CN204252146U - For the evacuation system of power station absorption basin - Google Patents

For the evacuation system of power station absorption basin Download PDF

Info

Publication number
CN204252146U
CN204252146U CN201420638099.3U CN201420638099U CN204252146U CN 204252146 U CN204252146 U CN 204252146U CN 201420638099 U CN201420638099 U CN 201420638099U CN 204252146 U CN204252146 U CN 204252146U
Authority
CN
China
Prior art keywords
pumping
water pump
pontoon
drainage system
floating drum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420638099.3U
Other languages
Chinese (zh)
Inventor
李晓燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201420638099.3U priority Critical patent/CN204252146U/en
Application granted granted Critical
Publication of CN204252146U publication Critical patent/CN204252146U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

本实用新型涉及一种用于水电站消力池的抽排系统。本实用新型提供一种用于水电站消力池的扬程变幅小,且操作简单的抽排系统,包括浮船和水泵,水泵固定设置于浮船上,水泵设有控制柜、进水管、排水管。本实用新型通过将水泵设置于浮船上,随着抽排水的进行,水位降低,水泵位置随着浮船也下降,扬程变幅小,且操作简单。本实用新型经进一步改进后,安装拆卸更方便,便于实施。

The utility model relates to a pumping and drainage system for stilling pools of hydropower stations. The utility model provides a pumping and discharging system with small head variation and simple operation for the stilling pool of a hydropower station, which includes a floating boat and a water pump. The water pump is fixedly arranged on the floating boat. The utility model arranges the water pump on the pontoon, and as the pumping and drainage proceeds, the water level decreases, and the position of the water pump also decreases along with the pontoon, the lift amplitude is small, and the operation is simple. After the utility model is further improved, the installation and disassembly are more convenient and easy to implement.

Description

For the evacuation system of power station absorption basin
Technical field
The utility model relates to a kind of evacuation system for power station absorption basin, belongs to power station absorption basin repair apparatus technical field.
Background technology
One of energy-dissipating installation that absorption basin often adopts as hydraulic structure, its steady in a long-term and safe operation to guarantee dam normal power generation and flood season safe flood passage most important.In recent years, along with the consideration to force reduction pool bottom safety and stability, in hydroelectric station design, the requirement of absorption basin maintenance emptying is inevitable trend.Lack the absorption basin maintenance pump drainage design of system in existing hydroelectric station design, part power station just starts in the runtime the relevant consideration carrying out absorption basin maintenance emptying operating mode.By restrictions such as civil engineering, boom hoisting, electrical loads, evacuation system pump selection is by very large limitation.If directly arrange proof submersible sand discharging pump in pond, because the maintenance water-pumping/draining water yield is comparatively large, lifting range is comparatively large, need arranges according to lift and organize proof submersible sand discharging pump more, often organize at least two, when overhauling pump drainage, staff, according to lifting range more water-change pump, uses and manages and extremely bother.
Utility model content
Technical problem to be solved in the utility model is: effectively solve the problem that in existing absorption basin maintenance water-pumping/draining system, the pump drainage water yield is comparatively large, lifting range is larger, provide a kind of lifting range for power station absorption basin little, and evacuation system simple to operate.
The technical scheme adopted for solving the problems of the technologies described above the utility model is: for the evacuation system of power station absorption basin, comprises pontoon and water pump, and water pump is fixedly installed on pontoon, and water pump is provided with switch board, water inlet pipe, gutter.
Further: drainage pipe end is provided with stationary pipes, stationary pipes has fixed bearing, and stationary pipes is connected by universal joint with gutter.
Further: gutter is flexible pipe, is provided with floating drum bottom gutter.
Further: floating drum comprises symmetrically arranged left floating drum, right floating drum, and gutter has tube connector, and tube connector is detachably fixedly connected with floating drum, on the center line between left floating drum, right floating drum.
Further: floating drum top, pontoon top are equipped with checking bollard, checking bollard cooperation is provided with steel wire, electric capstan, is provided with pulley bottom described floating drum.
Further: floating drum quantity is one or more, spaced set between multiple floating drum.
Further: gutter is rocking arm intake pipe, and fixed bearing is also provided with anchor block.
Further: pontoon is provided with hanging apparatus, pulley is provided with bottom pontoon.
Further: water pump is also provided with vacuum pump.
The beneficial effects of the utility model are: by being arranged on pontoon by water pump, along with the carrying out of water-pumping/draining, and water level reduces, and water pump location also declines along with pontoon, and lifting range is little, and simple to operate.The utility model is after improving further, and installing/dismounting is more convenient, is convenient to implement.
Accompanying drawing explanation
Fig. 1 is front view of the present utility model;
Fig. 2 is top view of the present utility model;
Schematic diagram when Fig. 3 is the utility model enforcement.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As shown in Figure 1 and Figure 2, the utility model comprises pontoon 1 and water pump 2, and water pump 2 is fixedly installed on pontoon 1, and water pump 2 is provided with switch board 3, water inlet pipe 4, gutter 5.
As shown in Figure 3, when implementing the utility model, be located at by pontoon 1 on the absorption basin water surface of power station, gutter 5 is connected with leader drain.Because water pump 2 is arranged on pontoon 1, along with the carrying out of water-pumping/draining, water level reduces, and water pump 2 position also declines along with pontoon 1, and lifting range is little, and simple to operate.Marking A in Fig. 3 is absorption basin peak level, time bottom pontoon 1 close to force reduction pool bottom, limits, stop pumping by the minimum water suction water level of water pump 2, and mark B is minimum water suction water level, and now pond water is about 300mm ~ 500mm.Power station absorption basin evacuation system generally need be provided with multiple stage water pump 2,1 water pump 2 and be located on 1 pontoon 1, and adopt pedal to connect between pontoon 1, form overall floating dock structure, gutter 5 connects into leader drain.In order to install and use the safety in process, pontoon 1 can arrange railing.
As to an improvement of the present utility model, gutter 5 end is provided with stationary pipes 51, and stationary pipes 51 has fixed bearing 52, and stationary pipes 51 is connected by universal joint 53 with gutter 5.During enforcement, stationary pipes 51 is connected with leader drain, and absorption basin bank is located at by fixed bearing 5, can take into consideration with wave wall.After adopting this kind of structure, gutter 5 is connected more convenient with leader drain, and in water-pumping/draining process, gutter 5 moves more convenient, and overall structure is more stable.
Stationary pipes 51 is connected by universal joint 53 with gutter 5, has flexible pipe to connect and the two kinds of modes that are rigidly connected.
When gutter 5 is flexible pipe, bottom gutter, be provided with floating drum 54.Floating drum 54 comprises symmetrically arranged left floating drum 541, right floating drum 542, gutter 5 has tube connector 55, tube connector 55 is detachably fixedly connected with floating drum 54, and on center line between left floating drum 541, right floating drum 542, the connection between gutter 5 and floating drum 54 can be made to arrange balance.For convenience of installing, be connected by flange between tube connector 55 with gutter 5.Floating drum 54 top, pontoon 1 top are equipped with checking bollard 11, and checking bollard 11 cooperation is provided with steel wire 12, electric capstan 13, and be provided with pulley 14 bottom floating drum 54, installation when facilitating the utility model to implement, steel wire 12 facilitates crane span structure cable simultaneously.In addition, bottom floating drum 54, be provided with pulley 14, in water-pumping/draining process, floating drum 54 also can be facilitated to slide at absorption basin pool wall.Floating drum 54 quantity is one or more, is preferably spaced set between multiple floating drum 54.
When employing is rigidly connected, gutter 5 is rocking arm intake pipe, and fixed bearing 52 is also provided with anchor block, and anchor block design can be taken into consideration with wave wall.When being provided with multiple stage water pump 2, for simplifying structure, the mode of contact coil pipe can being adopted, be connected with rocking arm intake pipe after water pump 2 outlet pipe is merged into 1 pipeline.
Improve as to another item of the present utility model, pontoon 1 is provided with hanging apparatus 15, is provided with pulley 14 bottom pontoon 1, facilitates the installation of pontoon.
Improve as to another item of the present utility model, water pump 2 is also provided with vacuum pump, ensures that water pump can normally absorb water.
The utility model is implemented at Guandi Hydropower Station, is described in detail below for Guandi Hydropower Station.
Adopt 3 water pumps 2, model is open double suction centrifugal pump in KQSN300-M9/387 type, coordinate and be provided with 3 2BV2071 type vacuum pumps, 3 pontoons 1, water pump 2 and vacuum pump are fixed on pontoon 1, and pontoon 1 specification designs according to water pump 2 specification, are connected between 3 pontoons 1 by pedal, form overall floating dock structure, pontoon 1 is provided with railing, and pontoon 1 is provided with hanging apparatus 15, is provided with pulley 14 bottom pontoon 1.
3 2-in-1 meters of water pump are provided with 1 switch board, 3,3 water inlet pipes, 4,3 gutters 5.During enforcement, switch board 3 is located at absorption basin bank, and 3 gutters 5 are incorporated to leader drain at end.Gutter 5 end is provided with stationary pipes 51, and stationary pipes 51 has fixed bearing 52, and stationary pipes 51 is connected by universal joint 53 with gutter 5.Gutter 5 is flexible pipe, is provided with floating drum 54 bottom gutter.Floating drum 54 comprises symmetrically arranged left floating drum 541, right floating drum 542, and gutter 5 has tube connector 55, and tube connector 55 is detachably fixedly connected with floating drum 54, and on center line between left floating drum 541, right floating drum 542.Be connected by flange between tube connector 55 with gutter 5.Floating drum 54 top, pontoon 1 top are equipped with checking bollard 11, and checking bollard 11 cooperation is provided with steel wire 12, electric capstan 13, is provided with pulley 14 bottom floating drum 54.Floating drum 54 is 5, spaced set.
During enforcement, need 1, auxiliary equipment 75T crane, 1,25T crane, 2,150KN hoist engine.Installation process is as follows:
1, with 75T crane, 3 pontoons are hung in water successively.
2, by Bolt Connection, 3 pontoons are assembled in aggregates in water.
3, water pump channel-section steel basis is installed.
4, lay the pedal between pontoon, pontoon surrounding railing is installed.
5, with 75T crane, water pump group is hung on pontoon, be arranged on foundation for water pumps by Bolt Connection.
6, with 75T crane, vacuum pump is hung on pontoon, be arranged on vacuum pump basis by Bolt Connection.
7, by the vacuum line of vacuum line figure connection vacuum pump and pump house.
8, with 75T crane, import and export pipeline, valve, lifting etc. are hung on ship, pump water inlet, the reducer union of exit of pump size, electronic dish valve, expansion joint, Tiny Drag Slow Shut Check Valves, outlet pipe, hanging apparatus are installed successively.
9, with program, water pump group on another two cover pontoons and vacuum pump group and other equipment are installed successively.
10, with 75T crane, floating drum is hung lower water, float in water and rely on pool wall limit.
11, coordinate special hanger to be hung down by 3 metal hoses with 25T crane simultaneously, lower end flanges is connected with floating drum.
12, with 75T crane, 3 metal hoses are hung down successively, with floating drum other end flange connect.Wirerope on 2 hoist engines is fixed on floating drum checking bollard.
13, with 75T crane, the 2nd trustship floating drum is hung lower water, on upper 2nd floating drum of personnel.
14,2 hoist engines are coordinated by floating drum toward pull-up with 25T crane.
15, the 1st floating drum lower end metal hose other end flange is connected with the 2nd trustship floating drum.
16, with 2 wireropes, two floating drums are connected and fixed, do not stress when the length of wirerope guarantees metal hose tension.
17, the cable testing bridge between two trustship floating drums is connected and fixed.
18, several floating drums are below installed successively.
19, last, flexible pipe and water pump are coupled together.
20, after connection terminates, whole drainage system wirerope is fixed in the hawser stake of bank.
21, water pump control cabinet is installed.
22, feed cable is laid.
23, crane and hoist engine is withdrawn.
24, to inspect for acceptance qualified rear machine debugging.
After being used to complete, now pool inner water position sees the bottom, and pontoon position is from pool wall about two meters distances, and five cover trustship floating drums are unsettled is affiliated on pool wall, roller contact between floating drum and pool wall, and unloading process is as follows:
1, remove water pump control cabinet and be transported to warehouse.
2, crane and hoist engine position by position when installing.
3, take the feed cable connected with motor apart, and receive and cable turntable is transported to warehouse on the bank.
4, coordinate special hanger to hang and the 3 metal hose flanges connected on the bank with 25T crane, take flange bolt apart.The wirerope of 2 hoist engines and the 1st floating drum near bank are connected and fixed, coordinate crane slowly to be transferred by whole pipeline.
5,3 metal hoses, wirerope and cable testing bridges being connected with water pump are unclamped.
6, remove all devices that pontoon is installed, hang on bank successively with 75T crane.
7, remove the attachment bolt between pontoon, successively 3 pontoons are hung on bank with 75T crane.
8, discharge pipe line slowly glides under the cooperation of 25T crane and hoist engine, allows a bottom floating drum the end, removes metal hose, wirerope and cable testing bridge, and hang on bank successively with 75T crane.
9, remove the metal hose flange bolt of floating drum bank end, with 75T crane, floating drum is hung on bank.
10, hydraulic pipeline slowly glides, and removes remaining metal hose and floating drum successively, and last 3 metal hoses hang on bank by 25T crane.
11, receive hoist engine wirerope, remove hoist engine.
12, scene withdrawn by crane.

Claims (8)

1.用于水电站消力池的抽排系统,包括浮船(1)和水泵(2),所述水泵(2)固定设置于所述浮船(1)上,所述水泵设有控制柜(3)、进水管(4)、排水管(5),其特征在于:所述排水管(5)末端设有固定管(51),所述固定管(51)具有固定支座(52),所述固定管(51)和排水管(5)通过万向接头(53)相连接。 1. A pumping and drainage system for stilling basins of hydropower stations, comprising a pontoon (1) and a water pump (2), the water pump (2) is fixedly arranged on the pontoon (1), and the water pump is provided with a control cabinet (3 ), water inlet pipe (4), drain pipe (5), it is characterized in that: the end of described drain pipe (5) is provided with fixed pipe (51), and described fixed pipe (51) has fixed support (52), and the Said fixed pipe (51) is connected with drainpipe (5) by universal joint (53). 2.如权利要求1所述的用于水电站消力池的抽排系统,其特征在于:所述排水管(5)为软管,所述排水管(5)底部设有浮筒(54)。 2. The pumping and drainage system for stilling basins of hydropower stations according to claim 1, characterized in that: the drain pipe (5) is a hose, and a buoy (54) is provided at the bottom of the drain pipe (5). 3.如权利要求2所述的用于水电站消力池的抽排系统,其特征在于:所述浮筒(54)包括对称设置的左浮筒(541)、右浮筒(542),所述排水管(5)具有连接管(55),所述连接管(55)与浮筒(54)可拆卸固定连接,且位于左浮筒(541)、右浮筒(542)之间的中心线上。 3. The pumping and drainage system for stilling basins of hydropower stations as claimed in claim 2, characterized in that: the buoys (54) include symmetrically arranged left buoys (541) and right buoys (542), and the drainage pipes (5) There is a connecting pipe (55), which is detachably and fixedly connected to the buoy (54), and is located on the center line between the left buoy (541) and the right buoy (542). 4.如权利要求2所述的用于水电站消力池的抽排系统,其特征在于:所述浮筒(54)顶部、浮船(1)顶部均设有缆桩(11),所述缆桩(11)配合设有钢丝(12)、电动绞盘(13),所述浮筒(54)底部设有滑轮(14)。 4. The pumping and drainage system for stilling basins of hydropower stations as claimed in claim 2, characterized in that: the top of the buoy (54) and the top of the pontoon (1) are provided with bollards (11), and the bollards (11) Steel wire (12) and electric winch (13) are matched, and a pulley (14) is provided at the bottom of the buoy (54). 5.如权利要求2所述的用于水电站消力池的抽排系统,其特征在于:所述浮筒(54)数量为1个或多个,且多个浮筒(54)之间等间距设置。 5. The pumping and drainage system for stilling basins of hydropower stations as claimed in claim 2, characterized in that: the number of buoys (54) is one or more, and the plurality of buoys (54) are arranged at equal intervals . 6.如权利要求1所述的用于水电站消力池的抽排系统,其特征在于:所述排水管(5)为摇臂取水管,所述固定支座(52)还设有镇墩。 6. The pumping and drainage system for the stilling pool of a hydropower station as claimed in claim 1, characterized in that: the drain pipe (5) is a rocker arm water intake pipe, and the fixed support (52) is also provided with a pier . 7.如权利要求1~6中任一项所述的用于水电站消力池的抽排系统,其特征在于:所述浮船(1)设有吊装装置(15),所述浮船(1)底部设有滑轮(14)。 7. The pumping and drainage system for stilling basins of hydropower stations according to any one of claims 1 to 6, characterized in that: the floating boat (1) is provided with a hoisting device (15), and the floating boat (1) The bottom is provided with pulley (14). 8.如权利要求1~6中任一项所述的用于水电站消力池的抽排系统,其特征在于:所述水泵(2)还设有真空泵。 8. The pumping and drainage system for stilling basins of hydropower stations according to any one of claims 1 to 6, characterized in that: the water pump (2) is also provided with a vacuum pump.
CN201420638099.3U 2014-10-29 2014-10-29 For the evacuation system of power station absorption basin Expired - Lifetime CN204252146U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420638099.3U CN204252146U (en) 2014-10-29 2014-10-29 For the evacuation system of power station absorption basin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420638099.3U CN204252146U (en) 2014-10-29 2014-10-29 For the evacuation system of power station absorption basin

Publications (1)

Publication Number Publication Date
CN204252146U true CN204252146U (en) 2015-04-08

Family

ID=52956471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420638099.3U Expired - Lifetime CN204252146U (en) 2014-10-29 2014-10-29 For the evacuation system of power station absorption basin

Country Status (1)

Country Link
CN (1) CN204252146U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111391984A (en) * 2020-04-09 2020-07-10 安徽水利开发有限公司 Split type water diversion pipeline mechanism of pontoon pump station
CN113089771A (en) * 2021-05-10 2021-07-09 上海熊猫机械(集团)有限公司 Sinking type ship bottom water taking floating boat device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111391984A (en) * 2020-04-09 2020-07-10 安徽水利开发有限公司 Split type water diversion pipeline mechanism of pontoon pump station
CN113089771A (en) * 2021-05-10 2021-07-09 上海熊猫机械(集团)有限公司 Sinking type ship bottom water taking floating boat device

Similar Documents

Publication Publication Date Title
CN106218828B (en) Removable wellhead platform and application method for offshore marginal oilfield exploitation
CN204252146U (en) For the evacuation system of power station absorption basin
CN205421401U (en) A portable water intake device of slope way for extensive water intaking
CN206986911U (en) A kind of spacing automatic start-stop device of underground pipe gallery deep foundation pit precipitation pipe well water-pump
CN206956921U (en) A kind of prefabricated pumping plant of step anti-floating
CN216920611U (en) Large-water-head vertical wharf ship sewage lifting device
CN203096813U (en) Seawater taking facility for liquefied natural gas receiving station
CN206052843U (en) A kind of water taking device by buoyant raft
CN206752573U (en) A kind of water fetching device of large span
CN201030346Y (en) Hoist lifting type flexible floating raft
CN106759666B (en) Oblique-pulling suspension type fixing matching device for multifunctional submersible pump station
CN114261486A (en) Pressure-discharging-loading system and method suitable for floating wind power platform
CN103866815A (en) Seawater taking facility for liquefied natural gas receiving station
CN211340970U (en) Ecological water intaking device of pump truck in tilting
CN202693084U (en) Liquid level detection device capable of regulating length
CN108868787B (en) Shield starting construction method for river-crossing tunnel
CN220505375U (en) Installation-free water pumping device
CN207633423U (en) A kind of floating dock type Boosting pumping station
CN208056167U (en) The water intaking ship of adaptive height of water level
CN219840155U (en) Buried centrifugal pump station
CN207500057U (en) Put down device in a kind of seabed
CN109972694A (en) Floating return pump station
CN111005399A (en) Equipment and method for prefabricating offshore wind power barrel type foundation at wharf front edge
CN204080923U (en) A kind of rivers water pumping well cage assembly
CN205223996U (en) Pontoon formula flexible hose is from supplying water and drainage device in tailing storehouse

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20150408

CX01 Expiry of patent term