Nothing Special   »   [go: up one dir, main page]

CN201187051Y - Deep water bridge foundation construction multifunctional drill platform top board - Google Patents

Deep water bridge foundation construction multifunctional drill platform top board Download PDF

Info

Publication number
CN201187051Y
CN201187051Y CNU2008200290288U CN200820029028U CN201187051Y CN 201187051 Y CN201187051 Y CN 201187051Y CN U2008200290288 U CNU2008200290288 U CN U2008200290288U CN 200820029028 U CN200820029028 U CN 200820029028U CN 201187051 Y CN201187051 Y CN 201187051Y
Authority
CN
China
Prior art keywords
girder
platform
platform top
panel
deep water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008200290288U
Other languages
Chinese (zh)
Inventor
欧阳效勇
任回兴
贺茂生
孙克强
聂青龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Highway Engineering Co Ltd
Original Assignee
CCCC Second Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Highway Engineering Co Ltd filed Critical CCCC Second Highway Engineering Co Ltd
Priority to CNU2008200290288U priority Critical patent/CN201187051Y/en
Application granted granted Critical
Publication of CN201187051Y publication Critical patent/CN201187051Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model provides a deep water bridge foundation construction multifunction drill platform top plate, which is characterized in that the multifunction drill platform top plate at least comprises a girder (101), a secondary girder (102), ring beams (103), small ribs (104), and a panel (105). Both the girder (101) and the secondary girder (102) are double girder bodies. The girder (101) and the secondary girder (102) constitute a reticular body through longitudinal and cross connection vertically; the ring beams (103) are connected inside the grids of the reticular body; the panel (105) is fixed on the upper surface of the reticular body; the small ribs (104) are connected between the girder (101) and the secondary girder (102); the girder (101), the secondary girder (102), the collar tie beams (103) and the small ribs (104) and the panel constitute a one-piece platform; the platform is connected above a platform top plate support distribution beam (4) arranged on a steel casing or a steel pipe pile (11). The deep water bridge foundation construction multifunction drill platform top plate can reduce the construction cost and quicken the construction progress.

Description

Deep water bridge foundation construction multifunctional hole-drilling platform top
Technical field
The utility model relates to a kind of deep water bridge foundation construction, particularly deep water bridge foundation construction multifunctional hole-drilling platform top.
Background technology
Along with China transport development Tongjiang reaches advancing by leaps and bounds of maritime works's journey, deep water multi-column pier foundation, highrise pile cap obtain very using widely as the main base form of striding river, Oversea bridge.
The construction traditional method on such basis is at present: build drilling platform construction drill castinplace pile in water, after pile foundation construction finishes, remove the drilling platform in the bearing platform construction scope, and the steel box is installed is carried out the construction of cushion cap.This kind job practices must be removed drilling platform, and reinstall steel box base plate after pile foundation construction is finished, and again as support, carries out the assembly unit of other members such as steel box wallboard, cause the waste of lot of materials, and the duration is longer.
Summary of the invention
The purpose of this utility model provides a kind of deep water bridge foundation construction multifunctional hole-drilling platform top that reduces construction cost, accelerating construction progress.
The purpose of this utility model is to realize like this, deep water bridge foundation construction multifunctional hole-drilling platform top, it is characterized in that: comprise girder, secondary beam, collar tie beam, riblet, panel at least, girder, secondary beam are the twin beams body, girder and the vertical in length and breadth reticulate body that connects and composes of secondary beam; Connect collar tie beam in the reticulate body grid, reticulate body upper surface fixed panel connects riblet between the girder of twin beams body and the secondary beam; Make girder, secondary beam, collar tie beam, riblet, panel-shaped be integral platform; Platform again with steel casing or steel pipe pile on the platform top that is provided with support the distribution beam top and be connected.
Describedly be integral platform by girder, secondary beam, collar tie beam, riblet, panel-shaped and be higher than more than the working water level 2m.
The utility model has the advantages that: top board double as box base plate, improved the drilling platform form of in the past supporting by the temporary steel pile tube, adopt the steel casing to support.The type platform can be in the drilled pile construction stage support platform as rig and placing of material, satisfy the drilling construction requirement, can transfer to design elevation directly as steel box base plate after drilling construction is finished again, play the bottom concrete cast and rely on the effect of structure.Use this multifunctional hole-drilling platform top, not only can be in the deep water foundation work progress, save steel box base plate and a large amount of temporory structuries and the material supporting with it, and reduce at pile foundation construction and bearing platform construction transition stage and face the operation that repeated structure is removed and installed greatly, a large amount of durations have been saved, for in the extensive deepwater high pile bearing platform construction of bridge, reduce aspects such as construction cost, accelerating construction progress, played significant effect and effect.
Description of drawings
Below in conjunction with the embodiment accompanying drawing the utility model is described further.
Fig. 1 is the double box base plate facade arrangement diagram of doing of drilling platform top board;
Fig. 2 is the double box base plate plane arrangement diagram of doing of drilling platform top board;
Fig. 3 is the A portion enlarged drawing among Fig. 1.
Among the figure: 1, drilling platform top board; 2, box base plate; 3, steel casing; 4, platform top supports distribution beam; 5, working platform; 6, rig; 7, steel box wallboard; 8, support in the steel box; 9, back cover concrete; 10, base plate suspension rod; 11, steel pipe pile; 101, girder; 102, secondary beam; 103, collar tie beam; 104, riblet; 105, panel.
The specific embodiment
As shown in figures 1 and 3, deep water bridge foundation construction multifunctional hole-drilling platform top comprises girder 101, secondary beam 102, collar tie beam 103, riblet 104, panel 105, girder 101, secondary beam 102 are the twin beams body, girder 101 and the vertical in length and breadth reticulate body that connects and composes of secondary beam 102; Connect collar tie beam 103 in the reticulate body grid,, adopt steel casing 3 to support as vertical owing to boring position, hole is set at steel casing 3 places.Reticulate body upper surface fixed panel 105 connects riblet 104 between the girder 101 of twin beams body and the secondary beam 102; Make girder 101, secondary beam 102, collar tie beam 103, riblet 104, panel 105 form the one platform.
As shown in Figure 2, form the one platform by girder 101, secondary beam 102, collar tie beam 103, riblet 104, panel 105, weld with working platform 5 around the one platform, the platform that is provided with on working platform 5 and steel casing 3 or the steel pipe pile 11 is worked on regular shifts and is supported distribution beam 4 (or being called bracket) top overlap joint, the vertical one platform that supports of steel casing 3 conducts.Consider drilling construction load and bottom concrete cast load in the design of platform.In the bored pile construction stage, 1 on drilling platform top board is held in steel and protects the upper end platform top that sets in advance of outer wall and support on the distribution beam 4 (support bracket).After bored pile is executed end, on steel casing 3 tops place system under the suspention is installed, at first drilling platform top board 1 is mentioned certain altitude, the platform top of cutting off drilling platform top board 1 below again supports distribution beam 4 (bracket), the platform top of transferring certain altitude to the water surface then supports on the distribution beam 4 (bracket), as the base plate of steel box.
In whole foundation construction process, to consider as a whole, drilling platform top board 1 function is taken into account drilling construction requirement and steel box back cover concrete cast requirement.
The drilled pile construction stage: drilling platform top board 1 machine-shaping steel latticework beam form, be placed in the platform top that is provided with on steel casing 3 or the steel pipe pile 11 and support distribution beam 4 (bracket) top, form the operation platform in the boring procedure, platform is higher than more than the working water level 2m, arrange boring rig 6 construction installations such as grade, carry out bore operation.
The steel box construction stage: after pile foundation construction is finished, remove on the platform all facilities 6 etc., (or transferring certain altitude) assembly unit steel box wallboard 7 on platform top 1, platform top 1 converts the base plate 2 of box to; Behind the interior support 8 of other auxiliary part one steel box of installation box, the base plate suspension rod 10 etc., transfer the steel box to design elevation, and base plate suspension rod 10 is connected with steel casing 3, as the overhung construction of steel box wallboard 7 with box base plate 2, with box base plate 2 (being drilling platform top board 1) is support, cast back cover concrete 9.

Claims (2)

1, deep water bridge foundation construction multifunctional hole-drilling platform top, it is characterized in that: which comprises at least girder (101), secondary beam (102), collar tie beam (103), riblet (104), panel (105), girder (101), secondary beam (102) are the twin beams body, girder (101) and the vertical in length and breadth reticulate body that connects and composes of secondary beam (102); Connect collar tie beam (103) in the reticulate body grid, reticulate body upper surface fixed panel (105) connects riblet (104) between girder of twin beams body (101) and the secondary beam (102); Make girder (101), secondary beam (102), collar tie beam (103), riblet (104), panel (105) form the one platform; Platform is gone up platform top support distribution beam (4) top that is provided with steel casing (3) or steel pipe pile (11) again and is connected.
2, deep water bridge foundation construction multifunctional hole-drilling platform top according to claim 1 is characterized in that: describedly form the one platform by girder (101), secondary beam (102), collar tie beam (103), riblet (104), panel (105) and be higher than more than the working water level 2m.
CNU2008200290288U 2008-05-06 2008-05-06 Deep water bridge foundation construction multifunctional drill platform top board Expired - Lifetime CN201187051Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200290288U CN201187051Y (en) 2008-05-06 2008-05-06 Deep water bridge foundation construction multifunctional drill platform top board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200290288U CN201187051Y (en) 2008-05-06 2008-05-06 Deep water bridge foundation construction multifunctional drill platform top board

Publications (1)

Publication Number Publication Date
CN201187051Y true CN201187051Y (en) 2009-01-28

Family

ID=40310069

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200290288U Expired - Lifetime CN201187051Y (en) 2008-05-06 2008-05-06 Deep water bridge foundation construction multifunctional drill platform top board

Country Status (1)

Country Link
CN (1) CN201187051Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900024A (en) * 2012-11-07 2013-01-30 中铁大桥局集团第六工程有限公司 Overturning die plate for large-scale concrete structure and using method for overturning die plate
CN104563076A (en) * 2014-12-19 2015-04-29 成都聚智工业设计有限公司 Pile foundation construction structure
CN115492141A (en) * 2022-10-21 2022-12-20 中铁二院工程集团有限责任公司 Steel suspension box cofferdam structure and bottom plate and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900024A (en) * 2012-11-07 2013-01-30 中铁大桥局集团第六工程有限公司 Overturning die plate for large-scale concrete structure and using method for overturning die plate
CN102900024B (en) * 2012-11-07 2015-07-08 中铁大桥局集团第六工程有限公司 Using method for overturning die plate for large-scale concrete structure and
CN104563076A (en) * 2014-12-19 2015-04-29 成都聚智工业设计有限公司 Pile foundation construction structure
CN115492141A (en) * 2022-10-21 2022-12-20 中铁二院工程集团有限责任公司 Steel suspension box cofferdam structure and bottom plate and construction method thereof
CN115492141B (en) * 2022-10-21 2024-01-30 中铁二院工程集团有限责任公司 Steel suspended box cofferdam structure, bottom plate thereof and construction method

Similar Documents

Publication Publication Date Title
CN103498523B (en) Floor system
CN201695681U (en) Integral self-elevating type elevator hoistway tube mold
CN201546227U (en) Steel support beam for supporting foundation pit bracing piling wall and basement structure outer wall
CN201883444U (en) Double-wall steel cofferdam for underwater low pile cap
CN101906754B (en) Rigid connection method for steel beam and concrete pier
CN103866693A (en) Installing method of reinforced concrete bowstring rod arch bridge arch ribs and hanging auxiliary bridge
CN103374923A (en) Method for prefabricating and mounting underwater pier
CN201187051Y (en) Deep water bridge foundation construction multifunctional drill platform top board
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN101560766B (en) Grid-like underground continuous wall plate and production method thereof
CN101503878B (en) Construction method for building foundation pit enclosure structure with thin-walled cylinder pile as fender post
CN201999656U (en) Detachable combined tower crane base
CN201486579U (en) Drilling anchor rod hole positioning device
CN104895221B (en) Assembled shaped steel confined concrete shear wall structure
CN109930624A (en) A kind of embedding petrographic province blower foundation of offshore wind farm and construction method
CN111042213A (en) Construction method for replacing raft split heads with anti-floating anchor rods for supporting
CN202416324U (en) Beam and slab structure superposed through top-down beam and down-top slab construction of foundation pit project
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN212317544U (en) A post connection structure about newly-built basis for expanding underground space
CN101886470B (en) Construction method of exposed concrete ribbed beams
CN112431208A (en) Construction method for deep foundation pit supporting by adopting component type force transmission belt
CN203007965U (en) Steel hanging box system for underwater high-rise pile cap construction
CN202108299U (en) Segmented assembled water tank tower with adjustable height
CN204385743U (en) A kind of pile foundation in deep water steel pile casting construction system
CN209779672U (en) Offshore wind power rock-socketed area fan foundation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20090128

CX01 Expiry of patent term