Nothing Special   »   [go: up one dir, main page]

CN206562789U - A kind of provisional protection column for building - Google Patents

A kind of provisional protection column for building Download PDF

Info

Publication number
CN206562789U
CN206562789U CN201720252223.6U CN201720252223U CN206562789U CN 206562789 U CN206562789 U CN 206562789U CN 201720252223 U CN201720252223 U CN 201720252223U CN 206562789 U CN206562789 U CN 206562789U
Authority
CN
China
Prior art keywords
level
pillar
pillars
protection column
sliding sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720252223.6U
Other languages
Chinese (zh)
Inventor
曾智华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720252223.6U priority Critical patent/CN206562789U/en
Application granted granted Critical
Publication of CN206562789U publication Critical patent/CN206562789U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a kind of provisional protection column for building, including pillar;The pillar has two, respectively the vertical left and right sides for being in guard rail;Level has been placed equidistant railing under upper between described two pillars;The lower end level of described two pillars is connected with support flat board;Roller is provided with four drift angles of described two support flat board lower surfaces;The lower end of described two pillars is cased with sliding sleeve;The left and right sides level of described two sliding sleeves is connected with L-shaped connecting rod.Railing of the present utility model plays a part of interception;Support flat board plays a part of support;Roller is easy to workman's Mobile guardrail;When guard rail is placed on correspondence position, slide downward sliding sleeve so that fixed plate is contacted on the ground, so as to prevent guard rail from moving;When needing Mobile guardrail, sliding sleeve is slided into upside so that fixed plate leaves ground, then rotates the first fixing bolt so that the first fixing bolt is pressed on the side wall of pillar, so as to fix sliding sleeve.

Description

A kind of provisional protection column for building
Technical field
The utility model is related to building field, specially a kind of provisional protection column for building.
Background technology
In building construction process, it is often necessary to use guard rail, guard rail can not only enter to the periphery of construction building Row protection, but also the remote safety of constructor can be ensured, but the guard rail of prior art installs trouble, or the company of fixation Connect, it is impossible to the need for meeting construction, and general guardrail structure is excessively simple, is easily fallen by wind, or mistake In heaviness, it has not been convenient to move, and if when boundary of works area is excessive, used general guard rail can be due to ground Shape, produces space, and when night, if sight is bad, pedestrian or vehicle can not see the position of guard rail, So as to causing traffic accident, in order to avoid these problems generation, it is necessary to existing guard rail is improved, in order to adapt to Building field of today.
Utility model content,
The purpose of this utility model is offer theme, to solve the problems mentioned in the above background technology.
To achieve the above object, the utility model provides following technical scheme:A kind of provisional protection column for building, including branch Post;The pillar has two, respectively the vertical left and right sides for being in guard rail;Between described two pillars under upper level etc. Away from being provided with railing;The lower end level of described two pillars is connected with support flat board;Described two support flat board lower surfaces Roller is provided with four drift angles;The lower end of described two pillars is cased with sliding sleeve;The left and right sides level of described two sliding sleeves is consolidated It is connected to L-shaped connecting rod;The lower end level of four L-shaped connecting rods is connected with fixed plate;The side wall of the sliding sleeve is installed with One fixing bolt;Level is connected with connecting rod in described two close L-shaped connecting rods;Level is consolidated between described two connecting rods It is connected to sole;The outside level of described two pillar upper ends is connected with cross bar;The left end of the cross bar in the left side is provided with work Dynamic hook;The right end of the cross bar on the right side is provided with clasp;Level is connected with bar shaped top between described two pillar upper ends Plate;The upper surface of the bar shaped top plate is provided with slideway;Left and right ends card on the inside of the slideway is placed with sliding block;Two pieces of cunnings The upper end of block is vertically installed with vertical bar;The upper end of described two vertical bars is provided with folder frame.
It is preferred that, the fixed plate lower surface is provided with raised particle.
It is preferred that, the length of the cross bar is more than the length that L-shaped connecting rod is added together with fixed plate.
It is preferred that, the upper end of described two pillars is provided with warning lamp.
It is preferred that, described two folder frame front end faces are installed with the second fixing bolt.
Compared with prior art, the beneficial effects of the utility model are:Railing plays a part of interception;Support flat board is played The effect of support;Roller is easy to workman's Mobile guardrail;When guard rail is placed on correspondence position, slide downward sliding sleeve so that Fixed plate is contacted on the ground, so as to prevent guard rail from moving;Raised particle is used for the frictional force for increasing fixed plate lower surface, prevents Only support flat board is slided;When needing Mobile guardrail, sliding sleeve is slided into upside so that fixed plate leaves ground, then rotates First fixing bolt so that the first fixing bolt is pressed on the side wall of pillar, so as to fix sliding sleeve;Sole is easy to workman to use Pin steps on the sliding sleeve of both sides simultaneously;When two guard rails come together, movable hook is buckled on the clasp of another guard rail, So as to which two guard rails be connected;The length of cross bar is more than the length that L-shaped connecting rod is added together with fixed plate, is easy to phase Two adjacent guard rails are connected;Warning lamp lights, and points out to be site boundary herein, it is to avoid vehicle and pedestrian miss at night Rush;According to the width of warning sign, sliding slider adjusts the distance between two folder frames, warning sign card then is placed on into two folders Between frame, pedestrian's project situation herein is reminded;After warning card holders to be placed on two folder inframes, the second fixing bolt is rotated, is compressed On warning sign, so that warning sign be fixed.
Brief description of the drawings
Fig. 1 is the structural representation on provisional protection column for building of the present utility model;
Fig. 2 is the bar shaped top board structure schematic diagram on the provisional protection column for building shown in Fig. 1;
Fig. 3 is the structural representation of the fixed plate on the provisional protection column for building shown in Fig. 1;
In figure:1- pillars;2- cross bars;3- movable hooks;4-L shape connecting rods;5- fixed plates;6- projection particles;7- rollers;8- Support flat board;The fixing bolts of 9- first;10-;11- soles;12- sliding sleeves;13- clasps;14- railings;15- bar shaped top plates;16- is erected Straight-bar;17- presss from both sides frame;18- warning lamps;The fixing bolts of 19- second;20- sliding blocks;21- slideways.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Refer to Fig. 1-3, a kind of embodiment that the utility model is provided:A kind of provisional protection column for building, including pillar 1;Pillar 1 has two, respectively the vertical left and right sides for being in guard rail;Level is placed equidistant under upper between two pillars 1 There is railing 14;The lower end level of two pillars 1 is connected with support flat board 8;At four drift angles of two support flat board 8 lower surfaces It is provided with roller 7;The lower end of two pillars 1 is cased with sliding sleeve 12;The left and right sides level of two sliding sleeves 12 is connected with L-shaped connecting rod 4;The lower end level of four L-shaped connecting rods is connected with fixed plate 5;The lower surface of fixed plate 5 is provided with raised particle 6;Sliding sleeve 12 Side wall be installed with the first fixing bolt 9;Level is connected with connecting rod 10 in two close L-shaped connecting rods 4;Two connecting rods 10 Between level be connected with sole 11;The outside level of two upper ends of pillar 1 is connected with cross bar 2;The left end of the cross bar 2 in left side is set It is equipped with movable hook 3;The right end of the cross bar 2 on right side is provided with clasp 13;The length of cross bar 2 is more than L-shaped connecting rod 4 and fixed plate 5 length being added together;The upper end of two pillars 1 is provided with warning lamp 18;Level is connected between two upper ends of pillar 1 Bar shaped top plate 15;The upper surface of bar shaped top plate 15 is provided with slideway 21;The left and right ends card of the inner side of slideway 21 is placed with sliding block 20;Two The upper end of block sliding block 20 is vertically installed with vertical bar 16;The upper end of two vertical bars 16 is provided with folder frame 17;Two folder frames 17 Front end face is installed with the second fixing bolt 19.
Specifically used mode:In use, slipping column 1, pillar 1 is moved to relevant position by roller 7, then with pin to Under step on sole 11 so that the fixed plate 5 of both sides is fitted on the ground, so as to fix whole guard rail, is then detained movable hook 3 On clasp 13 on another guard rail, so that multiple guard rails link together, it is easy to cross construction ground, it is to avoid car Drive into, destroy construction ground, according to the width of warning sign, the distance between two folder frames 17 are adjusted, then again by warning sign card It is placed between two folder frames 17, fixes warning sign using the second fixing bolt 19, write situation about constructing herein exactly, at night When open warning lamp 18, it is to avoid vehicle is hit on guard rail at night.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of without departing substantially from spirit or essential attributes of the present utility model, can realize that this practicality is new in other specific forms Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation Involved claim.

Claims (5)

1. a kind of provisional protection column for building, including pillar (1), it is characterised in that:The pillar (1) has two, respectively vertically The left and right sides in guard rail;Level has been placed equidistant railing (14) under upper between described two pillars (1);Described two The lower end level of individual pillar (1) is connected with support flat board (8);At four drift angles of described two support flat board (8) lower surfaces It is provided with roller (7);The lower end of described two pillars (1) is cased with sliding sleeve (12);The left and right sides water of described two sliding sleeves (12) It is flat to be connected with L-shaped connecting rod (4);The lower end level of four L-shaped connecting rods is connected with fixed plate (5);The sliding sleeve (12) side wall is installed with the first fixing bolt (9);Level is connected with connecting rod in described two close L-shaped connecting rods (4) (10);Level is connected with sole (11) between described two connecting rods (10);The outside level of described two pillar (1) upper ends is consolidated It is connected to cross bar (2);The left end of the cross bar (2) in the left side is provided with movable hook (3);The right-hand member of the cross bar (2) on the right side Head is provided with clasp (13);Level is connected with bar shaped top plate (15) between described two pillar (1) upper ends;The bar shaped top plate (15) upper surface is provided with slideway (21);Left and right ends card on the inside of the slideway (21) is placed with sliding block (20);Described two pieces The upper end of sliding block (20) is vertically installed with vertical bar (16);The upper end of described two vertical bars (16) is provided with folder frame (17).
2. provisional protection column for building according to claim 1, it is characterised in that:Fixed plate (5) lower surface is set There is raised particle (6).
3. provisional protection column for building according to claim 1, it is characterised in that:The length of the cross bar (2) is more than L-shaped The length that connecting rod (4) is added together with fixed plate (5).
4. provisional protection column for building according to claim 1, it is characterised in that:The upper end of described two pillars (1) It is provided with warning lamp (18).
5. provisional protection column for building according to claim 1, it is characterised in that:Described two folder frame (17) front end faces are worn There is the second fixing bolt (19).
CN201720252223.6U 2017-03-15 2017-03-15 A kind of provisional protection column for building Expired - Fee Related CN206562789U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720252223.6U CN206562789U (en) 2017-03-15 2017-03-15 A kind of provisional protection column for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720252223.6U CN206562789U (en) 2017-03-15 2017-03-15 A kind of provisional protection column for building

Publications (1)

Publication Number Publication Date
CN206562789U true CN206562789U (en) 2017-10-17

Family

ID=60032332

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720252223.6U Expired - Fee Related CN206562789U (en) 2017-03-15 2017-03-15 A kind of provisional protection column for building

Country Status (1)

Country Link
CN (1) CN206562789U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111778889A (en) * 2020-07-28 2020-10-16 浙江常青公路工程有限公司 Intelligent traffic dynamic signboard
CN113279328A (en) * 2021-06-23 2021-08-20 王科 Improved structure of concrete guardrail for highway bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111778889A (en) * 2020-07-28 2020-10-16 浙江常青公路工程有限公司 Intelligent traffic dynamic signboard
CN113279328A (en) * 2021-06-23 2021-08-20 王科 Improved structure of concrete guardrail for highway bridge

Similar Documents

Publication Publication Date Title
CN203977309U (en) A kind of shuttle type culvert linear steel form carrier
CN206562789U (en) A kind of provisional protection column for building
CN107285237A (en) A kind of constructing tunnel crane
CN206308562U (en) A kind of plug-in type rail
CN105151079B (en) A kind of contact net car ladder track-catching device
CN210948003U (en) Building construction safety rail guard convenient to adjust
CN103952989A (en) Folding hydraulic road cone collecting and placing state correcting mechanism for traffic road cone vehicle
CN203515607U (en) Adjustable steel mould trolley of tunnel widening section
CN207452782U (en) A kind of folding traffic guardrail
CN211115159U (en) Highway bridge construction safety device
CN213681626U (en) Town road crack repairing detection device
CN105239515A (en) Device and method for bracket installation of railway protective scaffolding in combined highway and railway bridge
CN205314666U (en) Novel protection guardrail with adjustable width
CN208563151U (en) A kind of new road Sign Board support frame
CN206607900U (en) A kind of safety guide rail for building
CN209989736U (en) Guardrail in middle of town road
CN211815844U (en) Municipal administration highway engineering is with portable guardrail of preventing wearing
CN211006471U (en) Municipal administration guardrail with adjustable
CN207567683U (en) A kind of highway bridge construction alarming device
CN207109674U (en) A kind of anti-collision energy absorption highway barrier of fast demountable
CN214939424U (en) Template support frame is used in public road bridge roof beam construction
CN104294772A (en) Wind shielding device for highway bridges
CN203373674U (en) City track underground line integral ballast bed center ditch template
CN207003661U (en) A kind of scattered formula movable plank house
CN213330359U (en) Assembled building protective fence

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171017

Termination date: 20200315