CN204906129U - Change vibrating motor's device - Google Patents
Change vibrating motor's device Download PDFInfo
- Publication number
- CN204906129U CN204906129U CN201520728372.6U CN201520728372U CN204906129U CN 204906129 U CN204906129 U CN 204906129U CN 201520728372 U CN201520728372 U CN 201520728372U CN 204906129 U CN204906129 U CN 204906129U
- Authority
- CN
- China
- Prior art keywords
- bracket
- vibrating motor
- channel
- travelling car
- section steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
The utility model relates to a supplementary erection equipment specifically is a change vibrating motor's device. Including travelling car, driving track, elevating system and bracket, on the track way was expert at in the travelling car setting, elevating system set up on the travelling car, and the bracket setting is on elevating system. The utility model discloses the work that makes the workman avoid the haulage equipment reduces workman intensity of labour, and factor of safety is high, has overcome the installation and has demolishd the problem that the motor in -process received the restriction in space easily and was difficult to shift, has improved work efficiency, simple structure, and the transportation of being convenient for is carried, adapts to the operation of various spaces, and the installation is simple swift.
Description
Technical field
The utility model relates to auxiliary installing device, specifically a kind of device changing vibrating motor.
Background technology
Vibrating screen sieves requisite equipment as supplementary material in metallurgy industry and is widely used, wherein vibrating motor plays vital effect to screening especially, along with metallurgy industry, constantly to develop increasing supplementary material screening production line requirement flow process short, equipment room compact conformation, which results in the restriction that some equipment are subject to space in installation and removal process, special lifting in the dismounting and installation process of vibrating motor and mobile all very difficult, remove by vibrating motor current technology and install, first a rational Heave Here is needed, guide chain cucurbit is fixed on position, Heave Here, guide chain cucurbit is utilized to be lifted by crane by vibrating motor, but go to find suitable Heave Here at this process need, even relate to work high above the ground and Heave Here is installed, like this with regard to the raising of waste of time and danger coefficient, the damage of colliding with of equipment is also likely caused in lifting process, in addition, remove and relate in installation process workman at vibrating motor to go to carry vibrating motor, in narrow space, haulage equipment causes very large difficulty to workman, and inefficiency, increase injury rate.
Utility model content
The utility model is intended to solve the problem, thus provides a kind of device being convenient to split, install simple, simple to operate, that coefficient of safety is high replacing vibrating motor.
The utility model solves described problem, and the technical scheme of employing is:
Change a device for vibrating motor, comprise travelling car, Crane Rail, elevating mechanism and bracket, travelling car is arranged on Crane Rail, and elevating mechanism is arranged on travelling car, and bracket is arranged on elevating mechanism.
Adopt the utility model of technique scheme, compared with prior art, its outstanding feature is:
1. the equipment that realizes is by ground to installing or the working method of sending area, and eliminate the potential safety hazard utilizing guide chain cucurbit to lift, coefficient of safety is high.
2. by the application of lowering or hoisting gear, in conjunction with bracket vibrating motor lifted and install or remove position, make workman exempt the work of haulage equipment, reduce labor strength;
3. overcome in installation and removal motor process the problem being easily subject to spatial limitation and being difficult to shift, thus improve operating efficiency and convenience, flexibility are installed;
4. structure is simple, easy to make, is convenient to transport and carries, adapt to various job space, installs simple and fast.
As preferably, the utility model further technical scheme is:
Crane Rail comprises the first channel-section steel and the second channel-section steel, and the upper surface of the first channel-section steel and the second channel-section steel both sides is connected with lower baffle plate respectively by overhead gage with on lower surface, and the wheel of travelling car both sides is placed in the groove of the first channel-section steel and the second channel-section steel respectively.
Elevating mechanism comprises hydraulic jack, and hydraulic jack is arranged on the platform of travelling car by cover plate, and the upper end of hydraulic jack is connected with bracket by locknut.
Bracket comprises base plate, the first supporting plate being placed in base plate both sides respectively and the second supporting plate, the first supporting plate and the second supporting plate is respectively arranged with the arcuate structure adapted with the dust cover of vibrating motor, base plate is provided with the centre bore coordinated with locknut.
Accompanying drawing explanation
Fig. 1 is the utility model example structure schematic diagram.
Fig. 2 is the structural representation of the utility model embodiment bracket.
In figure: Crane Rail 1, the first channel-section steel 2, second channel-section steel 3, travelling car 4, elevating mechanism 5, bracket 6, locknut 7, hydraulic jack 8, wheel 9, platform 10, cover plate 11, lower baffle plate 12, overhead gage 13, centre bore 14, the first supporting plate 15, base plate 16, the second supporting plate 17.
embodiment:
Below in conjunction with embodiment, the utility model is described in further detail, and object is only to understand the utility model content better, and therefore, the cited case does not limit protection range of the present utility model.
See Fig. 1, comprise Crane Rail 1, travelling car 4, elevating mechanism 5 and bracket 6, Crane Rail 1 comprises the first channel-section steel 2 and the second channel-section steel 3, first channel-section steel 2 is fixedly connected with lower baffle plate 12 respectively by overhead gage 13 with lower surface with the upper surface of the second channel-section steel 3 both sides, overhead gage 13 being processed with two diameters is the hole of 22mm, it is the screwed hole of M20mm that the corresponding overhead gage 13 of lower baffle plate 12 is processed with two specifications, on first channel-section steel 2 and the second channel-section steel 3, corresponding overhead gage 13 and lower baffle plate 12 are processed with hole that diameter is 22mm and specification is the screwed hole of M20mm respectively, on first channel-section steel 2 and the second channel-section steel 3, the wheel 9 of travelling car 4 both sides is placed in the groove of the first channel-section steel 2 and the second channel-section steel 3 respectively.
Elevating mechanism 5 comprises hydraulic jack 8, hydraulic jack 8 is arranged on the platform 10 of travelling car 4 by cover plate 11, cover plate 11 is processed with five are uniformly distributed, diameter is the hole of 17mm, the platform 10 of corresponding travelling car 4 is processed with ten are uniformly distributed, specification is the screwed hole of M16mm.
Bracket 6 comprises base plate 16, first supporting plate 15 and the second supporting plate 17, first supporting plate 15 and the second supporting plate 17 are respectively arranged with the arcuate structure adapted with the dust cover of vibrating motor, first supporting plate 15 and the second supporting plate 17 are vertically set on base plate 16 both sides respectively and symmetrically shape is arranged, base plate 16 is provided with the centre bore 14 coordinated with locknut 7, be connected by the upper end of locknut 7 with hydraulic jack 8, thus bracket 6 is arranged on hydraulic jack 8, hydraulic jack 8 must meet lifts requirement for height and load-bearing requirements, be implemented to motor designated mounting position or motor removes position, bracket 6 can ensure the fixing of motor according to the corresponding bracket of different self manufacture of motor model.Meanwhile, bracket 6 can meet the different setting angle of vibrating motor by adjusting angle.
Be described for jig vibrating motor under changing blast furnace ore tank, certain steel mill has 580m
3one, blast furnace, supporting have a set of blast furnace ore tank system, due to equipment construction comparatively early, exist unreasonable at design aspect, wherein, blast furnace ore tank vibrating screen under groove position narrow space, vibrating motor handling is installed more difficult, and the step changing motor is as follows;
One, the reserves space of first selected place's spaciousness, then the Crane Rail 1 of this device, travelling car 4, elevating mechanism 5 and bracket 6 are assembled in the following order:
One end of (1) first channel-section steel 2 and the second channel-section steel 3 utilizes bolt to fix by a set of overhead gage 13 and lower baffle plate 12, realizes mobile in the groove then wheel 9 of travelling car 4 being placed on the first channel-section steel 2 and the second channel-section steel 3.
(2) other end of the first channel-section steel 2 and the second channel-section steel 3 is bolted with another set of overhead gage 13 and lower baffle plate 12.
(3) by cover plate 11 and bolt fixed installation elevating mechanism 5 on the platform 10 of travelling car 4.
(4) utilize locknut 7 that the base plate 16 of bracket 6 is arranged on the upper end of hydraulic jack 8.
(5) leveling bracket 6, need meet vibrating motor can smoothly from forecast space to groove vibrating screen under groove position, ore deposit.
Two, promote travelling car 4 to move on Crane Rail 1, bracket 6 is moved into below the old vibrating motor in installation region, hydraulic jack 8 is utilized to make bracket 6 rise to motor position, the angle of bracket 6 makes it meet the requirement of fixed support vibrating motor, and the construction bolt of dismounting vibrating motor, after having dismantled, bracket 6 angle, utilize hydraulic jack 8 to reduce bracket 6 to initial position, promote travelling car 4 and remove installation region, unload old vibrating motor.
Three, new vibrating motor is fixed on bracket 6, promote travelling car 4 and move into installation region, hydraulic jack 8 is utilized to make bracket 6 rise to installation site, the angle of bracket 6 makes vibrating motor meet mounting condition, by vibrating motor fixed installation on the vibrating, hydraulic jack 8 reduces bracket 6 to initial position, and travelling car 4 shifts out installation region.
Four, Crane Rail 1, travelling car 4, elevating mechanism 5 and bracket 6 is dismantled:
(1) dismantle overhead gage 13 and the lower baffle plate 12 of the first channel-section steel 2 and the second channel-section steel 3 side, take out travelling car 4, then dismantle the overhead gage 13 on opposite side and lower baffle plate 12.
(2) by the cover plate 11 on the platform 10 of dismounting travelling car 4, hydraulic jack 8 is unloaded.
(3) by dismounting locknut 7, bracket 6 is unloaded.
The utility model can make motor device flexibly mobile and not by the restriction of small space between reserves space and installing space, improves operating efficiency, flexibly quick for installation.And the utility model easily manufacture, easy for installation, be convenient to transport.
The foregoing is only the better feasible embodiment of the utility model, not thereby limit to interest field of the present utility model, the equivalence change that all utilization the utility model specifications and accompanying drawing content thereof are done, be all contained within interest field of the present utility model.
Claims (4)
1. change a device for vibrating motor, it is characterized in that: comprise travelling car, Crane Rail, elevating mechanism and bracket, travelling car is arranged on Crane Rail, and elevating mechanism is arranged on travelling car, and bracket is arranged on elevating mechanism.
2. the device of replacing vibrating motor according to claim 1, it is characterized in that: Crane Rail comprises the first channel-section steel and the second channel-section steel, the upper surface of the first channel-section steel and the second channel-section steel both sides is connected with lower baffle plate respectively by overhead gage with on lower surface, and the wheel of travelling car both sides is placed in the groove of the first channel-section steel and the second channel-section steel respectively.
3. the device of replacing vibrating motor according to claim 1, is characterized in that: elevating mechanism comprises hydraulic jack, and hydraulic jack is arranged on the platform of travelling car by cover plate, and the upper end of hydraulic jack is connected with bracket by locknut.
4. the device of replacing vibrating motor according to claim 1, it is characterized in that: bracket comprises base plate, the first supporting plate being placed in base plate both sides respectively and the second supporting plate, first supporting plate and the second supporting plate are respectively arranged with the arcuate structure adapted with the dust cover of vibrating motor, base plate are provided with the centre bore coordinated with locknut.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520728372.6U CN204906129U (en) | 2015-09-21 | 2015-09-21 | Change vibrating motor's device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520728372.6U CN204906129U (en) | 2015-09-21 | 2015-09-21 | Change vibrating motor's device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204906129U true CN204906129U (en) | 2015-12-23 |
Family
ID=54928274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520728372.6U Expired - Fee Related CN204906129U (en) | 2015-09-21 | 2015-09-21 | Change vibrating motor's device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204906129U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105071604A (en) * | 2015-09-21 | 2015-11-18 | 唐山瑞丰钢铁(集团)有限公司 | Device and method for replacing vibration motors |
-
2015
- 2015-09-21 CN CN201520728372.6U patent/CN204906129U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105071604A (en) * | 2015-09-21 | 2015-11-18 | 唐山瑞丰钢铁(集团)有限公司 | Device and method for replacing vibration motors |
CN105071604B (en) * | 2015-09-21 | 2018-10-02 | 唐山瑞丰钢铁(集团)有限公司 | Replace the device and method of vibrating motor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105071604A (en) | Device and method for replacing vibration motors | |
CN202186848U (en) | Universal movable maintenance gantry crane | |
CN102306979A (en) | Core pulling and threading method for overhauling of large motor | |
CN103437563B (en) | Mounting method for steel skeleton of large steel structure factory building | |
CN104632088A (en) | Petroleum drilling machine tower-shaped derrick sleeving mounting method | |
CN104973517A (en) | Electric gantry platform for installing sintering machine head equipment and application method thereof | |
CN204747073U (en) | Conveyor is changed to slab band rolling mill AGC pneumatic cylinder | |
CN204906129U (en) | Change vibrating motor's device | |
CN109055637B (en) | Hydraulic lifting process for mounting furnace shell in blast furnace overhaul | |
CN106315407B (en) | Ultra-large type crane girder slides method for dismounting in small space | |
CN206692295U (en) | A kind of translation positioning apparatus of jumbo | |
CN203628021U (en) | Movable roadway pipeline installation trolley | |
CN101537982B (en) | Underground orbital transfer hydraulic crane truck | |
CN207671613U (en) | A kind of lift cart of Pipe installing | |
CN105626120A (en) | Hydraulic support loading and unloading device in roadway | |
CN202296886U (en) | Hoisting device for installing oversized radial gate of hydropower station | |
CN202208494U (en) | Impact type machine set rotating wheel transporting, dismounting trolley | |
CN103287986A (en) | Curtain board transport lifting device and method for mounting curtain board by using device | |
CN203402829U (en) | Frame of lifting machine for portable transformer | |
CN107288354B (en) | Construction method for overall displacement of gantry crane | |
KR20070077559A (en) | Self-stepping high tonage transporter | |
JP6368726B2 (en) | Belt conveyor lifting device | |
JP2017155463A (en) | Lifting support column and lifting device | |
CN103086259A (en) | Derrick spreader | |
CN205532649U (en) | Landing gear is used in hydraulic support installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151223 Termination date: 20200921 |