CN204780909U - Construct pre -buried foundation pile tamping unit - Google Patents
Construct pre -buried foundation pile tamping unit Download PDFInfo
- Publication number
- CN204780909U CN204780909U CN201520237639.1U CN201520237639U CN204780909U CN 204780909 U CN204780909 U CN 204780909U CN 201520237639 U CN201520237639 U CN 201520237639U CN 204780909 U CN204780909 U CN 204780909U
- Authority
- CN
- China
- Prior art keywords
- foundation pile
- buried foundation
- tamping unit
- screw rod
- connecting screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 150000001875 compounds Chemical class 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 5
- ZZUFCTLCJUWOSV-UHFFFAOYSA-N furosemide Chemical compound C1=C(Cl)C(S(=O)(=O)N)=CC(C(O)=O)=C1NCC1=CC=CO1 ZZUFCTLCJUWOSV-UHFFFAOYSA-N 0.000 abstract 3
- 230000035939 shock Effects 0.000 abstract 3
- 239000000725 suspension Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000007943 implant Substances 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a construct pre -buried foundation pile tamping unit, the device is including support frame, workstation, roof pressure hydro -cylinder, hydraulic shock hammer, tamp board, pre -buried foundation pile, workstation lower surface center fixedly connected with roof pressure hydro -cylinder, roof pressure hydro -cylinder beam hanger end is provided with quick change coupler, the upper end of quick change coupler and hydraulic shock hammer is connected, the front end of hydraulic shock hammer is provided with the impact pole, the impact pole passes through connecting screw rod and is connected with the link, connecting screw rod's the other end is provided with and relaxs the nut, link fixed connection is at tamp board upper surface, tamp board roof pressure is in pre -buried foundation pile upper end. The utility model has the advantages that: convenient to use, the transportation of removable branch is convenient, simple structure, the range of application is wide, work efficiency is high, improves the construction progress.
Description
Technical field
The utility model relates to a kind of architectural furniture, especially relates to the pre-buried foundation pile tamping unit of a kind of building, belongs to the realm of building construction.
Background technology
Along with the high speed development of China's building trade, soft building geology needs to fill or compacting, implant pre-buried foundation pile again and strengthen its bearing capacity, current pre-buried foundation pile is all carry out work by large-scale tamping apparatus, but some job site main equipment cannot enter, cause constructional difficulties, affect construction speed.
Utility model content
The purpose of this utility model is the deficiency for existing product, and provides a kind of building that is detachable, convenient transportation pre-buried foundation pile tamping unit.
The pre-buried foundation pile tamping unit of building of the present utility model, described device comprises bracing frame, workbench, top compressing cylinder, hydraulic impact hammer, compacting plate, pre-buried foundation pile, support frame as described above and workbench hinged, described workbench soffit center is fixedly connected with top compressing cylinder, compressing cylinder lower end, described top is provided with hydraulic quick coupler, described hydraulic quick coupler is connected with the upper end of hydraulic impact hammer, described hydraulic impact hammer lower end is provided with impact bar, described impact bar is connected with link by connecting screw rod, one end of described connecting screw rod is provided with jam nut, described link is fixedly connected on compacting plate upper surface, described compacting plate top is pressed in pre-buried foundation pile upper end.
Beam is provided with between described compacting plate and impact bar.
Described beam is made up of abrasive rubber, is provided with compound steel silk layer in beam.
Support frame as described above is triangular support bracket.
It is matched in clearance between described connecting screw rod and impact bar.
The beneficial effects of the utility model are: (1) is easy to use, and detachable transportation is convenient, and structure is simple, applied range; (2) operating efficiency is high, improves construction speed.
Accompanying drawing explanation
Fig. 1 is structure installment schematic diagram of the present utility model.
Fig. 2 is partial enlarged drawing of the present utility model.
In figure: bracing frame 1, workbench 2, suspension ring 3, top compressing cylinder 4, hydraulic quick coupler 5, hydraulic impact hammer 6, impact bar 7, compacting plate 8, pre-buried foundation pile 9, beam 10, link 11, connecting screw rod 12, jam nut 13.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described further.
In the drawings, the pre-buried foundation pile tamping unit of building of the present utility model, comprises bracing frame 1, workbench 2, suspension ring 3, top compressing cylinder 4, hydraulic quick coupler 5, hydraulic impact hammer 6, impact bar 7, compacting plate 8, pre-buried foundation pile 9, beam 10, link 11, connecting screw rod 12, loosens nut 13.
Support frame as described above 1 and workbench 2 hinged, described workbench 2 soffit center is fixedly connected with top compressing cylinder 4, compressing cylinder 4 lower end, described top is provided with hydraulic quick coupler 5, described hydraulic quick coupler 5 is connected with the upper end of hydraulic impact hammer 6, described hydraulic impact hammer 6 lower end is provided with impact bar 7, described impact bar 7 is connected with link 11 by connecting screw rod 12, one end of described connecting screw rod 12 is provided with jam nut 13, described link 11 is fixedly connected on compacting plate 8 upper surface, and described compacting plate 8 top is pressed in pre-buried foundation pile 9 upper end.
Beam 10 is provided with between described compacting plate 8 and impact bar 7.Described beam 10 is made up of abrasive rubber, is provided with compound steel silk layer in beam 10.Support frame as described above 1 is triangular support bracket.Be matched in clearance between described connecting screw rod 12 and impact bar 7.
Use the pre-buried foundation pile tamping unit of building of the present utility model, without the need to manual operation in pre-buried compacting process, installation process coordinates without the need to Large-scale Hoisting equipment, can improve mechanical utilization rate, accelerating construction progress, eliminates construction safety hidden danger.
Claims (5)
1. the pre-buried foundation pile tamping unit of building, it is characterized in that, described device comprises bracing frame (1), workbench (2), top compressing cylinder (4), hydraulic impact hammer (6), compacting plate (8), pre-buried foundation pile (9), support frame as described above (1) and workbench (2) hinged, described workbench (2) soffit center is fixedly connected with top compressing cylinder (4), compressing cylinder (4) lower end, described top is provided with hydraulic quick coupler (5), described hydraulic quick coupler (5) is connected with the upper end of hydraulic impact hammer (6), described hydraulic impact hammer (6) lower end is provided with impact bar (7), described impact bar (7) is connected with link (11) by connecting screw rod (12), one end of described connecting screw rod (12) is provided with jam nut (13), described link (11) is fixedly connected on compacting plate (8) upper surface, described compacting plate (8) top is pressed in pre-buried foundation pile (9) upper end.
2. the pre-buried foundation pile tamping unit of building according to claim 1, is characterized in that, is provided with beam (10) between described compacting plate (8) and impact bar (7).
3. the pre-buried foundation pile tamping unit of building according to claim 2, is characterized in that, described beam (10) is made up of abrasive rubber, is provided with compound steel silk layer in beam (10).
4. the pre-buried foundation pile tamping unit of building according to claim 1, is characterized in that, support frame as described above (1) is triangular support bracket.
5. the pre-buried foundation pile tamping unit of building according to claim 1, is characterized in that, is matched in clearance between described connecting screw rod (12) and impact bar (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520237639.1U CN204780909U (en) | 2015-04-20 | 2015-04-20 | Construct pre -buried foundation pile tamping unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520237639.1U CN204780909U (en) | 2015-04-20 | 2015-04-20 | Construct pre -buried foundation pile tamping unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204780909U true CN204780909U (en) | 2015-11-18 |
Family
ID=54520992
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520237639.1U Expired - Fee Related CN204780909U (en) | 2015-04-20 | 2015-04-20 | Construct pre -buried foundation pile tamping unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204780909U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106049408A (en) * | 2016-07-29 | 2016-10-26 | 无锡乐华自动化科技有限公司 | Automatic ramming device |
CN106087948A (en) * | 2016-07-29 | 2016-11-09 | 无锡乐华自动化科技有限公司 | Roadbed roller-compactor |
CN106087949A (en) * | 2016-07-29 | 2016-11-09 | 无锡乐华自动化科技有限公司 | Construction roller-compactor |
CN109024538A (en) * | 2018-07-25 | 2018-12-18 | 中国华冶科工集团有限公司 | Rammer compacter |
-
2015
- 2015-04-20 CN CN201520237639.1U patent/CN204780909U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106049408A (en) * | 2016-07-29 | 2016-10-26 | 无锡乐华自动化科技有限公司 | Automatic ramming device |
CN106087948A (en) * | 2016-07-29 | 2016-11-09 | 无锡乐华自动化科技有限公司 | Roadbed roller-compactor |
CN106087949A (en) * | 2016-07-29 | 2016-11-09 | 无锡乐华自动化科技有限公司 | Construction roller-compactor |
CN109024538A (en) * | 2018-07-25 | 2018-12-18 | 中国华冶科工集团有限公司 | Rammer compacter |
CN109024538B (en) * | 2018-07-25 | 2020-07-14 | 中国华冶科工集团有限公司 | Tamping machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204780909U (en) | Construct pre -buried foundation pile tamping unit | |
CN202690071U (en) | Multifunctional tunnel working trolley | |
CN202430997U (en) | Reinforcing device for template of sump or elevator shaft | |
CN105332376B (en) | Hydraulic mechanical hand-lifting stake clamping device and pile-drawing machine | |
CN205348147U (en) | A tamping unit for building site | |
CN203031575U (en) | Hydroelectric power plant guide vane servomotor push-pull rod overhaul bearing tackle | |
CN203593556U (en) | High safety tower crane | |
CN103382813B (en) | Bottom anchor drilling machine support | |
CN203924656U (en) | A kind of high-altitude overlength cable-stayed type shaped steel job platform structure | |
CN206570810U (en) | A kind of roof pressing type pile compacting equipment | |
CN202117045U (en) | Vibration-free compaction hole expanding equipment | |
CN102327788A (en) | Hydraulic crushing device for heaving floor in roadway | |
CN204139570U (en) | Containing the pre-buried fastening devices of detachable overhanging type steel beam of horizontal fixation kit | |
CN204418157U (en) | A kind of portable rammer | |
CN203133066U (en) | Large-scale compactor hammering system | |
CN203755677U (en) | Lower suspension hoisting type hoisting device for reinforced concrete floor construction | |
CN204151787U (en) | Pile driving system for building | |
CN203475435U (en) | Automatic locking type lever pile pulling device | |
CN205065036U (en) | Horizontal pump line of floor supports instrument during ground pump concreting | |
CN213685833U (en) | Portable pneumatic grouting pump for coal mine | |
CN203922526U (en) | A kind of loader lifting appliance | |
CN206352294U (en) | A kind of flood-fighting piling machine | |
CN206605072U (en) | Portable top plate drilling device | |
CN205636519U (en) | Hydraulic pre -compression construction device for cantilever suspension basket | |
CN110374611A (en) | A kind of adjustable reaction frame for launching shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151118 |
|
CF01 | Termination of patent right due to non-payment of annual fee |