CN205858348U - Coal resource stream based on TBM develops equipment mutually - Google Patents

Coal resource stream based on TBM develops equipment mutually Download PDF

Info

Publication number
CN205858348U
CN205858348U CN201620786819.XU CN201620786819U CN205858348U CN 205858348 U CN205858348 U CN 205858348U CN 201620786819 U CN201620786819 U CN 201620786819U CN 205858348 U CN205858348 U CN 205858348U
Authority
CN
China
Prior art keywords
conveyer belt
coal
colliery
generating set
choosing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620786819.XU
Other languages
Chinese (zh)
Inventor
谢和平
高明忠
鞠杨
高峰
张茹
邱治强
李安强
汪文勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan University
Original Assignee
Sichuan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan University filed Critical Sichuan University
Priority to CN201620786819.XU priority Critical patent/CN205858348U/en
Application granted granted Critical
Publication of CN205858348U publication Critical patent/CN205858348U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/16Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]
    • Y02E20/18Integrated gasification combined cycle [IGCC], e.g. combined with carbon capture and storage [CCS]

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Structure Of Belt Conveyors (AREA)

Abstract

This utility model provides a kind of coal resource stream based on TBM and develops equipment mutually, the full face tunnel boring machine of case is developed mutually including containing cutterhead, stream, first conveyer belt, the 5th conveyer belt, coal gas output channel, and be arranged on stream mutually exploitation case in colliery choosing wash device, the second conveyer belt, generating set, the 3rd conveyer belt, the 4th conveyer belt, casting resin Processing Room, gasification installation and wireless power transmission equipment.The coal resource stream based on TBM using this utility model to provide is developed equipment mutually and can be improved the safety of coal resource exploitation, reduce labor intensity and environmental pollution, reduces exploitation energy consumption and the cost of coal resource, it is achieved the exploitation of deep ground coal resource.

Description

Coal resource stream based on TBM develops equipment mutually
Technical field
This utility model belongs to coal resource exploitation and utilizes field, opens mutually particularly to coal resource stream based on TBM Send out equipment.
Background technology
Along with petering out of earth shallow coal ore resources, Earth is constantly moved towards in the exploitation of coal resource.At present The mining depth of coal resource has reached 1500 meters, and the exploitation of existing coal resource all uses the mode of solid phase exploitation, needs Want substantial amounts of manpower to go into the well exploitation, the colliery produced is transported to earth's surface, the ore dressing plant on the cooperation earth's surface coal to being produced Ore deposit is screened, and coordinates the Thermal Power Station on earth's surface and gasification workshop to carry out generating electricity and producing coal gas, and this development scheme is main Have the disadvantage that
(1) colliery that underground mining goes out is transported to ground, needs to take substantial amounts of ground space and deposit, repair on ground Build the facilities such as ore dressing plant, Thermal Power Station and gasification workshop to need also to take substantial amounts of space, and, thermal power generation can produce A large amount of cinders, and when colliery grade is relatively low, ore dressing can produce substantial amounts of mine tailing, these cinders and mine tailing are generally also deposited in Ground, waits otherwise processed, and this also can take substantial amounts of space, and the above can cause exploitation and the follow-up conversion profit in colliery With needs expropriation of land in a large number, there is problem with high costs;(2) colliery that underground mining goes out is transported to ground, needs to consume Substantial amounts of energy, and, along with the difference of surface geology situation, the exploitation point in some colliery and ground ore dressing plant, heating power The layout relative distribution in power plant, gasification workshop etc., it usually needs rely on track to carry out the transhipment of material between each operation, These also result in the problem that energy consumption is too high;(3) in ore dressing plant, ground, Thermal Power Station's work process produce spoil, waste residue, Dust, CO2More Deng waste gas, earth's surface can be increased the weight of and pollute;(4) facility such as ore dressing plant, ground, Thermal Power Station, ground transportation track Construction with safeguard be required for high cost;(5) substantial amounts of manpower is gone into the well exploitation, and mechanization degree is low, and labor intensity is big, labor Dynamic dense degree is high, and conditions down-hole is severe in addition, and security incident takes place frequently, and casualties rate is high;(6) due to the substantial amounts of manpower of needs Go into the well exploitation, and along with the increase of mining depth, underground activities environment can become more and more severe, such as, the problem such as high temperature, when When mining depth increases to a certain degree, underground environment has been not suitable for manpower existence and work, it is estimated that current coal resource The limit depth of solid phase mining type cannot realize opening the degree of depth coal resource more than 6000 meters more than 6000 meters Adopting utilization is that the mankind are expected untouchable extravagant hope.
Based on the above-mentioned state of the art, if existing coal resource development technique can be overturned, develop coal resource stream and open mutually Send out equipment and development approach, it is achieved people does not goes into the well, the coal resource of coal not gug is exploited and utilizes, and opens for solving existing colliery Energy consumption that the mode of adopting exists is high, cost is high, exploitation personal security, environmental pollution and cannot realize the problems such as exploitation deeply all incite somebody to action Produce positive meaning.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, it is provided that coal resource stream based on TBM is developed mutually Equipment, to improve the safety of coal resource exploitation, to reduce labor intensity and environmental pollution, reduces the exploitation energy consumption of coal resource And cost, it is achieved the exploitation of deep ground coal resource.
The coal resource stream based on TBM that this utility model provides develops equipment mutually, develops case mutually including containing cutterhead, stream Full face tunnel boring machine, the first conveyer belt, the 5th conveyer belt, coal gas output channel, and be arranged on stream mutually exploitation case in coal Device, the second conveyer belt, generating set, the 3rd conveyer belt, the 4th conveyer belt, casting resin Processing Room, gasification installation and nothing are washed in ore deposit choosing Line transmission facility;
One end of described first conveyer belt connects with the colliery outfan of cutterhead in full face tunnel boring machine, the other end and colliery Choosing is washed the charging aperture of device and is connected;The choosing of one end of described second conveyer belt and colliery is washed the common coal export of device and is connected, the other end with The fuel chambers of generating set connects;The choosing of one end of described 3rd conveyer belt and colliery is washed the cleaned coal outlet of device and is connected, the other end with The charging aperture of gasification installation connects;Described one end of 4th conveyer belt connects with the cinder delivery outlet of generating set, the other end with The charging aperture of casting resin Processing Room connects;Described one end of 5th conveyer belt connects with the discharging opening of casting resin Processing Room, another End connects with coal mine gob;Described coal gas output channel is connected with the coal gas delivery outlet of gasification installation, cleaned coal gasification is formed Coal gas be delivered to coal gas storage room;Described wireless power transmission equipment electrically connects with generating set, the electric power produced by generating set Being delivered to ground surface, the dynamic of device, gasification installation, casting resin Processing Room and each conveyer belt is washed in described full face tunnel boring machine, colliery choosing Power parts are electrically connected with generating set by transmission line respectively, obtain operating current from generating set.
In above-mentioned equipment, described coal gas storage room may be provided at ground surface, it is possible to is disposed proximate to the underground of ground surface.
In above-mentioned equipment, described casting resin Processing Room is provided with material storing district and casting resin processing district, material storing district Including cement, the solid powder of glue and water storage area, be respectively used to store cement, the solid powder of glue and water, each storage area respectively by pipe fitting with The solid powder of the cement on earth's surface, glue and water auxiliary point connect, for casting resin Processing Room supply cement, the solid powder of glue and water, in order to suitable Answer constantly pushing ahead of underground mining face, connect each storage area in casting resin Processing Room and the cement of ground surface, the solid powder of glue Can carry out on earth's surface adding long process with the pipe fitting of water auxiliary point;Being provided with mixing apparatus in described casting resin processing district, being used for will The solid powder of cinder, cement, glue and water are mixed to form casting resin.
In above-mentioned equipment, described TBM (abbreviation of Tunnel Boring Machine) is full face tunnel boring machine, tunneling boring The model of development machine selects according to practical situations such as the geological condition of engineering, mining depths.
In above-mentioned equipment, described full face tunnel boring machine carries whistle control system, enters coal resource using this equipment During row exploitation, between whistle control system and the control room of ground surface setting that full face tunnel boring machine carries, carry out the biography of signal Send, it is achieved control and the monitoring to development process.
Process that coal resource develops is as follows to use above-mentioned equipment to realize:
1. excavate passage from earth's surface and treat mine coal ore bed to underground, then along passage, each parts of described equipment are lifted To treating mine coal ore bed and described equipment being installed, coal gas output channel is connected with coal gas storage room from passage, will fill The solid powder of cement in the material storing district of filler Processing Room, glue and water storage area pass through the water of pipe fitting and earth's surface respectively from passage The solid powder of mud, glue and water auxiliary point connect, periodically to cement, the solid powder of glue and water storage area supply cement, the solid powder of glue and water;
2. the cutterhead intellectuality of full face tunnel boring machine is broken cuts colliery to be exploited, and colliery the first conveyer belt isolated enters Device is washed in colliery choosing, and colliery choosing is washed device and sorted in the colliery from the first conveyer belt is common coal and cleaned coal, and common coal is defeated through second The fuel chambers sending band to be transported to generating set is sent into gasification installation by the 3rd conveyer belt form coal as the energy generated electricity, cleaned coal Gas, the coal gas that gasification installation produces is delivered to coal gas storage room through coal gas output channel, and the electric power that generating set produces passes through nothing Line transmission facility output ground is also connected for use with electrical network, is that full face tunnel boring machine, colliery are selected and washed device, gas by transmission line Gasifying device, casting resin Processing Room and each conveyer belt provide operating current, and the cinder that generating set produces is sent into through the 4th conveyer belt Casting resin Processing Room, cinder is mixed to form casting resin with cement, the solid powder of glue and water by casting resin Processing Room, and casting resin is defeated through the 5th Send band to be transported to goaf, goaf is backfilled.
Compared with prior art, this utility model has the advantages that
1. it is based on stream phase developing thought design that the coal resource stream based on TBM that this utility model provides develops equipment mutually Form, based on this equipment is with full face tunnel boring machine (Tunnel Boring Machine, TBM), at the stream of full face tunnel boring machine Exploitation case is equipped with colliery choosing mutually and washes device, generating set, wireless power transmission equipment, gasification installation, casting resin Processing Room and corresponding Conveyer belt and conveyance conduit, full face tunnel boring machine and above-mentioned each equipment and parts are organically combined and form, this equipment collection colliery The exploitation of resource, screening, produce the function of the gentle energy of electric energy in one, can also realize the backfill to goaf simultaneously, using should Coal resource is developed by equipment, it is not necessary to operator go into the well work can realize directly exporting earthward from underground electric energy and Gas energy, it is not necessary to the Coal Transportation of exploitation to ground is carried out choosing wash, the operation such as generating, thus this equipment can effectively solve the problem that because of people The energy consumption that power is gone into the well, colliery gug, ground ore dressing, generating etc. bring is high, pollute weight, security risk is high, take up room many, facility The a series of problems such as maintenance cost is high.
2. due to this utility model provide when being equipped in exploitation coal resource without operator's down-hole operation, thus make Carry out coal resource exploitation with this equipment to be limited by mining depth and adverse circumstances, can realize the degree of depth more than 1500 Rice, the exploitation of deep ground coal resource of even 6000 meters, and petering out along with earth shallow coal ore resources, future colliery Earth can be constantly moved towards in the exploitation of resource, and the equipment that this utility model provides just adapts to the exploitation of future coal ore resources Development trend.Meanwhile, the equipment that this utility model provides is equally applicable to the beginning of earth shallow coal ore resources, the scope of application Extensively.Additionally, due to use equipment coal resource described in the utility model without operator's down-hole operation, mechanization degree Height, not only can greatly reduce labor intensity, moreover it is possible to be prevented effectively from the casualties that security incident causes, and safety is higher.
3. colliery choosing is washed device, generating set, wireless power transmission equipment, gasification installation, is filled by the equipment that this utility model provides The stream that filler Processing Room and corresponding conveyer belt concentrate on full face tunnel boring machine with conveyance conduit is developed in case mutually and coordinates complete Section boring machine is operated, this equipment respectively exploiting script relative distribution and utilizing operation to concentrate on full face tunnel boring machine Stream exploitation case mutually completes the exploitation of coal resource at below ground, screens, produces the merits such as the gentle energy of electric energy, backfilling goaf Can, with prior art ratio, it is not necessary to take ground space to deposit colliery, cinder and mine tailing, without taking substantial amounts of ground The facilities such as ore dressing plant, Thermal Power Station and gasification workshop are built in space, and equipment described in the utility model not only can greatly subtract Few expropriation of land, and the construction to facilities such as ore dressing plant, ground, Thermal Power Station, ground transportation tracks and maintenance cost can be reduced, There is the advantage saving coal resource development cost.
4. the equipment provided due to this utility model can realize directly being converted into by the coal resource of underground the gentle energy of electric energy And export, it is not necessary to by the Coal Transportation of exploitation to ground and carry out on ground colliery choosing wash, the operation such as generating, thus can save The most substantial amounts of colliery and the energy consumption of other substance transportations, and colliery choosing is washed, the waste residue that produces during generating etc. is through overcharging For backfilling goaf after the process of filler Processing Room, waste residue will not be discharged earthward, and generate electricity with gasification also at this dress Carry out in Bei, can the dust that discharges earthward of effective minimizing and waste gas, the most also have and can effectively alleviate the excellent of ground pollution Gesture.
Accompanying drawing explanation
Fig. 1 is the structural representation that coal resource stream based on TBM described in the utility model develops equipment mutually, in figure, 1 First conveyer belt, 2 collieries isolated, 3 collieries choosing wash device, 4 second conveyer belts, 5 common coals, 6 generating sets, 7 the 3rd conveyer belts, 8 cleaned coal, 9 the 4th conveyer belts, 10 cinders, 11 casting resin Processing Rooms, 12 gasification installations, 13 wireless power transmission equipment, 14 the 5th conveyer belts, 15 casting resins, 16 coal gas output channels, 17 goafs, 18 cuttves Dish, 19 connectors, 20 streams develop case, 21 collieries to be exploited mutually.
Detailed description of the invention
By the following examples and combine accompanying drawing coal resource stream based on TBM described in the utility model is developed equipment mutually It is described further.
Coal resource stream based on TBM develops the structural representation of equipment mutually as it is shown in figure 1, this equipment includes containing cutterhead 18, stream develops the full face tunnel boring machine of case 20 mutually, and described cutterhead 18 is connected with stream exploitation case 20 mutually by connector 19, also includes First conveyer belt the 1, the 5th conveyer belt 14, coal gas output channel 16, and be arranged on stream mutually exploitation case in colliery choosing wash device 3, Second conveyer belt 4, generating set the 6, the 3rd conveyer belt the 7, the 4th conveyer belt 9, casting resin Processing Room 11, gasification installation 12 and wireless Transmission facility 13.Described full face tunnel boring machine is 160 series 155-274 type full face tunnel boring machines, Luo Bin company of the U.S. produce, It is ZKZ-4 type straight line vibrating sieving machine that device 3 is washed in the choosing of described colliery, Shandong Taian Coal Mining Machinery Co., Ltd. produce, described gasification dress Putting 12 is QM1800 shape coal-gas producer, German-Chinese heavy industry Machinery Manufacturing Co., Ltd. of Zhengzhou City produce, described generating set 6 Model is N15-4.9, Shandong Qingneng Power Co., Ltd. produce, and described wireless power transmission equipment 13 is by the U.S. The electromagnetic wave wireless power transmission systems that WiTricity company produces;Described casting resin Processing Room 11 is provided with material storing district and fills Filler processing district, material storing district includes the solid powder of cement, glue and water storage area, is respectively used to store cement, the solid powder of glue and water, respectively Storage area is connected, for casting resin Processing Room make-up water with the cement on earth's surface, the solid powder of glue and water auxiliary point by pipe fitting respectively The solid powder of mud, glue and water, be provided with agitation mixer in described casting resin processing district, for by cinder, cement, the solid powder of glue and water Stirring is mixed to form casting resin;Described coal gas storage room can be located at ground surface, it is possible to is located adjacent to the underground of ground surface.
Described one end of first conveyer belt 1 connects with the colliery outfan of cutterhead in full face tunnel boring machine 18, the other end with Colliery choosing is washed the charging aperture of device 3 and is connected;The common coal export that device 3 is washed with colliery choosing in one end of described second conveyer belt 4 connects, separately One end connects with the fuel chambers of generating set 6;One end of described 3rd conveyer belt 7 is washed the cleaned coal outlet of device 3 and is connected with colliery choosing, The other end connects with the charging aperture of gasification installation 12;One end of described 4th conveyer belt 9 and the cinder delivery outlet phase of generating set 6 Connecing, the other end connects with the charging aperture of casting resin Processing Room 11;One end of described 5th conveyer belt 14 and casting resin Processing Room 11 Discharging opening connect, the other end connects with coal mine gob 17;Described coal gas output channel 16 is defeated with the coal gas of gasification installation 12 Outlet connects, and the coal gas that cleaned coal gasification is formed is delivered to coal gas storage room;Described wireless power transmission equipment 13 and generating set 6 electricity Connect, the power transmission that generating set 6 is produced to ground surface, described full face tunnel boring machine, colliery choosing wash device, gasification installation, The power part of casting resin Processing Room and each conveyer belt is electrically connected with generating set 6 by transmission line respectively, obtains from generating set 6 Take operating current.
In above-mentioned equipment, full face tunnel boring machine carries whistle control system, opens coal resource using this equipment When sending out, between whistle control system and the control room of ground surface setting that full face tunnel boring machine carries, carry out the transmission of signal, real Now control and the monitoring to development process.
The method using above-mentioned equipment to develop coal resource is as follows:
1. excavate vertical shaft from earth's surface and treat mine coal ore bed to underground, will each portion of equipment described in embodiment 1 along vertical shaft Part lifts to treating mine coal ore bed and being installed by described equipment, is connected with coal gas storage room by coal gas output channel 16 from vertical shaft Connect, the cement in the material storing district of casting resin Processing Room 11, the solid powder of glue and water storage area are passed through pipe fitting respectively from vertical shaft It is connected with the cement on earth's surface, the solid powder of glue and water auxiliary point, periodically to cement, the solid powder of glue and water storage area supply cement, the solid powder of glue And water;
2. intelligent the breaking of the cutterhead 18 of full face tunnel boring machine cuts colliery 21 to be exploited, and the colliery 2 isolated is through the first conveying Device 3 is washed in band 1 entrance colliery choosing, and it is common coal 5 and cleaned coal 8 that colliery choosing washes device by the colliery sorting from the first conveyer belt, commonly Coal 5 is transported to the fuel chambers energy as generating of generating set 6 through the second conveyer belt 4, and cleaned coal sends into gas by the 3rd conveyer belt 7 Gasifying device 12 forms coal gas, and the coal gas that gasification installation 12 produces is delivered to coal gas storage room, electromotor through coal gas output channel 16 The electric power of group 6 production exports ground by wireless power transmission equipment 13 and is connected with electrical network for use, is complete disconnected by transmission line Face development machine, colliery choosing wash device, gasification installation, casting resin Processing Room and each conveyer belt offer operating current, and generating set 6 produces Cinder 10 send into casting resin Processing Room 11 through the 4th conveyer belt 9, cinder and cement, the solid powder of glue and water are mixed by casting resin Processing Room Closing and form casting resin 15, casting resin is transported to goaf 17 through the 5th conveyer belt 14, backfills goaf.In this step, The transmission of signal is carried out, it is achieved to coal between whistle control system and the control room of ground surface setting that full face tunnel boring machine carries The control of ore deposit development process and monitoring.

Claims (1)

1. coal resource stream based on TBM develops equipment mutually, it is characterised in that include developing case (20) mutually containing cutterhead (18), stream Full face tunnel boring machine, the first conveyer belt (1), the 5th conveyer belt (14), coal gas output channel (16), and be arranged on stream open mutually Send out the choosing of the colliery in case wash device (3), the second conveyer belt (4), generating set (6), the 3rd conveyer belt (7), the 4th conveyer belt (9), Casting resin Processing Room (11), gasification installation (12) and wireless power transmission equipment (13);
One end of described first conveyer belt (1) connects with the colliery outfan of cutterhead in full face tunnel boring machine (18), the other end with Colliery choosing is washed the charging aperture of device (3) and is connected;The common coal export of device (3) is washed with colliery choosing in one end of described second conveyer belt (4) Connecting, the other end connects with the fuel chambers of generating set (6);Device (3) is washed with colliery choosing in one end of described 3rd conveyer belt (7) Cleaned coal outlet connects, and the other end connects with the charging aperture of gasification installation (12);One end of described 4th conveyer belt (9) and electromotor The cinder delivery outlet of group (6) connects, and the other end connects with the charging aperture of casting resin Processing Room (11);Described 5th conveyer belt (14) One end connect with the discharging opening of casting resin Processing Room (11), the other end connects with coal mine gob (17);Described coal gas exports Pipeline (16) is connected with the coal gas delivery outlet of gasification installation (12), and the coal gas that cleaned coal gasification is formed is delivered to coal gas storage room; Described wireless power transmission equipment (13) electrically connects with generating set (6), the power transmission that generating set (6) is produced to ground surface, Described full face tunnel boring machine, colliery choosing are washed the power part of device, gasification installation, casting resin Processing Room and each conveyer belt and are passed through respectively Transmission line electrically connects with generating set (6), obtains operating current from generating set (6).
CN201620786819.XU 2016-07-25 2016-07-25 Coal resource stream based on TBM develops equipment mutually Withdrawn - After Issue CN205858348U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620786819.XU CN205858348U (en) 2016-07-25 2016-07-25 Coal resource stream based on TBM develops equipment mutually

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620786819.XU CN205858348U (en) 2016-07-25 2016-07-25 Coal resource stream based on TBM develops equipment mutually

Publications (1)

Publication Number Publication Date
CN205858348U true CN205858348U (en) 2017-01-04

Family

ID=57648520

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620786819.XU Withdrawn - After Issue CN205858348U (en) 2016-07-25 2016-07-25 Coal resource stream based on TBM develops equipment mutually

Country Status (1)

Country Link
CN (1) CN205858348U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106089208A (en) * 2016-07-25 2016-11-09 四川大学 Coal resource stream based on TBM develops equipment and development approach mutually

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106089208A (en) * 2016-07-25 2016-11-09 四川大学 Coal resource stream based on TBM develops equipment and development approach mutually

Similar Documents

Publication Publication Date Title
Petlovanyi et al. Research into balance of rocks and underground cavities formation in the coal mine flowsheet when mining thin seams
AU2014223133B2 (en) Method and apparatus for underground separation, conveyance and fill-up of coal and coal gangues
CN111894666A (en) Coal mine underground selective grinding pump-charging integrated gangue slurry filling system and method
CN203925502U (en) The system that a kind of hydraulic coal mining and filling are synchronously carried out
US11965419B2 (en) Multi-energy complementary system for co-associated abandoned mine and use method
CN109882239B (en) Open-pit end slope coal-pressing radial filling mining method
CN112065393B (en) Underground coal gangue source reduction, selection and charging collaborative mining system
CN103590851A (en) Underground waste-rock concrete preparation, pumping and filling system and method
CN112796829A (en) Underground original gangue filling system and method for caving area of fully mechanized caving face
AU2018378009B2 (en) Mine field layout method suitable for fluidized mining of coal resources
CN202266260U (en) Technical equipment for separating coal from gangue and backfilling gangue
CN106089208B (en) Coal resource stream based on TBM mutually develops equipment and development approach
CN205858348U (en) Coal resource stream based on TBM develops equipment mutually
CN207592282U (en) Underground coal mine dry separation waste rock discharge device
CN108465542A (en) A kind of coal downhole intelligent separation system device layout
CN110645044A (en) Grouting filling system
CN110700835B (en) Shallow underground mining, selecting and charging integrated system for lead-zinc ores
CN108167017A (en) A kind of metal mine consolidated fill method of environmental protection cementitious material
CN112403647B (en) Arrangement method of intelligent dry separation system for underground transfer points
CN112573114B (en) Efficient hydraulic remote collection and conveying system and method for granular materials
CN113339053B (en) Fully-mechanized caving mining and filling process for coal mine
CN213557600U (en) Intelligent dry separation process arrangement system for coal bunker upper opening
CN114909137A (en) Coal mine underground column system wind filling mining device and method thereof
CN209430198U (en) A kind of low-grade phosphate ore stone stope of band containing shale scouring ore-sorting system
CN205532704U (en) Filling system for coal mine gob area

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20170104

Effective date of abandoning: 20180424