring system | |
CN215754834U (en) | Automatic monitoring system for carrier roller running state of belt conveyor | |
CN104765326A (en) | Air discharge monitoring system | |
CN203114683U (en) | Fan remote monitoring system | |
CN201886342U (en) | Intelligent secondary station capable of realizing programmable logic controller (PLC) system fault monitoring and display | |
CN202255776U (en) | Sulfur hexafluoride gas leakage monitoring alarm device | |
CN204422670U (en) | A kind of online aging testing system | |
CN207598550U (en) | A kind of mine main fan control system | |
CN204242248U (en) | A kind of power equipment intelligent patrol detection management system | |
CN207264176U (en) | A kind of defeated coal monitoring system in underground based on magneto driving | |
CN203333098U (en) | Dynamic load monitoring device of lifting bearing component of coal mine vertical shaft | |
CN206710858U (en) | A kind of prewarning service life supervising device of clothes airing machine part | |
CN205375179U (en) | Monitoring device is made to thing networking forging | |
CN204511937U (en) | A kind of dedusting fan state automated watch-keeping facility | |
CN204884082U (en) | Gaseous detection alarm device with information fusion and long -range SMS function | |
CN114415584A (en) | Remote centralized control unmanned control system and method for mining fan | |
CN112531896A (en) | Intelligent monitoring system and method for power transformation and distribution station based on big data drive |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111207 Termination date: 20170602 |
|
CF01 | Termination of patent right due to non-payment of annual fee |