CN205711566U - A kind of pre-embedded bolt, sleeve, the auxiliary transverse alignment instrument of ironware Fast Installation - Google Patents
A kind of pre-embedded bolt, sleeve, the auxiliary transverse alignment instrument of ironware Fast Installation Download PDFInfo
- Publication number
- CN205711566U CN205711566U CN201620312085.1U CN201620312085U CN205711566U CN 205711566 U CN205711566 U CN 205711566U CN 201620312085 U CN201620312085 U CN 201620312085U CN 205711566 U CN205711566 U CN 205711566U
- Authority
- CN
- China
- Prior art keywords
- tightener
- type frame
- door type
- alignment device
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims abstract description 19
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 11
- 239000010959 steel Substances 0.000 claims abstract description 11
- 239000000463 material Substances 0.000 claims abstract description 6
- 238000010276 construction Methods 0.000 abstract description 8
- 238000000034 method Methods 0.000 description 5
- 239000004677 Nylon Substances 0.000 description 2
- 229920001778 nylon Polymers 0.000 description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 238000007670 refining Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Bay Windows, Entrances, And Structural Adjustments Related Thereto (AREA)
Abstract
The utility model discloses a kind of pre-embedded bolt, sleeve, the auxiliary transverse alignment instrument of ironware Fast Installation, including door type frame and tightener, alignment device horizon bar it is provided with on described door type frame, the bottom of described alignment device horizon bar is provided with door type frame support bar, the top of described alignment device horizon bar is provided with fluting, described tightener is outside equipped with tightener cover plate, it is provided with aperture on described tightener cover plate, tightener rotating shaft it is provided with in described tightener, steel wire drum bobbin and center line pendant peg it is provided with on described tightener, it is provided with center line pendant on described center line pendant peg.This kind of pre-embedded bolt, sleeve, the auxiliary transverse alignment instrument of ironware Fast Installation, the material using job site common is processed making, reduces construction cost, improves progress and the quality of similar structures construction.
Description
Technical field
This utility model relates to the auxiliary transverse alignment instrument of a kind of pre-embedded bolt, sleeve, ironware Fast Installation.
Background technology
At present, industrial building basis is frequently encountered by the situation that there is a large amount of bolt, sleeve, built-in fitting, such as the track foundation in metallurgical engineering, refining furnace, conticaster, the main building basis etc. in thermoelectric engineering.The most conventional way is to carry elongated nylon wire on reinforcement foundation, often group bolt independent centering plan-position, recycling level gauge independent levelling elevation location, the feature that this method exists that progress is slow, installation accuracy is low, often organizes bolt position, bolt the relative position error is bigger;Another common solution is to be processed into bolt group size by waste and old template, template opens bolt hole, bolt template is fixed, the most still install according to nylon wire band wire centering, although such method solves the problem that the relative position error between bolt is bigger, but bolt group that template is processed into exists can not shift to an earlier date in processing space concentrated processing, have bad luck after the yielding shortcoming of bolt group, and template can not directly squeeze in base concrete, and the later stage needs to arrange for personnel and clears up separately.No matter using which kind of method, for ensureing the duration, be required for a number of technical staff scene and coordinate, on the contrary, use this construction method, although site administrator adds, quality and progress can not change accordingly.
Utility model content
The technical problems to be solved in the utility model is to overcome existing defect, it is provided that a kind of pre-embedded bolt, sleeve, the auxiliary transverse alignment instrument of ironware Fast Installation, thus solves the problems referred to above.
In order to solve above-mentioned technical problem, this utility model provides following technical scheme:
This utility model one pre-embedded bolt, sleeve, the auxiliary transverse alignment instrument of ironware Fast Installation, including door type frame and tightener, alignment device horizon bar it is provided with on described door type frame, the bottom of described alignment device horizon bar is provided with door type frame support bar, the top of described alignment device horizon bar is provided with fluting, described tightener is outside equipped with tightener cover plate, it is provided with aperture on described tightener cover plate, tightener rotating shaft it is provided with in described tightener, steel wire drum bobbin and center line pendant peg it is provided with on described tightener, it is provided with center line pendant on described center line pendant peg.
As a kind of optimal technical scheme of the present utility model, described door type frame support bar connects by door type frame screw rod and described alignment device horizon bar are fixing.
As a kind of optimal technical scheme of the present utility model, described tightener connects by tightener screw rod and described alignment device horizon bar are fixing.
As a kind of optimal technical scheme of the present utility model, described alignment device horizon bar is that flat bar stock is made, and described door type frame support bar is that angle steel material is made.
Compared with prior art, the beneficial effects of the utility model are: this kind of pre-embedded bolt, sleeve, the auxiliary transverse alignment instrument of ironware Fast Installation, the material using job site common is processed making, and reduces construction cost, improves progress and the quality of similar structures construction.
Accompanying drawing explanation
Accompanying drawing is used for providing being further appreciated by of the present utility model, and constitutes a part for description, is used for explaining this utility model, is not intended that restriction of the present utility model together with embodiment of the present utility model.In the accompanying drawings:
Fig. 1 is the front view of tightener described in the utility model;
Fig. 2 is the top view of tightener described in the utility model;
Fig. 3 is the front view of door type frame described in the utility model;
Fig. 4 is the top view of door type frame described in the utility model;
In figure: 1, door type frame support bar;2, door type frame screw rod;3, alignment device horizon bar;4, fluting;5, aperture;6, tightener rotating shaft;7, steel wire drum bobbin;8, center line pendant peg;9, center line pendant;10, tightener cover plate;11, door type frame;12, tightener;13, tightener screw rod.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment; technical scheme in this utility model embodiment is clearly and completely described; obviously; described embodiment is only a part of embodiment of this utility model; rather than whole embodiments; based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art are obtained under not making creative work premise, broadly fall into the scope of this utility model protection.
Refer to Fig. 1-4, a kind of technical scheme of this utility model offer: a kind of pre-embedded bolt, sleeve, the auxiliary transverse alignment instrument of ironware Fast Installation, including door type frame 11 and tightener 12, alignment device horizon bar 3 it is provided with on door type frame 11, the bottom of alignment device horizon bar 3 is provided with door type frame support bar 1, the top of alignment device horizon bar 3 is provided with fluting 4, tightener 12 is outside equipped with tightener cover plate 10, aperture 5 it is provided with on tightener cover plate 10, tightener rotating shaft 6 it is provided with in tightener 12, steel wire drum bobbin 7 and center line pendant peg 8 it is provided with on tightener 12, it is provided with center line pendant 9 on center line pendant peg 8.Door type frame support bar 1 is by door type frame screw rod 2 and the fixing connection of alignment device horizon bar 3.Tightener 12 is by tightener screw rod 13 and the fixing connection of alignment device horizon bar 3.Alignment device horizon bar 3 is made for flat bar stock, and door type frame support bar 1 is made for angle steel material.
During use, its construction procedure is: one, determine on-the-spot axial line control point;Two on-the-spot auxiliary transverse alignment device door type frames are installed;Three alignment device tightening devices are installed, centering;Four takeup shaft net control lines.Wherein: 1, determine on-the-spot axial line control point: first according to design drawing, need the axis that the regional choice utilization rate of unwrapping wire is higher on basis, use total powerstation or theodolite that in basal perimeter, control axle net is being made control point, make marks with timber or reinforcing bar.This control point is mainly used in outside the installation of bolt, sleeve, embedded iron parts, and the later stage is alternatively arranged as the control point that equipment is installed.2, on-the-spot auxiliary transverse alignment device door type frame is installed: according to position, control point, two support bars of alignment device door type frame are squeezed into respectively the soil layer of both sides, position, control point, door type frame support bar center line will be on position, control point, installation requirement consolidates, does not rocks, supporting bar top absolute altitude identical (coordinate with level indicator and install).Support bar fixes, adjust after, alignment device horizon bar is installed.Alignment device door type frame structure is shown in Fig. 1.Door type frame installs rear inspection AQL degree, errorless rear installation steel wire tightener.3, alignment device tightening device installation, centering: be arranged on by tightening device on door type frame cross bar, utilize control point below line pendant alignment.4, takeup shaft net control line.Check again for tightening device line and fall whether alignment axis control point, confirm errorless after, tighten up axis two ends wire, auxiliary transverse alignment device installs substantially.Alignment device door type frame uses angle steel to make, and tightener is transformed by reel.The direct welding production of angle steel, wire disposable band wire centering is may be used without during field condition deficiency.
This kind of pre-embedded bolt, sleeve, the auxiliary transverse alignment instrument of ironware Fast Installation, the material using job site common is processed making, reduces construction cost, improves progress and the quality of similar structures construction.
Last it is noted that the foregoing is only preferred embodiment of the present utility model; it is not limited to this utility model; although this utility model being described in detail with reference to previous embodiment; for a person skilled in the art; technical scheme described in foregoing embodiments still can be modified by it; or wherein portion of techniques feature is carried out equivalent; all within spirit of the present utility model and principle; the any modification, equivalent substitution and improvement etc. made, within should be included in protection domain of the present utility model.
Claims (4)
1. an auxiliary transverse alignment instrument for pre-embedded bolt, sleeve, ironware Fast Installation, including door type frame (11)
With tightener (12), it is characterised in that be provided with alignment device horizon bar (3) on described door type frame (11),
The bottom of described alignment device horizon bar (3) is provided with door type frame support bar (1), described alignment device horizon bar (3)
Top be provided with fluting (4), described tightener (12) is outside equipped with tightener cover plate (10), described receipts
It is provided with aperture (5) on tight device cover plate (10), in described tightener (12), is provided with tightener rotating shaft (6),
Steel wire drum bobbin (7) and center line pendant peg (8), described centering it is provided with on described tightener (12)
Center line pendant (9) it is provided with on line pendant peg (8).
A kind of pre-embedded bolt the most according to claim 1, sleeve, the auxiliary transverse alignment of ironware Fast Installation
Instrument, it is characterised in that described door type frame support bar (1) passes through door type frame screw rod (2) and described alignment device
Horizon bar (3) is fixing to be connected.
A kind of pre-embedded bolt the most according to claim 1, sleeve, the auxiliary transverse alignment of ironware Fast Installation
Instrument, it is characterised in that described tightener (12) passes through tightener screw rod (13) and described alignment device level
Bar (3) is fixing to be connected.
A kind of pre-embedded bolt the most according to claim 1, sleeve, the auxiliary transverse alignment of ironware Fast Installation
Instrument, it is characterised in that described alignment device horizon bar (3) is that flat bar stock is made, described door type frame supports
Bar (1) is that angle steel material is made.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620312085.1U CN205711566U (en) | 2016-04-13 | 2016-04-13 | A kind of pre-embedded bolt, sleeve, the auxiliary transverse alignment instrument of ironware Fast Installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620312085.1U CN205711566U (en) | 2016-04-13 | 2016-04-13 | A kind of pre-embedded bolt, sleeve, the auxiliary transverse alignment instrument of ironware Fast Installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205711566U true CN205711566U (en) | 2016-11-23 |
Family
ID=57307470
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620312085.1U Expired - Fee Related CN205711566U (en) | 2016-04-13 | 2016-04-13 | A kind of pre-embedded bolt, sleeve, the auxiliary transverse alignment instrument of ironware Fast Installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205711566U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107700670A (en) * | 2017-09-29 | 2018-02-16 | 中国十七冶集团有限公司 | A kind of high precision large-sized bolt sleeve bottom localization method |
CN111395339A (en) * | 2020-03-23 | 2020-07-10 | 中国一冶集团有限公司 | Mounting structure and mounting method for accurately embedding cast-in-situ bored pile casing |
-
2016
- 2016-04-13 CN CN201620312085.1U patent/CN205711566U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107700670A (en) * | 2017-09-29 | 2018-02-16 | 中国十七冶集团有限公司 | A kind of high precision large-sized bolt sleeve bottom localization method |
CN111395339A (en) * | 2020-03-23 | 2020-07-10 | 中国一冶集团有限公司 | Mounting structure and mounting method for accurately embedding cast-in-situ bored pile casing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106120559B (en) | A kind of bridge limited bracket construction method and bridge | |
CN106006404A (en) | Super high-rise external hanging movable arm tower crane climbing supporting device | |
CN102080417B (en) | Construction method for split burying of large T-shaped sleeve bolt | |
CN205711566U (en) | A kind of pre-embedded bolt, sleeve, the auxiliary transverse alignment instrument of ironware Fast Installation | |
CN203965074U (en) | The stress monitoring system of reinforced concrete tie-rod in a kind of bowstring arch bridge | |
CN103352476A (en) | Large-scale bolt high-precision pre-burying construction method | |
CN110499702A (en) | A kind of cable saddle positioning reinforcing device of Cable-stayed Bridge Pylon | |
CN206591832U (en) | The bracing means of high layer concrete vertical transport pipe | |
CN106320186B (en) | A kind of skewback embedded anchor bar positioning system and construction method | |
CN105317052A (en) | Tower crane foundation bolt fixing method | |
CN104032676B (en) | A kind of horizontal drawing cable bridge steel wire rope self-anchored type bridge abutment structure | |
CN208995861U (en) | A kind of concrete road surface rod piece installation stationary steel bushing tube stent device | |
CN204884580U (en) | Containment steel construction floor support system | |
CN208310219U (en) | Board bottom has assembled composite beam-plate connection support device of height difference | |
CN105887917B (en) | A kind of foundation bolt sleeve rapid processing, installation, the method for centering | |
CN205296455U (en) | A positioner for between buttress and isolation bearing | |
CN208649894U (en) | A kind of steel anchor beam and steel corbel unit spelling moulding bed | |
CN104989107A (en) | Curved ribbed beam processing and assembling construction process | |
CN205743048U (en) | Correction positioner installed by a kind of curtain wall large-size column | |
CN201610553U (en) | Plug-in anti-twist device of angle steel | |
CN204530480U (en) | Faulting of slab ends adjusting device | |
CN105386531A (en) | Locating device used between buttress and vibration insulation support and construction method thereof | |
CN109458002A (en) | A kind of support rod and support frame | |
CN115262778A (en) | Novel connection construction method for box steel column and reinforced concrete beam | |
CN103938556A (en) | Transverse reinforcing device of space double K-shaped supports of concrete beam bridge with T-shaped section |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161123 |