Nothing Special   »   [go: up one dir, main page]

CN201793319U - Crane girder - Google Patents

Crane girder Download PDF

Info

Publication number
CN201793319U
CN201793319U CN2010205093508U CN201020509350U CN201793319U CN 201793319 U CN201793319 U CN 201793319U CN 2010205093508 U CN2010205093508 U CN 2010205093508U CN 201020509350 U CN201020509350 U CN 201020509350U CN 201793319 U CN201793319 U CN 201793319U
Authority
CN
China
Prior art keywords
girder
attaching beam
web
cover plate
upper cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205093508U
Other languages
Chinese (zh)
Inventor
张正国
梁玉军
王国磊
王岐婷
刘林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANQI HEAVY MACHINERY CO Ltd
Original Assignee
SHANQI HEAVY MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANQI HEAVY MACHINERY CO Ltd filed Critical SHANQI HEAVY MACHINERY CO Ltd
Priority to CN2010205093508U priority Critical patent/CN201793319U/en
Application granted granted Critical
Publication of CN201793319U publication Critical patent/CN201793319U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The utility model discloses a crane girder, which belongs to the technical field of cranes. The crane girder comprises an upper girder cover board, a main web plate, a secondary web plate, a lower girder cover board and an auxiliary girder, wherein the upper girder cover board is used for arranging a main trolley rail; the main web plate and the secondary web plate are arranged opposite to each other; the main web plate and the secondary web plate are fixedly arranged on the upper girder cover board respectively and are vertical to the upper girder cover board; the lower girder cover board is arranged opposite to the upper girder cover board and is connected between the main web plate and the secondary web plate; and the auxiliary beam is used for the running of a secondary trolley, is fixedly arranged on the main web plate and is positioned at one end of the lower girder cover board. The crane girder can realize the running of upper and lower trolleys through the auxiliary girder, has a compact structure, saves the manufacturing cost of a crane and reduces the requirement on the height of a workshop.

Description

Crane girder
Technical field
The utility model relates to the hoisting crane technical field, relates in particular to a kind of girder of hoisting crane.
Background technology
Hoisting crane all is the lifting work of being carried out weight by a trolley travelling on a secondary girder usually, but two dollies of the need of work of some occasion are coordinated just can finish one on the other mutually, arrange simultaneously on a secondary girder that like this two dollies do not realize, therefore need two dollies of two secondary girders finish this work jointly.For example, in the steel ladle hoisting process of steelworks, hoisting crane not only will be finished the action of slinging of steel ladle, the upset that also will realize steel ladle is poured molten steel in transport trolley or the die cavity sequence, these actions can't realize on a dolly simultaneously, are therefore just finished jointly by two hoisting cranes arranging up and down.Two hoisting cranes just have two secondary girders and two dollies, and this just needs factory building height to raise, and has increased the design cost and the building cost of factory building.
The utility model content
Technical problem to be solved in the utility model is: a kind of crane girder is provided, makes a secondary girder can realize up and down two trolley travellings simultaneously, and compact conformation, the manufacturing cost of having saved hoisting crane has reduced the requirement for height of factory building.
For solving the problems of the technologies described above, the technical solution of the utility model is: crane girder comprises the girder upper cover plate that is used to install the main carriage track; Main web that is oppositely arranged and secondary web, described main web and secondary web are fixedly installed on the described girder upper cover plate respectively and perpendicular to described girder upper cover plate; With the relative girder lower cover in described girder upper cover plate position, described girder lower cover is connected between described main web and the secondary web; Described girder also comprises the attaching beam that is used for secondary carriage walking, and described attaching beam is fixedly installed on the described main web and is positioned at described girder lower cover one end.
As a kind of improvement, described attaching beam comprises the attaching beam upper cover plate that is used to install secondary trolley track, and described attaching beam upper cover plate is fixedly installed on the described main web and perpendicular to described main web; Attaching beam lower cover, described attaching beam lower cover are fixedly installed on the described main web and are relative with described attaching beam upper cover plate position; Attaching beam web, described attaching beam web are connected between described attaching beam upper cover plate and the attaching beam lower cover and are positioned at the below of described secondary trolley track.
After having adopted technique scheme, the beneficial effects of the utility model are: owing to be provided with attaching beam in the side of crane girder, make that the girder of a hoisting crane can be simultaneously for two carriage walkings of arranging up and down, compare for the structure of independent carriage walking respectively with two traditional girders, structure is compact more, save a girder, saved material, reduced the manufacturing cost of hoisting crane; In the side of girder the attaching beam that is used for carriage walking is installed simultaneously, has been realized two combination actions that hoisting crane could be realized, reduced the requirement for height of factory building with the installing space of a hoisting crane.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is the structural representation of the utility model embodiment;
Fig. 2 is the running condition figure of the utility model embodiment;
Among the figure: 1, girder upper cover plate, 2, main web, 3, secondary web, 4, the girder lower cover, 5, the main carriage track, 6, attaching beam, 61, the attaching beam upper cover plate, 62, the attaching beam web, 63, the attaching beam lower cover, 7, secondary trolley track, 8, main carriage, 9, secondary dolly.
The specific embodiment
As shown in Figure 1, a kind of crane girder comprises the box-structure that is surrounded by girder upper cover plate 1, main web 2, secondary web 3 and girder lower cover 4, and the side of girder is provided with attaching beam 6.Wherein, described girder upper cover plate 1 is used to install main carriage track 5; Described main web 2 and secondary web 3 are oppositely arranged, and described main web 2 and secondary web 3 are fixedly installed on the described girder upper cover plate 1 respectively and perpendicular to described girder upper cover plate 1; Described girder lower cover 4 is relative with the position of girder upper cover plate 1, and described girder lower cover 4 is connected between described main web 2 and the secondary web 3; Described attaching beam 6 is used for secondary dolly 9 walkings, and described attaching beam 6 is fixedly installed on the described main web 2 and is positioned at described girder lower cover 4 one ends, and described attaching beam 6 is consistent with the bearing of trend of girder upper cover plate 1.
Described attaching beam 6 mainly comprises attaching beam upper cover plate 61, attaching beam lower cover 63 and attaching beam web 62.Described attaching beam upper cover plate 61 is used to install secondary trolley track 7, and described attaching beam upper cover plate 61 is fixedly installed on the described main web 2 and perpendicular to described main web 2; Described attaching beam lower cover 63 is fixedly installed on the described main web 2 and is relative with described attaching beam upper cover plate 61 positions; Described attaching beam web 62 is connected between described attaching beam upper cover plate 61 and the attaching beam lower cover 63 and is positioned at the below of described secondary trolley track 7.
Its principle of work is as follows:
As shown in Figure 2, girder mounted in pairs during use, form a secondary main beam structure, on the girder upper cover plate 1 above the girder, be installed with main carriage track 5, walk back and forth for main carriage 8, be positioned at girder lower cover 4 one ends in main web 2 sides of girder and be provided with attaching beam 6, be installed with secondary trolley track 7 on the attaching beam 6, walk back and forth for secondary dolly 9, the intensity of attaching beam 6 can be designed according to the weight that secondary dolly 9 is lifted,, the form of welded steel structure can be adopted if the dynamics of secondary dolly 9 liftings is little, for example lifting steel ladle is mainly realized by main carriage 8, and rotary movement is realized by secondary dolly 9, so the relative main carriage of the power that secondary dolly 9 bears 8 is much smaller, so attaching beam 6 can be by attaching beam upper cover plate 61, attaching beam lower cover 63 and attaching beam web 62 are welded, this welded steel structure can satisfy the required load of upset moment of torsion of steel ladle fully, during work, main carriage 8 is realized lifting, and secondary dolly 9 is realized upset, two dollies are coordinated mutually, finish sequence jointly.This girder is incorporated into the girder of two hoisting cranes together, has saved two girders, has saved material, reduced productive costs, simultaneously, have only the height that satisfies a hoisting crane of installation to implement, reduced the design cost and the building cost of factory building requirement on height of workshop.
The utility model is not limited to above-mentioned concrete embodiment, and those of ordinary skill in the art is from above-mentioned design, and without performing creative labour, all conversion of having done all drop within the protection domain of the present utility model.

Claims (2)

1. crane girder comprises
Be used to install the girder upper cover plate of main carriage track;
Main web that is oppositely arranged and secondary web, described main web and secondary web are fixedly installed on the described girder upper cover plate respectively and perpendicular to described girder upper cover plate;
With the relative girder lower cover in described girder upper cover plate position, described girder lower cover is connected between described main web and the secondary web; It is characterized in that: described girder also comprises
The attaching beam that is used for secondary carriage walking, described attaching beam are fixedly installed on the described main web and are positioned at described girder lower cover one end.
2. crane girder as claimed in claim 1 is characterized in that: described attaching beam comprises
Be used to install the attaching beam upper cover plate of secondary trolley track, described attaching beam upper cover plate is fixedly installed on the described main web and perpendicular to described main web;
Attaching beam lower cover, described attaching beam lower cover are fixedly installed on the described main web and are relative with described attaching beam upper cover plate position;
Attaching beam web, described attaching beam web are connected between described attaching beam upper cover plate and the attaching beam lower cover and are positioned at the below of described secondary trolley track.
CN2010205093508U 2010-08-27 2010-08-27 Crane girder Expired - Fee Related CN201793319U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205093508U CN201793319U (en) 2010-08-27 2010-08-27 Crane girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205093508U CN201793319U (en) 2010-08-27 2010-08-27 Crane girder

Publications (1)

Publication Number Publication Date
CN201793319U true CN201793319U (en) 2011-04-13

Family

ID=43848240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205093508U Expired - Fee Related CN201793319U (en) 2010-08-27 2010-08-27 Crane girder

Country Status (1)

Country Link
CN (1) CN201793319U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104401882A (en) * 2014-11-27 2015-03-11 南通润邦重机有限公司 Double-beam four-rail European crane
CN105540429A (en) * 2016-01-28 2016-05-04 常州常矿起重机械有限公司 Crane main beam and machining method thereof
CN106516975A (en) * 2016-11-10 2017-03-22 大连理工大学 Novel bridge crane main beam
CN106586827A (en) * 2017-01-23 2017-04-26 上海振华重工(集团)股份有限公司 Solid web type crane track beam and shore bridge

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104401882A (en) * 2014-11-27 2015-03-11 南通润邦重机有限公司 Double-beam four-rail European crane
CN105540429A (en) * 2016-01-28 2016-05-04 常州常矿起重机械有限公司 Crane main beam and machining method thereof
CN105540429B (en) * 2016-01-28 2018-03-27 常州常矿起重机械有限公司 A kind of crane girder and its processing method
CN106516975A (en) * 2016-11-10 2017-03-22 大连理工大学 Novel bridge crane main beam
CN106586827A (en) * 2017-01-23 2017-04-26 上海振华重工(集团)股份有限公司 Solid web type crane track beam and shore bridge

Similar Documents

Publication Publication Date Title
CN201660380U (en) Novel hoisting transportation vehicle
CN201793319U (en) Crane girder
CN202643142U (en) Double-beam portal crane turnover structure
CN201458582U (en) Ladle turret bay transverse movement hoisting tool
CN201933415U (en) Highway and railway twin-girder bridge erection machine
CN201999647U (en) Ladle crane with structure of two trolleys and two main beams
CN203373019U (en) Low-height bridge crane
CN202429920U (en) Multi-trolley and double-girder gantry crane
CN204111204U (en) A kind of little span hoisting crane
CN201647822U (en) Main girder of double girder crane and double girder crane using same
CN202785373U (en) Double-trolley portal crane
CN202465073U (en) Crane traveling mechanism
CN202030454U (en) Crown block capable of being used in both manufacturing and overhauling
CN201305406Y (en) Finger small car for crane
CN208454328U (en) A kind of novel track turning lifting beam machine
CN202465102U (en) Double-trolley rotary electromagnetic overhead crane with carrier-beam
CN202465115U (en) Double main beam gantry crane
CN202609790U (en) Wall crane frame beam and hoisting device
CN206915601U (en) The traveller gantry of installation activity bottom plate
CN107738986B (en) Full-manual maintenance-free simple hoisting system
CN101586365B (en) Crane girder and roof supporting structure with span greater than or equal to 100m
CN202703742U (en) Combined weight moving trolley
CN211895780U (en) Driving of sand paper machine
CN201882802U (en) Monorail car
CN202465101U (en) Bridge-type crane with temporary trolley

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110413

Termination date: 20130827