CN201074401Y - Plastering machine - Google Patents
Plastering machine Download PDFInfo
- Publication number
- CN201074401Y CN201074401Y CNU2007201464935U CN200720146493U CN201074401Y CN 201074401 Y CN201074401 Y CN 201074401Y CN U2007201464935 U CNU2007201464935 U CN U2007201464935U CN 200720146493 U CN200720146493 U CN 200720146493U CN 201074401 Y CN201074401 Y CN 201074401Y
- Authority
- CN
- China
- Prior art keywords
- plastering
- ash
- ash hole
- rope
- links
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides a plastering machine which can plaster a wall from top to bottom. The front surface of a plastering device of the plastering machine is provided with a square ash hole, the back surface of the ash hole is provided with an ash material funnel, an ash chamber is disposed at the connecting position of the ash material funnel and the ash hole, and two sides of the plastering device are provided with gliders which contact with an upright column. A lifting device is composed of a generator, a decelerator, a volume roller and a whipping area, the plastering device is pulled to move up and down along the upright column by the lifting device. The top portion of two side prisms of the square ash hole extends upward, which enables an upper prism of the ash hole to be at the highest position of the plastering device. The bottom portion of two side prisms of the square ash hole extends downward, which enables the lower prism of the ash hole to be at the lowest position of the plastering device. When the plastering device is lifted to the highest position, the upper prism of the ash hole can contact with the ceiling, and when the plastering device is dropped to the lowest position, the lower prism of the ash hole can contact with the ground, and the ash material is transported to the ash hole by a pressure device. The utility model has the advantages that the plastering machine can plaster a wall from top to bottom, thereby reducing the manual labor intensity.
Description
Technical field:
The present invention relates to a kind of troweling machine, is a kind of improved troweling machine.
Background technology:
In the market the troweling machine ash hole of Chu Shouing up and down between the rib distance less, apparatus of plastering runs to the top can not touch ceiling, run to the bottom can not touch ground line.Can leave at the bottom of the top of wall the room smear less than.
Summary of the invention:
The invention provides a kind of troweling machine that can plaster from the top to bottom to wall.
For solving the problems of the technologies described above, the present invention by the following technical solutions:
A kind of troweling machine, by support, apparatus of plastering, lifting appliance, running gear, vertical adjustment directly device form; Frame bottom is a underframe, and at least two root posts are installed on the underframe, and the column top is the top frame; The apparatus of plastering front is square ash hole, and the ash hole back side is grey hopper, and grey hopper and ash hole connecting place are the ash discharge chamber, and the apparatus of plastering dual-side is installed glider, and glider contacts with column; Lifting appliance is made up of motor, reducer, volume Kun, rope woolding district, and lifting appliance pulling apparatus of plastering moves up and down along column; It is characterized in that square ash hole two incline tops extend upward, make that rib is the highest point of apparatus of plastering on the ash hole; Extend downwards ash hole two inclines bottoms, makes that rib is the lowest part of apparatus of plastering under the ash hole.When apparatus of plastering rose to highest point, rib can touch ceiling on the ash hole, and when apparatus of plastering dropped to lowest part, rib can touch ground line under the ash hole; The ash material is transported to the ash hole place by the device that pressure is arranged.
This troweling machine has top ceiling device to be installed in the end of top frame crossbeam; Top ceiling device is made up of the movable push rod of adorning in sleeve, the sleeve, movable push rod mobile device, movable push rod fastener.Prop up the sagging cord of top of the trellis, regulating block is arranged at the cord bottom; Touch circle and link to each other with support, touching has at least two contacts in the circle, and the direction of contact is corresponding with the direction of support vertical adjusting device adjusting rod; Regulating block is in touching circle, and the cross section of regulating block and contact position, contact is circular; The central point of this circular cross-section equates to each contact distance.Support is placed on the carriage; The relative position of support and carriage is regulated with adjusting device.There is movably plastering plate at the positive place of ash hole, the plastering plate back side and positive movable contact of ash hole; Plastering plate links to each other with the plastering plate adjusting device.The ash hopper is a compression ash hopper: interlocked by hopper and hopper cover, hopper links to each other with the head of plastering; In the ash hopper pliable and tough grey pocket is arranged, extrude the ash material with material pressing device.This troweling machine has stifled grey panel assembly to be: plastering plate both sides fixed point rope links to each other with the lever lever arm of stifled grey panel assembly through ash hole both sides pulleys (440) or pulley (441); The fulcrum of stifled hawk lever is the ash hole two side; Stifled hawk lever working end links to each other with stifled hawk.At least one incline of ash hole is movably connected with secondary secondary ash hole one incline of plastering head; Pair plaster the head link to each other with the ash discharge chamber.This troweling machine has the ash hole of smearing the door and window device to meet at right angles; Smear the door and window device and rotate along the track box similar to the door and window shape, carriage is arranged in the track box, track box links to each other with connecting rod with carriage, and four jiaos of places of track box are movable rail; The ash material is stressed and flows to ash hole; Smearing Door/window brace member can positively lock or/and link to each other with little support member is removable with the troweling machine cradle back with the troweling machine support.The plastering plate locating part is made up of spacing point, spring, little stuck point, little card base, pin, connector bar, is installed in the place, two ends of movable rail; Plastering plate small rack, a small rack of plastering overlap substantially on same plane substantially, and the bottom of locating part links to each other with movable rail with pin, and a side is stretched out spring, and the little card base of spring is stuck in the little stuck point, and connector bar connects spring bottom and trigger point; One end of plastering plate T shape small rack horizontal sides can contact with the spacing point of locating part; An end of T shape small rack horizontal sides of plastering links to each other with lead limit switch, can contact with the trigger point; Plastering plate T shape small rack, a two-end structure of T shape small rack horizontal sides of plastering are identical.
Advantage of the present invention: can plaster from the top to bottom to wall, reduce hand labor intensity.
Description of drawings
Below in conjunction with accompanying drawing embodiment of the present utility model is done further introduction.
Ceiling device schematic diagram Figure 102 top, Figure 101 top ceiling device side perspective
Figure 103 top ceiling device back of the body is looked phantom drawing Figure 104 top ceiling device side perspective
Figure 105 top ceiling device side-looking schematic perspective view diagram 106 movable push rod fastener structural representations
The straight apparatus structure schematic diagram of Figure 20 1 vertical adjustment Figure 20 2 regulating blocks, touch the circle vertical view
The adjustable syndeton schematic diagram of turning connection diagram Figure 20 4 cross bars of Figure 20 3 cross bars
The adjustable syndeton schematic diagram of the straight apparatus structure schematic diagram of Figure 20 5 vertical adjustments Figure 20 6 cross bars
Figure 30 1 aligning device of grouting apparatus schematic diagram Figure 30 2 straight line post back views
Figure 30 3 bar gage schematic diagrames
Figure 40 1 troweling machine front view 402 plastering plate schematic diagrames
Figure 40 3 plastering plate vertical view Figure 40 4 ash hole elevations
Figure 40 5I-I sectional view Figure 40 6 rope controller structure schematic diagrames
The spacing hole pattern of Figure 40 7 rope micro actuator structural representation Figure 40 8 pulleys
The spacing hole pattern Figure 41 0 apparatus of plastering structural representation of Figure 40 9 pulleys
Figure 41 1 stifled hawk apparatus structure schematic diagram Figure 41 2 stifled grey panel assembly and ash hole cavity structure schematic diagrames
Figure 41 3 last items are swung locating part structural representation Figure 41 4 last items and are swung the locating part structural representation
Figure 41 5 hinge cross-sectional structure schematic diagram Figure 41 6 hinge cross-sectional structure schematic diagrames
Figure 41 7 hinge cross-sectional structure schematic diagrames
Figure 50 1 smears Door/window brace member and smears door and window device front elevational schematic
Figure 50 2 smears Door/window brace member and smears door and window apparatus structure schematic diagram
Ramuscule support member figure Figure 50 4 movable rail schematic diagrames of Figure 50 3 troweling machine columns
Figure 50 5 plastering plate structural representation Figure 50 6 smear door and window apparatus structure schematic diagram
The cover chalaza schematic diagram of Figure 50 7 movable rail lock member structure schematic diagram Figure 50 8 track box carriages
Figure 50 9 movable rail lock member structure schematic diagram Figure 51 0 locating part structural representation
Figure 51 1 locating part structural representation Figure 51 2 movable rail work schematic diagrames
Figure 51 3 movable rail structural representation Figure 51 4 hound structural representations
109 wire rope handling roads, 108 wire rope handling roads, 101 column 102 sleeves, 103 movable push rod 104 fixed points, 105 truckle 106 elastic components, 107 summits, 110 ropes, 111 levers, 112 supports, 113 lesser calorie spares, 114 handwheels, 115 hand wheel shafts, 116 top frames, 117 underframes, 118 top ceiling devices, 119 pulleys, 120 fulcrums
202 top of the trellis of 201 supports, 203 frame bottom, 204 cross bars, 205 cross bars, 206 cords, 207 regulating blocks 208 touch circle 209 contact 210 magnet, 211 small rack 212 perps, 213 straight tube 214 plates, 215 plate 216 face adapted, 217 pins or hinge 218 fixed edges 219 Uprightness adjusting devices 220 small racks 221 small racks 222 nuts 223 nuts 224 nuts 225 screw rods 226 handwheels 227 regulating electric machines 228 decelerators 229 bent axles 230 connecting rods 231 lever arms 232 jack shells 233 motion bars 234 ejector pins 235 small racks 236 springs 237 levers 238 ejector pin pull bars 239 ejector pin trigger pieces 240 pulleys 241 small racks 242 rangefinders 243 motion bar trigger pieces
301. 322. tape measures, 323. unwrapping wire places, 316. weight 317. rules, 318. little prap 319. secure alignment device 320. fulcrums, 321. back sides, wall 302. columns, 303. crossbeam 304. crossbeams, 305. bar gage 306. small racks, 307. spring 308. lesser calorie spares, 309. plate 310. plates, 311. small rack 312. screw rods, 313. handwheel 314. hypotenuses, 315. bases, 324. screw threads, 325. diagonal braces, 326. small racks, 327. rangefinders
401. 402. 403. 404. 405. 406. 407. 408. 409. 410. 411. 412. 413.414. 415. 416. 417. 418. 419. 420.421. 22. 23. 24. 25. 26. 27. 428. 429. 430. 431. 432. 433. 434. 35. 436. 437 438. 39. 440. 441.442. 443. 444. 4445. 446. 447. 448.449. 450 451. 452 453. 454. 455. 456. 457. 458. 459. 460. 461.461’.61”. 462.462’.462”. 463. 464. 465. 466. 467. 468. 469. 470. 471. 472. 473.474. 475.475’. 476. 477. 478. 479. 480. 481. 482. 483.L 484. 485. 486.487. 488. 489.
501。Window limit 502.Track 503.Carriage 504.Smear door and window device 505.Movable rail 505 ' the secondary movable rail 506.Fulcrum 507.Truckle 508.Triangle 509.Track room 510.Plastering plate 511.Rope 512.Rope 513.Roller 514.Card wheel 515.Small rack 516.Median of a triangle 517.Connecting rod 518.Rope woolding district 519.Slideway 520.Needle roller 521.Plaster 522.Spring 523.Ash hole 524.Room 525.Cover chalaza 526.Ramuscule support member 527.Lock 528.Last item 529.Last item wheel 530.Join last item 531.Join last item wheel 532.Bearing 533.Charging covers 534.Locker 535.Hand-held hole 536.Pin 537.Hopper 538.Hopper cover 539.Locking bar 540.Lock end 541.Trigger point 542.Locator 543.Ash hole stuck point 544.Pulley (fixed point) 545.Small rack 546.Small rack 547.Locating part 548.Interior pipe 549.Hole 550.Orbital plane 551.Bolt and nut 552.Rope fixed point 553.Stuck point 554.Inlet pipe place 555.Spring 556.Lead limit switch 557.Lock point 558.Spacing point 559.Spring 560.Lesser calorie point 561.Lesser calorie pin 562.Pin 63.Connector bar 564.Hound 565.Scrap (bridge) 566.Needling 567.The strong point 568.Spring 569.Strong point fulcrum 570.Pin 571.Recess 572.Pin 573.Recess 574.Recess 575.Take bar
The specific embodiment
A kind of troweling machine, by support, apparatus of plastering, lifting appliance, running gear, vertical adjustment directly device form; This troweling machine has top ceiling device, and vertical adjustment is directly installed, and straightening line apparatus, grey hopper are compression ash hopper, removable plastering plate device, and stifled grey panel assembly is smeared Yin and yang angle apparatus, smears compositions such as door and window device.
Figure 101 is a top ceiling device schematic diagram.With support 4 root posts being arranged among the figure is example, and sleeve, movable push rod etc. is installed in place, every root post top.Sleeve 102 is fixedly linked with support 112, the movable push rods 103 of dresses in the sleeve 102, movable push rod up, there is summit 107 on the top, the summit is a matsurface, increases frictional force.Movable push rod is similar to the sleeve cross section, and suitable, and both are shiny surface by contact surface, and the gap is very little.Sleeve can be the top of bracket upright post.Figure 101 middle sleeve, movable push rod etc. can be the structures (Figure 102 Figure 103 is a kind of structure) of Figure 102 Figure 103, also can be the structures (Figure 104 Figure 105 is another kind of structure) of Fig. 4 Fig. 5.
Figure 102 ~ Figure 105 is the enlarged drawing of sleeve, movable push rod etc.Figure 102 is a side perspective, and Figure 103 looks phantom drawing for the back of the body. movable push rod mobile device is: movable push rod 103 back sides have vertical hole as wire rope handling road 108.Rope 110 1 ends link to each other with the fixed point 104 of bottom, the movable push rod back side, and the other end wears long rope race 108 upwards, and the truckle 105 fixing through top, sleeve 102 back side links to each other downwards with elastic component 106 (spring or elastic threads).
Figure 104 is a side perspective, and Figure 105 is that the back of the body is looked phantom drawing.Movable push rod mobile device: vertical hole, sleeve 102 back sides is wire rope handling road 109, and wire rope handling road 109 tip positions are installed truckle 105.Wire rope handling road 108 can be opened in movable push rod back, also can not open.Rope 110 1 ends link to each other with bottom, movable push rod back side fixed point, and the other end passes 108 wire rope handling roads 109, wire rope handling road, or only passes wire rope handling road 109 through truckle 105, and it is downward to connect elastic component.
Movable push rod fastener is: rope shown in Figure 101 links to each other with hand wheel shaft 115, and hand wheel shaft 115 can link to each other with a rope, also can with adjacent or cornerwise 2 link to each other, also can link to each other with three or four.Hand wheel shaft links to each other with support is rotatable.There is handwheel 114 on the hand wheel shaft top, and lesser calorie spare 113 is arranged near the handwheel 114, can block handwheel and make it no longer to rotate.Hand wheel shaft 115, handwheel 114, lesser calorie spare 113 also can be contained on the column.Handwheel drive rope is downward, and drive activity push rod upwards holds out against with ceiling, thus fixed support.
The another kind of structure of movable push rod fastener is: rope 110 links to each other with lever 111 cardinal principle mid points, and lever one end links to each other as fulcrum 120 with pin with the column lower, and the lever other end is pulled down and can be blocked mutually with lesser calorie spare 113.Little fastener links to each other with column.
The third structure of movable push rod fastener is: the rope 110 downward pulleys 119 of crossing, link to each other with column downwards, and lever is that L shaped, L shaped angle is 0 ~ 180 degree.L shaped break place is the fulcrum 120 that links to each other with column.Lever 11 front ends can be adorned truckle, and rope passes the spacing hole of truckle, and lever is pulled down the back and fastened mutually with lesser calorie spare.The another kind of structure of lever 11 as shown in Figure 6, rope links to each other with an end of lever, lever 111 links to each other with column 101 usefulness fulcrums, lever top is fixed with lesser calorie spare 113 with column, lever is upwards pulled and can be blocked mutually with lesser calorie spare.Pull lever 111 and pull down running rope 110, movable push rod upwards holds out against ceiling.
The structure of any sleeve, movable push rod etc. all can link to each other with any movable push rod mobile device, all can link to each other with any movable push rod fastener.The contacted starting point at least of rope and all pulleys, terminal point all can have the rope spacing hole, can not break away from slideway when making rope loose.But pulley is the liner bearing all, reduces friction.The third structure of top ceiling device: the shell of hydraulic jack is fixed to the relevant position of support as sleeve 102, and the motion bar of hydraulic jack is up as movable push rod 103, and movable top masthead end has summit 107.The oil inlet pipe of hydraulic jack respectively or synthetic one link to each other with the oil pump that is contained in the underframe place, fuel tank.
Figure 20 1 is depicted as the straight apparatus structure schematic diagram of troweling machine vertical adjustment, and when column was 2, the top frame was a measurement.The top frame is installed one one cross bar 204 that end stretches out, and in a plane, cross bar 204 is not higher than the top frame and is advisable substantially for a cross bar and a top of the trellis 202.Cross bar 204 external parts have a perps 212, and perps end place is the L shape, and fixedly cord 206, make it can not be offset.Also can be at the direct sagging cord 206 of top frame.
Cord connects regulating block 207 206 times, and regulating block is positioned at and touches circle 208, touches circle and links to each other with support.Touching the circle inwall has contact 209, and the contact is corresponding with the direction of the accent plumb adjusting rod of frame bottom.Contact 209 is a conductor, insulate each other in the contact.Regulating block is circular with the cross section of contact position, contact at least, and this circular central point equates to each contact distance.Regulating block is shapes such as cylinder, circular cone, ball.The contact is at least 2, optional 3 or 4.Wherein can there be the adjusting plumb of at least one contact correspondence can use manual adjustments.Touch circle and can be circle or regular polygon.Regulating block and contact position, contact for not yielding, be difficult for oxidation, conductor material that conductive effect is good.Regulating block itself has voltage ± 12 volt, and available dry cell, button cell, electrical source of power are installed on the regulating block after the transformation rectification, or are electrically connected with regulating block with the lead of dead-soft.After linking to each other with power supply, regulating block keeps balance.When support was vertical fully, regulating block was positioned at the circle center of touching, and do not contact with each contact, and distance equated.
But some material of regulating block and magnet have magnetic force.Level is installed magnet 210 under the regulating block, magnet with touch circle or support and be fixedly linked.Magnetic force between magnet and the regulating block plays damping action to regulating block.Regulating magnet size, position, magnetic intensity, regulating block magnetic material size, position make distance minimum between regulating block and the contact, and can guarantee its working stability.
Touching circle links to each other with cross bar 205 with support.Cross bar 204, cross bar 205 adopt removable the connection or/and reversible connects or/and adjustable connection with support.
Removable connection: cross bar is suitable with weighing connecting place, and screw thread is got in the boring of suitable place, is fixedly linked with short screw.
Turning connection: a limit of pin apparatuses or hinge is a fixed edge, and fixed edge is fixedlyed connected with weighing, and active edges makes and crossbeam external surface form fitting, and suitable links to each other with cross bar, locates to hole for suitable and gets screw thread, is fixedly linked with short screw.The time spent is not turning to internal stent.
Can regulate connection: first kind, two block-shaped essentially identical plates 214, plate 215 are weighed, are touched circle respectively and link to each other with underframe.Two plates are formed cross bar 205 together.Two plate correspondences are drilled into few 1 hole, use than micro screw, nut to connect, and a fixed gap is arranged between screw rod and the hole, and the relative position of two plates is adjustable.Second kind, frame bottom 203 is outwards installed small rack 220.Small rack 221 is installed on frame bottom 203 or the small rack, is adorned 2 nuts 223 on the small rack 221, loading nut 222 on frame bottom 203 and the small rack 220, nut 222 is identical with nut 223.Touch circle 208 outside loading nuts 224, the silk groove of nut 224 is than the silk groove width of nut 222 nuts 223 or narrow.Screw rod 225 screws in the nut 222,223,224, and screw rod 225 front and back silk grooves match with the nut of relevant position.Screw rod 225 ends have handwheel 226, and two screw rods 225 in same plane, does not stagger a bit.Nut 222, nut 223 nuts 224 all have locking nut.
Transferring plumb is jack device or screw device, is installed on the support underframe, transfers the direction of plumb adjusting rod corresponding with the direction of contact, regulates motor 227 and links to each other with underframe, and the lowest part of jack shell links to each other with support, can reduce the height of transferring plumb.Transfer plumb to drive crankshaft connecting rod system by regulating motor shaft through reducer output shaft, the lever arm of connecting rod movable end and jack device is movably connected.Jack is a knock pin type, and the movable end of the pull lever 237 of at least one jack ejector pin 234 links to each other, and synthetic one is stretched out underframe one side as ejector pin trigger piece 239.At least one jack motion bar is end fixed to lift behind the spacing hole of the pulley 240 of rope through linking to each other with underframe synthetic one, reaches underframe one side as motion bar trigger piece 242.Motion bar trigger piece 242 ejector pin trigger pieces 239 are drawn in together among the figure, and they can separate, and respectively are each, the convenient use.Ejector pin lever movable end with lift rope and have spring element to link to each other; Lift rope pulling pin earlier, lift rope pulling activity push rod simultaneously.The accent plumb also can be by regulating motor shaft through the reducer output shaft driven gear; It is mutually meshing that the thumb wheel of the adjusting device of the thumb wheel of the level-off device of surveying instrument or Double Happiness table tennis table leg bottom makes the gear that drives with reducer output shaft, as transferring plumb.When regulating motor and not changeing, highly available manual adjustments of use of transferring the plumb adjusting rod of cradle back at least.
At the higher rangefinder (as laser sensor, infrared ambulator etc.) of bottom, top installation accuracy of the positive at least one root post of support, measurement bracket and the distance of having smeared wall.Rangefinder can directly be installed, or stretches out a small rack 26 to the support side and install.Whether rangefinder band display makes things convenient for the distance of observing support top, the end and having smeared wall suitable.After two rangefinders can output signal subtract each other, only with a display.The support balance can be with transferring plumb to regulate.Display is positioned at the support lower.
Figure 30 1 is depicted as the aligning device of grouting apparatus schematic diagram, and carriage has only shown back side crossbeam 304 among the figure, and the carriage bottom is installed running gear, transferred plumb etc.The bracket cage of carriage and bracket bottom shaped as frame shape are basic identical.The support underframe is put on the bracket cage.At least one group of relative crossbeam of support underframe or/and crossbeam down admittedly at least one group of corresponding crossbeam of the bracket cage of plane forming of thing and carriage or/and crossbeam is consolidated the plane that thing forms down contacts.Support underframe crossbeam 303 two ends places respectively install one identical, can be around crossbeam 303 lockovers or turning fixing movable standard apparatus, the benchmark that contacts with troweling machine as straight line.The structure of standard apparatus is: small rack fixed head 309, plate 310, two plates that stretch out to the underframe back respectively have a hole, can stagger a bit a little in two holes.Bar gage 305 passes compression spring 307 and penetrates in two holes and block no gap.Bar gage 305 is illustrated in figure 3 as the straight rod of smooth in appearance, and there is lid on the top, cover compression spring 307 below the lid, and the bottom is a taper shape, the last plane of circular cone can be stuck in below the hole of plate 309, makes the unlikely disengaging plate 309 of bar gage.The hole of plate 309 plates 310 is that internal diameter is smooth.Lesser calorie spare 308 is installed on the plate 309, and after bar gage 305 was depressed, little fastener can block bar gage, and it is unable to stir any more.Bar gage 305 bottoms are last plane than big coniform in bar gage cross section; The aperture of plate 310 is greater than the aperture of plate 309; The borehole jack with plate 310 of circular cone closes, no gap.
Adjusting device: small rack 311 is installed near the standard apparatus place in crossbeam 304 two ends, and small rack 311 and the boring of crossbeam 303 equal-height positions are provided with screw thread 324, and screw rod 312 ends are provided with handwheel 313, and front end penetrates nut 324, and level is to being movably connected with crossbeam 303.Between nut 324 and the screw rod 312 fixed gap is arranged, make screw rod that certain swing space be arranged.Bracket cage both sides crossbeam extends certain distance to both sides respectively little fastener is installed, and underframe can be moved in the certain limit on bracket cage, and can not drop to below the bracket cage.The connected mode of screw rod 312 front ends and crossbeam 303 is: first kind, crossbeam 303 back sides vertically fix have between one and the crossbeam space than wide plate, porose in the middle of the plate.Screw rod 312 front ends pass the hole, respectively do a fixed point before and after the hole, must make in the two screw rods 312 one stretch out long and another stretches out more in short-term, still can freely rotate and not block.Also can be without plate, the installation of directly holing at the crossbeam back side.Second kind, ball overlaps suit with the semicircle that adapts, and puts at semicircle to add some restrictions, and making between ball and the semicircle cover has certain slewing area and can not break away from the semicircle cover.Screw rod 312 front ends or crossbeam 303 link to each other with ball, and crossbeam 303 or screw rod 312 front ends link to each other with the ball cover.The third uses a circle of bearing to link to each other with crossbeam 303, and another circle links to each other with screw rod 312 front ends.
Linear device: comprise straight line post and straight line.The straight line post is low wide and up narrow angle shape, and there is fulcrum 320 angle on hypotenuse 314, base 315.The vertical level of installing with the base is to the rule 317 towards wall near fulcrum 320, and rule and base connecting place can be the tape measure structure, regains to make things convenient for rule, as building the invar tape that worker or carpenter use.Weight 316 is placed on the base, if the straight line post is firm, also can without weight.Straight line capital place is a wiring point, and wiring point is the little prap 318 of at least one close proximity, can know with naked eyes and judge that little prap 318 two straight lines that connect serve as to separate or contact to be advisable, and little prap 318 can be 1,2,3.Near the little prap 318 secure alignment device 319 is installed.Secure alignment device 319 is that at least one is pasted mutually with the straight line post by bouncing plate or flexible thin slice, and straight line can be fixedly clamped.At least one is subjected at least one limit of bouncing plate or flexible thin slice outwardly-bent, makes things convenient for snapping in of straight line.On the straight line post unwrapping wire place 323 can be installed, also can be a shrinkage pool, can be placed on unnecessary line unwrapping wire place 323.Straight line preferably adopts the fine rule of bright-colored, and straight line can connect one, also can connect parallel at a distance of extremely near two, three.Straight line capital end links to each other with diagonal brace 325, and fulcrum is arranged at diagonal brace 325 bottoms, and diagonal brace 325 does not cover little prap 318, and diagonal brace plays the effect of stability line post.The back on straight line post hypotenuse, base can link to each other with straight-bar or straight plate, reinforces the straight line post.
At the higher rangefinder (as laser sensor, infrared ambulator etc.) of bottom, top installation accuracy of the positive at least one root post of support, measurement bracket and the distance of having smeared wall.Rangefinder can directly be installed, or stretches out a small rack 326 to the support side and install.Whether rangefinder band display makes things convenient for the distance of observing support top, the end and having smeared wall suitable.After two rangefinders can output signal subtract each other, only with a display.The support balance can be with transferring plumb to regulate.Display is positioned at the support lower.
When the straightening line apparatus uses, earlier troweling machine support, Tuo Jia are moved to first work plane, support is adjusted to vertical with horizontal plane, two straight line posts are put into place, wall two ends, decontrol tape measure 322, adjust suitable rule 317 and fixing, put straight line post position well, connect two straight lines, tighten straight line with secure alignment device 319.Pressing bar gage 305 usefulness lesser calorie spares 3038 blocks.According to the distance of bar gage and straight line, with handwheel 313 adjusting screw(rod)s 312, drive support and move, bar gage is contacted with first straight line, observe the spacing of two straight lines at the bar gage place, adjustable support is to the optimum position.After having smeared ash, pull open on small rack 308 bar gages and move, mobile troweling machine repeats said process to next work plane.
Also available other the standard apparatus of standard apparatus of the present invention, as use the laser sensor measurement bracket that links to each other with support and the distance between the straight line; The straight line post is removable or fixable; The straight line post can be with the few back of the body limit of square frame shape or square frame shape, the straight line post can with ground or wall mounted; Also available other the structure of adjusting device.In a word, as long as the support of troweling machine is placed on the carriage; The relative position of support and carriage is adjustable, and the standard of adjusting is a straight device, all should think and drop in protection scope of the present invention.
Troweling machine is directly installed etc. by support, apparatus of plastering, lifting appliance, running gear, vertical adjustment to be formed; Support is made up of column, top frame, underframe etc.; Apparatus of plastering is made up of glider, plaster head, ash discharge chamber, ash hole, grey hopper, plastering plate etc.; Lifting appliance is made up of motor, reducer, winding up roller, rope woolding district etc.Troweling machine is positive towards wall surface, and opposite one side is the back side, and two sides, the left and right sides is the side.Figure 40 1 is the troweling machine elevation.Column 401 can for shown in positive 2, also the corresponding position has 2 overleaf.If have only 2 root posts, glider is positioned at the centre position of apparatus of plastering substantially, the last item 450 of material pressing device, joins last item 454 and also is positioned at this position substantially.Glider can be one section straight tube that is nested with column, also roller.Underframe is installed running gear, vertical adjustment and directly is installed etc., picture among the figure.Plastering plate just covers ash hole among Figure 40 1.Plastering plate is wider than ash hole, and there is slideway 403 at the back side at plastering plate two ends places, and needle roller 404, needle roller be ball also.Needle roller 404 is a dotted line among Fig. 2, can not directly see.There is the slideway 471 supporting with slideway 3 the ash hole both sides, and needle roller (ball) 404 is a slideway 403 and the phase-contact surface of slideway 471.Slideway room 405 is the position of slideway 471.Vertically middle place, the back side, plastering plate both sides has stuck point 427 can block mutually with the upper and lower stuck point 470 of ash hole both sides, and promptly stuck point 427 is all the time up and down between the stuck point 470.Stuck point 427 can be fixed point, also can be removable or packaged type.Plastering plate is the thin plate of hardness, elasticity, good toughness.Plastering plate is the thin plate of hardness, elasticity, good toughness.The ash discharge chamber is plaster limit, the crown, base, cavity that dual-side surrounded.
Ash hole is divided into ash hole 413, lower ash output mouth 414, cavity 415 shown in Figure 40 4, all ribs of ash hole become a plane.Ash hole dual-side pulley 440, pulley 441 are crossed pulley by plastering plate 402 fixed point ropes.The plastering plate mobile device is: plastering plate 402 back side dual-sides vertically cardinal principle middle part have fixed point 436 (fixed point 36 selects same position, also available diverse location with stuck point 27 among the figure).Rope one end links to each other with fixed point 436, the other end is through pulley 441, upwards (it is example that this example is 4 with column 1 downwards through place, crossbeam two ends, the positive back side of top frame pulley, if column is 2, then have only cantilever tip crossbeam, bottom crossbeam, and do not have the branch of positive back side crossbeam), through rope adjuster place, through place, underframe back of the body crossbeam two ends, front pulley, upwards link to each other with fixed point through pulley 440.2 or 4 in the lifting rope of apparatus of plastering (when rope is 2, has 2 rope woolding districts; Rope has 4 rope woolding districts when being 4; Be example with 4 rope woolding districts among the figure), every rope all has independent rope woolding district at volume rod place.Each rope woolding district twines the rope of one deck rope that twines and grows up in the maximum lifting height that equals apparatus of plastering.When column is 2, promotes rope and link to each other with the rope woolding district at place, the underframe back side through the pulley of underframe dual-side.The rope woolding district is positioned at place, the underframe back side substantially.Motor 410, winding up roller 439, rope woolding district 411, reducer etc. do not influence bottom the apparatus of plastering contact even run to and be lower than the underframe plane.Underframe crossbeam 438 overlaps substantially with winding up roller 439 among Fig. 1.Link to each other near one end of the rope of lifting appliance and glider or the glider, the other end links to each other with independent rope woolding district downwards through place, crossbeam two ends, the positive back side of top frame pulley.Top frame positive back side crossbeam and underframe back of the body crossbeam two ends, front place's pulley and rope do not influence apparatus of plastering and are up to the ceiling place, go downwards to the ground line place.Pulley can be contained in the part that crossbeam stretches out column, also can adorn pulley spindle in addition at place, crossbeam two ends, and several pulleys are staggered mutually, and what have is contained on the crossbeam, and what have is contained on the pulley spindle, moves up and down to apparatus of plastering and vacates maximum space.Vibrating motor 406 is contained in the ash hole cavity, and cavity locates to adorn vibrating plate for 415 mouthfuls, and vibrating plate links to each other with vibrating motor, is positioned at the plastering plate back side, the vibrating motor front.Plastering plate can be used this vibrating device during for monoblock.The ash material at 408 pairs of ash hole places of the also available vibration flexible axle of vibrating motor 406 vibrates.The vibration flexible axle can pass through ash hole up and down, also can also be used in combination with vibrating plate only through one of them.Vibrating motor 406 can be contained in the cavity, also can be contained in other positions of apparatus of plastering, and the vibration flexible axle links to each other with ash hole with small rack, and at the plastering plate back side.The principle of vibration flexible axle and the vibrating head of building site, the operating principle of the wind pen of archaeology is identical.Plastering plate is wider than ash hole, and the rib of ash hole is thicker slightly, the support of while as the plastering plate back side of gaining in strength.
Figure 41 0 is the grey hopper schematic diagram of compression.Hopper 443 be a plane about the back of the body three sides vertical bucket wall is arranged, hopper with plaster the head be fixedly linked.Hopper cover 444 is identical with hopper 443 structures, and is slightly smaller, also can be more bigger, can interlock with hopper.The material pressing device structure is: forward of hopper cover is located level last item 450 is installed, and the hopper cover back links to each other with bucket wall with pin.Last item links to each other with bearing with hopper cover, and bearing inner race links to each other with last item, and bearing outer ring links to each other with hopper cover.Hopper, hopper cover etc. are formed grey hopper.Last item stretches out the two ends of grey hopper and locates to be equipped with fixing last item wheel 452; The feed hopper bottom correspondence position has the last item of joining 454, and joining last item and last item wheel corresponding position has the last item of joining wheel 453.Last item is taken turns, is joined the last item wheel and has at least one to be at least one, forms assembly pulley, and in pulling force one timing of puller system, increase pulley quantity can increase the pressure to the ash material.Last item, join the last item two ends in the crossbeam of frame both sides, top, in the chain wheel rope.The place links to each other with the fixed point 456 of bucket wall in the middle of the lifting rope of ash hopper, and fixed point also can be positioned at hopper cover upper planar surface place.The assembly pulley that the last item wheel is formed is taken turns, is joined at rope two ends last item together, and two ends separately are positioned at the pulley 457 of apparatus of plastering bottom respectively near glider, and upwards the pulley of locating through crossbeam two ends, the positive back side of top frame links to each other with the rope woolding district downwards.The opposite side of apparatus of plastering adopts same structure.The structure of another kind of puller system is: rope one end links to each other with fixed point 456, through the last item wheel, joins the assembly pulley that the last item wheel is formed, and links to each other with a spring element behind the pulley of bucket wall, and spring element can be spring or elastic threads or other elastic structure.448 removable the linking to each other of fixed point of the tension of the spring element other end and bucket wall or hopper cover upper planar surface (as hook etc.).The opposite side of apparatus of plastering adopts same structure.The last item wheel can be gear, and rope is taken turns contact Duan Weixiang meshing chain or chain with last item.Gear also can be in the rope race of last item wheel, and gear side still can be used as rope race.The branch fake of joining the last item wheel can be 2, a closure, and one is not closed.So for a virtual connection point 458 is arranged among the structure figure that two kinds of puller systems are described, this contact does not exist in fact.Have charging on the hopper cover and cover 445, the charging lid is positioned at the less side of troweling machine obstacle, convenient dress ash material.Charging lid pin 446, also available hinge links to each other with hopper cover, between charging lid and the hopper cover locking device 449 is arranged, and can lock behind the charged.In the cavity that hopper, hopper cover, the head of plastering are formed the pliable and tough soft grey pocket of fitting is with it arranged.The ash pocket has the opening of ash hole shape at the ash hole place, this opening links to each other with each limit in the ash hole.The ash pocket has charging to cover the charging door of shape under the charging lid, goes up the plane around the opening of charging door and hopper cover and fixes.Can adorn one deck flexible layer below the charging lid, the charging lid presses down locking.The ash pocket is airtight except that the opening at ash hole place, can not spill during ash material pressurized.
Apparatus of plastering lifting rope can be fixed near glider after place, crossbeam two ends, the positive back side of top frame pulley links to each other with the rope woolding district.
Figure 41 1, Figure 41 2 are stifled hawk apparatus structure schematic diagram.Ash hole cavity 415 does not draw among Figure 11.The longitudinal section of ash hole cavity is rectangle or triangle or trapezoidal among Figure 41 2, can choose any one kind of them.Drawn cavity depth is more shallow among the figure, can be deeply.When cavity is dark, must reserve activity space for lever 459 in the relevant position.Stifled grey panel assembly: plastering plate is in the position that covers ash hole, promptly in the ash hole front.Plastering plate fixed point 436 links to each other with rope 424 1 ends, and the rope other end is downward through ash hole both sides pulley 440, is linking to each other with the end of the lever arm 460 of stifled hawk lever 459 with fixed point 436 corresponding positions.The end of lever arm 460 also can make progress at process pulley 441 with rope 424, is linking to each other with fixed point 436 corresponding positions.Above-mentioned two kinds of connection side's ratio juris are identical, select one.Lever arm 460 is in the outside of ash hole both sides, and fulcrum 463 is on a side of plastering, and lever passes grey pocket at the fulcrum place, links to each other with stifled hawk 62 at the end of motion end 464.Stifled hawk longitudinal section is for being the circular arc in the center of circle with the fulcrum, also can be other circular arc, plane, folding face etc.Wherein the folding face is the stifled hawk of circular arc and motion end 464 joinings and stifled hawk summit, end point, 3 flaps that constituted.A limit of transverse slat 469 links to each other with the cavity back, and level is stretched to grey hopper direction.Transverse slat stretches out short to the back side.Transverse slat 469 is left room on lever 459 moving lines and is blocked up the ash inlet that hawk can be blocked the head of plastering.
The fulcrum 463 of lever can be bearing or other rolling connectors, also can.A circle of bearing links to each other with lever, and another circle links to each other with a sidewall of plastering.Movement arm 61 can be Figure 11, Figure 12 461,461 ', 461 " or 461 or 461 ', 461 " lever that constituted.461 ' 461 " be upper position-arresting, the lower position-arresting of movement arm 461.Movement arm 461 ', 461 " form one complete with transverse slat 469 and cooperates with stifled hawk, block jointly and greyly expect.Dust block board 464, stifled hawk contact, and stifled hawk, transverse slat touching position all can be arc surface, help sliding friction, also can have small distance not contact each other.The rib place all has stuck point 473 to block mutually with transverse slat under the last rib of stifled hawk.When stifled hawk ran to upper position-arresting, transverse slat blocked mutually with following rib stuck point, and plastering plate runs to upper position-arresting simultaneously, exposes the lower ash output mouth, and plastering plate stuck point 427 blocks mutually with ash hole top stuck point 470.Stifled hawk stuck point 473 blocks simultaneously with plastering plate stuck point 427.Stifled grey plate height be about it with plaster between a top, corresponding position, the bottom highly half.When plastering plate was blocked ash hole, stifled hawk was just blocked ash inlet.When stifled hawk 462 upper position-arrestings, lower position-arresting, be positioned at the place, front of dust block board 64.The horizontal rib of each of plastering plate is sword, and the hypotenuse of sword is that plastering plate leans on the ash hole limit or/and plastering plate leans on the wall limit.Plastering plate also can be straight plate.The upper wall of ash hole cavity, lower wall, rear wall have pilot port 467, the pilot port in last ash discharge chamber, lower ash output chamber place each at least one.Pilot part 468 is equipped with at 467 places, pilot port, and the pilot part is that the good flexible layer of elastic extension or two overlapping bouncing plates of mid portion are sealed the pilot port.When pilot part pressure increases, the distortion of pilot part, a part of ash expects in the ash hole cavity that pressure reduces back pilot part and restores, and blocks the pilot port.
Plastering plate can be divided into plastering plate, cavity, following patter, and plastering plate can cover ash hole up and down up and down.
Rib is the highest point of apparatus of plastering on the ash hole, and following rib is the lowest part of apparatus of plastering.The head of plastering is gone up rib when being up to the top can touch ceiling, goes downwards to the rib plane of can contacting to earth at present, bottom.
The contacted starting point at least of pulley and rope, terminal point have the rope limit to live the hole, and rope is sending Shi Buhui to run out of pulley and rope race.
Pulley all can expert bearing, reduces friction.
The last item wheel is fast pulley, but the locating part of at least 2 shift locks is arranged on every side.Two locating parts can wholely move locking.As the slideway 475,475 ' of the locating part 474 of Figure 41 3 last items wheel 452, the slideway cross section is non-circular, and locating part 474 can not rotate, can only move left and right.Stuck point 476 deformables are stuck in the left side or the right side of fastener 477 by fastener 477.The locating part 474 of Figure 14 links to each other with spring element 478 with last item wheel or last item, and locating part 474 is pulled down and can be blocked mutually with fastener 477.Locating part 474 front and back are pulled and can be broken away from fastener 477, are reset to original position.Last item wheel and the rope place of being in contact with one another can increase the layer of substance of friction, increase frictional force for matsurface or other.
Apparatus of plastering and lifting rope connecting place are or/and the rope micro actuator can be installed with lifting rope connecting place by the rope woolding district.As shown in Figure 7, screw rod 428 front ends, rear end and nut 430 fits.Nut 430 links to each other with apparatus of plastering or rope woolding district.Nut 430 1 sides have locking nut 431.Screw rod 28 interpositions are equipped with protruding circular cone 479, and rope links to each other with fixed point 429 on the apparatus of plastering, walk around circular cone upwards.There is retaining rope part 480 the rope both sides, and retaining rope part and apparatus of plastering or rope woolding district are fixed.
When promoting rope and being 4,4 ropes are after through the frame back side, top crossbeam, and 2 of every sides can be combined into 1.
The rope adjuster of plastering plate adjusting device: the column about lever 19 front ends and support links to each other with horizontal pin 418.The lever rear portion is a manual arm 422, and the place links to each other with clamp arm 421 with vertical pin 420 in the middle of the lever 419.Top rope bar 25 is installed at lever 419 forward places, and top rope bar 425 ends can be adorned pulley 426, and rope 424 is through the spacing hole of pulley 426.Between top rope bar 425 and the lever 419 certain angle is arranged.Can do the same fixed point of pearl string on the rope, certain distance is arranged between each fixed point, convenient with pulling running rope, observe the length that rope is regulated.The rope 424 also device of available other structures is regulated.Column is respectively installed a locating part 423 up and down pin 418, the angular range that restriction lever 419 is up and down.Two clamp arms 421 can link to each other with a cross bar.
Ash hole two side pulley 440 or/and the rope stretching point of pulley 441 (being the point that rope leaves pulley) in the top dead centre of stifled hawk lever lever arm 60 end points, the lower dead center centre position of the horizontal line of vertical line separately.
Stifled grey panel assembly, the head unit of plastering be boundary's symmetry up and down with center line 472, also can lower height greatly.
Frame bottom is equipped with ash material pump and ash bucket.Ash material pump links to each other with apparatus of plastering with flexible pipe.The ash hole of ash material pump hose links to each other with the grey hopper of apparatus of plastering.Ash material pump hose ash hole links to each other with the ash discharge chamber of the head of plastering, and the flexible pipe ash hole communicates with grey hopper.The ash hole cavity or/and the ash discharge chamber or/and top, the bottom of the head of plastering respectively have at least one pilot port, the pilot part is equipped with at pilot port place.
The higher rangefinder (as laser sensor, infrared ambulator etc.) of bottom, top installation accuracy of the positive at least one root post of support, measurement bracket and the distance of having smeared wall.Rangefinder can directly be installed, or stretches out a small rack to the support side and install.Whether rangefinder band display makes things convenient for the distance of observing support top, the end and having smeared wall suitable.After two rangefinders can output signal subtract each other, only with a display.The support balance can be with transferring plumb to regulate.Display is positioned at the support lower.
Plaster crown portion, bottom can adorn travel switch.Adjust the travel switch height and make on the ash hole rib with ceiling, apparatus of plastering stopped to move when time rib contacted soon with ground line, and fix.At this moment, with the rope adjuster manually or other device pulling ropes 424 move down, promote plastering plate to the ceiling place, stifled simultaneously hawk is blocked ash and is expected.Fixedly rope 424, and the starter motor counter-rotating moves down apparatus of plastering, exposes the lower ash output mouth, decontrol rope 424 and begin to plaster.When apparatus of plastering ran to the ground line place, mobile plastering plate is the plane contiguously.
When running into wall room such as door and window at ash hole, removable plastering plate covers ash hole, and stifled simultaneously hawk also can be blocked the ash material and not move to ash hole.Can signal generator be installed at the following place, top that support be positioned at door and window,, send certain signal (as light emitting diode or sound etc.), remind the operator to carry out corresponding operating when apparatus of plastering during through signal generator.For making the lower ash output mouth have more the ash material, can promote a segment distance to apparatus of plastering earlier, remove plastering plate again and begin to plaster; Apparatus of plastering moves down at present, and ash hole can have more the ash material.
Plastering plate 402 links to each other with secondary plastering plate 482 usefulness hinges 484 among Figure 40 1.An available big hinge links to each other from the top to bottom.Plastering plate 402 and secondary plastering plate 482 are equivalent to the both sides of hinge.Plastering plate 402 is connected with the also available bent thing of secondary plastering plate 482 connecting places, and bent 90 spend to 120 degree, give negative and positive angle and plane troweling.Slideway is equipped with at the place, the side back side of secondary plastering plate, contacts with the slideway of the secondary ash hole side of the secondary head of plastering with needle roller or ball.Bent thing becomes a plane with plastering plate with secondary plastering plate, and angle, bending back is the smooth angle of seeing rib.The pair header structure of plastering is roughly a bit of of the first end of plastering.Pair is plastered head when pasting mutually with a side of plastering, and two ash hole angles are not more than 90 degree, preferably equal 90 and spend.
When plastering plate linked to each other with hinge with secondary plastering plate, pair is plastered, and synapsis maybe need not link to each other with scalable thing is continuous head with plastering mutually.
When plastering plate linked to each other with bent thing with secondary plastering plate, pair is plastered, and synapsis linked to each other with hinge or bent thing head with plastering mutually.
The pair head of plastering is installed fastening position 488 with the place, the back side that plasters, and becomes 90 degree, 180 to spend with the head of plastering, 270 spends angles but in order to the difference that L bar 483.L bar is installed the fixed joint head of plastering is installed.L bar 483 also can be hinged and connected with lockable at the break place, and lockable is fixed 90 degree, 180 degree, 270 degree three positions, angle.L bar 483 is easy to fixed disassembly with fastening position 488.
Pair 481 a usefulness telescopic tube 485 of plastering link to each other with apparatus of plastering as grey materials flow circulation passage.The ash discharge chamber of position for stifled hawk front or place, the back side links to each other.The plaster part of whole and side at a back side of telescoping tube and pair links to each other.Pair plaster a Facad structure can with plaster identical.
Hinge 484 structures are different with ready-made hinge, and shown in Figure 41 5, Figure 41 6, Figure 41 7: limit of hinge links to each other with hinge axis 87, and hinge axis housing 489 links to each other with another limit.The housing cross section is roughly square.When the hinge limit became three positions among the figure, two limits of hinge (being plastering plate and secondary plastering plate) just formed complete with hinge axis housing 489, distinguished floating, external corner, inner corner trim.Each stress surface of L bar is slightly crooked, and when stressed, stress surface is in line in the work.Pair plaster the head secondary ash discharge chamber be that single tube or centre have interlayer.The plaster secondary ash hole of head of pair can be divided into secondary ash hole, cavity, time secondary ash hole.Bent thing in the front of plastering plate and secondary plastering plate or/and the back side or/and between.Pair is plastered, and a back side is whole, the side is a part of links to each other with the ash discharge chamber.Hinge limit thickness is roughly half of the outer width of frame of hinge axis.When space, hinge both sides contacted with the angle of hinge axis housing, the hinge both sides became complete.
As Figure 50 1, Figure 50 2, Figure 50 4, be example to smear window among the figure, door lacks a base than window.The supporting structure of smearing door and window by: become the shaped as frame shape identical with the external corner of window, two track 502 frames that the length of side is smaller and two smaller carriages 503 of side ratio track 502 frames link to each other with connecting rod 517 between each edge.The limit of two tracks, 502 frames does not connect each other.The corresponding limit formed plane of two tracks, 502 frames is relative with the window external corner, perhaps parallels with a limit of external corner or perpendicular.This plane parallels with the horizontal sides of external corner among Figure 50 1.The glider of smearing door and window device 504 can be roller 513, card wheel 514 and small rack 515, also can be the perps straight tube.Perps slides glider not block in orbit smoothly; Straight tube makes to be smeared door and window device 4 and blocks mutually with track 502.Roller 513, card wheel 514 and small rack 515 make to be smeared the door and window device and blocks mutually with track 502.Four Jiao Chu both sides of track 502 frames are respectively removed one section, and movable rail 505 is installed.Movable rail 505 two ends link to each other with four angles of carriage 503 with straight-bar, connecting place with pin or bearing as fulcrum 506, formation isosceles triangle 508.Figure 50 1 middle orbit room 509 is a dotted line, and movable rail 505 also can be positioned at this dotted line place.Movable rail 505 two ends are the inclined-plane, can fit with inclined-plane, track 502 two ends.Place, movable rail 505 two ends side has truckle 507, and truckle 507 does not influence movable rail 505 and contacts with track 502.All can there be cover chalaza 525, lock 527 in each limit of track 502 frames, carriage 503.Identical as Figure 50 8 cover chalaza 525 both sides diameters, manage 548 in the internal fixation on one side therein, interior pipe 548 porose 549, in pipe 548 can be with bolt and nut 551 or/and another side be fixedly linked, track 502 frames that form to enlarge are or/and carriage 503, make track 502 frames and the carriage 503 can be with the size adjustment of door and window.The orbital plane 550 that installs different length during adjusting additional gets final product.
Troweling machine support front column or/and the limit of carriage 503 is fixedly linked or lockable links to each other, can be used as special plastering machine for plastering door and window with the track 502 of smearing Door/window brace member.
The troweling machine cradle back is or/and ramuscule support member 526 is respectively installed on side uprights top, bottom, and track 502 is or/and lock 527 is installed on the limit of carriage 503.Smear Door/window brace member and can turn to positive place around the troweling machine support along the arcwall face of ramuscule support member 526, use lock 527 and column or/and ramuscule support member 526 locks, the locking back is parallel with column.Adjust the size, direction of column front ramuscule support member 526 etc., make the apparatus of plastering of troweling machine can be up smoothly, descend.The contact takes place the signal that ramuscule support member 526 can be used as apparatus of plastering simultaneously: apparatus of plastering or support lower are installed illuminating part or jingle bell spare is connected with the mains, power switch is stress deformation when running to ramuscule support member 526 places, power connection, illuminating part or jingle bell spare give the alarm; When power switch broke away from ramuscule support member 526, power switch disconnected, all clear.The usefulness of the plastering plate of apparatus of plastering is moved in alarm signal for operating personnel.
Movable rail 505 is the base of triangle 508.Movable rail 505 can forward to vertically from level, thereby forms complete continuous track 502 frames.Fulcrum 506 vicinity of corresponding triangle 508 can link to each other with connecting rod 517, and two triangles 508 form an integral body.As Figure 50 7 movable rail, 505 external surfaces or inner dress short tube shape locator 542; Middle locking bar 539 middle parts that can be slightly crooked are in locator 542, and locking bar 539 links to each other with locator 542 usefulness springs 555.Regulate locking bar 539 two ends lock end 540 the position and be subjected to elastic force.Locking bar 539 is installed and the vertical substantially trigger point 541 of track 502 with lock end 540 intersections.There is the lock point 557 of lock end 540 at the place, inclined-plane of track 502, and lock end 540 can be stuck in the lock point 557, and track 502 forms fastening complete track with movable rail 505.Locking bar 539 hardness are big, and are indeformable.Lead limit switch 556 is contained on the head of plastering of smearing the door and window device among Figure 50 1, Figure 50 4, the serrated end of lead limit switch 556 can add a kind of form of a thin hard little straight rod as small rack 546, respectively add a kind of form of the thin hard little straight rod of one (or middle) with the two ends on plastering plate 510 top margins, base as small rack 545 only with one, adapt with the little straight rod length of lead limit switch 556 (position was identical when small rack 545 can work with lead limit switch, or forward or lean on after a bit).The another kind of mounting method of lead limit switch 56: plastering plate 510 midpoint are installed a T shape small rack 545 among Figure 50 7.T shape small rack 545, small rack 546 partially overlap among Figure 50 7, Figure 50 9.The position is identical when can work with lead limit switch in the two ends of small rack 545 horizontal sides, or forward or lean on after a bit.Lead limit switch 556 links to each other with a T shape small rack 546 between the head with plastering, the end of this T shape vertical edge links to each other with a mid point of plastering, respectively install lead limit switch 556, two lead limit switches 556 back to small rack 546 and equate with small rack 546 vertical edges distance at the place, two ends of T shape horizontal edge.Near the trigger point 541 locating part 547 can be installed, locating part 547 can unite two into one with trigger point 541, also can be divided into two.Link to each other with lock end 540 with a little spring by the place, top as movable rail 505 two ends among Figure 50 9, two lock end 540 usefulness small circle rings and locking bar 539 are movably connected.Locking bar 539 middle parts are in locator 542.When lock end 540 blocked mutually with the lock point 557 of track 502, locating part 547 (being trigger point 541) change in location can not run into the small rack 545 of lead limit switch 556, plastering plate.When lock end 40 did not block mutually with lock point 557, locating part 547 (being trigger point 541) spilt movable rail 505, can run into the small rack 545 of lead limit switch 556, plastering plate.When smearing the door and window device and running to movable rail 505 ends, lead limit switch 556 is run into trigger point 541 (being locating part 547), and the stop motion of door and window device is smeared in the motor stall.Pulling plastering plate rope 511, plastering plate 510 is blocked ash hole 523.Small rack 545 1 ends contact with locating part 547, and at this moment, the rib of plastering plate is just in time in the angle of door and window horizontal sides, vertical edges.When forward, small rack 545 is run into locating part 547 when work than lead limit switch 556 in plastering plate small rack 45 horizontal edge two ends, the lock end 540 of locating part 547 pulling locking bars 539 opposite sides, and lock end 540 release lock points 557, movable rail 505 de-orbits 502.Concordant when work with lead limit switch 556 in small rack 545 two ends, plastering plate 510 is blocked ash hole 523, the motor stall.At this moment, with another switch closure loop start motor, the stressed pulling locking bar 539 of locating part 547 (trigger point 541), pulling lock end 540 release lock points 557, movable rail 505 de-orbits 502.(available staff is pushed down elastic switch a period of time, and staff is removed, and switch opens circuit in this switch time-delay disconnection in several seconds to tens seconds; Also available delay switch).
Smear door and window device 504 as Figure 50 1, Figure 50 2, Figure 50 4, Figure 50 6.There is removable plastering plate 510 at ash hole 523 positive places.Plastering plate 510 can be straight plate, also arc.Ash hole 523, the plastering plate 510 integral body shape that meets at right angles.Can there be slideway 519 at place, the back side, plastering plate both sides, and there is the slideway (not drawing among the figure) that matches ash hole 523 dual-side corresponding positions, and two slideway phase suit places contact with needle roller 520 or ball, make plastering plate 510 back sides be close to ash hole 523.The all smooth rib of seeing is located at the positive back side of plastering plate angle.The plane of ash hole 523 and angle be all smooth sees rib.The horizontal rib of plastering plate 510 all can be sword.As Figure 50 5, plastering plate is divided into two from the angle.The sheet of plastering of wherein smearing the external corner horizontal plane vertically passes another sheet of plastering.This sheet practical length of plastering can have trace to regulate with the variation of door and window installation site.This sheet angle of plastering is slightly long, and side edge is equipped with the spring 522 of certain pressure, and the spring another side links to each other with the limit in the room 524 of an angle of plastering.Spring 522 can be regulated the little distance of this sheet of plastering, and this sheet of plastering is pressed to another sheet of plastering (spring 522 forms an angle with this sheet of plastering), makes two tights between the sheet of plastering, and becomes complete angle.Ball must be used if slideway is arranged in this sheet back side of plastering.Can there be slideway two angles of plastering one of sheet, and slideway contacts with needle roller or ball.Can there be rope fixed point 552, stuck point 553 in place, the back side, both sides, the place, the angle back side of plastering plate 510.The rope fixed point also can be two, by last, by one down respectively.Rope 511 (in the middle of available 2 or the whole plastering plate one.2 are arbitrary sheet two ends or whole plastering plate two ends place that plasters) end links to each other with fixed point 552, the other end is through four jiaos of places of track 502 frames truckle 507, near 518 places, rope woolding district, can adorn rope adjuster (identical) in carriage 503 the insides with the used rope controller structure of the mobile plastering plate of troweling machine.Rope passes between the clamp arm and lever of rope adjuster, and rope links to each other with fixed point 552 at last.Stuck point 553 can block with it between the stuck point of ash hole up and down 543 of 523 liang of inclines of ash hole mutually.Stuck point 553 can make movable, no longer blocks mutually with ash hole stuck point 543 after moving, and is convenient for dismounting and washing.As Figure 50 6 bottom, the crown of plastering pulley 544 (also can be fixed point 544, when the pulling force of the grey hopper of compression needn't be with the pulling force between the rope 512, available fixed point 544, an end of rope 512 directly linked to each other with fixed point 544) is arranged respectively.One end of rope 512 links to each other with hopper 537 walls, and the other end is through last item wheel 529, joins behind the assembly pulleys that last item wheel 531 forms around truckle 507, in rope woolding district 518, twine a few, around truckle 507, cross another pulley 544, the reverse assembly pulley of crossing links to each other with hopper 537 walls.Rope 512 is the material that matsurface or one deck can increase frictional force with the place of being in contact with one another of assembly pulley, or other structures (as assembly pulley is gear, and rope is chain or chain).Pulley (fixed point) 544 can be directly installed on the head of plastering, also can lead to a small rack to plaster first side shifting some.Rope 512 is crossed pulley (or fixed point) 544 can connect one section elastic threads, and these elastic threads two ends link to each other with static line and a little link to each other by (as hook, lock etc.) for removable, and elastic threads is removed static line two ends, back lockable and linked to each other.Rope woolding district 518 can be two kinds of positions among Fig. 1: leave room in triangle 508, the relevant position of smearing the door and window device for first kind, rope woolding district 518 is installed; Second kind is to adorn the direction that pulley changes rope by other, in the outside of track 502 frames or the inside of carriage 503 the rope woolding district is installed.Promoting motor links to each other with rope woolding district 518 by reducer, volume rod etc.Smearing also can be without plastering plate 510 in the door and window device, corresponding rope 511 and the small rack 545 of removing.Smear that the door and window device is whole when running to movable rail 505 ends smears one side that the door and window device is preferably in median of a triangle 516, more also can cross median of a triangle 516 if smear the door and window device.The rib of ash hole 523 can be thicker, and as the support of plastering plate 510, horizontal rib can make circular-arc, reduces the friction with the face of not plastering a wall.Plastering plate 510 ribs are in the middle place of ash hole 523 horizontal ribs.The place can have a horizontal cross bar to link to each other with the ash hole both sides in the middle of the ash hole 502, and the cross bar width is big, is a transverse slat, and transverse slat is parallel with ash hole; Just an ash hole becomes a plane, pastes mutually with the plastering plate back side.
Structure such as Figure 50 6 of ash hopper, plastering plate 510 meets at right angles, ash hole 523 meets at right angles, both paste mutually, and with slideway, needle roller or/and ball is continuous.Roller 513, card wheel 514, small rack 515 (three is collectively referred to as glider, also available have seam straight tube) are stuck in track 502 or/and on the movable rail 505.An angle of plastering has vacant position 524, can be used to install whole in the tensile sheet of plastering, spring 522, card wheel 514, roller 513, lesser calorie spare 515, track 502, the movable rail 505 etc. or one one.Hopper 537, hopper cover 538 interlock.With bearing 532 dress last items 528, last item stretches out hopper dual-side place last item wheel 529 on the hopper cover 538, and last item wheel 529 is a fast pulley.Hopper 537 bottoms and last item 528, last item are taken turns and 529 are correspondingly gone out to assemble last item 530, join last item wheel 531.One end of two ropes 512 links to each other with hopper 537 walls or hopper cover 538, the other end is walked around at least one last item wheel 529, at least one is joined and separates after last item is taken turns 531 assembly pulleys of forming, respectively through bottom, the crown pulley 544 of plastering (pulley or fixed point 544 can be selected plastering plate 510 dual-side places, angle any two places in totally three places for use), around truckle 507, curl rope district's 518, two ropes and link to each other.There is one section rope that switches mutually for scalable rope and static line at two pulley 544 places that restricted.Perhaps there is one section flexible rope at every rope 512 two ends, can remove or connect flexible rope as required.To be that lockable is removable with the elastic threads connecting place be connected static line.Hopper 37 links to each other with hopper cover 538 usefulness pins.Having charging on the hopper cover 538 and cover 533, feeding and to cover 533 and link to each other with hopper cover 538 usefulness pins 536.Hopper cover becomes to have in the cavity pliable and tough grey pocket with hopper.The ash pocket.Covering 533 times in charging has charging door, and charging door is gone up the plane all around with the opening of the charging lid 533 of hopper cover 538 and pasted mutually.The ash pocket has opening at ash hole 523 places, and opening pastes fixing with an inwall of plastering mutually.Charging door covers 533 with charging and pastes mutually, and with locker 534 lockings, pressurized can not spill the ash material.Compressing the also available rope of grey hopper crosses and connects elastic threads behind the assembly pulley or spring links to each other with hook or lock etc. are removable in bucket wall back side midpoint.Bucket wall back side midpoint can be installed a fixed bit, and fixedly elastic threads is or/and spring.
The troweling machine frame bottom is equipped with ash material pump and ash bucket.Ash material pump with flexible pipe with smear the door and window device and link to each other.Ash material pump hose enters from inlet pipe 554 positions of Figure 50 1 and smears Door/window brace member, and unnecessary flexible pipe is positioned at 554 outsides, inlet pipe place, personnel selection control.The ash hole of ash material pump hose links to each other with the grey hopper of smearing the door and window device.Ash material pump hose ash hole links to each other with the ash discharge chamber of the head of plastering, and the flexible pipe ash hole communicates with grey hopper.
The higher rangefinder (as laser sensor, infrared ambulator etc.) of bottom, top installation accuracy of the positive at least one root post of troweling machine support, measurement bracket and the distance of having smeared wall.Rangefinder is vertical with the whole sidewalls of having smeared.Rangefinder can directly be installed, or stretches out a small rack to the support side and install.Whether rangefinder band display makes things convenient for the distance of observing support top, the end and having smeared wall suitable.After two rangefinders can output signal subtract each other, only with a display.Display is positioned at the support lower.The support balance can be with transferring plumb to regulate.
Vibrating shaft or vibration flexible axle can be installed by ash hole 523 places.Vibrating shaft or vibration flexible axle link to each other with vibrating motor, and vibrating motor is contained in to be smeared on the door and window device.Vibrating device also can not installed by ash hole 523 places.
Smear the door and window device among Figure 50 2, Figure 50 4 and only drawn plaster head, plastering plate part; Roller 513 can move on to the trapezoidal position of the head of plastering among Figure 50 1, Figure 50 2, Figure 50 4, and card wheel 514, small rack 515 move on together simultaneously, reduce the head institute that plasters and take up space, and are beneficial to triangle 508 and rotate.
Pulley all has spacing hole, and rope can not be run out of spacing hole when loose.The last item wheel is fast pulley, and the position-limited edge of its spacing hole is therefrom separated, and the position-limited edge on both sides is a spring.
Locating part 547 can not unite two into one with trigger point 541.As Figure 51 0, Figure 51 1, separate with locating part the trigger point.Locating part 547 is contained in the two ends of movable rail 505, is subjected to the triggering of trigger point 541.Be trigger point 541 when moving, locating part 547 also moves immediately; When trigger point 541 was motionless, locating part 547 is stressed can not to be moved yet.Lead limit switch 556 contacts with trigger point 541; The small rack of plastering plate contacts with locating part 547.Figure 51 1 is the partial enlarged drawing of Figure 51 0.Spacing point 558, spring 559, lesser calorie point 560, lesser calorie pin 561, pin 562, the connector bar 563 common locating parts 547 of forming among Figure 51 1, the two ends that are installed in movable rail 505 are located.Locating part 547 can overlap on same plane substantially with trigger point 541, also certain distance can be arranged each other.Small rack 545, small rack 546 overlaps substantially on same plane substantially, observes for convenient, among the figure small rack 546 is moved down, simultaneously trigger point 541 drawn longlyer.The bottom of locating part 547 links to each other with movable rail 505 with pin 562, and a side is stretched out spring 559, and the lesser calorie pin 561 of spring 559 is stuck in the lesser calorie point 560, and connector bar 563 links to each other spring 559 bottoms with trigger point 541.One end of T shape small rack 545 horizontal sides contacts with the spacing point 58 of locating part 547; One end of T shape small rack 546 horizontal sides links to each other with lead limit switch 556, can contact with trigger point 541.The two-end structure of T shape small rack 545, small rack 546 horizontal sides is identical.Lead limit switch 556 is run into trigger point 541, the motor stall.Pulling plastering plate rope 511, plastering plate 510 is blocked ash hole 523, and T shape small rack 545 is run into the spacing point 558 of locating part 547.With another switch activated motor, lead limit switch 556 promotes trigger point 541 forward, lock end 540 drives de-orbit 502 lock point 557 of another lock end 540, movable rail 505 is rotated along fulcrum 56 gradually, connector bar 563 pulling springs 559 shrink simultaneously, lesser calorie pin 561 breaks away from lesser calorie point 560, and locating part 547 rotates around pin 562, and small rack 455 pushes over locating part 547 forward.Movable rail 505 is blocked mutually with another track 502, and lock end 540 upwards drives trigger point 541 upwards, and connector bar 563 drives locating part 547 lodging.Small rack 545 can not run into the spacing point 558 of locating part 547.When trigger point 541 resets to position shown in the figure again, lesser calorie pin 561 is positioned at lesser calorie point 560 again.Lesser calorie pin 561 is put 560 CONTACT WITH FRICTION places with lesser calorie and is made the variation that the inclined-plane helps the mutual alignment.Connector bar 563 can change the extension spring of point hardness into; Or the part of connector bar 563 changes extension spring into.
The another kind of structure of movable rail 505 such as Figure 51 2, Figure 51 3, Figure 51 4.Figure 51 3 is movable rail 505 structural representations.Secondary movable rail 505 ' one end links to each other with track 502 1 ends with pin 570.Secondary movable rail 505 ' external surface and movable rail 505 inner surfaces suitable (angle bar shape, semicircle tubulose, en tubulose etc.).Secondary movable rail 505 ' links to each other with movable rail 505 usefulness pins 572 (for convenient the observation both are separated picture among the figure, pin 572 is one).Pin 570 is concordant with track 502 external surfaces; Pin 572 is concordant with movable rail 505 external surfaces.The recess 573 of movable rail 505 overlaps with the recess 574 of secondary movable rail 505 '.There is recess 71 at the place, plane on the movable rail 505, and recess 5571 is the position of needling 566.Needling 566 can be filled and led up recess 571.Two recesses 571 are positioned at the place, two ends of lever, and fulcrum is the mid point of lever, and fulcrum links to each other with movable rail 505.When needling 566 was filled and led up a recess 571, another recess 571 was filled and led up in the perk of the lever other end.Link to each other with the angle of carriage 503 as Figure 51 4 hounds 564 1 ends.Hound 564 is contained in movable rail 505 outsides.On two braces of hound 564 with movable rail 505 bases parallel installation strong point fulcrum 569, strong point fulcrum 569 springs, 568 bracing diagonals and the strong point 567.The relative edge of two strong points 567 is a hypotenuse, and portable propelling track 505 snaps in from bottom to top.The strong point 567, spring 568 are positioned in the middle of the hole of two braces of hound 564, and the hole intermediate space is bigger.The both sides dress lead limit switch 556 of plastering among Figure 51 2, lead limit switch 556 1 ends can add little hard rod shape small rack 546, and (small rack 546 can have two kinds of structures: a kind ofly be little hard rod, another kind is a T shape, all has among two kinds of structure charts 512, Figure 51 4.Small rack 545 can have two kinds of structures: a kind of for little hard rod, another kind is a T shape, all has among two kinds of structure charts 512, Figure 51 4), little hard rod shape small rack 545 can be installed by a middle place that plasters.The end position of small rack 545, small rack 546 adapt (slightly long, slightly short, or concordant when small rack 545 works than small rack 546 lead limit switch of adorning 556).Take bar 575 and be positioned at the end of the track 502 of relevant position.Taking bar 575 overlaps mutually with recess 572, recess 573.Bar 575 also can be taken in track 502 ends, also just without recess 572, recess 573.Movable rail 505 can be installed damping device with contact position, track 502 two ends.
A T shape small rack 546 is installed at the place that plasters in the middle of the head, and the two ends of T shape horizontal sides are lead limit switch 556, and lead limit switch 556 contacts with the strong point 567 as trigger point 541.The two ends of the horizontal sides of the T shape small rack 545 of plastering plate 510 can with contact as the strong point fulcrum 569 of locating part 547 or two braces of hound 564.The suitable bar 575 of taking in recess 573, recess 574 and track 502 two ends cooperates.The higher roller 513 in a both sides of plastering works to press movable rail 505 two ends.
Claims (10)
1. troweling machine, by support, apparatus of plastering, lifting appliance, running gear, vertical adjustment directly device form; Frame bottom is a underframe, and at least two root posts are installed on the underframe, and the column top is the top frame; The apparatus of plastering front is square ash hole, and the ash hole back side is grey hopper, and grey hopper and ash hole connecting place are the ash discharge chamber, and the apparatus of plastering dual-side is installed glider, and glider contacts with column; Lifting appliance is made up of motor, reducer, volume Kun, rope woolding district, and lifting appliance pulling apparatus of plastering moves up and down along column; It is characterized in that square ash hole two incline tops extend upward, make that rib is the highest point of apparatus of plastering on the ash hole; Extend downwards ash hole two inclines bottoms, makes that rib is the lowest part of apparatus of plastering under the ash hole.
2. according to the described a kind of troweling machine of claim 1, it is characterized in that this troweling machine has top ceiling device to be installed in the end of top frame crossbeam; Top ceiling device is made up of the movable push rod of adorning in sleeve, the sleeve, movable push rod mobile device, movable push rod fastener.
3. according to the described a kind of troweling machine of claim 1, it is characterized in that a sagging cord of top of the trellis, regulating block is arranged at the cord bottom; Touch circle and link to each other with support, touching has at least two contacts in the circle, and the direction of contact is corresponding with the direction of support vertical adjusting device adjusting rod; Regulating block is in touching circle, and the cross section of regulating block and contact position, contact is circular; The central point of this circular cross-section equates to each contact distance.
4. according to the described a kind of troweling machine of claim 1, it is characterized in that support is placed on the carriage; The relative position of support and carriage is regulated with adjusting device.
5. according to the described a kind of troweling machine of claim 1, it is characterized in that there is movably plastering plate at the positive place of ash hole, the plastering plate back side and positive movable contact of ash hole; Plastering plate links to each other with the plastering plate adjusting device.
6. according to the described a kind of troweling machine of claim 1, it is characterized in that grey hopper is a compression ash hopper: interlocked by hopper and hopper cover, hopper links to each other with the head of plastering; In the ash hopper pliable and tough grey pocket is arranged, extrude the ash material with material pressing device.
7. according to the described a kind of troweling machine of claim 1, it is characterized in that this troweling machine has stifled grey panel assembly to be: plastering plate both sides fixed point rope links to each other with the lever lever arm of stifled grey panel assembly through ash hole both sides pulleys (40) or pulley (41); The fulcrum of stifled hawk lever is the ash hole two side; Stifled hawk lever working end links to each other with stifled hawk.
8. according to the described a kind of troweling machine of claim 1, it is characterized in that at least one incline of ash hole and secondary secondary ash hole one incline of plastering head are movably connected; Pair plaster the head link to each other with the ash discharge chamber.
9. according to the described a kind of troweling machine of claim 1, it is characterized in that this troweling machine has the ash hole of smearing the door and window device to meet at right angles; Smear the door and window device and rotate along the track box similar to the door and window shape, carriage is arranged in the track box, track box links to each other with connecting rod with carriage, and four jiaos of places of track box are movable rail; The ash material is stressed and flows to ash hole;
Smearing Door/window brace member can positively lock or/and link to each other with little support member is removable with the troweling machine cradle back with the troweling machine support.
10. according to the described a kind of troweling machine of claim 9, it is characterized in that the plastering plate locating part is made up of spacing point, spring, little stuck point, little card base, pin, connector bar, be installed in the place, two ends of movable rail;
Plastering plate small rack, a small rack of plastering overlap substantially on same plane substantially, and the bottom of locating part links to each other with movable rail with pin, and a side is stretched out spring, and the little card base of spring is stuck in the little stuck point, and connector bar connects spring bottom and trigger point; One end of plastering plate T shape small rack horizontal sides can contact with the spacing point of locating part; An end of T shape small rack horizontal sides of plastering links to each other with lead limit switch, can contact with the trigger point; Plastering plate T shape small rack, a two-end structure of T shape small rack horizontal sides of plastering are identical.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007201464935U CN201074401Y (en) | 2007-04-07 | 2007-04-07 | Plastering machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007201464935U CN201074401Y (en) | 2007-04-07 | 2007-04-07 | Plastering machine |
Related Child Applications (8)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007201935168U Division CN201099981Y (en) | 2007-04-07 | 2007-04-07 | Plastering machine aligning device |
CNU2007201935149U Division CN201137286Y (en) | 2007-04-07 | 2007-04-07 | Plastering machine plastering board device |
CN2008203017339U Division CN201874211U (en) | 2007-04-07 | 2007-04-07 | Plastering device with improved plastering plate |
CNU2007201935153U Division CN201099980Y (en) | 2007-04-07 | 2007-04-07 | Plastering machine yin and yang corner plastering device |
CN2008203017324U Division CN201874210U (en) | 2007-04-07 | 2007-04-07 | Yin-Yang corner plastering machine |
CN2008203017358U Division CN201874212U (en) | 2007-04-07 | 2007-04-07 | Door and window plastering structure of plastering machine |
CN200820301731XU Division CN201874209U (en) | 2007-04-07 | 2007-04-07 | Plastering machine capable of aligning |
CNU2007201935134U Division CN201099979Y (en) | 2007-04-07 | 2007-04-07 | Door and window plastering machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201074401Y true CN201074401Y (en) | 2008-06-18 |
Family
ID=39519664
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007201464935U Expired - Fee Related CN201074401Y (en) | 2007-04-07 | 2007-04-07 | Plastering machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201074401Y (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105275192A (en) * | 2015-09-11 | 2016-01-27 | 赵企跃 | Vacuum-consolidation automatic wall plastering machine |
CN107013023A (en) * | 2017-05-31 | 2017-08-04 | 李明 | A kind of efficient mechanical float of convenient construction |
CN114232951A (en) * | 2022-01-07 | 2022-03-25 | 陕西建工集团股份有限公司 | Trowel suitable for narrow pipe shaft |
-
2007
- 2007-04-07 CN CNU2007201464935U patent/CN201074401Y/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105275192A (en) * | 2015-09-11 | 2016-01-27 | 赵企跃 | Vacuum-consolidation automatic wall plastering machine |
CN107013023A (en) * | 2017-05-31 | 2017-08-04 | 李明 | A kind of efficient mechanical float of convenient construction |
CN107013023B (en) * | 2017-05-31 | 2019-11-01 | 中庆建设有限责任公司 | It is a kind of to facilitate high construction efficiency mechanical float |
CN114232951A (en) * | 2022-01-07 | 2022-03-25 | 陕西建工集团股份有限公司 | Trowel suitable for narrow pipe shaft |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
MX2010000071A (en) | Wind generator with folding mast. | |
CN105643597B (en) | Wearable power assisting device without external impetus | |
CN201074401Y (en) | Plastering machine | |
CN204121694U (en) | Mobile basketball frame | |
CN104727539B (en) | Power equipment maintaining operating platform | |
CN217720663U (en) | Temporary cable supporting device for building machine | |
CN206439584U (en) | A kind of novel computer display fixing device | |
CN213724678U (en) | Flexible leg separator of sports cross arm | |
CN106794372B (en) | vertical paddle core actuator | |
CN203598473U (en) | Rollover prevention rotating swing | |
CN201099979Y (en) | Door and window plastering machine | |
CN101275430B (en) | Yin and yang angle apparatus of plastering machine | |
CN201874210U (en) | Yin-Yang corner plastering machine | |
CN201874212U (en) | Door and window plastering structure of plastering machine | |
CN209422857U (en) | A kind of dance training pressing-leg device convenient for adjusting height | |
CN210622356U (en) | Construction building railing | |
CN201874211U (en) | Plastering device with improved plastering plate | |
CN207883172U (en) | A kind of changeable gravity centre swing rod | |
CN207181073U (en) | A kind of fixing device for gene detection sampling rod | |
CN110251895A (en) | Physical training chin-up training device | |
CN209885178U (en) | Children are with small-size over-and-under type basketball stands | |
CN109621314A (en) | Split fitness equipment | |
CN212290669U (en) | Winding device is used in V belt production | |
CN214344217U (en) | Multi-functional sports dance barre with height-adjustable | |
CN216855551U (en) | Deep well rescue device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080618 |