CN113931449B - Anti-seismic construction method for assembled node connection part - Google Patents
Anti-seismic construction method for assembled node connection part Download PDFInfo
- Publication number
- CN113931449B CN113931449B CN202010605416.1A CN202010605416A CN113931449B CN 113931449 B CN113931449 B CN 113931449B CN 202010605416 A CN202010605416 A CN 202010605416A CN 113931449 B CN113931449 B CN 113931449B
- Authority
- CN
- China
- Prior art keywords
- seismic
- steel
- angle channel
- construction method
- ceiling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/92—Protection against other undesired influences or dangers
- E04B1/98—Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H9/00—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
- E04H9/02—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
- E04H9/021—Bearing, supporting or connecting constructions specially adapted for such buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention discloses an anti-seismic construction method for a fabricated joint connection part, which comprises the following steps that anti-seismic right-angle channel steel penetrates through stirrups of a bearing column, and the anti-seismic right-angle channel steel is leaned against the inner side of the bearing column; at least one easily-detachable window is reserved in the middle of the joint of the wallboard close to the bearing column, and a clamping steel groove for connecting the anti-seismic right-angle channel steel is formed in the inner side of the wallboard; at least one ceiling on the other side is provided with special-shaped buckling reinforcing steel bars connected with the wall plate reinforcing steel bars, and the special-shaped buckling reinforcing steel bars are connected with the structural reinforcing steel bars of the ceiling; the bearing columns, the wall plates and the ceiling are connected to form a stable triangular structure, so that triangular support of an escape space is formed, and emergency escape is realized after collapse. The anti-seismic construction method for the assembled joint connection part is scientific and reasonable in design, and the precise steel bar pre-tightening pieces are matched to achieve firmness; the space is not stacked, and a triangular supporting structure for escaping is formed in each space, so that the living space is improved; the window which is quick in rescue and easy to detach for survival is provided, and the rescue speed is improved.
Description
Technical Field
The invention relates to the technical field of buildings, in particular to an anti-seismic construction method for a joint of an assembly type node.
Background
Earthquake (also called earthquake and earth vibration) is a natural phenomenon that the earth crust vibrates during the process of quickly releasing energy and earthquake waves are generated during the process. Statistically, about more than 500 ten thousand earthquakes occur on earth every year, i.e., more than ten thousand earthquakes occur each day. Most of them are too small or too far away to be felt by people; the earthquake which can really cause serious harm to human beings is about more than ten and twenty times; there are about two earthquakes that can cause particularly serious disasters.
In order to resist the sudden attack of an earthquake, attention is often paid to the repair and maintenance of old houses. If the wall body has cracks or is in a wrong flashing state, the wall body needs to be repaired in time; periodically plastering the easily weathered and shortbread soil wall; the roof leakage can be repaired quickly; and accumulated water around the house is immediately discharged after heavy rain so as to avoid soaking the wall base for a long time. Wooden beams, columns and the like are required to prevent decay and worm damage, and if damaged, the wooden beams, the columns and the like are overhauled in time.
In the prefabricated building which is currently emerging, the requirements for earthquake resistance are the highest. Due to the adoption of the splicing mode, the joint is easy to break in earthquake, so that the earthquake-resistant design of the connecting joint of the fabricated building is very necessary.
Disclosure of Invention
Aiming at the defects of the traditional elevator shaft, the invention provides an anti-seismic construction method for an assembled node joint, which is used for overcoming the defects of the prior art.
In order to overcome the defects in the prior art, the invention adopts the following technical scheme:
an earthquake-proof construction method for a fabricated joint connection comprises the following steps,
the method comprises the following steps: the anti-seismic right-angle channel steel is added when the bearing column is prefabricated, the anti-seismic right-angle channel steel penetrates through a stirrup of the bearing column, the length of the outward extension of the anti-seismic right-angle channel steel is gradually increased from bottom to top, and the anti-seismic right-angle channel steel is leaned against the inner side of the bearing column;
step two: when the wallboard is prefabricated, at least one easily-detachable window is reserved in the middle of the joint of the bearing columns, and the inner side of the wallboard is provided with a clamping steel groove for connecting the anti-seismic right-angle channel steel;
the clamping steel groove is provided with a prestress adjusting bolt and a vibration emergency spring, the prestress adjusting bolt is locked with the anti-seismic right-angle channel steel, and the vibration emergency spring is abutted against the anti-seismic right-angle channel steel;
step three: at least one ceiling on the other side is provided with special-shaped buckling reinforcing steel bars connected with the wall plate reinforcing steel bars, and the special-shaped buckling reinforcing steel bars are connected with the structural reinforcing steel bars of the ceiling;
step four; the bearing columns, the wall plates and the ceiling are connected to form a stable triangular structure, so that a triangular support of an escape space is formed when a severe earthquake exceeding a building standard occurs, and emergency escape is realized after collapse.
Furthermore, antidetonation right angle channel-section steel and joint steel bay are the node additional strengthening that wallboard and heel post are connected.
Furthermore, prestressing force adjusting bolt and antidetonation right angle channel-section steel threaded connection or joint, and prestressing force adjusting bolt is connected with the owner reinforcing bar of wallboard.
Furthermore, prestressing force adjusting bolt and antidetonation right angle channel-section steel threaded connection or joint, the back is connected two and reserves the activity stroke, and the emergent spring housing of vibrations reduces the influence that vibrations caused between prestressing force adjusting bolt and joint steel bay.
Further, the emergent spring of vibrations is the buffer of heel post and wallboard, and the emergent spring of vibrations buffering grade is little on the one hand, and on the other hand and the cooperation of prestressing force adjusting bolt lose the prestressing force adjusting bolt of the biggest dynamics of bearing and bounce-back by the emergent spring of vibrations and let heel post and wallboard form fixed angle.
Furthermore, the special-shaped buckling reinforcing steel bars are Z-shaped and embedded below the ceiling, and the Z-shaped bending positions of the special-shaped buckling reinforcing steel bars are different from the positions of the wall boards.
Furthermore, when the special-shaped buckling reinforcing steel bars vibrate, the bearing part of the wallboard is supported on a ceiling.
The earthquake-resistant construction method for the assembled joint connection part is scientific and reasonable in design, simple and convenient in construction method, and has at least the following specific advantages:
1. the precise steel bar prefastening piece is matched in the anti-seismic construction method of the assembled joint connection part, so that firmness and shock resistance are realized.
2. The earthquake-resistant construction method for the assembly type joint connection part can prevent the traditional assembly type building from collapsing into prefabricated block-shaped stacking when an extra-strong earthquake occurs, and each space forms a triangular support structure with escape, so that the living space is improved.
3. The fabricated node joint anti-seismic construction method has a window which is used for quick rescue and easy to detach, and rescue speed is improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without inventive exercise:
FIG. 1 is a schematic structural view of an earthquake-resistant construction method for a fabricated joint connection according to the present invention;
FIG. 2 is a schematic view of a connection between a bearing column and a wallboard in an earthquake-resistant construction method at a fabricated joint connection;
in the drawings: 1-a bearing column; 2-wallboard; 3-a ceiling; 11-anti-seismic right-angle channel steel; 21-clamping a steel slot; 22-a readily removable window; 211-prestress adjusting bolt; 212-shock emergency spring.
Detailed Description
The present invention will be described in detail with reference to the drawings and specific embodiments, which are illustrative of the present invention and are not to be construed as limiting the present invention.
As shown in fig. 1 and 2, a method for constructing an anti-seismic structure at an assembled joint connection includes the steps of,
the method comprises the following steps: when the load-bearing column 1 is prefabricated, the anti-seismic right-angle channel steel 11 is added, the anti-seismic right-angle channel steel 11 penetrates through a stirrup of the load-bearing column 1, the outward extension length of the anti-seismic right-angle channel steel 11 is gradually increased from bottom to top, and the anti-seismic right-angle channel steel 11 is arranged on the inner side of the load-bearing column 1; precisely, the strength is increased by using the hooping that the anti-seismic right-angle channel steel 11 penetrates through the bearing column 1, and the situation that the upper and lower parts of the collapse bearing column 1 and the wallboard 2 are unevenly stressed and gradually become a triangular structure when the assembled type meets strong earthquake is achieved due to different lengths.
Step two: when the wallboard 2 is prefabricated, at least one easily-detachable window 22 is reserved in the middle of the joint of the bearing column 1, a clamping steel groove 21 for connecting the anti-seismic right-angle channel steel 11 is formed in the inner side of the wallboard 2, and the clamping steel groove 21 is fixedly connected with the wallboard 2; the clamping steel slot 21 is provided with a prestress adjusting bolt 211 and a vibration emergency spring 212, the prestress adjusting bolt is locked with the anti-vibration right-angle channel steel 11, and the vibration emergency spring 212 pushes against the anti-vibration right-angle channel steel 11; in detail, the easily detachable window 22 is filled with light concrete and plastic, the strength of the easily detachable window is about the concrete grade C15, and the easily detachable window is easy to break and leave an escape passage under strong earthquake.
Step three: at least one ceiling 3 on the other side is provided with special-shaped buckling reinforcing steel bars connected with the reinforcing steel bars of the wall plate 2, and the special-shaped buckling reinforcing steel bars are connected with the structural reinforcing steel bars of the ceiling 3; the special-shaped buckling reinforcing steel bars are Z-shaped and are embedded below the ceiling 3, and the Z-shaped bending positions of the special-shaped buckling reinforcing steel bars are different from the positions of the wall boards 2. When the special-shaped buckling reinforcing steel bars vibrate, the bearing part of the wallboard 2 is supported on the ceiling 3.
Step four; the bearing column 1, the wall plate 2 and the ceiling 3 are connected to form a stable triangular structure, so that a triangular support of an escape space is formed when a severe earthquake exceeding the building standard occurs, and the emergency escape function is realized after collapse.
The structural principle is further described as follows: in the bearing column 1, the wall plate 2 and the ceiling 3, the bearing column 1 is used as a main supporting center, the wall plate 2 and the ceiling 3 are connected with reinforcing steel bars or embedded parts through unequal designs to form a triangular escape space (as shown in figure 2), the lengthened reinforcing steel bars and the embedded parts can play a role in buffering in ordinary small vibration, and the triangular bodies which are radiated out of two surfaces of the wall plate 2 and the ceiling 3 by using the bearing column 1 as the center provide convenience for escape in strong vibration.
Specifically, antidetonation right angle channel-section steel 11 and joint steel bay 21 are the node additional strengthening that wallboard 2 and heel post 1 are connected.
In the embodiment, the prestress adjusting bolt 211 is screwed or clamped with the anti-seismic right-angle channel 11, and precisely, the prestress adjusting bolt 211 is connected with the main steel bar of the wall panel 2. Prestressing force adjusting bolt 211 and antidetonation right angle channel-section steel 11 threaded connection or joint, the activity stroke is reserved to two pairs after connecting, and the emergent spring 212 cover of vibrations reduces the influence that vibrations caused between prestressing force adjusting bolt 211 and joint steel bay 21.
In some embodiments, the vibration emergency spring 212 is a buffer for the load-bearing column 1 and the wall plate 2, the vibration emergency spring 212 buffers the vibration of a small level on one hand and cooperates with the pre-stress adjusting bolt 211 on the other hand, and the pre-stress adjusting bolt 211 losing the maximum bearing force is rebounded by the vibration emergency spring 212 to form a fixed angle between the load-bearing column 1 and the wall plate 2.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.
Claims (5)
1. The anti-seismic construction method for the assembled node connection part is characterized by comprising the following steps of: comprises the following steps of (a) preparing a solution,
the method comprises the following steps: the anti-seismic right-angle channel steel is added when the bearing column is prefabricated, the anti-seismic right-angle channel steel penetrates through a stirrup of the bearing column, the length of the outward extension of the anti-seismic right-angle channel steel is gradually increased from bottom to top, and the anti-seismic right-angle channel steel is leaned against the inner side of the bearing column;
step two: when the wallboard is prefabricated, at least one easily-detachable window is reserved in the middle of the joint of the bearing columns, and the inner side of the wallboard is provided with a clamping steel groove for connecting the anti-seismic right-angle channel steel;
the clamping steel groove is provided with a prestress adjusting bolt and a vibration emergency spring, the prestress adjusting bolt is locked with the anti-seismic right-angle channel steel, and the vibration emergency spring is abutted against the anti-seismic right-angle channel steel;
step three: the ceiling is provided with special-shaped buckling reinforcing steel bars connected with the wall plate reinforcing steel bars, and the special-shaped buckling reinforcing steel bars are connected with structural reinforcing steel bars of the ceiling;
step four; the bearing columns, the wall plates and the ceiling are connected to form a stable triangular structure, so that a triangular support of an escape space is formed when a violent earthquake exceeding a building standard occurs, and the building has an emergency escape function after collapse.
2. The fabricated node connection seismic construction method according to claim 1, characterized in that: the anti-seismic right-angle channel steel and the clamping steel groove are node reinforcing structures connected with the wall plate and the bearing column.
3. The fabricated joint connection seismic construction method according to claim 1, characterized in that: the prestress adjusting bolt is in threaded connection with the clamping steel groove, and the prestress adjusting bolt is connected with a main steel bar of the wallboard.
4. The fabricated joint connection seismic construction method according to claim 1, characterized in that: prestressing force adjusting bolt and joint steel slot threaded connection, the back prestressing force adjusting bolt of connecting reserves the activity stroke with joint steel slot screw thread, shakes the emergent spring housing and reduces the influence that vibrations caused between prestressing force adjusting bolt and joint steel slot.
5. The fabricated node connection seismic construction method according to claim 4, characterized in that: when the special-shaped buckling reinforcing steel bars vibrate, the bearing part of the wallboard is supported on the ceiling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010605416.1A CN113931449B (en) | 2020-06-29 | 2020-06-29 | Anti-seismic construction method for assembled node connection part |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010605416.1A CN113931449B (en) | 2020-06-29 | 2020-06-29 | Anti-seismic construction method for assembled node connection part |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113931449A CN113931449A (en) | 2022-01-14 |
CN113931449B true CN113931449B (en) | 2023-03-31 |
Family
ID=79272946
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010605416.1A Active CN113931449B (en) | 2020-06-29 | 2020-06-29 | Anti-seismic construction method for assembled node connection part |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113931449B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108560761B (en) * | 2018-06-27 | 2024-06-21 | 河北慧水新材料科技发展有限公司 | Plug-in type heat preservation and insulation wall |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8887648B2 (en) * | 2010-06-21 | 2014-11-18 | A.D. Meraz Industries Ltd. | Impact resistant structure |
CN108149799B (en) * | 2017-12-07 | 2020-06-02 | 同济大学 | Assembled mortise and tenon joint structure with inclined struts |
CN208808009U (en) * | 2018-04-10 | 2019-05-03 | 湖北理工学院 | A kind of two plane type heavy-duty Cantilever Racking |
CN109779064B (en) * | 2019-03-08 | 2024-02-02 | 辽宁工程技术大学 | Energy consumption connection structure of connection frame and swinging wall |
CN210395633U (en) * | 2019-08-13 | 2020-04-24 | 王义正 | Anti-seismic combined beam for house building |
-
2020
- 2020-06-29 CN CN202010605416.1A patent/CN113931449B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN113931449A (en) | 2022-01-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Quintana Gallo et al. | State of the art and practice of seismic-resistant hybrid timber structures | |
CN101024987B (en) | Storied-building energy-eliminating shock-damping structure | |
CN111997412B (en) | Structure is built to antidetonation room | |
CN211596811U (en) | Earthquake-resistant building foundation | |
Porcu | Ductile behavior of timber structures under strong dynamic loads | |
CN113931449B (en) | Anti-seismic construction method for assembled node connection part | |
CN1125218C (en) | Assembled arthitecutral structure | |
CN102912878A (en) | Modularized building isolation system | |
WO2021087630A1 (en) | Hybrid shear-wall system for the construction of solid-wood buildings in seismic zones | |
CN112459584B (en) | Wallboard concatenation and ground absorbing assembled frame construction | |
CN213683321U (en) | Assembled antidetonation reinforced structure of building brick concrete structure wall body | |
CN214090322U (en) | Anti-seismic concrete reinforcement frame structure | |
CN210263361U (en) | Frame structure for reducing torsional deformation | |
CN210217207U (en) | Brick brickwork infilled wall plane external reinforcement device among traditional timber structure | |
Dodiya et al. | Analysis of multistorey building with shear wall using etabs software | |
JP2010229801A (en) | Construction method | |
Xiong et al. | Research on seismic behavior of wood-concrete hybrid structure | |
CN111364636A (en) | House earthquake-resistant structure | |
CN210767326U (en) | A earthquake-resistant structure for architectural design | |
CN215631876U (en) | Reinforced structure is used to house antidetonation | |
CN113818559B (en) | Giant frame structure and three-dimensional shock absorption substructure | |
CN110206368B (en) | Cross-span force-control buckling-restrained center supporting structure | |
CN214461390U (en) | A earthquake-resistant structure for architectural design | |
CN211973821U (en) | Anti-seismic structure of frame beam | |
CN214220083U (en) | Prefabricated shear wall of assembled |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |