CN207959289U - Structure is repaired in a kind of leak for basement post-pouring zone position - Google Patents

Structure is repaired in a kind of leak for basement post-pouring zone position Download PDF

Info

Publication number
CN207959289U
CN207959289U CN201721812493.4U CN201721812493U CN207959289U CN 207959289 U CN207959289 U CN 207959289U CN 201721812493 U CN201721812493 U CN 201721812493U CN 207959289 U CN207959289 U CN 207959289U
Authority
CN
China
Prior art keywords
post
repaired
cast strip
zone position
pouring zone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721812493.4U
Other languages
Chinese (zh)
Inventor
王强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Oriental Yuhong Waterproof Technology Co Ltd
Original Assignee
Beijing Oriental Yuhong Waterproof Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Oriental Yuhong Waterproof Technology Co Ltd filed Critical Beijing Oriental Yuhong Waterproof Technology Co Ltd
Priority to CN201721812493.4U priority Critical patent/CN207959289U/en
Application granted granted Critical
Publication of CN207959289U publication Critical patent/CN207959289U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Building Environments (AREA)

Abstract

The utility model discloses a kind of leaks for basement post-pouring zone position to repair structure, including V-groove, two V-grooves are separately positioned on the seam crossing between post-cast strip and both sides diaphragm wall;Sealing rod, the sealing rod are embedded in the V-groove;Funnel is noted, multiple note funnels are laid in blossom type on the post-cast strip and the diaphragm wall of the V-groove both sides;Slip casting, the slip casting are filled in by the note funnel in the post-cast strip and the diaphragm wall;Film layer, the film layer are coated on the post-cast strip and the diaphragm wall.By the setting of above structure, by effective combination of grouting for water plugging and water-repellent paint, a diversified repair method is provided for underground space structure leakage maintaining, while secondary seepage problem caused by system of Himdu logic water channeling will not be caused.

Description

Structure is repaired in a kind of leak for basement post-pouring zone position
Technical field
The utility model belongs to basement post-pouring zone part leakage maintenance technique field, and in particular to one kind being used for basement Structure is repaired in the leak at post-cast strip position.
Background technology
With the continuous improvement of the sustainable development and people's lives of society, pursuit of the people to living conditions and environmental quality Also it improves increasingly, this also proposes requirements at the higher level to the normal usage function of building.Significant points underground as building Room, also more and more common in current architectural design, but the leakage problems of basement are high, especially basement post-pouring zone The leakage of junction becomes one leakage keypoint part of basement, and detrimental effect is caused to the normal use of basement.
Currently, after underground space post-cast strip position leaks, the repair mostly based on grouting for water plugging, supplemented by water-repellent paint Method.The effects that its principle is the infiltration of itself, the foaming and intumescing by injecting paste material blocks up the micro-cracks of concrete itself, Play the role of impervious leakage-stopping.Its drawback has:1. grouting for water plugging is mostly with the slip casting in the case where wall body slit has bright water, effect is most It is good.And encountering when actually slip casting is repaired has the condition in the wall leakage crack of bright water to be relatively difficult to reach.2. encountering more multiple Miscellaneous structure wall crack, often once grouting leak stopping do not live, and need 2-3 slip casting, can just play due effect.
The utility model patent of Patent No. ZL 201720021325.7 discloses a kind of underground connection wall seaming position Water sealing structure, including after the leading width diaphragm wall of seam and after row width diaphragm wall, in leading width diaphragm wall and rear row width diaphragm wall It includes the end socket muscle of the diaphragm wall main reinforcement and seam crossing of vertical setting that bundle, which has steel reinforcement cage, steel reinforcement cage, it is characterised in that:In leading width The inside top vertical of diaphragm wall end socket muscle is arranged and the isometric slip casting steel pipe of diaphragm wall main reinforcement, quincunx in slip casting steel pipe wall Arrange injected hole.
But above structure still has the following problems:
1, above structure is only used for being attached wall water seal when construction, it is impossible to be used in the leak of post-cast strip is repaired;
2, the intensity of slip casting steel pipe is big, and the permeability of slip casting is caused to reduce, and can not further penetrate into both sides connection structure Inside, the defect inside the connection wall of both sides can not be repaired, water-stagnating effect is not high.
Therefore, for the above deficiency, the utility model urgent need provides a kind of leak for basement post-pouring zone position and repaiies Mend structure.
Utility model content
The purpose of this utility model is to provide a kind of leaks for basement post-pouring zone position to repair structure, in combination Lower structure grouting for water plugging provides a diversified repair method, while grouting for water plugging for underground space structure leakage maintaining With effective combination of water-repellent paint, secondary seepage problem caused by system of Himdu logic water channeling will not be caused.
The utility model provides following proposal:
Structure is repaired in a kind of leak for basement post-pouring zone position, including:Two V-grooves, two V-grooves point Seam crossing between post-cast strip and both sides diaphragm wall is not set;Sealing rod, the sealing rod are embedded in the V-groove;It is more A note funnel, multiple note funnels are laid in blossom type on the post-cast strip and the diaphragm wall of the V-groove both sides; Slip casting, the slip casting are filled in by the note funnel in the post-cast strip and the diaphragm wall;Film layer, the film layer apply It is overlying on the post-cast strip and the diaphragm wall.
Structure, further preferably, the film layer are repaired in leak as described above for basement post-pouring zone position Including PCC-501 cement based penetration crystallization type water proofing paints and PMC-421 polymer waterproof mortars, the PMC-421 polymer Waterproof mortar is coated on the PCC-501 cement based penetration crystallization type water proofing paints.
Structure, further preferably, the PCC-501 are repaired in leak as described above for basement post-pouring zone position The thickness of cement based penetration crystallization type water proofing paint is 1mm.
Structure, further preferably, the PMC-421 are repaired in leak as described above for basement post-pouring zone position The thickness of polymer waterproof mortar is 3mm.
Leak repairing structure as described above for basement post-pouring zone position further includes further preferably rigidity Leak stopping is precious, and the rigidity leak stopping treasured is set on the outside of the note funnel, for blocking slip casting.
Structure, further preferably, the V-groove are repaired in leak as described above for basement post-pouring zone position Width is not less than 50mm, depth 30-50mm.
Structure, further preferably, the note funnel are repaired in leak as described above for basement post-pouring zone position It it is 45 ° with the angle of the diaphragm wall or the basal plane of the post-cast strip.
Structure is repaired in leak as described above for basement post-pouring zone position, further preferably, described in adjacent two The distance of hole for injecting glue is 20-25cm, and the depth of the note funnel is the 33%-50% of the continuous wall thickness.
Structure, further preferably, the film layer are repaired in leak as described above for basement post-pouring zone position Coated on the diaphragm wall at two each 300mm of side seams extension of the post-cast strip and the post-cast strip.
Leak repairing structure as described above for basement post-pouring zone position further includes further preferably slip casting Mouth, the grouting nozzle is inserted into the pouring hole and stretches out 1-1.5cm, for connecting grouting pump.
A kind of leak repairing structure for basement post-pouring zone position disclosed in the utility model, including V-groove, two A V-groove is separately positioned on the seam crossing between post-cast strip and both sides diaphragm wall;Sealing rod, the sealing rod are embedded in institute It states in V-groove;Note funnel, multiple note funnels are laid in the post-cast strip of the V-groove both sides and described in blossom type On diaphragm wall;Slip casting, the slip casting are filled in by the note funnel in the post-cast strip and the diaphragm wall;Film layer, institute Film layer is stated coated on the post-cast strip and the diaphragm wall.By the setting of above structure, by by grouting for water plugging with it is anti- Effective combination of water paint provides a diversified repair method for underground space structure leakage maintaining, while will not make At caused by the system of Himdu logic water channeling the problem of secondary seepage.
Description of the drawings
Fig. 1 is the structural schematic diagram that structure is repaired in a kind of leak for basement post-pouring zone position in the present embodiment;
Fig. 2 is the plum blossom cloth hole schematic diagram for noting funnel.
Reference sign:
1- diaphragm walls, 2-V type grooves, 3- sealing rods, 4- leak stopping is precious, and 5- notes funnel, 6- grouting nozzles, 7-PCC-501 cement bases Penetration crystallization type water proofing paint, 8-PMC-421 polymer waterproof mortars, the post-cast strips 9-.
Specific implementation mode
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, originally The every other embodiment that field those of ordinary skill is obtained without making creative work, belongs to this practicality Novel protected range.
It is in the description of the present invention, it should be noted that term "center", "upper", "lower", "left", "right", " perpendicular Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only The utility model and simplifying describes for ease of description, do not indicate or imply the indicated device or element must have it is specific Orientation, with specific azimuth configuration and operation, therefore should not be understood as limiting the present invention.In addition, term " the One ", " second ", " third " are used for description purposes only, and are not understood to indicate or imply relative importance.
As shown in Figure 1, present embodiment discloses a kind of leaks for basement post-pouring zone position to repair structure, including: Two V-grooves 2, two V-grooves 2 are separately positioned on the seam crossing between post-cast strip 9 and both sides diaphragm wall 1;Sealing rod 3, sealing Item 3 is embedded in V-groove 2, and leak stopping treasured 4 is additionally provided on sealing rod 3, for blocking plastering;Funnel 5 is noted, multiple note funnels 5 are in Blossom type is laid on the post-cast strip 9 and diaphragm wall 1 of 2 both sides of V-groove;Slip casting, slip casting are filled in post-cast strip 9 by noting funnel 5 In diaphragm wall 1;Film layer, film layer are coated on post-cast strip 9 and diaphragm wall 1.
Meanwhile the invention also discloses the construction procedures of above structure:
Step 1:It determines the position of post-cast strip 9, and clears up the dirt near post-cast strip 9, then connect along 9 both sides of post-cast strip One V-groove 2 of chisel is respectively picked at seam position, and will be cleaned out in slot, it is preferred that the width of V-groove 2 is not less than 50mm, and depth is 30-50mm;
Step 2:Sealing rod 3 is buried in V-groove 2, and leak stopping treasured 4 is additionally provided on sealing rod 3;In the present embodiment, sealing The length of item 3 is identical as the length of V-groove 2, the leak stopping treasured 4 configured is then smeared, by 2 sealing Smoothing of V-groove;Preferably, Expansion sealing strip 3 or rubber water-proof item 3 can be selected in sealing rod 3;
Step 3:The position of arrangement note funnel 5 on the diaphragm wall 1 of post-cast strip 9 and its both sides, it is preferred that V-groove 2 one The pitch-row of the adjacent two notes funnel in side 5 is 20-25cm, and note funnel 5 is arranged in 2 both sides of V-groove in blossom type;
Step 4:After cloth hole, drilling construction is carried out to post-cast strip 9 and diaphragm wall 1, it is preferred that electric drill is protected with basal plane 45° angle drilling is held, the depth of drilling is the 1/3-1/2 of 1 thickness of post-cast strip 9 or diaphragm wall;Then pacify in the note funnel 5 being drilled Grouting nozzle 6 is filled, when installation will set deeply as possible, i.e., grouting nozzle 6 exposes 1-1.5cm outside and tightens;
Step 5:Grouting nozzle 6 connects grouting pump, and carries out slip casting, while one end peace of Grouting Pipe using electronic grouting pump Pressure gauge is filled, the moment shows the pressure of slip casting, when the grout absorption of each hole section of slip casting is less than 5L/min, and reaches steady after design pressure Determine 10min, when every meter of the water absorption of inspection hole is less than 1.0L/min slip casting terminate, then carry out the construction of next step;
Step 6:After slip casting, the grouting nozzle 6 for chiseling out and exposing basal plane is picked, then with rigid leak stopping treasured closing;
Step 7:Brush rigid film layer, in the present embodiment, film layer includes that PCC-501 cement-base infiltration crystallization types are anti- Water paint 7 and PMC-421 polymer waterproof mortar 8, wherein PCC-501 cement based penetration crystallization type water proofing paints 7 directly coat On the diaphragm wall 1 and post-cast strip 9 after slip casting, PMC-421 polymer waterproof mortar 8 is coated on PCC-501 cement-based penetrants On crystalline waterproof coating 7, it is preferred that the thickness of PCC-501 cement based penetration crystallization type water proofing paints 7 is 1mm, PMC- The thickness of 421 polymer waterproof mortars is 3mm;Further, film layer is coated on post-cast strip 9 and 9 liang of post-cast strip side seams On diaphragm wall 1 at each 300mm of extension.
Compared with prior art, a kind of leak for 9 position of basement post-pouring zone disclosed in the utility model is repaired Structure has the advantages that:
1, in the utility model, by effective combination of grouting for water plugging and water-repellent paint, for underground space structure leakage dimension It repaiies and provides a diversified repair method, while secondary seepage problem caused by system of Himdu logic water channeling will not be caused;
2, in the utility model, grouting equipment by casting head grouting under pressure, the slurries of injection diaphragm wall 1 and after pour Slip casting is filled with 9 concrete, is reinforced, and has on the one hand repaired the concrete defects such as honeycomb, hole, on the other hand It also enhances concrete strength, improve impermeability;
3, in the utility model, by the way that two layers of waterproof coating is arranged, waterproof at the post-cast strip 9 after repairing is further enhanced Performance ensure that construction quality.
Finally it should be noted that:The above various embodiments is only to illustrate the technical solution of the utility model, rather than limits it System;Although the utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art should Understand:It still can be with technical scheme described in the above embodiments is modified, either to which part or whole Technical characteristic carries out equivalent replacement;And these modifications or replacements, this practicality that it does not separate the essence of the corresponding technical solution are new The range of each embodiment technical solution of type.

Claims (10)

1. structure is repaired in a kind of leak for basement post-pouring zone position, which is characterized in that including:
Two V-grooves, two V-grooves are separately positioned on the seam crossing between post-cast strip and both sides diaphragm wall;
Sealing rod, the sealing rod are embedded in the V-groove;
Multiple note funnels, multiple note funnels are laid in the post-cast strip of the V-groove both sides and the company in blossom type On continuous wall;
Slip casting, the slip casting are filled in by the note funnel in the post-cast strip and the diaphragm wall;
Film layer, the film layer are coated on the post-cast strip and the diaphragm wall.
2. structure is repaired in the leak according to claim 1 for basement post-pouring zone position, which is characterized in that the painting Film layer includes PCC-501 cement based penetration crystallization type water proofing paints and PMC-421 polymer waterproof mortars, and the PMC-421 is poly- Object waterproof mortar is closed to be coated on the PCC-501 cement based penetration crystallization type water proofing paints.
3. structure is repaired in the leak according to claim 2 for basement post-pouring zone position, which is characterized in that described The thickness of PCC-501 cement based penetration crystallization type water proofing paints is 1mm.
4. structure is repaired in the leak according to claim 2 for basement post-pouring zone position, which is characterized in that described The thickness of PMC-421 polymer waterproof mortars is 3mm.
5. structure is repaired in the leak according to claim 1 or 2 for basement post-pouring zone position, which is characterized in that also Including rigid leak stopping treasured, the rigidity leak stopping treasured is set on the outside of the note funnel, for blocking slip casting.
6. structure is repaired in the leak according to claim 1 or 2 for basement post-pouring zone position, which is characterized in that institute The width for stating V-groove is not less than 50mm, depth 30-50mm.
7. structure is repaired in the leak according to claim 1 or 2 for basement post-pouring zone position, which is characterized in that institute It is 45 ° that note funnel, which is stated, with the angle of the diaphragm wall or the basal plane of the post-cast strip.
8. structure is repaired in the leak according to claim 1 or 2 for basement post-pouring zone position, which is characterized in that phase The distance of the two note funnel of neighbour is 20-25cm, and the depth of the note funnel is the 33%-50% of the continuous wall thickness.
9. structure is repaired in the leak according to claim 1 or 2 for basement post-pouring zone position, which is characterized in that institute Film layer is stated coated on the diaphragm wall at two each 300mm of side seams extension of the post-cast strip and the post-cast strip.
10. structure is repaired in the leak according to claim 5 for basement post-pouring zone position, which is characterized in that also wrap Grouting nozzle is included, the grouting nozzle is inserted into the note funnel and stretches out 1-1.5cm, for connecting grouting pump.
CN201721812493.4U 2017-12-21 2017-12-21 Structure is repaired in a kind of leak for basement post-pouring zone position Active CN207959289U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721812493.4U CN207959289U (en) 2017-12-21 2017-12-21 Structure is repaired in a kind of leak for basement post-pouring zone position

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721812493.4U CN207959289U (en) 2017-12-21 2017-12-21 Structure is repaired in a kind of leak for basement post-pouring zone position

Publications (1)

Publication Number Publication Date
CN207959289U true CN207959289U (en) 2018-10-12

Family

ID=63729434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721812493.4U Active CN207959289U (en) 2017-12-21 2017-12-21 Structure is repaired in a kind of leak for basement post-pouring zone position

Country Status (1)

Country Link
CN (1) CN207959289U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110607921A (en) * 2019-09-23 2019-12-24 周伟 Automatic repairing leakage stoppage treatment method and waterproof leakage stoppage structure
CN111206632A (en) * 2020-02-15 2020-05-29 赵利 Construction method for surface reinforcement treatment after building foundation pouring
CN111877409A (en) * 2020-08-17 2020-11-03 河南五建建设集团有限公司 Construction method of cement-based capillary crystalline waterproof coating for underground engineering

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110607921A (en) * 2019-09-23 2019-12-24 周伟 Automatic repairing leakage stoppage treatment method and waterproof leakage stoppage structure
CN111206632A (en) * 2020-02-15 2020-05-29 赵利 Construction method for surface reinforcement treatment after building foundation pouring
CN111206632B (en) * 2020-02-15 2021-04-20 大庆珑达建工集团有限公司 Construction method for surface reinforcement treatment after building foundation pouring
CN111877409A (en) * 2020-08-17 2020-11-03 河南五建建设集团有限公司 Construction method of cement-based capillary crystalline waterproof coating for underground engineering

Similar Documents

Publication Publication Date Title
CN202788022U (en) Wall crack combined type repair structure
CN207959289U (en) Structure is repaired in a kind of leak for basement post-pouring zone position
CN104805912A (en) Connecting node of prefabricated air conditioner panel and prefabricated shear wall
CN107620312A (en) High hydraulic pressure precipitation well construction and hydrostatic slip casting method for blocking in a kind of Metro station excavation
CN102011397A (en) Construction process of concrete form water-stopping occlusion pile
CN108166517B (en) Well sealing method and well sealing device for super high-rise high-water pressure deep well dewatering well
CN106284706A (en) The construction method of external wall outer insulation rock cotton board
CN210163948U (en) Construction system for pouring post-cast strip of basement roof
CN110952644B (en) Leakage detection and leakage stoppage integrated device and process method thereof
CN109629845A (en) Concrete structure seam areas leakage treatment device and its construction method
CN113107018B (en) Method for treating leakage water of underground structure crack
CN103046513A (en) Method for coating and sealing fracture of bed rock in uncovered heavy consolidation grouting
CN111828056A (en) Shallow-buried underground excavation tunnel waterproof construction method
CN204492022U (en) The waterproof construction of parapet high-low bay deformation joint
CN208777468U (en) A kind of kitchen and bath's water-proofing anticracking structure
CN205804419U (en) The tenon formula joint waterproofing structure of concrete waist rail embedded structure side wall
CN112195970A (en) River-crossing tunnel engineering waterproof construction method
CN207959290U (en) A kind of leakage maintaining structure for basement construction seam position
CN112901222B (en) Treatment process for concrete water seepage cracks of inverted arch of tunnel
CN109779287A (en) Microdilatancy water-proof emulsion construction technology
CN213539105U (en) A leaking stoppage structure for deep basal pit basement outer wall crack
CN114607170A (en) Seam leakage stopping and reinforcing method for roof
CN104343137B (en) Underground waterproof engineering construction method
CN113503056A (en) Building deformation joint leakage maintenance method
CN109183800B (en) Construction process of preliminary grouting system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant