CN205712589U - A kind of heat preservation decoration integrative combined wall - Google Patents
A kind of heat preservation decoration integrative combined wall Download PDFInfo
- Publication number
- CN205712589U CN205712589U CN201620535406.4U CN201620535406U CN205712589U CN 205712589 U CN205712589 U CN 205712589U CN 201620535406 U CN201620535406 U CN 201620535406U CN 205712589 U CN205712589 U CN 205712589U
- Authority
- CN
- China
- Prior art keywords
- decorative panel
- wall
- heat preservation
- combined wall
- fibre board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model discloses a kind of heat preservation decoration integrative combined wall, described integration combined wall includes the decorative panel as wall outer side face and the fibre board as body of wall medial surface, described decorative panel and fibre board are each attached on keel structure, and form the concreting cavity of built-in described keel structure between decorative panel inner surface, fibre board medial surface and major structure of construction outer surface;Pour foam concrete in described concreting cavity and make foam concrete, decorative panel, fibre board, keel structure and major structure of construction form the heat preservation decoration integrative combined wall as skin.Thus, decorative panel and fibre board are directly doubled as formwork for placing by this utility model, quick construction and without arranging template again, reduce cost, use foam concrete simultaneously, can improve heat insulation effect further.
Description
Technical field
This utility model relates to a kind of building element, is specially a kind of heat preservation decoration integrative combined wall.
Background technology
Building energy conservation is a worldwide trend, and building enclosure energy-conservation is again the most important thing of building energy conservation.Go along with sb. to guard him knot
Structure it is important that exterior wall, its heat consump-tion in transfer accounts for the 23%~34% of building total heat consumption, and external wall energy-saving accounts in building energy conservation
Very important status.Improve the performances such as material insulation, durable, mechanics and fire prevention, it is achieved wall thermal insulating is Tong Bu with building structure
Design, synchronous construction, be allowed to quality safety reliable, and insulated fire performance is good, and heat preservation energy-saving and building same life-span, be to biography
System architectural design and a major transformation of construction method, be also the effective way cracking building heat preservation construction quality potential safety hazard
Footpath, is the most also to adapt to country's Developing Energy-saving Construction target, promotes energy-saving building technology innovation level, it is achieved green building can be held
Continuous thinking of development.
At present, building energy conservation is also limited only to smear thermal insulation mortar and patch extension warming plate at exterior wall surface, although external thermal insulation skill
Art than inside holding and sandwich heat preservation technology advantageously, but the quality execute-in-place of external thermal insulation has uncontrollability, the most easily draws
Send out hollowing come off wait quality drawback, even initiation fire difficulty;In terms of decoration of exterior wall, the most mostly use dry-hang stone technology,
But the most cracking, deformation, variable color of easily whitening, come off and heat preservation and insulation difference etc. shortcoming.
The necessity of this utility model research and development:
1) needs of building energy conservation
Building energy conservation is a worldwide trend, and building enclosure energy-conservation is again the most important thing of building energy conservation.Go along with sb. to guard him knot
Structure it is important that exterior wall, its heat consump-tion in transfer accounts for the 23%~34% of building total heat consumption, and external wall energy-saving accounts in building energy conservation
Very important status.The concrete structural system such as framework, frame-shear structure is developing progressively as the main structure of building construction
System.But, in engineering reality, building energy conservation is also limited only to smear thermal insulation mortar and patch extension warming plate at exterior wall surface.External thermal insulation skill
Art than inside holding and sandwich heat preservation technology advantageously, but the quality execute-in-place of external thermal insulation has uncontrollability, the most easily draws
Send out hollowing come off wait quality drawback, even initiation fire difficulty.National energy-saving requires to improve constantly (from 0 to 50% to 65%), existing
A large amount of energy-saving wall technology can not meet the requirement of energy-conservation 65%.So, the research and development of novel energy-conserving wall technology and building structure
System combines can be more efficient, and development building energy conservation is imperative with structure-integrated technology.
2) " prohibit viscous " and save needs native, that economize on resources
[2005] No. 33 notices are sent out by the Office of the State Council, have issued the notice of " prohibiting real ", have passed through three batches of " prohibiting real " work, complete
Become set objective, it is desirable to materials for wall " is prohibited viscous " further.Past, substantial amounts of clay-ware was as materials for wall, did not met country
Joint local policy.So, Development of Novel non-clay goods body of wall is at the eyebrows and eyelashes.
Foam concrete foaming is formed, and takies the fewest resource, and lightweight, alleviates the deadweight of body of wall, saved and held
Weight component resource.
3) needs that labor productivity improves
At present, one of labour force's problem having become construction industry headache in short supply.Though construction industry development is fast, material technology
Basis is obviously enhanced, but in terms of entirety, labor productivity increase rate is little, and more problems, overall technology progress is slow.For really
Protect quality and the function of all kinds of building final products particularly residential housing, optimize the structure of production, Accelerating The Construction speed, improve labor
Dynamic condition, increases substantially labor productivity, makes building industry make the best of one's way profit evaluation model road of improving quality, becomes the mainstay of the national economy
Industry.Body of wall, especially external wall protection body at present, mainly by manually building by laying bricks or stones, industrialization degree is low, takies a large amount of labo r resources.
It is therefore desirable to significantly reform, the wall technology that research and development labor productivity is high.
4) needs of architectural industrialization
Architectural industrialization is the developing direction of Building Trade in China, is the concept occurred with western industrial revolution, 1974, connection
Close defined in " policy of architectural industrialization is done step-by-step for government and measure is guided " that state publishes " architectural industrialization ": according to greatly
Industrial mode of production transformation building industry, is allowed to progressively produce the process turning to the big production of socialization from handicraft.Its basic way
Footpath is that building standardization, component and fitting production plant, mechanization of building operation and organization and administration are scientific, and progressively uses modern science
The new results of technology, to raise labour productivity, Accelerating The Construction speed, reduces engineering cost, improves construction quality.
Utility model content
The purpose of this utility model content is to solve the problems referred to above, proposes one insulation, lightweight and fire protecting performance good, executes
The heat preservation decoration integrative combined wall of the fast low cost of work.
For achieving the above object, this utility model employing techniques below:
A kind of heat preservation decoration integrative combined wall, including the decorative panel as wall outer side face with as body of wall medial surface
Fibre board, described decorative panel and fibre board be each attached on keel structure, and decorative panel inner surface, fibre board medial surface,
And between major structure of construction outer surface, form the concreting cavity of built-in described keel structure;Described concreting
Pour foam concrete in cavity and made foam concrete, decorative panel, fibre board, keel structure and major structure of construction be formed
Heat preservation decoration integrative combined wall as skin.
Thus, decorative panel and fibre board are directly doubled as formwork for placing by this utility model, quick construction and without arranging again
Template, reduces cost, uses foam concrete simultaneously, can improve heat insulation effect further.
According to embodiment of the present utility model, it is also possible to make this utility model further to optimize, after being below optimization
The technical scheme formed:
Preferably, described decorative panel is to carry on the back stone plate, porcelain plate or the ceramic plate that bolt perforate is fixing.
Preferably, described fibre board is without asbestos fibre cellulose fiber cement plate.
Preferably, described keel structure includes column and Os Draconis, and described fibre board is connected by anchor studs and column are fixing,
Described decorative panel is connected by the screw rod back of the body bolt and fixing Os Draconis are fixing, and this decorative panel and the anchor connector of major structure of construction
It is fixedly linked.In order to form three-dimensional framework, improving the structural strength of insulated wall, described Os Draconis include the centre keel that square steel is made
With horizontal Os Draconis, horizontal Os Draconis are connected by anchor studs and centre keel are fixing.
Preferably, described column is c-type lightweight steel column.
Further, described decorative panel is spliced by polylith, and is filled with in the gap between adjacent two packaged plaques
Weather proofing sealant.
Preferably, the packed density of described foam concrete is 450kg/m-700kg/m.
Preferably, on described decorative panel carry on the back bolt perforate density be every square metre open 10-12 carry on the back keyhole.
The construction method of above-mentioned heat preservation decoration integrative combined wall comprises the steps:
S1, the outrigger of removing major structure of construction, and installation hanging basket;
S2, on major structure of construction bore installing hole install anchor studs;
S3, installation Os Draconis, Os Draconis include centre keel and horizontal Os Draconis;Wherein, in the position without anchoring stress point, perpendicular dragon is installed
Bone, and centre keel is fixed in body pillar, on centre keel, then fixedly mount horizontal Os Draconis;
S4, major structure of construction is installed and bears the support of foam concrete weight for auxiliary;
S5, implant reinforcing bar at the seam of major structure of construction and outer filling wall, and the surrounding peace of position is set at window
Dress reinforcement;
S6, installation column, decorative panel and fibre board;
S7, formed between decorative panel inner surface, fibre board medial surface and major structure of construction outer surface in cavity point
Layer cast foam concrete.
In step S7, if floor height is less than 3 meters, then the foam concrete of every layer is the most cast-in-place, window surrounding microlith
Concrete irrigates at twice, crossed construction.
By said structure, the heat preservation decoration integrative combined wall that this utility model provides includes the outside of body of wall both sides
Face decorative panel, medial surface fibre board and connect described lateral surface decorative panel, the connector of medial surface fibre board, lateral surface is decorated
Plate is to carry on the back stone plate, porcelain plate or the ceramic plate that bolt perforate is fixing, and medial surface fibre board is that steam pressure is without asbestos fibre cellulose fiber cement
Plate;Outside side decoration plate and medial surface fibre board intermediate distribution lightgage steel joist as column, shaped steel Os Draconis as centre keel and
Horizontal Os Draconis, medial surface fibre board is connected with column by anchor studs, and lateral surface decorative panel is by screw rod back of the body bolt and the horizontal Os Draconis of shaped steel
Connect;At major structure of construction position, lateral surface decorative panel is connected with major structure of construction anchor connector by screw rod back of the body bolt;
Between side decoration plate and medial surface cement fibrolite plate and major structure of construction outer surface, in self-assembling formation cavity, cast is steeped outside
Foam concrete forms heat preservation decoration integrative composite exterior wall body.
Described column is specially c-type lightweight steel;Described shaped steel centre keel is square steel, and arranges at shaped steel centre keel
The horizontal Os Draconis L-angle steel of cross direction profiles, horizontal Os Draconis L-angle steel is connected with centre keel square steel by anchor studs.Lateral surface decorative panel it
Between gap filling weather proofing sealant.
This utility model is on the basis of basing oneself upon Hunan area existence conditions, by domestic and international building energy conservation composite exterior wall body
System's contrast, Experience and the current situation of analysis China building energy conservation composite outer wall system, propose frame structure on the middle and senior level
Heat preservation decoration integrative design is used, it is achieved composite exterior wall wall thermal insulating fills with part short-shear wall structure building Pack the outer wall
Decorations integration.Generally during cast-in-place foamed concrete lightgage steel joist composite exterior wall body construction, for avoiding producing heat bridge effect, use double
Row lightgage steel joist, double-layer cement fiberboard structure.Exterior wall lateral surface cement fibrolite plate is used instead exterior wall dress by this problem on this basis
Plaque replaces, and uses the proprietary technology perforates such as back bolt type to connect, and anchor studs is fixed, and installs lightgage steel joist and provides anchoring stress point;
Medial surface still uses cement fibrolite plate light gauge steel structure, and lightgage steel joist is arranged in filling wall, it is ensured that cement fibrolite plate and cutting
Power surface within the walls flushes;Self-assembling formation cavity between outside decorative panel and inner side cement fibrolite plate and building body outer surface,
Pouring into a mould dry density in cavity is 600/m3 foam concrete.Heat preservation decoration integrative is i.e. formed after foam concrete solidifies
Composite outer wall system.
After this utility model uses above-mentioned technology, have the advantage that
1, light weight.Lightweight, high-strength foam concrete is poured, by foam concrete density domination 450-in cavity
750kg/m3, building deadweight typically can be made to reduce 25%-30%.
2, thermal and insulating performance is good.Containing a large amount of tiny holes closed in foam concrete, can effectively intercept in room
Outer energy exchange, has good thermal property, when foam concrete density is less than 700kg/m3Time, use different body of wall thick
Degree, its exterior wall all can realize self-heat conserving, reach the requirement of national energy-saving 65%.
3, sound-proof refractory performance is good.Foam concrete genus polyporus material, is therefore a kind of good deadener, and foam
Concrete is inorganic material, will not burn, thus has good fire resistance.
4, water resistance is strong.Cast-in-place foamed concrete water absorption rate is relatively low, relatively independent CAB and good entirety
Property so that it is there is certain water resistance.The hole of foam concrete mostly is hole-closing structure, does not connects, and anti-permeability performance is fine.
More than the cast-in-place foamed concrete that 300mm is thick, its waterproof impervious characteristic smears 20-than on the blockwork thick at 200mm far away
Waterproof mortar thick for 30mm is good.
5, decorative plate of outer wall is installed more firm.Decorative plate of outer wall uses back of the body bolt perforate, and crab-bolt is fixed, all metal fastenings
All fully wrapped around by foam concrete with Os Draconis, it is allowed to be difficult to by corrosion.The installation of conventional vacuum decorative panel is to use patch, mounting
The mode closed, time length, there is the danger come off.
6, globality and shock resistance are good.Foam concrete uses cast-in-site construction, is tightly combined with major project;Foam
The porous of concrete makes it have low elastic modelling quantity, so that it has good absorption to impact load and dispersion is made
With, there is preferable anti-seismic performance.At earthquake-prone region, this kind of composite exterior wall is used can at utmost to avoid exterior wall finish pull-up
Fall to hurting sb.'s feelings.
7, heat preservation decoration integrative is realized.Wall thermal insulating and building structure Synchronization Design, synchronous construction can be realized, it is achieved protect
Temperature is decoration integrated, and quality safety is more reliable, and insulated fire performance is good, heat preservation energy-saving and building same life-span.
8, construction cost is substantially reduced;Use identical decorative plate of outer wall (outsourcing price all by 60 yuan/based on), use
The exterior wall comprehensive cost of integrated construction technique, than traditional dry-hanging exterior wall comprehensive cost reduce by 181 yuan/.
9, speed of application is fast, can the reduction of erection time.Traditional external wall construction must be by following four step: build outer filling by laying bricks or stones
Wall, two sides are smeared cement mortar, are done exterior-wall heat insulation, do decoration of exterior wall.If back does not complete, then a rear step is difficult to construction,
Must follow the prescribed order, cause speed of application slow.If using structure of the present utility model, the most not only eliminating wall face and smearing water
Cement mortar engineering, and exterior wall is filled, is incubated and decorates and once complete, speed of application quickly, can the reduction of erection time, for investor and
Construction Party saves financial cost and management cost.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of embodiment of this utility model.
Fig. 2 is A-A sectional drawing;
Fig. 3 is B-B profile;
Fig. 4 is C-C profile;
In the drawings
1-fibre board;2-decorative panel;3-column;4-screw rod back of the body bolt;5-centre keel;The horizontal Os Draconis of 6-;7-foam concrete;8-
Connector;9-weather proofing sealant;10-major structure of construction.
Detailed description of the invention
In figures 1-4, a kind of heat preservation decoration integrative combined wall, including medial surface fibre board 1, the outside of body of wall both sides
Face decorative panel 2, it is can without asbestos fibre cellulose fiber cement plate, lateral surface decorative panel 2 that medial surface fibre board 1 is specially a kind of steam pressure
Carry on the back the fixing stone plate of bolt perforate, porcelain plate, ceramic plate etc.;Medial surface fibre board 1 and lateral surface decorative panel 2 intermediate distribution c-type lightweight
Steel column 3, square steel centre keel 5, the horizontal Os Draconis of L-angle steel 6;Medial surface fibre board 1 is anchored at c-type lightweight steel column by anchor studs
On 3;The horizontal Os Draconis of L-angle steel 6 are connected with square steel centre keel 5 by anchor studs;Lateral surface decorative panel 2 is by screw rod back of the body bolt 4 and L angle
The horizontal Os Draconis of steel are connected;At major structure of construction position 10, lateral surface decorative panel 2 is by screw rod back of the body bolt 4 with agent structure anchoring even
Fitting 8 connects;Natural shape between side decoration plate 2 and medial surface cement fibrolite plate 1 and major structure of construction 10 outer surface outside
In becoming cavity, cast light foam concrete 7 forms heat preservation decoration integrative composite exterior wall body.Adjacent two plates of lateral surface decorative panel 2
Between gap filling weather proofing sealant 9.
Prior art relatively, lateral surface of the present utility model does not use cement fibrolite plate, and uses decorative plate of outer wall, and adopts
Fix by back bolt type perforate, anchor studs, do not anchor the position of stress point, steel structure keel is installed anchoring stress point is provided;In
Side still uses cement fibrolite plate light gauge steel structure, and lightgage steel joist is arranged in filling wall, it is ensured that cement fibrolite plate and shearing
Surface flushes within the walls.Can self-assembling formation one between outside decorative panel and inner side cement fibrolite plate and building body outer surface
Individual cavity, pouring into a mould dry density in this cavity is the light foam concrete of 600kg/m3.After foam concrete solidifies, i.e. shape
Become filling, insulation, decoration integrated composite exterior wall.
Spacing between decorative plate of outer wall of the present utility model and building main body arbitrarily can be adjusted by anchor studs and suspension member
Whole.Spacing is the biggest, and the integument of foam concrete (to building body pillar, post and shearing face of wall) is the thickest, insulation
Effect is the best.Dry density be the foam concrete heat conductivity of 600kg/m3 be the integument that 0.14w/ (m.k), 120mm are thick
The XPS plate that its thermal resistance is thick with 30mm is suitable, the most just can reach country's hot-summer and cold-winter area building energy conservation requirement.Fill wall position
Heat-insulating property more preferable, if the spacing between decorative plate of outer wall and building main body is 120mm, then fill wall position
Foam concrete thickness can reach 312mm, it is achieved self-heat conserving is more than sufficient.Cold district higher for thermal requirements, permissible
Paste several centimeters of thick XPS plates (i.e. using decorative heat preservation composite board) at the back side of decorative plate of outer wall again, mix with foam after installation
Solidifying soil is cast in together, both can strengthen heat-insulating property, to meet the building energy conservation requirement of cold district, also can shorten decorative panel with
Spacing between main body, reduces combined wall thickness, reduces the fluence of watering of foam concrete, cost-effective.
The structural system of this integration composite exterior wall meets " cast-in-place foamed concrete light steel-framed composite wall application technology
Code " requirement of (CECS406:2015);The use material of decorative plate of outer wall and mounting means, referring generally to following standard and atlas:
1. " heat insulating decorative board material for external thermal insulation system of external wall " (JG/T287 2013);
2. " heat insulative fire-proof composite plate application technology code " (JG/T350 2015);
3. " outer heat preservation construction structure for external wall " (10J121).
Must be appropriate for carrying on the back bolt perforate for decorative plate of outer wall of the present utility model to fix, both can meet above-mentioned standard-required,
The decorative plate of outer wall that can carry on the back again bolt perforate fixing has stone plate, porcelain plate, ceramic plate etc., and thickness is about 10mm.During installation, (foundation
Standard) every square metre at least to open 6 the back of the body keyholes, single-point anchor force >=0.6KN, suspension force >=0.1KN.In view of foam coagulation
Lateral pressure to decorative panel during soil cast, this utility model every square metre is opened 10-12 and is carried on the back keyhole, single-point anchor force >=0.9KN.
The building composite outer wall system that this utility model is studied be by inside and outside for cement fibrolite plate clad can light steel dragon
Bone formula composite wall system is developed and to use outside exterior wall decorative panel to substitute Cement fibre panel clad can, and inner side of outer wall is still
Using Cement fibre sheet material clad can, part uses cast-in-place foamed concrete to fill.This composite exterior wall system not only against
The shortcomings such as poor thermal insulation property that blockwork homogenous material single layer structure is brought, poor seismic behavior, sound insulation sound absorption qualities difference,
Simultaneously as chamber portion use cast-in-place foamed concrete fill, the dry volume density of foam concrete be 200kg/m3~
700kg/m3, is equivalent to 1/3~the 1/10 of clay brick, the 1/5 of normal concrete~1/10, can significantly alleviate building certainly
Weight, increases story height, reduces foundation cost about 10%;Foam concrete is internal containing a large amount of bubbles and micropore, possesses good
Heat-insulating property, heat conductivity is usually 0.07W/ (m K)~0.16W/ (m K), and its heat insulation and preservation effect is than common coagulation
The high decades of times of soil, the foam concrete exterior wall that 20cm is thick, its heat insulation effect is equivalent to the clay brick exterior wall of more than 49cm thickness, can
Effective thinning thickness of wall body, saves usable floor area about 12%, and foam concrete sandwich layer is completely wrapped in middle cavity, by force
Spend the shortcomings such as poor, weather resistance is poor, easy dry shrinkage and cracking farthest to be weakened or make up, lightweight, good heat preservation performance, production cost
The advantage such as low is also not fully exerted, and particularly exterior wall lateral surface is used decorative panel instead and substituted Cement fibre panel clad can, it is achieved that
Outer wall body fills heat preservation decoration integrative, is that one had both responded country's building energy conservation call, promotes again energy-saving building technology wound
New height, it is achieved the novel building power-saving technology composite outer wall system of Green Sustainable.Greatly develop this composite exterior wall body
System, to promoting that building energy conservation reduces discharging, it is ensured that construction quality and safety, it is achieved building industry develops in a healthy way, and has positive role, in work
Cheng Dangzhong has much application value.
Architectural industrialization refers to that building industry will be from traditional little mode of production based on manual operations progressively to socialization
Big mode of production transition.This utility model can be greatly promoted enterprise development architectural industrialization, promotes labor-intensive building
The transition of enterprise, improve labor productivity, drive enterprise's industrial chain, make the change of appearance of enterprise matter.
The content that above-described embodiment illustrates should be understood to that these embodiments are only used for being illustrated more clearly that this utility model,
Rather than limit scope of the present utility model, after having read this utility model, those skilled in the art are new to this practicality
The amendment of the various equivalent form of values of type each falls within the application claims limited range.
Claims (9)
1. a heat preservation decoration integrative combined wall, it is characterised in that: include the decorative panel (2) as wall outer side face and make
It is each attached on keel structure for the fibre board (1) of body of wall medial surface, described decorative panel (2) and fibre board (1), and at decorative panel
(2) built-in described keel structure is formed between inner surface, fibre board (1) medial surface and major structure of construction (10) outer surface
Concreting cavity;Pour foam concrete (7) in described concreting cavity and made foam concrete (7), dress
It is heat insulation decoration integrated that plaque (2), fibre board (1), keel structure and major structure of construction (10) are formed as skin
Change combined wall.
Heat preservation decoration integrative combined wall the most according to claim 1, it is characterised in that: described keel structure includes standing
Post and Os Draconis, described fibre board (1) is connected by anchor studs and column are fixing, and described decorative panel (2) carries on the back bolt with solid by screw rod
Determine that Os Draconis are fixing to be connected, and the anchor connector of this decorative panel (2) and major structure of construction (10) is fixedly linked.
Heat preservation decoration integrative combined wall the most according to claim 1, it is characterised in that: described decorative panel (2) is can
Stone plate, porcelain plate or the ceramic plate that back of the body bolt perforate is fixing.
Heat preservation decoration integrative combined wall the most according to claim 1, it is characterised in that: described fibre board (1) is nothing
Asbestos fibre cellulose fiber cement plate.
Heat preservation decoration integrative combined wall the most according to claim 2, it is characterised in that: described column is c-type lightweight
Steel column (3).
Heat preservation decoration integrative combined wall the most according to claim 2, it is characterised in that: described Os Draconis include square steel
The centre keel (5) made and horizontal Os Draconis (6), horizontal Os Draconis (6) are connected by anchor studs and centre keel (5) are fixing.
Heat preservation decoration integrative combined wall the most according to claim 1, it is characterised in that: described decorative panel (2) is by many
Block is spliced, and is filled with weather proofing sealant (9) in the gap between adjacent two packaged plaques.
Heat preservation decoration integrative combined wall the most according to claim 1, it is characterised in that: described foam concrete (7)
Packed density be 450kg/m-700kg/m.
Heat preservation decoration integrative combined wall the most according to claim 3, it is characterised in that: the upper back of the body of described decorative panel (2)
The density of bolt perforate is every square metre and opens 10-12 back of the body keyhole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620535406.4U CN205712589U (en) | 2016-06-03 | 2016-06-03 | A kind of heat preservation decoration integrative combined wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620535406.4U CN205712589U (en) | 2016-06-03 | 2016-06-03 | A kind of heat preservation decoration integrative combined wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205712589U true CN205712589U (en) | 2016-11-23 |
Family
ID=57302422
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620535406.4U Expired - Fee Related CN205712589U (en) | 2016-06-03 | 2016-06-03 | A kind of heat preservation decoration integrative combined wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205712589U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105888099A (en) * | 2016-06-03 | 2016-08-24 | 湖南省建筑工程集团总公司 | Heat preservation and decoration integrated composite wall serving as building outer wall and construction method of integrated composite wall |
CN108756025A (en) * | 2018-05-17 | 2018-11-06 | 张栋 | A kind of cast-in-place lightweight concrete skeleton assembling wall and its construction method |
CN110397182A (en) * | 2019-07-26 | 2019-11-01 | 青岛科瑞新型环保材料集团有限公司 | Cell curtain wall formula heat preservation decoration integrative wall goes along with sb. to guard him layer system and construction technology |
-
2016
- 2016-06-03 CN CN201620535406.4U patent/CN205712589U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105888099A (en) * | 2016-06-03 | 2016-08-24 | 湖南省建筑工程集团总公司 | Heat preservation and decoration integrated composite wall serving as building outer wall and construction method of integrated composite wall |
CN108756025A (en) * | 2018-05-17 | 2018-11-06 | 张栋 | A kind of cast-in-place lightweight concrete skeleton assembling wall and its construction method |
CN110397182A (en) * | 2019-07-26 | 2019-11-01 | 青岛科瑞新型环保材料集团有限公司 | Cell curtain wall formula heat preservation decoration integrative wall goes along with sb. to guard him layer system and construction technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105888099A (en) | Heat preservation and decoration integrated composite wall serving as building outer wall and construction method of integrated composite wall | |
CN202767293U (en) | Cast-in-place foam concrete external wall free of form removal | |
CN105507462B (en) | Have both the combined wall and its construction method of load-bearing and heat insulation function | |
CN105714962B (en) | The cast-in-place external wall system and construction method for building prefabricated overall assembling insulation exterior sheathing free of demolition | |
CN103266686B (en) | Inflatable skeleton filling wall | |
CN105619596A (en) | Preparation method of foam concrete composite board | |
CN205712589U (en) | A kind of heat preservation decoration integrative combined wall | |
CN108252407A (en) | A kind of building with prefabricated reinforced concrete bearing | |
CN106968369A (en) | A kind of single-chamber heat-preserving wall component | |
CN103352537B (en) | Overall load bearing heat preserving wallboard and production construction process thereof | |
CN209040360U (en) | The cast-in-situ thermal-insulated decorating wall of non-dismantling formwork is made of decoration panel and keel | |
CN100999918B (en) | Manufacture method of pouring polyurethane heat insulating wall | |
CN205502373U (en) | Evaporate and press whole wallboard that keeps warm of aerated concrete | |
CN206752765U (en) | A kind of single-chamber heat-preserving wall component | |
CN206591692U (en) | A kind of steel wire net rack cast-in-place concrete exempts to tear compound external mold integrated plate for heat insulation open | |
CN106567494B (en) | A kind of prefabricated outer wall panel and its assembly method | |
CN201459966U (en) | Self-insulation wall structure for building | |
CN109372104A (en) | Assembled architecture with prefabricated reinforced concrete convex support | |
CN106827178A (en) | A kind of FRP muscle strengthens heat insulating decorative board and its production method | |
CN208088589U (en) | Non-dismantling formwork double-layer heat insulation in-situ concrete wall | |
CN208072710U (en) | A kind of composite filled wall of cast-in-place steel wire net rack | |
CN207469430U (en) | A kind of assembled arthitecutral structure | |
CN207144237U (en) | Assembled heat insulation concrete walls structural connection and attachment structure | |
CN206752744U (en) | A kind of two-chamber heat-preserving wall component | |
CN212317251U (en) | UHPC color finish coat outer-hanging wallboard |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161123 |