CN201892726U
CN201892726U CN2010202680990U CN201020268099U CN201892726U CN 201892726 U CN201892726 U CN 201892726U CN 2010202680990 U CN2010202680990 U CN 2010202680990U CN 201020268099 U CN201020268099 U CN 201020268099U CN 201892726 U CN201892726 U CN 201892726U
Authority
CN
China
Prior art keywords
relay
electric power
terminal
protective relaying
power substation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010202680990U
Other languages
Chinese (zh)
Inventor
沈炯
范维平
李发良
李磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN2010202680990U priority Critical patent/CN201892726U/en
Priority to CN2011101781372A priority patent/CN102375105A/en
Application granted granted Critical
Publication of CN201892726U publication Critical patent/CN201892726U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Emergency Protection Circuit Devices (AREA)

Abstract

The utility model relates to a protective system of an electric power substation, in particular to a test system for the protective system of the electric power substation equipment. The simulation test system for a protective relaying system of electric power substation equipment comprises a tested protector, a protective relaying tester and a connection box connecting the tested protector and the protective relaying tester through a wiring harness cable and also comprises a terminal preinstalled with a related testing software, and a programmable controller; the terminal is connected with the protective relaying tester through a CAT5E cable; the programmable controller is connected with the terminal through a field bus, connected with the connection box through a wiring harness cable and connected with the tested protector through a field bus and a wiring harness cable.

Description

Substation facilities relay protection system simulated testing system
Technical field
The utility model relates to the substation protection system, relates in particular to the test macro of substation facilities protection system.
Background technology
The large-scale transformer and distribution station of China is built in the eighties in last century more, can not satisfy the needs of modern power systems management mode far away to its means of relay protection now, therefore must upgrade to original protective device.Be because the power supply object of large-scale electric substation all is some important production unit and places; for the economic loss that house of correction is produced minimizes; just must in that do not have a power failure or short as far as possible power-off time, upgrade to protective relay; otherwise just necessary power down process will cause very big influence to worker, civilian electricity.
Summary of the invention
The utility model is intended to address the aforementioned drawbacks, and a kind of substation facilities relay protection system simulated testing system is provided.The utility model can carry out simulation test to protection system in advance, can finish the upgrading of protection system with not cutting off the power supply.
A kind of substation facilities relay protection system simulated testing system; it comprises tested protective device, relay-protection tester and one couple together tested protective device and relay-protection tester by the wire harness cable junction box, and described test macro also comprises:
The terminal that dependence test software is housed in advance, this terminal connects described relay-protection tester by CAT5E UTP cable;
A Programmable Logic Controller, it is connected with described terminal by fieldbus, is connected with the wire harness cable with the junction box, is connected with the wire harness cable by fieldbus with tested protective device.
The utility model can be simulated the practical operation situation behind the protective device upgrading truly, be convenient to find in advance to design and equipment in the problem that exists, and solve.
Description of drawings
Below, in conjunction with the accompanying drawings, the utility model is further described
Fig. 1 is the utility model synoptic diagram.
Embodiment
As shown in Figure 1; a kind of substation facilities relay protection system simulated testing system; it comprises tested protective device 1, relay-protection tester 2 and one couple together tested protective device 1 and relay-protection tester 2 by wire harness cable 10 junction box 3, and described test macro also comprises:
The terminal 4 that dependence test software is housed in advance, this terminal connects described relay-protection tester 2 by CAT5E UTP cable 11; A Programmable Logic Controller 5, it is connected with described terminal 4 by fieldbus 12, is connected with wire harness cable 10 with junction box 3, is connected with wire harness cable 10 by fieldbus 12 with tested protective device 1.

Claims (1)

1. substation facilities relay protection system simulated testing system, it comprises tested protective device, relay-protection tester and one couple together tested protective device and relay-protection tester by the wire harness cable junction box, it is characterized in that, described test macro also comprises: the terminal that dependence test software is housed in advance, and this terminal connects described relay-protection tester by CAT5E UTP cable; A Programmable Logic Controller, it is connected with described terminal by fieldbus, is connected with the wire harness cable with the junction box, is connected with the wire harness cable by fieldbus with tested protective device.
CN2010202680990U 2010-07-22 2010-07-22 Simulation test system for protective relaying system of electric power substation equipment Expired - Lifetime CN201892726U (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN2010202680990U CN201892726U (en) 2010-07-22 2010-07-22 Simulation test system for protective relaying system of electric power substation equipment
CN2011101781372A CN102375105A (en) 2010-07-22 2011-06-29 Simulation test system of substation equipment relay protection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202680990U CN201892726U (en) 2010-07-22 2010-07-22 Simulation test system for protective relaying system of electric power substation equipment

Publications (1)

Publication Number Publication Date
CN201892726U true CN201892726U (en) 2011-07-06

Family

ID=44222198

Family Applications (2)

Application Number Title Priority Date Filing Date
CN2010202680990U Expired - Lifetime CN201892726U (en) 2010-07-22 2010-07-22 Simulation test system for protective relaying system of electric power substation equipment
CN2011101781372A Pending CN102375105A (en) 2010-07-22 2011-06-29 Simulation test system of substation equipment relay protection system

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN2011101781372A Pending CN102375105A (en) 2010-07-22 2011-06-29 Simulation test system of substation equipment relay protection system

Country Status (1)

Country Link
CN (2) CN201892726U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103544104A (en) * 2013-10-22 2014-01-29 珠海许继电气有限公司 Testing method for power distribution terminal remote control functional software module

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103364663B (en) * 2013-07-16 2015-06-17 上海毅昊自动化有限公司 Intelligent device for simulating transformer substation primary equipment behavior
CN104467182B (en) * 2014-12-05 2017-05-03 国家电网公司 Substation control layer device non-power-outage remote control system and method
CN105548742B (en) * 2015-12-04 2018-11-09 国家电网公司华东分部 System is tested in a distant place for relay protection
CN109541353B (en) * 2018-11-30 2021-10-08 广州供电局有限公司 Distribution automation detecting system

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2531988B2 (en) * 1989-08-02 1996-09-04 関西電力株式会社 Transformer protection relay device test equipment and test method
US8968093B2 (en) * 2004-07-15 2015-03-03 Intel Corporation Dynamic insertion of personalized content in online game scenes
CN2826453Y (en) * 2004-11-30 2006-10-11 湖南大学 Multifunctional microcomputer protection and converting station integrated automation experiment training system
CN101482602A (en) * 2008-11-25 2009-07-15 甘肃电力科学研究院 Detection analysis system of relay-protection tester
CN201319063Y (en) * 2008-11-25 2009-09-30 甘肃电力科学研究院 Detecting and analyzing device of relay protection testing device
CN201449436U (en) * 2009-06-08 2010-05-05 南京工业职业技术学院 Failure diagnosing and positioning system for power system earthing net
CN201518052U (en) * 2009-10-26 2010-06-30 江西省电力科学研究院 Portable all-digital relay protection transient closed-loop tester

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103544104A (en) * 2013-10-22 2014-01-29 珠海许继电气有限公司 Testing method for power distribution terminal remote control functional software module
CN103544104B (en) * 2013-10-22 2017-01-11 珠海许继电气有限公司 Testing method for power distribution terminal remote control functional software module

Also Published As

Publication number Publication date
CN102375105A (en) 2012-03-14

Similar Documents

Publication Publication Date Title
CN201892726U (en) Simulation test system for protective relaying system of electric power substation equipment
CN102495322B (en) Synchronous performance test method for digital relay protection device based on IEC61850 (International Electrotechnical Commission 61850)
WO2010101963A3 (en) Meter socket connection methods and systems for local generators or monitoring connections
WO2011018684A1 (en) Method and system for engineering a substation automation system
CN102208801A (en) Operation method for safely applying line protection device to wind power station
CN104242472B (en) A kind of railway station low buckling distribution intelligent monitor system
CN102981087A (en) Interface system for RTDS and intelligent relaying protection device
CN105548742A (en) Remote relay protection test system
CN102426309A (en) Method for testing area spare power automatic switching system in engine room environment of master station
CN104124916B (en) High aititude photovoltaic plant electric network fault simulated testing system mobile detection apparatus
CN103887882B (en) A kind of prefabricated cover half blocking secondary device system for transformer station
CN203350349U (en) Transformer substation bus phase voltage off-limit alarm system
CN202393853U (en) Digitalized relay protection tester of transformer station
CN203445597U (en) Zero power protector
CN102508052A (en) Test method for field band channel operation of automatic bus transfer system of area network
CN204166360U (en) Based on the Feed Manufacturing control system of wireless transmission
CN203352281U (en) Automatic measuring and controlling device for electricity distribution network
CN204156604U (en) A kind of Multifunctional power distribution automatization terminal
CN202978295U (en) Water power and photovoltaic power generation shared control apparatus
CN202130408U (en) Control box for battery electric vehicle
CN104518429A (en) In-situ placement type intelligent relay protection device
CN204256095U (en) Intelligent Bus ground connection alarm device
CN213126060U (en) Distribution network automation testing arrangement
CN103346496B (en) Intelligent substationization transformation double-bus protects the transition method that do not have a power failure
CN202796778U (en) Intelligent integrated 10 kV breaker

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant