CN1644834A - Construction of steel bar reinforced hollow concrete floor cast-in-situs - Google Patents

Construction of steel bar reinforced hollow concrete floor cast-in-situs Download PDF

Info

Publication number
CN1644834A
CN1644834A CN 200510020286 CN200510020286A CN1644834A CN 1644834 A CN1644834 A CN 1644834A CN 200510020286 CN200510020286 CN 200510020286 CN 200510020286 A CN200510020286 A CN 200510020286A CN 1644834 A CN1644834 A CN 1644834A
Authority
CN
China
Prior art keywords
bar
floor
capsule
moulding core
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510020286
Other languages
Chinese (zh)
Other versions
CN1318711C (en
Inventor
刘国模
邸江枫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangsha Chongqing First Construction Group Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2005100202860A priority Critical patent/CN1318711C/en
Publication of CN1644834A publication Critical patent/CN1644834A/en
Application granted granted Critical
Publication of CN1318711C publication Critical patent/CN1318711C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

A construction method for in-situ casting hollow reinforced concrete floor slab features use of the inflatable and air releasing flexible core moulds, and includes such steps as binding reinforcing bars, arranging said flexible core moulds in the reinforcing cage at intervals, inflating them, pouring concrete but preserving a slot, releasing air from said moulds, taking them from the internal cavity via said slot, and pouring concrete in the slot.

Description

The making job practices of cast-in-situ reinforced concrete hollow floor
Technical field
The invention belongs to the realm of building construction, be specifically related to a kind of making job practices of cast-in-situ reinforced concrete hollow floor.
Technical background
In building trade, the reinforced concrete floor plate has two kinds of form of structure, and a kind of is the prestressed reinforced concrete cassette ceiling, and another kind is the cast-in-situ steel reinforced concrete solid floor.It is assembled by the some prestressed reinforced concrete cassette ceilings of making in advance adopting the flooring of prestressed reinforced concrete cassette ceiling, the heat insulating ability of this kind structure floor, thermal insulation, sound insulation and moisture resistance are better, and saving concrete material, but its globality, shock resistance and antiseep are poor, ftracture easily between plate and the plate.The cast-in-situ steel reinforced concrete solid floor that generally adopts is to lay floor bar is installed between Liang Yuliang now, carry out concreting again, make flooring form a whole reinforced concrete slab, because this kind floor is to build at the scene, can not adopt as the mode of prestressed reinforced concrete cassette ceiling and loose core, so this kind floor is solid plate body, its globality, shock resistance and antiseep are good, but owing to be solid plate body, its heat insulating ability, thermal insulation, sound insulation and moisture resistance are relatively poor, and expend Reinforced Concrete Materials, from great and uneconomical.
Summary of the invention
The making job practices that the purpose of this invention is to provide a kind of cast-in-situ reinforced concrete hollow floor is to make the cast-in-situ reinforced concrete hollow floor.
The making job practices of cast-in-situ reinforced concrete hollow floor of the present invention is: lay floor bar is installed, wherein parallel with the long limit of floor reinforcing bar is a distributing bar, the reinforcing bar parallel with the floor minor face is steel bar stress, with the moulding core along distributing bar direction equidistant placement in floor bar and parallel with steel bar stress; This moulding core is tubular capsule after by inflation, is sleeved on the outer cylinder-shaped coat of capsule by what cloth or plastic sheeting were made, and the strip steel disc composition that is axially fixed in the overcoat inner surface along overcoat, the capsule closed at both ends, a blind end setting therein has the valve of one way valve; Build carrying out floorslab concrete after the inflation of the capsule in the moulding core, and in floor bar and beam steel binding site reservation ater-casting, after the discharge of the gas in the moulding core capsule, the moulding core is extracted out through the ater-casting from steel concrete, after the concrete initial set expiration, finished building of ater-casting.
The making construction of cast-in-situ reinforced concrete hollow floor of the present invention can also be carried out by the following method: lay floor bar is installed, wherein parallel with the long limit of floor reinforcing bar is a distributing bar, the reinforcing bar parallel with the floor minor face is steel bar stress, with the moulding core along distributing bar direction equidistant placement in floor bar and parallel with steel bar stress; This moulding core is by pvc pipe and be tubular capsule after being positioned at wherein inflation and form, the capsule closed at both ends, and a blind end setting therein has the valve of one way valve; Build carrying out floorslab concrete after the inflation of the capsule in the moulding core, and in floor bar and beam steel binding site reservation ater-casting, after the discharge of the gas in the moulding core capsule, capsule is extracted out through the ater-casting in pvc pipe, finish building of ater-casting in the phase at concrete initial set.
The moulding core that the present invention adopts in a kind of method before above-mentioned is made up of capsule, overcoat and the strip steel disc that is fixed on the overcoat inner surface, when capsule is full of gas, the capsule of bulging will support overcoat makes the moulding core form the cylinder bodily form, and the strip steel disc that is fixed on the overcoat inner surface will make this one-tenth core mold be equipped with certain rigidity, pressure when enabling to bear concreting is realized building of floorslab concrete; And after the gas in the capsule is discharged, because capsule and overcoat are made by the flexibility material, and the strip steel disc also has certain pliability, can carry out largely curved around, so floor build finish after, this moulding core can be easily extracted out through the ater-casting in steel concrete, thereby realizes building and loosing core of in-situ reinforced concrete slab, and the moulding core can use repeatedly.
The moulding core that the present invention adopts in a kind of method in above-mentioned back is made up of pvc pipe and capsule, builds at steel concrete and finishes the back and only capsule extraction in the steel concrete also can be used repeatedly, and pvc pipe then forever is retained in the steel concrete.Because pvc pipe self has certain rigidity, and when capsule is full of gas, the capsule of bulging will play a supportive role to pvc pipe, pressure when enabling to bear concreting, realize building of floorslab concrete, and just because of the supporting role of capsule is arranged, make this pvc pipe can adopt thin wall type tubing, thereby reduce the cost of pvc pipe; After the gas in the capsule is discharged, because capsule is made by the flexibility material, can in steel concrete, extract out easily, thereby realize building and loosing core of in-situ reinforced concrete slab through the ater-casting.
The cast-in-situ reinforced concrete hollow floor that adopts the method for the invention to make possesses the advantage of prestressed reinforced concrete cassette ceiling and cast-in-situ steel reinforced concrete solid floor simultaneously, its globality, shock resistance, antiseep, heat insulating ability, thermal insulation, sound insulation and moisture resistance are all better, its hollow rate can reach 28.5%~39.6%, can save a large amount of Reinforced Concrete Materials, from heavy and light; The cast-in-situ reinforced concrete hollow floor that adopts above-mentioned preceding a kind of method to make is cost-saved more than 18%, and is though the cast-in-situ reinforced concrete hollow floor that adopts a kind of method in above-mentioned back to make has used Thin-Wall PVC tubing, also cost-saved more than 6%.
Description of drawings
Now in conjunction with the accompanying drawings the present invention is described in further detail.
Fig. 1 makes the schematic diagram of cast-in-situ reinforced concrete hollow floor for adopting the method for the invention;
Fig. 2 is the sectional view of A-A line among Fig. 1;
Fig. 3 is the cross-sectional view of the above-mentioned preceding employed moulding core of a kind of method (the moulding core is made up of capsule, overcoat and strip steel disc) after the capsule inflation;
Fig. 4 is the cross-sectional view of the above-mentioned back employed moulding core of a kind of method (the moulding core is made up of pvc pipe and capsule) after the capsule inflation.
The specific embodiment
Embodiment one:
As shown in Figure 1 and Figure 2, the making job practices of this cast-in-situ reinforced concrete hollow floor is:
1, lay lower floor's reinforcing bar that floor bar is installed, wherein parallel with the long limit of floor reinforcing bar is a distributing bar (non-stress reinforcing bar) 1, the reinforcing bar parallel with the floor minor face is steel bar stress 2, many locating rings 4 are equidistantly placed (locating ring quantity is decided according to steel bar stress length) along steel bar stress 2, form a location circular row, and along the such location circular row (the locating ring number of columns is decided according to distributing bar length) of distributing bar 1 equidistant placement multiple row, moulding core 3 is through respectively locatees in the circular row, re-lay the top reinforcement that floor bar is installed, and each locating ring 4 colligation is fixed on the distributing bar 1 of top reinforcement, be located at, between lower floor's reinforcing bar with last, lower floor's reinforcing bar is vertical.As shown in Figure 3, described moulding core 3 is tubular capsule 7 after by inflation, is sleeved on the outer cylinder-shaped coat 5 of capsule 7 by what cloth or plastic sheeting were made, and four strip steel discs, 6 compositions that are axially fixed in overcoat 5 inner surfaces along overcoat 5, article four, strip steel disc 6 is distributed on overcoat 5 inner surfaces, capsule 7 closed at both ends, a blind end setting therein has the valve of one way valve, can inflate to capsule 7 by this valve, and the gases in the capsule 7 can be given off.With the capsule in the moulding core 37 inflation, capsule 7 is propped up overcoat 5 makes moulding core 3 be cylinder, then this moulding core 3 along distributing bar 1 direction equidistant placement in floor bar and parallel with steel bar stress 2;
2, carry out floorslab concrete and build, and reserve ater-casting L, temporarily concreting not at floor bar and beam steel binding site;
3, the gas in the moulding core capsule 7 is discharged, and moulding core 3 is extracted out through ater-casting L from steel concrete;
4, after the concrete initial set expiration, finish building of ater-casting L.
Embodiment two:
As shown in Figure 1 and Figure 2, the making job practices of this cast-in-situ reinforced concrete hollow floor is:
1, lay lower floor's reinforcing bar that floor bar is installed, wherein parallel with the long limit of floor reinforcing bar is a distributing bar (non-stress reinforcing bar) 1, the reinforcing bar parallel with the floor minor face is steel bar stress 2, many locating rings 4 are equidistantly placed (locating ring quantity is decided according to steel bar stress length) along steel bar stress 2, form a location circular row, and along the such location circular row (the locating ring number of columns is decided according to distributing bar length) of distributing bar 1 equidistant placement multiple row, moulding core 3 is through respectively locatees in the circular row, re-lay the top reinforcement that floor bar is installed, and each locating ring 4 colligation is fixed on the distributing bar 1 of top reinforcement, be located at, between lower floor's reinforcing bar with last, lower floor's reinforcing bar is vertical.As shown in Figure 4, described moulding core 3 is by pvc pipe 8 and be tubular capsule 7 after being positioned at wherein inflation and form, capsule 7 closed at both ends, and a blind end setting therein has the valve of one way valve, can inflate to capsule 7 by this valve, and the gases in the capsule 7 can be given off.With the capsule in the moulding core 37 inflation, make capsule 7 supports be pressed in pvc pipe 8 inner surfaces, then this moulding core 3 along distributing bar 1 direction equidistant placement in floor bar and parallel with steel bar stress 2;
2, carry out floorslab concrete and build, and reserve ater-casting L, temporarily concreting not at floor bar and beam steel binding site;
3, the gas in the moulding core capsule 7 is discharged, and capsule 7 is extracted out through ater-casting L in pvc pipe 5;
4, finish building of ater-casting L in the phase at concrete initial set.

Claims (2)

1, the making job practices of cast-in-situ reinforced concrete hollow floor, it is characterized in that: lay floor bar is installed, wherein parallel with the long limit of floor reinforcing bar is distributing bar (1), the reinforcing bar parallel with the floor minor face is steel bar stress (2), with moulding core (3) along distributing bar direction equidistant placement in floor bar and parallel with steel bar stress; This moulding core is tubular capsule (7) after by inflation, is sleeved on the outer cylinder-shaped coat (5) of capsule by what cloth or plastic sheeting were made, and strip steel disc (6) composition that is axially fixed in the overcoat inner surface along overcoat, the capsule closed at both ends, a blind end setting therein has the valve of one way valve; Build carrying out floorslab concrete after the inflation of the capsule in the moulding core, and in floor bar and beam steel binding site reservation ater-casting (L), after the discharge of the gas in the moulding core capsule, the moulding core is extracted out through the ater-casting from steel concrete, after the concrete initial set expiration, finished building of ater-casting.
2, the making job practices of cast-in-situ reinforced concrete hollow floor, it is characterized in that: lay floor bar is installed, wherein parallel with the long limit of floor reinforcing bar is distributing bar (1), the reinforcing bar parallel with the floor minor face is steel bar stress (2), with moulding core (3) along distributing bar direction equidistant placement in floor bar and parallel with steel bar stress; This moulding core is by pvc pipe (8) and be tubular capsule (7) after being positioned at wherein inflation and form, the capsule closed at both ends, and a blind end setting therein has the valve of one way valve; Build carrying out floorslab concrete after the inflation of the capsule in the moulding core, and in floor bar and beam steel binding site reservation ater-casting (L), after the discharge of the gas in the moulding core capsule, capsule is extracted out through the ater-casting in pvc pipe, finish building of ater-casting in the phase at concrete initial set.
CNB2005100202860A 2005-01-28 2005-01-28 Construction of steel bar reinforced hollow concrete floor cast-in-situs Expired - Fee Related CN1318711C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100202860A CN1318711C (en) 2005-01-28 2005-01-28 Construction of steel bar reinforced hollow concrete floor cast-in-situs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100202860A CN1318711C (en) 2005-01-28 2005-01-28 Construction of steel bar reinforced hollow concrete floor cast-in-situs

Publications (2)

Publication Number Publication Date
CN1644834A true CN1644834A (en) 2005-07-27
CN1318711C CN1318711C (en) 2007-05-30

Family

ID=34875758

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100202860A Expired - Fee Related CN1318711C (en) 2005-01-28 2005-01-28 Construction of steel bar reinforced hollow concrete floor cast-in-situs

Country Status (1)

Country Link
CN (1) CN1318711C (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100363584C (en) * 2005-09-14 2008-01-23 傅礼铭 Soft form and construction method for cast-in-situ concrete cavity floor utilizing soft form
CN101793070A (en) * 2010-03-22 2010-08-04 徐焱 Hollow floor system filled with an air-filling bag and construction method thereof
CN102304952A (en) * 2011-07-07 2012-01-04 孙广亮 Inner partition board formed by cast-in-situ and manufacture method thereof
CN105256947A (en) * 2015-09-24 2016-01-20 广州建筑股份有限公司 Method for constructing recycled mixed concrete beams and slabs
CN105696790A (en) * 2016-03-01 2016-06-22 中国建筑第二工程局有限公司 Double-layer connecting beam opening formwork system and construction method thereof applied to double-layer connecting beam
CN105908887A (en) * 2016-06-24 2016-08-31 重庆道同建材有限公司 Airbag core mold component cast hollow floor construction method
CN105908886A (en) * 2016-06-24 2016-08-31 重庆道同建材有限公司 Airbag core mold component
CN107313541A (en) * 2017-08-23 2017-11-03 广东班高得绿色建工科技有限公司 A kind of making of prefabricated assembled sandwich hollow slab and construction method
CN107379226A (en) * 2017-08-23 2017-11-24 广东班高得绿色建工科技有限公司 A kind of preparation method of multifunctional fabricated precast hollow building block
CN107471427A (en) * 2017-08-23 2017-12-15 广东班高得绿色建工科技有限公司 A kind of construction method of prefabricated assembled cassette ceiling
CN107700846A (en) * 2017-11-14 2018-02-16 中建四局第六建筑工程有限公司 A kind of post-cast strip concrete arrester and its application method
CN110630019A (en) * 2019-09-16 2019-12-31 中铁广州工程局集团深圳工程有限公司 Core mold for pouring subway rail top air duct and construction method
CN110748060A (en) * 2019-11-25 2020-02-04 中国建筑第四工程局有限公司 Novel assembled hollow composite floor slab air bag core mold and using method thereof
CN111749395A (en) * 2020-06-22 2020-10-09 吉林建筑大学 Hollow partition plate and vertical connection method thereof
CN113944258A (en) * 2021-11-05 2022-01-18 北京天邦巨成科技有限公司 Manufacturing method of hollow shear wall and house building

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1022194C (en) * 1988-08-29 1993-09-22 和景义 Superposed hollow building roof and construction method thereof
CN1116486C (en) * 2000-07-18 2003-07-30 长沙巨星轻质建材有限公司 In-situ deposited porous reinforced concrete roof and its construction process
JP3673162B2 (en) * 2000-11-06 2005-07-20 株式会社栗本鐵工所 Embedded hollow form fixing structure for hollow concrete floor board
CN1152182C (en) * 2001-10-09 2004-06-02 邱则有 Hollow pipe member for in-situ deposited steel bar reinforced concrete combined structure
CN2536676Y (en) * 2001-12-10 2003-02-19 邱则有 Steel bar reinforced hollow blocks
CN2617841Y (en) * 2002-04-19 2004-05-26 王亮 Cast-in-situs environmental protective hollow wall body structure
CN1521376A (en) * 2003-01-30 2004-08-18 吴学文 Hollow slab beam and filling construction method therefor
CN1445422A (en) * 2003-03-11 2003-10-01 綦玉良 Gas-filled type tube mold for cast-in-situ concrete hollow floor

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100363584C (en) * 2005-09-14 2008-01-23 傅礼铭 Soft form and construction method for cast-in-situ concrete cavity floor utilizing soft form
CN101793070A (en) * 2010-03-22 2010-08-04 徐焱 Hollow floor system filled with an air-filling bag and construction method thereof
CN102304952A (en) * 2011-07-07 2012-01-04 孙广亮 Inner partition board formed by cast-in-situ and manufacture method thereof
CN105256947A (en) * 2015-09-24 2016-01-20 广州建筑股份有限公司 Method for constructing recycled mixed concrete beams and slabs
CN105696790A (en) * 2016-03-01 2016-06-22 中国建筑第二工程局有限公司 Double-layer connecting beam opening formwork system and construction method thereof applied to double-layer connecting beam
CN105908887A (en) * 2016-06-24 2016-08-31 重庆道同建材有限公司 Airbag core mold component cast hollow floor construction method
CN105908886A (en) * 2016-06-24 2016-08-31 重庆道同建材有限公司 Airbag core mold component
CN107379226A (en) * 2017-08-23 2017-11-24 广东班高得绿色建工科技有限公司 A kind of preparation method of multifunctional fabricated precast hollow building block
CN107313541A (en) * 2017-08-23 2017-11-03 广东班高得绿色建工科技有限公司 A kind of making of prefabricated assembled sandwich hollow slab and construction method
CN107471427A (en) * 2017-08-23 2017-12-15 广东班高得绿色建工科技有限公司 A kind of construction method of prefabricated assembled cassette ceiling
CN107471427B (en) * 2017-08-23 2020-06-23 广东班高得绿色建工科技有限公司 Construction method of prefabricated hollow floor slab
CN107313541B (en) * 2017-08-23 2020-06-23 广东班高得绿色建工科技有限公司 Manufacturing and construction method of prefabricated hollow floor slab module
CN107379226B (en) * 2017-08-23 2020-06-23 广东班高得绿色建工科技有限公司 Manufacturing method of multifunctional assembled prefabricated hollow building module
CN107700846A (en) * 2017-11-14 2018-02-16 中建四局第六建筑工程有限公司 A kind of post-cast strip concrete arrester and its application method
CN110630019A (en) * 2019-09-16 2019-12-31 中铁广州工程局集团深圳工程有限公司 Core mold for pouring subway rail top air duct and construction method
CN110630019B (en) * 2019-09-16 2021-06-04 中铁广州工程局集团深圳工程有限公司 Core mold for pouring subway rail top air duct and construction method
CN110748060A (en) * 2019-11-25 2020-02-04 中国建筑第四工程局有限公司 Novel assembled hollow composite floor slab air bag core mold and using method thereof
CN111749395A (en) * 2020-06-22 2020-10-09 吉林建筑大学 Hollow partition plate and vertical connection method thereof
CN113944258A (en) * 2021-11-05 2022-01-18 北京天邦巨成科技有限公司 Manufacturing method of hollow shear wall and house building

Also Published As

Publication number Publication date
CN1318711C (en) 2007-05-30

Similar Documents

Publication Publication Date Title
CN1644834A (en) Construction of steel bar reinforced hollow concrete floor cast-in-situs
KR101986990B1 (en) Outside heat-insulation wall method and outside heat-insulation wall thereby
CN113235807A (en) Energy-saving assembly type building wall and construction process thereof
CN206681202U (en) For filling the prefabricated steel wire net rack integrated board self-heat conserving structure of wall
CN202380618U (en) Device used for positioning thin-wall square boxes in hollow floor framework
EP1908891A2 (en) Composite precast slab for flooring
CN100594280C (en) Method and device for producing prefabricated building panels
CN205369689U (en) Keep warm and decorate assembled precast floor plank of integration
CN110409700B (en) Composite prefabricated inner wallboard for prefabricated building
RU2335604C2 (en) Process of sandwich wall formation
CN208803582U (en) A kind of fireproof heated board being pre-installed on concreting exterior sheathing
US20030218265A1 (en) Mold and process for casting and manufacturing of concrete structural columns
CN100427708C (en) Energy saving composite self heat insulation wall for building
CN112324009A (en) Precast concrete hollow heat-insulation wall structure and construction process
CN208803581U (en) A kind of fireproof heated board of liner on concreting exterior sheathing
CN206418841U (en) A kind of high-air-tightness one-shot forming horizontal warehouse arched roof plate
CN205369679U (en) Prefabricated hollow slab
EP3719229B1 (en) Concrete floor panel, method of production of such panel and floor made of this panel
WO2006050665A1 (en) A filling mould and the sandwich and hollow structure thereof
KR101616483B1 (en) Construction Method Of Underground Parking Lot Using Precast Concrete Beam With Changing Cross Section
CN208455933U (en) A kind of insulated compound trabs of prefabricated band ceramic tile layer
CN208455859U (en) A kind of prefabricated thermal insulation combined wall board
CN2900677Y (en) Building energy saving composite self heat insulation wall
CN201133020Y (en) PCM reinforced concrete cast-in-situ hollow floor
CN2455809Y (en) Thermal insulating metal blocks for complete use

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUANGSHA CHONGQING FIRST BUILDING (GROUP) CO., LT

Free format text: FORMER OWNER: LIU GUOMO

Effective date: 20080704

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20080704

Address after: Chongqing Jiulongpo Tanzikou Guangsha City Office Building No.

Patentee after: Guangsha Chongqing First Construction (Group) Co.,Ltd.

Address before: Chongqing, Fuling District, the magic Road, Seven Star Garden Complex Building 9-3

Patentee before: Liu Guomo

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070530

Termination date: 20220128

CF01 Termination of patent right due to non-payment of annual fee