CN207740012U - A kind of synchronous grouting mortar vehicle for shield-tunneling construction - Google Patents
A kind of synchronous grouting mortar vehicle for shield-tunneling construction Download PDFInfo
- Publication number
- CN207740012U CN207740012U CN201820086315.6U CN201820086315U CN207740012U CN 207740012 U CN207740012 U CN 207740012U CN 201820086315 U CN201820086315 U CN 201820086315U CN 207740012 U CN207740012 U CN 207740012U
- Authority
- CN
- China
- Prior art keywords
- slurry
- storage bin
- bin hopper
- grouting
- pump
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model provides a kind of synchronous grouting mortar vehicle for shield-tunneling construction.The mortar vehicle includes slurry can and the suction pump in slurry can bottom is arranged, and stirring blade is equipped in slurry can, it is characterised in that:Storage bin hopper is equipped in slurry can, the storage bin hopper is placed in slurry can top, it is equipped with grouting port in the bottom of storage bin hopper, in storage bin hopper overflow port is offered higher than the position of slurry can, the suction pump of the slurry can bottom is connected to by jelly suction pipe with storage bin hopper, the grouting port of storage bin hopper is connect by Grouting Pipe with shield tunneling synchronous mud injecting pump feed inlet, and the size of grouting port and the feed inlet of tunneling synchronous mud injecting pump are equal in magnitude, and the return duct for leading to slurry can is equipped at storage bin hopper overflow port.The utility model is simple in structure, avoids because of the slip casting tracheal rupture of the inconsistent appearance of power of suction pump and grouting pump, grouting pump damage or phenomena such as jam of grouting pipe, and its slip casting effect can reach normal slip casting effect.
Description
Technical field
The utility model is related to tunneling shield filling systems, refer in particular to a kind of synchronous grouting mortar for shield-tunneling construction
Vehicle.
Background technology
In recent years, subway transportation has gradually become the important means that city solves traffic congestion, and shield method is as ground
The main engineering method of iron construction, has been obtained for being more and more widely used.In municipal construction, Land-Subsidence Control is to ensure ground
The factor first of face construction of structures safety, and with the expansion of subway transportation network and perfect, subway tunnel inevitably needs
More constructions of structures even operated subway line is passed through under complex geological condition, this controls the stratum settlement of shield-tunneling construction
More stringent requirements are proposed for technology.
The ground settlement generated in shield tunneling process is mainly caused by construction caused by Stratum Loss.(stratum
Loss is to excavate soil body volume in shield-tunneling construction and build up the difference of tunnel volume), Stratum Loss, shield machine are provided with together in order to control
Filling system is walked, section of jurisdiction outer void is filled to make up Stratum Loss by injecting synchronous slurries in time at shield tail rear.Upper soft
During lower hard formation, risk source is crossed in order to better, synchronous grouting is taken to be filled with inert slurry both of which, it can be in time
So that the sedimentation above shield body with shield tail rear is dropped in controlled range;It is carried due to the synchronous grouting system of existing shield machine
Vehicle mortar jar only there are one, and inert slurry viscosity is higher, can not direct slip casting, need first to inject in mortar jar and be noted again
Slurry will use mortar vehicle directly to carry out slip casting as mortar holding vessel to meet the two slip casting simultaneously.But in slip casting
Cheng Zhong, can be because suction pump and slip casting stick power be inconsistent, and lead to mortar tracheal rupture or mortar pump motor damage or mortar
A series of problems, such as pump case is blocked with pipeline, influences the normal slip casting process of mortar.
Invention content
In order to solve defect of the existing technology, the utility model provides a kind of synchronous grouting sand for shield-tunneling construction
Vehicle is starched, which can be used for mortar holding vessel and synchronize slip casting, can't lead to slip casting tracheal rupture or blocking, will not
There is the problems such as grouting pump damage.
Technical solution provided by the utility model:A kind of synchronous grouting mortar vehicle for shield-tunneling construction, including storage
It starches tank and the suction pump in slurry can bottom is set, stirring blade is equipped in slurry can, it is characterised in that:It is set in slurry can
There are storage bin hopper, the storage bin hopper to be placed in slurry can top, its underpart is in funnel-form, grout outlet is equipped in its bottom, in storage bin hopper
Position higher than slurry can offers overflow port, and the suction pump of the slurry can bottom is connected to by jelly suction pipe with storage bin hopper, storage
The grouting port of hopper is connect by Grouting Pipe with shield tunneling synchronous mud injecting pump feed inlet, and the size of grouting port and tunneling synchronous mud injecting pump
Feed inlet is equal in magnitude, and the return duct for leading to slurry can is equipped at storage bin hopper overflow port.
The utility model preferably technical solution:The storage bin hopper is placed in the top of slurry can tail portion, and part is higher by storage
Tank is starched, the overflow port is placed in the part that storage bin hopper is higher by slurry can.
The utility model preferably technical solution:The suction pump is placed in slurry can lower center position, is located at suction pump
The stirring blade angle of both sides is opposite.
The utility model preferably technical solution:Grout outlet and overflow diameter on the storage bin hopper are 150mm.
The slip casting transport system of the utility model, battery truck is starched in vehicle transported slurry to tunnel, anti-by mortar vehicle suction pump
Conveying slurries prevent grouting pump and mortar pump power inconsistent to mortar funnel again, cause mortar vehicle funnel to overflow mortar, in sand
It starches and increases overflow passage on the outside of vehicle funnel, overflow passage flows back to slurry vehicle again, and mortar vehicle funnel is by itself drop height slurry
Liquid is transported to grouting pump feed inlet, and slurries are transported to each Grouting Pipe by grouting pump by self-suction function.
The utility model increases a storage bin hopper in the slurry can of grouting vehicle, keeps the slurries that suction pump is extracted out directly defeated
It is sent in storage bin hopper, is opened up among storage bin hopper there are two mouth, one is connect with grouting pump by feed liquid delivery pipe, and ensures
The load of material mouth is consistent with the inlet amount of grouting pump, another is flowed back by return duct in slurry can, avoids because taking out
Phenomena such as slip casting tracheal rupture of the inconsistent appearance of the power of stock pump and grouting pump, grouting pump damage or jam of grouting pipe, and its
Slip casting effect can reach normal slip casting effect, the case where being not in that flow is small, influence slip casting.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is mortar vehicle internal structure schematic diagram;
Fig. 3 is the structural schematic diagram of the stirring blade of the utility model.
Specific implementation mode
The utility model is described in further detail below in conjunction with the accompanying drawings.As shown in Figure 2 is a kind of for the same of shield-tunneling construction
Slip casting mortar vehicle is walked, including slurry can 1 and the suction pump 2 in 1 bottom of slurry can is set, the suction pump 2 is placed in 1 bottom of slurry can
Portion middle position is equipped with stirring blade 3 in slurry can 1, as shown in figure 3,3 angle of stirring blade positioned at 2 both sides of suction pump
On the contrary, when stirring, agitating shaft drives stirring blade by mortar toward conveying at slurry pumping port, ensures that slurries are drained only in mortar vehicle.
As depicted in figs. 1 and 2, storage bin hopper 4 is equipped in slurry can 1, the storage bin hopper 4 is placed in the top of 1 tail portion of slurry can
End, and part is higher by slurry can 1, is in funnel-form in its underpart, and grout outlet 5 is equipped in its bottom, is higher than slurry can in storage bin hopper 4
1 position offers overflow port 6, and the grout outlet 5 and 6 diameter of overflow port on the storage bin hopper 4 are 150mm, grout outlet 5 with
The feed inlet of tunneling synchronous mud injecting pump 8 is equal in magnitude, matches.The suction pump 2 of 1 bottom of the slurry can passes through jelly suction pipe 2-1 and storage
Hopper 4 is connected to, and the grouting port 5 of storage bin hopper 4 is connect by Grouting Pipe 7 with 8 feed inlet of shield tunneling synchronous mud injecting pump, and grouting port 5
Size leads to the return duct 9 of slurry can 1 with being equipped at 4 overflow port 6 of storage bin hopper.
The utility model can directly synchronize slip casting directly as storage tank, and the grouting vehicle is storage battery grouting vehicle,
When carrying out slip casting, the grouting vehicle for being packed into mortar enters in tunnel, conveys slurries repeatedly by mortar vehicle suction pump 2 to storage bin hopper 4
Interior, the lower part of storage bin hopper 4 is in funnel-form, and bottom is equipped with grout outlet 5, and is connected to grouting pump 8 by Grouting Pipe 7, is carried out same
Walk slip casting;Grouting pump 8 and 2 power of suction pump are inconsistent in order to prevent, cause mortar vehicle storage bin hopper 4 to overflow mortar, in mortar vehicle
Storage bin hopper 4 is equipped with overflow port 6, and is flowed back into storage tank 1 by return duct 9, and mortar vehicle storage bin hopper 4 passes through itself drop height
Slurries are transported to 8 feed inlet of grouting pump by degree, and slurries are transported to each Grouting Pipe by grouting pump 8 by self-suction function.
Claims (4)
1. a kind of synchronous grouting mortar vehicle for shield-tunneling construction, including slurry can (1) and setting are in the pumping of slurry can (1) bottom
Stock pump (2) is equipped with stirring blade (3) in slurry can (1), it is characterised in that:Storage bin hopper (4), institute are equipped in slurry can (1)
It states storage bin hopper (4) and is placed in slurry can (1) top, its underpart is in funnel-form, grout outlet (5) is equipped in its bottom, in storage bin hopper (4)
Position higher than slurry can (1) offers overflow port (6), and the suction pump (2) of slurry can (1) bottom passes through jelly suction pipe (2-
1) it is connected to storage bin hopper (4), the grouting port (5) of storage bin hopper (4) passes through Grouting Pipe (7) and shield tunneling synchronous mud injecting pump (8) feed inlet
Connection, and the size of grouting port (5) and the feed inlet of tunneling synchronous mud injecting pump (8) are equal in magnitude, are set at storage bin hopper (4) overflow port (6)
There is the return duct (9) for leading to slurry can (1).
2. a kind of synchronous grouting mortar vehicle for shield-tunneling construction according to claim 1, it is characterised in that:The storing
Bucket (4) is placed in the top of slurry can (1) tail portion, and part is higher by slurry can (1), and the overflow port (6) is placed in storage bin hopper (4) height
Go out the part of slurry can (1).
3. a kind of synchronous grouting mortar vehicle for shield-tunneling construction according to claim 1, it is characterised in that:The pumping slurry
Pump (2) is placed in slurry can (1) lower center position, and stirring blade (3) angle for being located at suction pump (2) both sides is opposite.
4. a kind of synchronous grouting mortar vehicle for shield-tunneling construction according to claim 1, it is characterised in that:The storing
Grout outlet (5) and overflow port (6) diameter on bucket (4) are 150mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820086315.6U CN207740012U (en) | 2018-01-18 | 2018-01-18 | A kind of synchronous grouting mortar vehicle for shield-tunneling construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820086315.6U CN207740012U (en) | 2018-01-18 | 2018-01-18 | A kind of synchronous grouting mortar vehicle for shield-tunneling construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207740012U true CN207740012U (en) | 2018-08-17 |
Family
ID=63123410
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820086315.6U Expired - Fee Related CN207740012U (en) | 2018-01-18 | 2018-01-18 | A kind of synchronous grouting mortar vehicle for shield-tunneling construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207740012U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109550620A (en) * | 2018-09-28 | 2019-04-02 | 重庆福瑞斯自动化设备股份有限公司 | Lead agent automatic spraying system |
CN109653754A (en) * | 2018-12-13 | 2019-04-19 | 中铁隧道集团二处有限公司 | A kind of improved method for preventing shield machine feeding hard tube from blocking |
-
2018
- 2018-01-18 CN CN201820086315.6U patent/CN207740012U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109550620A (en) * | 2018-09-28 | 2019-04-02 | 重庆福瑞斯自动化设备股份有限公司 | Lead agent automatic spraying system |
CN109653754A (en) * | 2018-12-13 | 2019-04-19 | 中铁隧道集团二处有限公司 | A kind of improved method for preventing shield machine feeding hard tube from blocking |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102418555B (en) | Method for filling mine goaf by utilizing high-concentration all tailing cement | |
CN103437786B (en) | Shield structure body refuse Recovery Purifying reutilization system is used for the method for Shield Construction Method Used | |
CN102261262B (en) | High-performance foam mortar filling method for mine stope | |
CN106194252B (en) | A kind of coal mining totipotency end pipeline Paste-filling System and method | |
CN112814732A (en) | Preparation of mixed ground paste of barren rock and tailings and pump sending filling device | |
CN106121722A (en) | A kind of method quickly constructing fire dam | |
CN103306719B (en) | Coal mine underground drilling filling and reinforcing device and method | |
CN102493839A (en) | Method for filling gob | |
CN102758641A (en) | Construction method for ultralarge-diameter shield synchronous grouting | |
CN207740012U (en) | A kind of synchronous grouting mortar vehicle for shield-tunneling construction | |
CN107191222A (en) | A kind of utilization pressure-air conveys the device and method of lotion | |
CN106065782A (en) | A kind of big flow high concentration structure stream full tail sand cemented filling technique | |
CN108868799A (en) | A kind of earth pressure balanced shield, EPBS is synchronous to infuse mud construction and construction auxiliary system | |
CN101701527A (en) | Goaf open-type packing method | |
CN114033483A (en) | Construction method suitable for collapse pit tailing filling process | |
CN208294565U (en) | Tailing slurry filling system | |
CN105525945B (en) | A kind of cementing continuous device for filling of high concentration crude tailings and fill method | |
CN106065783A (en) | Device for filling and using method thereof for extensive non-metal mine | |
CN214303937U (en) | Preparation of mixed ground paste of barren rock and tailings and pump sending filling device | |
CN205823327U (en) | Device for filling for extensive non-metal mine | |
CN103352722B (en) | Cemented filling close to back processing technology for goaf at barren rock filling background | |
CN105952417A (en) | Slurry mixing, slurry injection and water blocking device for adding dry aggregates outside holes of super high-water material of strong water-containing layer | |
CN207740011U (en) | Novel slurry filling system for effectively controlling surface subsidence | |
CN108060931A (en) | For effectively controlling the novel slurry filling system of surface subsidence and grouting process | |
CN205936461U (en) | Well site detritus is collected and is installed fully with carrying sled |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180817 Termination date: 20220118 |
|
CF01 | Termination of patent right due to non-payment of annual fee |