CN201187051Y - Deep water bridge foundation construction multifunctional drill platform top board - Google Patents
Deep water bridge foundation construction multifunctional drill platform top board Download PDFInfo
- Publication number
- CN201187051Y CN201187051Y CNU2008200290288U CN200820029028U CN201187051Y CN 201187051 Y CN201187051 Y CN 201187051Y CN U2008200290288 U CNU2008200290288 U CN U2008200290288U CN 200820029028 U CN200820029028 U CN 200820029028U CN 201187051 Y CN201187051 Y CN 201187051Y
- Authority
- CN
- China
- Prior art keywords
- girder
- platform
- platform top
- panel
- deep water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Foundations (AREA)
Abstract
The utility model provides a deep water bridge foundation construction multifunction drill platform top plate, which is characterized in that the multifunction drill platform top plate at least comprises a girder (101), a secondary girder (102), ring beams (103), small ribs (104), and a panel (105). Both the girder (101) and the secondary girder (102) are double girder bodies. The girder (101) and the secondary girder (102) constitute a reticular body through longitudinal and cross connection vertically; the ring beams (103) are connected inside the grids of the reticular body; the panel (105) is fixed on the upper surface of the reticular body; the small ribs (104) are connected between the girder (101) and the secondary girder (102); the girder (101), the secondary girder (102), the collar tie beams (103) and the small ribs (104) and the panel constitute a one-piece platform; the platform is connected above a platform top plate support distribution beam (4) arranged on a steel casing or a steel pipe pile (11). The deep water bridge foundation construction multifunction drill platform top plate can reduce the construction cost and quicken the construction progress.
Description
Technical field
The utility model relates to a kind of deep water bridge foundation construction, particularly deep water bridge foundation construction multifunctional hole-drilling platform top.
Background technology
Along with China transport development Tongjiang reaches advancing by leaps and bounds of maritime works's journey, deep water multi-column pier foundation, highrise pile cap obtain very using widely as the main base form of striding river, Oversea bridge.
The construction traditional method on such basis is at present: build drilling platform construction drill castinplace pile in water, after pile foundation construction finishes, remove the drilling platform in the bearing platform construction scope, and the steel box is installed is carried out the construction of cushion cap.This kind job practices must be removed drilling platform, and reinstall steel box base plate after pile foundation construction is finished, and again as support, carries out the assembly unit of other members such as steel box wallboard, cause the waste of lot of materials, and the duration is longer.
Summary of the invention
The purpose of this utility model provides a kind of deep water bridge foundation construction multifunctional hole-drilling platform top that reduces construction cost, accelerating construction progress.
The purpose of this utility model is to realize like this, deep water bridge foundation construction multifunctional hole-drilling platform top, it is characterized in that: comprise girder, secondary beam, collar tie beam, riblet, panel at least, girder, secondary beam are the twin beams body, girder and the vertical in length and breadth reticulate body that connects and composes of secondary beam; Connect collar tie beam in the reticulate body grid, reticulate body upper surface fixed panel connects riblet between the girder of twin beams body and the secondary beam; Make girder, secondary beam, collar tie beam, riblet, panel-shaped be integral platform; Platform again with steel casing or steel pipe pile on the platform top that is provided with support the distribution beam top and be connected.
Describedly be integral platform by girder, secondary beam, collar tie beam, riblet, panel-shaped and be higher than more than the working water level 2m.
The utility model has the advantages that: top board double as box base plate, improved the drilling platform form of in the past supporting by the temporary steel pile tube, adopt the steel casing to support.The type platform can be in the drilled pile construction stage support platform as rig and placing of material, satisfy the drilling construction requirement, can transfer to design elevation directly as steel box base plate after drilling construction is finished again, play the bottom concrete cast and rely on the effect of structure.Use this multifunctional hole-drilling platform top, not only can be in the deep water foundation work progress, save steel box base plate and a large amount of temporory structuries and the material supporting with it, and reduce at pile foundation construction and bearing platform construction transition stage and face the operation that repeated structure is removed and installed greatly, a large amount of durations have been saved, for in the extensive deepwater high pile bearing platform construction of bridge, reduce aspects such as construction cost, accelerating construction progress, played significant effect and effect.
Description of drawings
Below in conjunction with the embodiment accompanying drawing the utility model is described further.
Fig. 1 is the double box base plate facade arrangement diagram of doing of drilling platform top board;
Fig. 2 is the double box base plate plane arrangement diagram of doing of drilling platform top board;
Fig. 3 is the A portion enlarged drawing among Fig. 1.
Among the figure: 1, drilling platform top board; 2, box base plate; 3, steel casing; 4, platform top supports distribution beam; 5, working platform; 6, rig; 7, steel box wallboard; 8, support in the steel box; 9, back cover concrete; 10, base plate suspension rod; 11, steel pipe pile; 101, girder; 102, secondary beam; 103, collar tie beam; 104, riblet; 105, panel.
The specific embodiment
As shown in figures 1 and 3, deep water bridge foundation construction multifunctional hole-drilling platform top comprises girder 101, secondary beam 102, collar tie beam 103, riblet 104, panel 105, girder 101, secondary beam 102 are the twin beams body, girder 101 and the vertical in length and breadth reticulate body that connects and composes of secondary beam 102; Connect collar tie beam 103 in the reticulate body grid,, adopt steel casing 3 to support as vertical owing to boring position, hole is set at steel casing 3 places.Reticulate body upper surface fixed panel 105 connects riblet 104 between the girder 101 of twin beams body and the secondary beam 102; Make girder 101, secondary beam 102, collar tie beam 103, riblet 104, panel 105 form the one platform.
As shown in Figure 2, form the one platform by girder 101, secondary beam 102, collar tie beam 103, riblet 104, panel 105, weld with working platform 5 around the one platform, the platform that is provided with on working platform 5 and steel casing 3 or the steel pipe pile 11 is worked on regular shifts and is supported distribution beam 4 (or being called bracket) top overlap joint, the vertical one platform that supports of steel casing 3 conducts.Consider drilling construction load and bottom concrete cast load in the design of platform.In the bored pile construction stage, 1 on drilling platform top board is held in steel and protects the upper end platform top that sets in advance of outer wall and support on the distribution beam 4 (support bracket).After bored pile is executed end, on steel casing 3 tops place system under the suspention is installed, at first drilling platform top board 1 is mentioned certain altitude, the platform top of cutting off drilling platform top board 1 below again supports distribution beam 4 (bracket), the platform top of transferring certain altitude to the water surface then supports on the distribution beam 4 (bracket), as the base plate of steel box.
In whole foundation construction process, to consider as a whole, drilling platform top board 1 function is taken into account drilling construction requirement and steel box back cover concrete cast requirement.
The drilled pile construction stage: drilling platform top board 1 machine-shaping steel latticework beam form, be placed in the platform top that is provided with on steel casing 3 or the steel pipe pile 11 and support distribution beam 4 (bracket) top, form the operation platform in the boring procedure, platform is higher than more than the working water level 2m, arrange boring rig 6 construction installations such as grade, carry out bore operation.
The steel box construction stage: after pile foundation construction is finished, remove on the platform all facilities 6 etc., (or transferring certain altitude) assembly unit steel box wallboard 7 on platform top 1, platform top 1 converts the base plate 2 of box to; Behind the interior support 8 of other auxiliary part one steel box of installation box, the base plate suspension rod 10 etc., transfer the steel box to design elevation, and base plate suspension rod 10 is connected with steel casing 3, as the overhung construction of steel box wallboard 7 with box base plate 2, with box base plate 2 (being drilling platform top board 1) is support, cast back cover concrete 9.
Claims (2)
1, deep water bridge foundation construction multifunctional hole-drilling platform top, it is characterized in that: which comprises at least girder (101), secondary beam (102), collar tie beam (103), riblet (104), panel (105), girder (101), secondary beam (102) are the twin beams body, girder (101) and the vertical in length and breadth reticulate body that connects and composes of secondary beam (102); Connect collar tie beam (103) in the reticulate body grid, reticulate body upper surface fixed panel (105) connects riblet (104) between girder of twin beams body (101) and the secondary beam (102); Make girder (101), secondary beam (102), collar tie beam (103), riblet (104), panel (105) form the one platform; Platform is gone up platform top support distribution beam (4) top that is provided with steel casing (3) or steel pipe pile (11) again and is connected.
2, deep water bridge foundation construction multifunctional hole-drilling platform top according to claim 1 is characterized in that: describedly form the one platform by girder (101), secondary beam (102), collar tie beam (103), riblet (104), panel (105) and be higher than more than the working water level 2m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200290288U CN201187051Y (en) | 2008-05-06 | 2008-05-06 | Deep water bridge foundation construction multifunctional drill platform top board |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200290288U CN201187051Y (en) | 2008-05-06 | 2008-05-06 | Deep water bridge foundation construction multifunctional drill platform top board |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201187051Y true CN201187051Y (en) | 2009-01-28 |
Family
ID=40310069
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008200290288U Expired - Lifetime CN201187051Y (en) | 2008-05-06 | 2008-05-06 | Deep water bridge foundation construction multifunctional drill platform top board |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201187051Y (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102900024A (en) * | 2012-11-07 | 2013-01-30 | 中铁大桥局集团第六工程有限公司 | Overturning die plate for large-scale concrete structure and using method for overturning die plate |
CN104563076A (en) * | 2014-12-19 | 2015-04-29 | 成都聚智工业设计有限公司 | Pile foundation construction structure |
CN115492141A (en) * | 2022-10-21 | 2022-12-20 | 中铁二院工程集团有限责任公司 | Steel suspension box cofferdam structure and bottom plate and construction method thereof |
-
2008
- 2008-05-06 CN CNU2008200290288U patent/CN201187051Y/en not_active Expired - Lifetime
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102900024A (en) * | 2012-11-07 | 2013-01-30 | 中铁大桥局集团第六工程有限公司 | Overturning die plate for large-scale concrete structure and using method for overturning die plate |
CN102900024B (en) * | 2012-11-07 | 2015-07-08 | 中铁大桥局集团第六工程有限公司 | Using method for overturning die plate for large-scale concrete structure and |
CN104563076A (en) * | 2014-12-19 | 2015-04-29 | 成都聚智工业设计有限公司 | Pile foundation construction structure |
CN115492141A (en) * | 2022-10-21 | 2022-12-20 | 中铁二院工程集团有限责任公司 | Steel suspension box cofferdam structure and bottom plate and construction method thereof |
CN115492141B (en) * | 2022-10-21 | 2024-01-30 | 中铁二院工程集团有限责任公司 | Steel suspended box cofferdam structure, bottom plate thereof and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103498523B (en) | Floor system | |
CN201695681U (en) | Integral self-elevating type elevator hoistway tube mold | |
CN201546227U (en) | Steel support beam for supporting foundation pit bracing piling wall and basement structure outer wall | |
CN201883444U (en) | Double-wall steel cofferdam for underwater low pile cap | |
CN101906754B (en) | Rigid connection method for steel beam and concrete pier | |
CN103866693A (en) | Installing method of reinforced concrete bowstring rod arch bridge arch ribs and hanging auxiliary bridge | |
CN103374923A (en) | Method for prefabricating and mounting underwater pier | |
CN201187051Y (en) | Deep water bridge foundation construction multifunctional drill platform top board | |
CN103122691A (en) | Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method | |
CN101560766B (en) | Grid-like underground continuous wall plate and production method thereof | |
CN101503878B (en) | Construction method for building foundation pit enclosure structure with thin-walled cylinder pile as fender post | |
CN201999656U (en) | Detachable combined tower crane base | |
CN201486579U (en) | Drilling anchor rod hole positioning device | |
CN104895221B (en) | Assembled shaped steel confined concrete shear wall structure | |
CN109930624A (en) | A kind of embedding petrographic province blower foundation of offshore wind farm and construction method | |
CN111042213A (en) | Construction method for replacing raft split heads with anti-floating anchor rods for supporting | |
CN202416324U (en) | Beam and slab structure superposed through top-down beam and down-top slab construction of foundation pit project | |
CN203034799U (en) | Tower hoist standard knot bearing overhead support formwork steel platform structure | |
CN212317544U (en) | A post connection structure about newly-built basis for expanding underground space | |
CN101886470B (en) | Construction method of exposed concrete ribbed beams | |
CN112431208A (en) | Construction method for deep foundation pit supporting by adopting component type force transmission belt | |
CN203007965U (en) | Steel hanging box system for underwater high-rise pile cap construction | |
CN202108299U (en) | Segmented assembled water tank tower with adjustable height | |
CN204385743U (en) | A kind of pile foundation in deep water steel pile casting construction system | |
CN209779672U (en) | Offshore wind power rock-socketed area fan foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20090128 |
|
CX01 | Expiry of patent term |