CN200982967Y - 模拟水平定向钻孔施工中能预测泥浆性能的实验装置 - Google Patents
模拟水平定向钻孔施工中能预测泥浆性能的实验装置 Download PDFInfo
- Publication number
- CN200982967Y CN200982967Y CNU2006200487988U CN200620048798U CN200982967Y CN 200982967 Y CN200982967 Y CN 200982967Y CN U2006200487988 U CNU2006200487988 U CN U2006200487988U CN 200620048798 U CN200620048798 U CN 200620048798U CN 200982967 Y CN200982967 Y CN 200982967Y
- Authority
- CN
- China
- Prior art keywords
- construction
- soil
- directional drilling
- mud
- chamber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2006200487988U CN200982967Y (zh) | 2006-12-12 | 2006-12-12 | 模拟水平定向钻孔施工中能预测泥浆性能的实验装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2006200487988U CN200982967Y (zh) | 2006-12-12 | 2006-12-12 | 模拟水平定向钻孔施工中能预测泥浆性能的实验装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN200982967Y true CN200982967Y (zh) | 2007-11-28 |
Family
ID=38910124
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2006200487988U Expired - Lifetime CN200982967Y (zh) | 2006-12-12 | 2006-12-12 | 模拟水平定向钻孔施工中能预测泥浆性能的实验装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN200982967Y (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101343876B (zh) * | 2008-08-22 | 2010-04-21 | 长江工程地球物理勘测武汉有限公司 | 水工岩锚注浆电测监控方法 |
CN102012416A (zh) * | 2010-09-21 | 2011-04-13 | 上海大学 | 一种极端条件下测量材料应变特性的方法及系统 |
CN102434166A (zh) * | 2011-11-24 | 2012-05-02 | 上海交通大学 | 隧道开挖对既有近距离平行隧道影响的试验装置和方法 |
CN104165980A (zh) * | 2014-06-16 | 2014-11-26 | 同济大学 | 一种带有土体水平位移及压力一体观测组件的实验装置 |
CN104965060A (zh) * | 2015-07-02 | 2015-10-07 | 山东大学 | 评价不同因素对破碎岩体注浆加固效果的模拟实验方法 |
CN112147313A (zh) * | 2020-10-20 | 2020-12-29 | 上海公路桥梁(集团)有限公司 | 大断面矩形顶管减摩注浆的模拟试验装置 |
CN112281867A (zh) * | 2020-10-21 | 2021-01-29 | 福建江夏学院 | 一种基于远程力稳定性监控的深基坑用支架及施工方法 |
CN113533693A (zh) * | 2021-07-19 | 2021-10-22 | 核工业井巷建设集团有限公司 | 一种触变泥浆携岩能力模拟试验平台 |
-
2006
- 2006-12-12 CN CNU2006200487988U patent/CN200982967Y/zh not_active Expired - Lifetime
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101343876B (zh) * | 2008-08-22 | 2010-04-21 | 长江工程地球物理勘测武汉有限公司 | 水工岩锚注浆电测监控方法 |
CN102012416A (zh) * | 2010-09-21 | 2011-04-13 | 上海大学 | 一种极端条件下测量材料应变特性的方法及系统 |
CN102012416B (zh) * | 2010-09-21 | 2013-10-16 | 上海大学 | 一种极端条件下测量材料应变特性的方法 |
CN102434166A (zh) * | 2011-11-24 | 2012-05-02 | 上海交通大学 | 隧道开挖对既有近距离平行隧道影响的试验装置和方法 |
CN104165980A (zh) * | 2014-06-16 | 2014-11-26 | 同济大学 | 一种带有土体水平位移及压力一体观测组件的实验装置 |
CN104165980B (zh) * | 2014-06-16 | 2016-04-20 | 同济大学 | 一种带有土体水平位移及压力一体观测组件的实验装置 |
CN104965060A (zh) * | 2015-07-02 | 2015-10-07 | 山东大学 | 评价不同因素对破碎岩体注浆加固效果的模拟实验方法 |
CN112147313A (zh) * | 2020-10-20 | 2020-12-29 | 上海公路桥梁(集团)有限公司 | 大断面矩形顶管减摩注浆的模拟试验装置 |
CN112281867A (zh) * | 2020-10-21 | 2021-01-29 | 福建江夏学院 | 一种基于远程力稳定性监控的深基坑用支架及施工方法 |
CN112281867B (zh) * | 2020-10-21 | 2021-11-16 | 福建江夏学院 | 一种基于远程力稳定性监控的深基坑用支架的施工方法 |
CN113533693A (zh) * | 2021-07-19 | 2021-10-22 | 核工业井巷建设集团有限公司 | 一种触变泥浆携岩能力模拟试验平台 |
CN113533693B (zh) * | 2021-07-19 | 2024-06-07 | 核工业井巷建设集团有限公司 | 一种触变泥浆携岩能力模拟试验平台 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN200982967Y (zh) | 模拟水平定向钻孔施工中能预测泥浆性能的实验装置 | |
Wu et al. | Drilling and completion technologies for deep carbonate rocks in the Sichuan Basin: Practices and prospects | |
CN202578708U (zh) | 一种软基动水地层盾构隧道同步注浆效果评价模拟装置 | |
CN211904664U (zh) | 多功能顶管及注浆润滑减阻过程模拟实验装置 | |
CN106950070A (zh) | 用于矩形顶管顶进施工全过程模拟的试验装置 | |
CN105547967A (zh) | 裂隙介质系统渗透张量室内测定装置 | |
CN102252952A (zh) | 一种测定土层原位渗透系数的装置 | |
CN111914373A (zh) | 长距离岩石顶管摩阻力计算方法及管岩接触状态检测方法 | |
Shu et al. | Cuttings transport mechanism in a large-diameter HDD borehole | |
Zhang et al. | Critical drawdown pressure of sanding onset for offshore depleted and water cut gas reservoirs: modeling and application | |
CN112227989A (zh) | 一种可视化水平环空岩屑运移模拟方法 | |
CN100590292C (zh) | 模拟水平定向钻孔施工中能预测泥浆性能的实验装置 | |
Ozbayoglu et al. | Hole cleaning performance of light-weight drilling fluids during horizontal underbalanced drilling | |
CN101800000A (zh) | 多角度水平分支井天然气开采模拟装置 | |
CN202166595U (zh) | 一种测定土层原位渗透系数的装置 | |
CN100342115C (zh) | 筛管模拟实验装置 | |
Zhai et al. | Precise application of grouting technology in underground coal mining: water inrush risk of floor elimination | |
Loew et al. | Engineering geology of Alpine tunnels: Past, present and future | |
CN206329273U (zh) | 一种滑动钻井系统 | |
CN104631418A (zh) | 简易人力设备在城市地质勘察中排查地下管线的方法 | |
CN103397874A (zh) | 化学防砂固砂评价实验装置 | |
CN111364969A (zh) | 一种用于生成井筒钻井参数的可视化表示的方法 | |
Parker | Geotechnical investigations | |
Yu et al. | Chemical effect on wellbore instability of Nahr Umr shale | |
Zhang et al. | Study on bearing characteristics of bored piles in coral reef |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Shanghai Subway Shield Equipment Engineering Co., Ltd. Assignor: Shanghai No.2 Municipal Engineering Co., Ltd. Contract fulfillment period: 2008.7.30 to 2013.7.30 Contract record no.: 2008310000134 Denomination of utility model: Experimental device for predicting slurry performance in simulation of horizontal directional drilling construction Granted publication date: 20071128 License type: Exclusive license Record date: 20081007 |
|
LIC | Patent licence contract for exploitation submitted for record |
Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2008.7.30 TO 2013.7.30; CHANGE OF CONTRACT Name of requester: SHANGHAI SUBWAY DUNGOU EQUIPMENT ENGINEERING CO., Effective date: 20081007 |
|
EC01 | Cancellation of recordation of patent licensing contract |
Assignee: Shanghai Subway Shield Equipment Engineering Co., Ltd. Assignor: Shanghai No.2 Municipal Engineering Co., Ltd. Contract record no.: 2008310000134 Date of cancellation: 20100518 |
|
CX01 | Expiry of patent term |
Granted publication date: 20071128 |
|
EXPY | Termination of patent right or utility model |