CN113529754B - Granular-body slope ecological slope protection structure and construction method - Google Patents

Granular-body slope ecological slope protection structure and construction method Download PDF

Info

Publication number
CN113529754B
CN113529754B CN202110795970.5A CN202110795970A CN113529754B CN 113529754 B CN113529754 B CN 113529754B CN 202110795970 A CN202110795970 A CN 202110795970A CN 113529754 B CN113529754 B CN 113529754B
Authority
CN
China
Prior art keywords
slope
layer
grass
granular body
piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110795970.5A
Other languages
Chinese (zh)
Other versions
CN113529754A (en
Inventor
叶建军
王鑫
李虎
肖本林
王冠海
田莉
刘迪
张辉
朱兆华
肖衡林
刘瑛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei University of Technology
First Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
Hubei University of Technology
First Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei University of Technology, First Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical Hubei University of Technology
Priority to CN202110795970.5A priority Critical patent/CN113529754B/en
Publication of CN113529754A publication Critical patent/CN113529754A/en
Application granted granted Critical
Publication of CN113529754B publication Critical patent/CN113529754B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G20/00Cultivation of turf, lawn or the like; Apparatus or methods therefor
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/10Growth substrates; Culture media; Apparatus or methods therefor based on or containing inorganic material
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/10Growth substrates; Culture media; Apparatus or methods therefor based on or containing inorganic material
    • A01G24/12Growth substrates; Culture media; Apparatus or methods therefor based on or containing inorganic material containing soil minerals
    • A01G24/15Calcined rock, e.g. perlite, vermiculite or clay aggregates
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/20Growth substrates; Culture media; Apparatus or methods therefor based on or containing natural organic material
    • A01G24/22Growth substrates; Culture media; Apparatus or methods therefor based on or containing natural organic material containing plant material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/202Securing of slopes or inclines with flexible securing means
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental Sciences (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Inorganic Chemistry (AREA)
  • Chemical & Material Sciences (AREA)
  • Soil Sciences (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Cultivation Of Plants (AREA)

Abstract

The invention discloses an ecological slope protection structure of a granular body side slope and a construction method, wherein the ecological slope protection structure comprises a planting soil layer arranged on a granular body slope surface, an isolation layer is arranged between the planting soil layer and the granular body slope surface, a plurality of water diversion piles are inserted into the granular body slope surface, the isolation layer and the planting soil layer, and a water diversion sheet used for communicating the water diversion piles is arranged on the surface of the planting soil layer; the invention can build a good growing environment for the granular body side slope, and can restore the vegetation ecosystem of the slope surface while protecting the slope and controlling the soil erosion.

Description

散粒体边坡生态护坡结构与施工方法Ecological Slope Protection Structure and Construction Method of Particulate Slope

技术领域technical field

本发明涉及生态护坡和生态修复技术领域,具体地指一种散粒体边坡生态护坡结构与施工方法。The invention relates to the technical field of ecological slope protection and ecological restoration, in particular to an ecological slope protection structure and construction method of a granular side slope.

背景技术Background technique

散粒体作为一种特殊的岩土材料,广泛存在于矿山尾砂库和煤矸石堆场、采石场、各种掘进工程弃渣场。其基本特征是结构松散,颗粒较大,颗粒之间几乎没有细粒物质和其他胶结物连接,完全是一盘“散沙"。散粒体往往体积巨大,形成很大面积的边坡,并以自然安息角为坡角堆积。由于胶结性差,整体性差,遇地震或人畜踩踏易局部变形、失稳,而且由于缺乏细颗粒土壤颗粒,自然沉降的灰尘又很容易被雨水淋洗丧失,散粒体形成的边坡表面往往不能自然恢复植被。As a special kind of geotechnical material, granular body widely exists in mine tailings reservoir, coal gangue dump, quarry, and various excavation engineering waste slag yards. Its basic characteristics are that the structure is loose, the particles are large, and there is almost no connection between fine-grained substances and other cements between the particles, and it is completely a plate of "loose sand". Particulates are often huge in size, forming a large area of slope, and accumulating at the natural repose angle as the slope angle. Due to poor cementation and poor integrity, local deformation and instability are easy to occur in case of earthquakes or trampled by humans and animals. Moreover, due to the lack of fine-grained soil particles, the naturally settled dust is easily lost by rainwater leaching, and the surface of the slope formed by granular bodies is often unable to Natural restoration of vegetation.

发明内容SUMMARY OF THE INVENTION

本发明的目的在于克服上述不足,提供一种散粒体边坡生态护坡结构与施工方法,可为散粒体边坡营造良好的生长环境,在护坡和控制土壤侵蚀的同时,恢复坡面植被生态系统。The purpose of the present invention is to overcome the above-mentioned deficiencies, and to provide a granular body slope ecological slope protection structure and construction method, which can create a good growth environment for the granular body slope, and restore slope vegetation while protecting the slope and controlling soil erosion. ecosystem.

本发明为解决上述技术问题,所采用的技术方案是:一种散粒体边坡生态护坡结构,包括设于散粒体坡面上的种植土层,所述种植土层与散粒体坡面之间设有隔离层,所述散粒体坡面、隔离层和种植土层内插装有多个引水桩,种植土层表面设有用于连通各引水桩的引流片。In order to solve the above-mentioned technical problems, the technical scheme adopted in the present invention is: an ecological slope protection structure for a granular body slope, comprising a planting soil layer arranged on the granular body slope surface, the planting soil layer and the granular body slope An isolation layer is arranged between the surfaces, a plurality of water diversion piles are inserted in the granular body slope, the isolation layer and the planting soil layer, and a diversion piece for connecting the water diversion piles is arranged on the surface of the planting soil layer.

进一步地,所述种植土层包括不含种子的基层和含有种子的面层。Further, the planting soil layer includes a seed-free base layer and a seed-containing surface layer.

优选地,所述基层内各组分按照体积份数计分别为:壤土90-95份,草纤维5-10份,保水剂0.08-0.1份,复合肥0.6-0.8份;所述面层内各组分按照体积份数计分别为:壤土91-94份,草纤维6-9份,保水剂0.08-0.1份,复合肥0.4-0.6份,植物种子为290-310 g/m3;所述草纤维为稻草或麦草加工而成,长度为0.5-2cm。Preferably, the components in the base layer are respectively 90-95 parts by volume of loam, 5-10 parts of grass fiber, 0.08-0.1 part of water retention agent, and 0.6-0.8 part of compound fertilizer; Each component is calculated according to volume: 91-94 parts of loam, 6-9 parts of grass fiber, 0.08-0.1 part of water retention agent, 0.4-0.6 part of compound fertilizer, and 290-310 g/m 3 of plant seeds; The grass fiber is processed from straw or wheat straw, and the length is 0.5-2cm.

优选地,所述基层内各组分按照体积百分比计分别为:保水剂0.08-0.12%,复合肥0.7-0.9%,其他为壤土;所述面层内各组分按照体积百分比计分别为:保水剂0.08-0.1%,复合肥0.5-0.7%,其他为壤土,其中植物种子为280-300 g/m3Preferably, the components in the base layer are respectively: 0.08-0.12% of the water-retaining agent, 0.7-0.9% of the compound fertilizer, and the others are loam soil; the components in the surface layer are: Water retention agent 0.08-0.1%, compound fertilizer 0.5-0.7%, others are loam soil, and plant seeds are 280-300 g/m 3 .

优选地,所述隔离层内各组分按照体积份数计分别为:草纤维8-10份,黏土60-80份,水泥10-15份,所述草纤维长度为2-4cm。Preferably, the components in the isolation layer are respectively 8-10 parts by volume of grass fiber, 60-80 parts of clay, 10-15 parts of cement, and the length of the grass fiber is 2-4 cm.

优选地,所述隔离层内各组分按照体积份数计分别为:草纤维10-20份,黏土80-90份,所述草纤维长度为2-4cm。Preferably, the components in the isolation layer are respectively 10-20 parts by volume of grass fiber, 80-90 parts of clay, and the length of the grass fiber is 2-4 cm.

进一步地,所述引水桩为竹桩材质的圆筒形结构,所述引流片为弧形竹片结构,引流片插装于引水桩侧部的通孔内,多个引水桩和引流片组合形成网状结构。Further, the water diversion pile is a cylindrical structure made of bamboo pile material, the diversion piece is an arc-shaped bamboo piece structure, the diversion piece is inserted in the through hole of the side part of the water diversion pile, and a plurality of water diversion piles and the diversion piece are combined. form a network structure.

进一步地,所述种植土层内还埋设有栅格状篱笆或草笼或土工格室或三维网,以固定土壤防止泥土下滑和滑坡。Further, grid-like fences or grass cages or geocells or three-dimensional nets are buried in the planting soil layer to fix the soil to prevent the soil from sliding down and landslides.

进一步地,所述隔离层与散粒体坡面之间还设有草帘或草毯,所述草帘或草毯由稻草或麦草编制而成。Further, a straw curtain or straw blanket is also arranged between the isolation layer and the granular body slope, and the straw curtain or straw blanket is woven from straw or wheat straw.

另外本发明还公开上述散粒体边坡生态护坡结构的施工方法,它包括如下步骤:In addition, the present invention also discloses the construction method of the above-mentioned granular body slope ecological slope protection structure, which comprises the following steps:

步骤1):对原有堆体坡面进行整形,采用机械和人工方法进行清坡和回填修整;对于高大边坡实施分级放坡,并留设坡顶道路和多级马道;Step 1): Reshape the original pile slope, and use mechanical and manual methods to clear the slope and backfill it; implement graded grading for tall and large slopes, and leave slope top roads and multi-level horse tracks;

步骤2):在散粒体坡面上铺草帘或草毯的同时,钻孔安装引水桩,引水桩按照一定的间距插入散粒体坡面,由引水桩固定草帘或草毯;Step 2): While laying straw curtains or grass blankets on the granular body slope, drill holes to install water diversion piles, and the water diversion piles are inserted into the granular body slope surface at a certain distance, and the straw curtains or grass blankets are fixed by the water diversion piles;

步骤3):在坡顶道路或马道上用后卸式汽车往下倾倒拌合好的隔离层的材料,用机械或人工整平形成隔离层;Step 3): Dump down the material of the mixed isolation layer on the road at the top of the slope or on the horse track with a rear unloading vehicle, and level it mechanically or manually to form the isolation layer;

步骤4):在引水桩之间通过扎丝绑扎形成栅格状篱笆或者在散粒体坡面上紧挨坡面铺设多个草笼或者铺设土工格室或者铺设三维网;草笼或土工格室或三维网用竹桩或短锚杆固定;Step 4): Form a grid-like fence by tying wires between the water diversion piles, or laying multiple grass cages or laying geocells or laying three-dimensional nets on the slope of the granular body next to the slope; grass cages or geogrids The chamber or three-dimensional net is fixed with bamboo stakes or short bolts;

步骤5):按配比配制、拌合好种植土层的材料,铺设到散粒体坡面上,先铺设基层,再铺设面层;Step 5): Prepare and mix the materials for the planting soil layer according to the proportion, and lay them on the slope of the granular body, first lay the base layer, and then lay the surface layer;

步骤6):将引流片与引水桩互相连接;Step 6): Connect the diversion piece and the diversion pile to each other;

步骤7):在面层上盖上一层无纺布,待草籽发芽后掀掉无纺布,晴天定期洒水养护,完成施工。Step 7): Cover the surface layer with a layer of non-woven fabric, remove the non-woven fabric after the grass seeds germinate, and regularly sprinkle water for maintenance on sunny days to complete the construction.

本发明的有益效果:Beneficial effects of the present invention:

(1)在散粒体坡面与隔离层之间铺设草帘或草毯能够减少黏土从散粒体缝隙中冲刷掉,利于种植层保持水土;从而降低成本,使散粒体堆场进行可持续性生态修复,并且建立稳定的坡面生态系统。(1) Laying straw curtains or grass blankets between the granular body slope and the isolation layer can reduce the scouring of clay from the granular body gaps, which is conducive to the maintenance of soil and water in the planting layer; thereby reducing the cost and making the granular body storage yard feasible. Sustainable ecological restoration and establishment of a stable slope ecosystem.

(2)当隔离层使用水泥时,由于水泥具有较好的粘结性,与黏土混合后覆盖在坡面上,更加稳固,与草纤维混合也能够增加隔离层的整体性和抗侵蚀性,早期能起到很好的隔离效果;后期在淋溶作用和植物根系分泌酸性物质的作用下,能够降低隔离层碱性,伴随土壤微生物和根系持续联合作用,逐步改善土壤结构和酸碱性,植物根系也能扎入其中,甚至可以长入散粒体中去;此时,种植土层和隔离层中密布植物根系,有很好的整体性,连同植物一起,构成一张柔性的大毯覆盖了散粒体坡面,提高了散粒体坡面抵抗震动等破坏的能力;当隔离层不使用水泥时,植物的根系能够很快长入到土壤中,实现坡面的快速复绿,这种隔离层配方适用于降雨较少的地方。(2) When cement is used for the isolation layer, because the cement has good adhesion, it is more stable when mixed with clay and covered on the slope. Mixing with grass fiber can also increase the integrity and erosion resistance of the isolation layer. It can play a good isolation effect in the early stage; in the later stage, under the action of leaching and the secretion of acidic substances by plant roots, it can reduce the alkalinity of the isolation layer, and with the continuous joint action of soil microorganisms and roots, the soil structure and acidity and alkalinity can be gradually improved. Plant roots can also penetrate into it, and even grow into granules; at this time, the planting soil layer and the isolation layer are densely covered with plant roots, which have good integrity, and together with the plants, form a large flexible blanket It covers the granular slope surface, which improves the ability of the granular body slope to resist vibration and other damage; when the isolation layer does not use cement, the roots of the plants can quickly grow into the soil, and the rapid re-greening of the slope can be achieved. This barrier formula is suitable for places with less rainfall.

(3)使用引水桩既可起到固定作用又可以将坡面的水流就地引入到散粒体内,而且通过引流片与引水桩引流配合,可以防止在坡面产生集中水流对坡面土壤产生切沟侵蚀。这种设计,充分利用了散粒体坡面自身稳定,有很大渗透性利于排水的特点,可以极大降低坡面水土保持成本。(3) The use of water diversion piles can not only play a fixed role, but also can introduce the water flow on the slope into the granular body on the spot, and through the cooperation of the diversion sheet and the water diversion pile, it can prevent the concentrated water flow on the slope from causing the soil on the slope. Gutter erosion. This design makes full use of the stability of the granular body slope itself, which has great permeability and is conducive to drainage, and can greatly reduce the cost of soil and water conservation on the slope.

(4)栅格状篱笆,草笼,土工格室,三维网都能够有效防止泥土下滑,起到固土的目的,有效的防止了滑坡。(4) Grid-shaped fences, grass cages, geocells, and three-dimensional nets can effectively prevent the soil from sliding down, achieve the purpose of soil consolidation, and effectively prevent landslides.

(5)本发明可提供多种解决方案,以应对不同气候和边坡条件。使用材料大部分为生态材料,可为植物生长提供良好的条件,同时起到水土保持、生态修复和稳定护坡的作用。(5) The present invention can provide various solutions to deal with different climate and slope conditions. Most of the materials used are ecological materials, which can provide good conditions for plant growth, and at the same time play the role of soil and water conservation, ecological restoration and stable slope protection.

附图说明Description of drawings

图 1是采用栅格状篱笆时散粒体边坡生态护坡结构剖面示意图;Figure 1 is a schematic cross-sectional view of the ecological slope protection structure of the granular slope when the grid-shaped fence is used;

图2是采用草笼时散粒体边坡生态护坡结构剖面示意图;Figure 2 is a schematic cross-sectional view of the ecological slope protection structure of the granular body slope when using grass cages;

图3是采土工格室时散粒体边坡生态护坡结构剖面示意图;Figure 3 is a schematic cross-sectional view of the ecological slope protection structure of the granular body slope during the excavation of the earth cell;

图4是采用三维网时散粒体边坡生态护坡结构剖面示意图;Figure 4 is a schematic cross-sectional view of the ecological slope protection structure of the granular body slope when a three-dimensional network is adopted;

图5为引水桩与引流片渗排水结构平面示意图;Figure 5 is a schematic plan view of the seepage and drainage structure of the water diversion pile and the diversion sheet;

图6为引水桩与引流片渗排水结构局部立体示意图;Fig. 6 is a partial three-dimensional schematic diagram of the seepage and drainage structure of the water diversion pile and the diversion sheet;

图7为本发明从图1的A向视角看栅格状篱笆与引水桩之间关系示意图。FIG. 7 is a schematic diagram of the relationship between the grid-shaped fence and the water diversion pile viewed from the perspective of the A direction in FIG. 1 according to the present invention.

具体实施方式Detailed ways

下面结合附图和具体实施例对本发明作进一步的详细描述。The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.

如图1至6所示,一种散粒体边坡生态护坡结构,包括设于散粒体坡面1上的种植土层2,所述种植土层2与散粒体坡面1之间设有隔离层3,所述散粒体坡面1、隔离层3和种植土层2内插装有多个引水桩4,种植土层2表面设有用于连通各引水桩4的引流片5。As shown in Figures 1 to 6, an ecological slope protection structure for a granular body slope includes a planting soil layer 2 arranged on the granular body slope surface 1, and between the planting soil layer 2 and the granular body slope surface 1 There is an isolation layer 3, the granular body slope 1, the isolation layer 3 and the planting soil layer 2 are inserted with a plurality of water diversion piles 4, and the surface of the planting soil layer 2 is provided with a diversion piece 5 for connecting each water diversion pile 4. .

进一步地,所述种植土层2包括不含种子的基层2.1和含有种子的面层2.2。Further, the planting soil layer 2 includes a seed-free base layer 2.1 and a seed-containing surface layer 2.2.

优选地,所述基层2.1内各组分按照体积份数计分别为:壤土90-95份,草纤维5-10份,保水剂0.08-0.1份,复合肥0.6-0.8份;所述面层2.2内各组分按照体积份数计分别为:壤土91-94份,草纤维6-9份,保水剂0.08-0.1份,复合肥0.4-0.6份,植物种子为290-310 g/m3;所述草纤维为稻草或麦草加工而成,长度为0.5-2cm。Preferably, the components in the base layer 2.1 are respectively 90-95 parts by volume of loam, 5-10 parts of grass fiber, 0.08-0.1 part of water retention agent, and 0.6-0.8 part of compound fertilizer; the surface layer 2.2 The components in 2.2 are: 91-94 parts of loam, 6-9 parts of grass fiber, 0.08-0.1 part of water retention agent, 0.4-0.6 part of compound fertilizer, and 290-310 g/ m3 of plant seeds. ; The grass fiber is processed from straw or wheat straw, and the length is 0.5-2cm.

优选地,所述基层2.1内各组分按照体积百分比计分别为:保水剂0.08-0.12%,复合肥0.7-0.9%,其他为壤土;所述面层2.2内各组分按照体积百分比计分别为:保水剂0.08-0.1%,复合肥0.5-0.7%,其他为壤土,其中植物种子为280-300 g/m3Preferably, the components in the base layer 2.1 are respectively: 0.08-0.12% of the water-retaining agent, 0.7-0.9% of the compound fertilizer, and the others are loam soil; the components in the surface layer 2.2 are respectively calculated by volume percentage It is: water retention agent 0.08-0.1%, compound fertilizer 0.5-0.7%, others are loam soil, and plant seeds are 280-300 g/m 3 .

优选地,所述隔离层3内各组分按照体积份数计分别为:草纤维8-10份,黏土60-80份,水泥10-15份,所述草纤维长度为2-4cm。Preferably, the components in the isolation layer 3 are respectively 8-10 parts by volume of grass fiber, 60-80 parts of clay, 10-15 parts of cement, and the length of the grass fiber is 2-4 cm.

优选地,所述隔离层3内各组分按照体积份数计分别为:草纤维10-20份,黏土80-90份,所述草纤维长度为2-4cm。Preferably, the components in the isolation layer 3 are respectively 10-20 parts by volume of grass fiber, 80-90 parts of clay, and the length of the grass fiber is 2-4 cm.

进一步地,所述引水桩4为竹桩材质的圆筒形结构,所述引流片5为弧形竹片结构,引流片5插装于引水桩4侧部的通孔4.1内,多个引水桩4和引流片5组合形成网状结构。在本实施例中,引水桩4所选用竹桩的尺寸为:外径为8-12cm,内径为6-10cm,高度为50-80cm;引流片5是以直径为8-12cm的竹子一分为二用于截水的竹片;另外竹桩和竹片都被预先去掉横隔,并且彼此连接处钻设通孔4.1,,以便水流通过竹片进入到竹桩内。Further, the water diversion pile 4 is a cylindrical structure made of bamboo pile material, the diversion piece 5 is an arc-shaped bamboo piece structure, and the diversion piece 5 is inserted into the through hole 4.1 on the side of the water diversion pile 4, and a plurality of water diversion pieces 5. The pile 4 and the drainage sheet 5 are combined to form a network structure. In the present embodiment, the size of the selected bamboo pile for the water diversion pile 4 is: the outer diameter is 8-12cm, the inner diameter is 6-10cm, and the height is 50-80cm; the drainage sheet 5 is a bamboo with a diameter of 8-12cm It is two bamboo pieces for intercepting water; in addition, the bamboo stakes and the bamboo pieces are all pre-removed, and through holes 4.1 are drilled at the connection with each other, so that the water can flow into the bamboo stakes through the bamboo pieces.

进一步地,所述种植土层2内还埋设有栅格状篱笆6或草笼7或土工格室8或三维网9,以固定土壤防止泥土下滑和滑坡。在本实施例中,如图1和7所示,通过扎丝绑扎有若干根水平横杆,水平横杆和竖直枝条组成栅格状篱笆6;如图2所示,种植土层2中埋设有草笼7,多个草笼7紧挨铺设在散粒体坡面1上;如图3和4所示,种植土层中埋有土工格室8或三维网9;如图3所示,当采用土工格室8时,种植土层2厚度等于土工格室8深度;如图4所示,当采用三维网9时,三维网9埋在种植土层2内。Further, a grid-shaped fence 6 or a grass cage 7 or a geocell 8 or a three-dimensional net 9 is also embedded in the planting soil layer 2 to fix the soil to prevent the soil from sliding down and landslides. In this embodiment, as shown in FIGS. 1 and 7 , several horizontal bars are tied with wires, and the horizontal bars and vertical branches form a grid-like fence 6 ; as shown in FIG. 2 , in the planting soil layer 2 Buried with grass cages 7, a plurality of grass cages 7 are laid close to the granular body slope 1; as shown in Figures 3 and 4, a geocell 8 or a three-dimensional net 9 is buried in the planting soil layer; as shown in Figure 3 As shown, when the geocell 8 is used, the thickness of the planting soil layer 2 is equal to the depth of the geocell 8; as shown in FIG.

进一步地,所述隔离层3与散粒体坡面1之间还设有草帘或草毯,所述草帘或草毯由稻草或麦草编制而成。Further, a straw curtain or a straw blanket is also arranged between the isolation layer 3 and the granular body slope 1, and the straw curtain or grass blanket is woven from straw or wheat straw.

另外本发明还公开上述散粒体边坡生态护坡结构的施工方法,它包括如下步骤:In addition, the present invention also discloses the construction method of the above-mentioned granular body slope ecological slope protection structure, which comprises the following steps:

步骤1):对原有堆体坡面进行整形,采用机械和人工方法进行清坡和回填修整;对于高大边坡实施分级放坡,并留设坡顶道路和多级马道;Step 1): Reshape the original pile slope, and use mechanical and manual methods to clear the slope and backfill it; implement graded grading for tall and large slopes, and leave slope top roads and multi-level horse tracks;

步骤2):在散粒体坡面1上铺草帘或草毯的同时,钻孔安装引水桩4,引水桩4按照一定的间距插入散粒体坡面1,由引水桩4固定草帘或草毯;Step 2): While laying grass curtains or grass blankets on the granular body slope 1, drill holes to install water diversion piles 4. The water diversion piles 4 are inserted into the granular body slope 1 at a certain distance, and the straw curtains are fixed by the water diversion piles 4. or grass carpet;

步骤3):在坡顶道路或马道上用后卸式汽车往下倾倒拌合好的隔离层3的材料,用机械或人工整平形成隔离层3;Step 3): Dump down the material of the mixed isolation layer 3 on the road at the top of the slope or on the horse track with a rear unloading vehicle, and level it mechanically or manually to form the isolation layer 3;

步骤4):在引水桩4之间通过扎丝绑扎形成栅格状篱笆6或者在散粒体坡面1上紧挨坡面铺设多个草笼7或者铺设土工格室8或者铺设三维网9;草笼7或土工格室8或三维网9用竹桩或短锚杆固定;Step 4): forming a grid-like fence 6 by tying wires between the water diversion piles 4, or laying a plurality of grass cages 7 on the granular body slope 1 close to the slope, or laying a geocell 8 or laying a three-dimensional mesh 9 ; The grass cage 7 or the geocell 8 or the three-dimensional net 9 is fixed with bamboo stakes or short bolts;

步骤5):按配比配制、拌合好种植土层2的材料,铺设到散粒体坡面1上,先铺设基层2.1,再铺设面层2.2;Step 5): Prepare and mix the materials of the planting soil layer 2 according to the proportion, and lay them on the granular body slope 1, first lay the base layer 2.1, and then lay the surface layer 2.2;

步骤6):将引流片5与引水桩4互相连接;Step 6): connect the diversion piece 5 and the diversion pile 4 to each other;

步骤7):在面层2.2上盖上一层无纺布,待草籽发芽后掀掉无纺布,晴天定期洒水养护,完成施工。Step 7): Cover the surface layer 2.2 with a layer of non-woven fabric, remove the non-woven fabric after the grass seeds germinate, and regularly sprinkle water for maintenance on sunny days to complete the construction.

下面以三个具体实施例来具体说明;Describe in detail below with three specific embodiments;

实施例1Example 1

南方某地碎石堆场边坡,坡度为32°,拟采用本发明栅格状篱笆结构进行生态护坡。The slope of a gravel yard in a certain place in the south has a slope of 32°, and the grid-like fence structure of the present invention is planned to be used for ecological slope protection.

隔离层与散粒体坡面之间有草帘,草帘的材料是由稻草编制而成。There is a straw curtain between the isolation layer and the granular body slope, and the material of the straw curtain is made of straw.

隔离层的材料组成为(体积比):草纤维(8%),黏土(80%)与水泥(12%)混拌而成;所述草纤维长度为2-4cm,隔离层厚度3cm。The material composition of the isolation layer is (volume ratio): grass fiber (8%), clay (80%) and cement (12%) are mixed; the grass fiber length is 2-4cm, and the thickness of the isolation layer is 3cm.

所述同一分层面上的引水桩通过扎丝绑扎有若干根水平横杆,水平横杆和竖直枝条组成栅格状篱笆;所述水平横杆采用长度为1-2m,宽度为4-8cm的竹片,竖直枝条采用杨柳活枝。The water diversion piles on the same layered surface are bound with a number of horizontal crossbars, and the horizontal crossbars and the vertical branches form a grid-like fence; the horizontal crossbars are 1-2m in length and 4-8cm in width Bamboo slices, vertical branches are willow live branches.

引水桩采用外径为8cm,内径为6cm,高度为50cm的竹筒。The water diversion pile adopts a bamboo tube with an outer diameter of 8cm, an inner diameter of 6cm and a height of 50cm.

引流片采用以直径为8cm的竹子竖向一分为二而得到的竹片。The drainage piece is a bamboo piece obtained by vertically dividing a bamboo with a diameter of 8cm into two.

所述基层配方为(体积比):壤土90%,草纤维10%,保水剂0.08%,复合肥0.6%,面层配方为(体积比):壤土91%,草纤维9%,保水剂0.08%,复合肥0.4%,植物种子290g/m3;所述基层厚度7cm,面层厚度1cm;所述草纤维为稻草或麦草加工而成,长度为0.5-2cm。The base layer formula is (volume ratio): loam 90%, grass fiber 10%, water retention agent 0.08%, compound fertilizer 0.6%, and the surface layer formula is (volume ratio): loam 91%, grass fiber 9%, water retention agent 0.08 %, compound fertilizer 0.4%, plant seeds 290g/m 3 ; the thickness of the base layer is 7cm, and the thickness of the surface layer is 1cm; the grass fiber is processed from straw or wheat straw, and the length is 0.5-2cm.

试验坡采用如下施工步骤对该堆场进行植被恢复和生态护坡。The test slope adopts the following construction steps to carry out vegetation restoration and ecological slope protection for the yard.

(1)对原有堆体坡面进行整形,采用机械和人工方法进行清坡和回填修整;对于高大边坡实施分级放坡,并留设坡顶道路和多级马道;(1) Reshape the original pile slope, and use mechanical and manual methods to clear and backfill the slope; implement graded grading for tall and large side slopes, and leave slope top roads and multi-level horse tracks;

(2)在散粒体坡面上铺草帘或草毯的同时,钻孔安装引水桩,引水桩插入散粒体坡面深度为8cm,引水桩的水平间距为1m,分层高度为1m,并由引水桩固定草帘或草毯;(2) While laying straw curtains or grass blankets on the granular body slope, drill holes and install water diversion piles. The depth of the water diversion piles inserted into the granular body slope surface is 8cm, the horizontal spacing of water diversion piles is 1m, and the layer height is 1m , and the straw curtain or straw blanket is fixed by the water diversion pile;

(3)在坡顶道路或马道上用后卸式汽车往下倾倒拌合好的隔离层材料,用机械或人工整平;(3) On the slope top road or horse track, use the rear unloading vehicle to dump the mixed isolation layer material down, and use it to level it mechanically or manually;

(4)在引水桩之间通过扎丝绑扎栅格状篱笆;(4) Bind the grid-like fence by tying wire between the water diversion piles;

(5)在坡顶道路或马道上往下倾倒拌合好的种植土层材料,先施工基层,再施工面层,人工或机械扒平,使种植土层均匀覆盖在栅格状篱笆之间的坡面。(5) Dump down the mixed planting soil material on the road or horse road at the top of the slope, construct the base layer first, then construct the surface layer, and level it manually or mechanically, so that the planting soil layer is evenly covered between the grid-like fences 's slope.

(6)将引流片一端用扎丝固定,另一端插入带通孔的引水桩;(6) Fix one end of the drainage sheet with a wire tie, and insert the other end into a water diversion pile with a through hole;

(7)在面层上盖上一层无纺布,待草籽发芽后掀掉无纺布,晴天定期洒水养护,完成施工。(7) Cover the surface layer with a layer of non-woven fabric, remove the non-woven fabric after the grass seeds germinate, and regularly sprinkle water for maintenance on sunny days to complete the construction.

实施例2Example 2

北方某地碎石堆场边坡,坡度为34°,拟采用本发明草笼结构进行生态护坡。The slope of a gravel yard in a certain place in the north has a slope of 34°, and the grass cage structure of the present invention is planned to be used for ecological slope protection.

隔离层的材料组成为(体积比):草纤维(10%),黏土(90%);所述草纤维长度为2-4cm,隔离层厚度5cm。The material composition of the isolation layer is (volume ratio): grass fiber (10%), clay (90%); the grass fiber length is 2-4cm, and the thickness of the isolation layer is 5cm.

草笼中,族芯夹持多根族刺的中间部位,族刺两端向各方向延伸,形成蓬松圆柱状草笼,族芯采用稻草绳制作,族刺采用干燥稻草秸秆制作,长度12 cm。In the straw cage, the core holds the middle part of multiple thorns, and the two ends of the thorns extend in all directions to form a fluffy cylindrical grass cage. The core is made of straw rope, and the thorns are made of dry straw, with a length of 12 cm. .

族芯用扎丝绑扎在固定网上;所述固定网采用10#镀锌菱形铁丝网,网孔6cm,用扎丝绑扎在引水桩上,使铁丝网距离散粒体坡面7cm。The core is bound on the fixed net with tie wire; the fixed net adopts 10# galvanized diamond wire mesh with 6cm mesh, and is bound on the water diversion pile with tie wire, so that the wire mesh is 7cm away from the slope of the granular body.

基层包括壤土,草纤维,复合肥和保水剂,配方为(体积比):壤土95%,草纤维5%,保水剂0.09%,复合肥0.7%;面层5包括壤土,草纤维,复合肥,保水剂及植物种子,配方为(体积比):壤土94%,草纤维6%,保水剂0.09%,复合肥0.8%,植物种子310 g/m3;所述基层厚度10cm,面层厚度2cm;所述草纤维为稻草加工而成,长度为0.5-2cm。The base layer includes loam, grass fiber, compound fertilizer and water retention agent, and the formula is (volume ratio): loam 95%, grass fiber 5%, water retention agent 0.09%, compound fertilizer 0.7%; surface layer 5 includes loam, grass fiber, compound fertilizer , water-retaining agent and plant seeds, the formula is (volume ratio): loam soil 94%, grass fiber 6%, water-retaining agent 0.09%, compound fertilizer 0.8%, plant seeds 310 g/m 3 ; the thickness of the base layer is 10cm, the thickness of the surface layer 2cm; the grass fiber is processed from straw, and the length is 0.5-2cm.

引水桩选用外径为10cm,内径为8cm,高度为60cm的竹筒。The water diversion piles are made of bamboo tubes with an outer diameter of 10cm, an inner diameter of 8cm and a height of 60cm.

引流片采用以直径为10cm的竹子竖向一分为二而得到的竹片。The drainage sheet is a bamboo sheet obtained by vertically dividing a bamboo with a diameter of 10 cm into two.

试验坡采用如下施工步骤对该堆场进行植被恢复和生态护坡。The test slope adopts the following construction steps to carry out vegetation restoration and ecological slope protection for the yard.

(1)对原有堆体坡面进行整形,采用机械和人工方法进行清坡和回填修整;对于高大边坡实施分级放坡,并留设坡顶道路和多级马道;(1) Reshape the original pile slope, and use mechanical and manual methods to clear and backfill the slope; implement graded grading for tall and large side slopes, and leave slope top roads and multi-level horse tracks;

(2)在坡顶道路或马道上用后卸式汽车往下倾倒拌合好的隔离层材料,用机械或人工整平;(2) On the slope top road or horse track, use the rear dump truck to dump the mixed isolation layer material down, and use it to level it mechanically or manually;

(3)在隔离层上铺设固定网的同时,钻孔安装引水桩,引水桩插入散粒体坡面深度为7cm,引水桩的水平间距为1.2m,分层高度为1.2m,并由引水桩固定固定网;(3) While laying the fixed net on the isolation layer, the water diversion piles are drilled and installed. The depth of the water diversion piles inserted into the granular body slope is 7cm, the horizontal spacing of the diversion piles is 1.2m, and the layer height is 1.2m. Pile fixed fixed net;

(4)在散粒体坡面上紧挨坡面铺设多个草笼,各草笼通过固定网固定;(4) Lay a number of grass cages on the slope of the granular body next to the slope, and each grass cage is fixed by a fixed net;

(5)按配比配制、拌合好种植土层材料,采用湿喷机将基材喷射到散粒体坡面上,先喷基层,再喷面层;(5) Prepare and mix the planting soil layer materials according to the proportion, and spray the base material on the slope of the granular body with a wet sprayer, spray the base layer first, and then spray the surface layer;

(6)将引流片一端用扎丝固定,另一端插入带通孔的引水桩;(6) Fix one end of the drainage sheet with a wire tie, and insert the other end into a water diversion pile with a through hole;

(7)在面层上盖上一层无纺布,待草籽发芽后掀掉无纺布,晴天定期洒水养护,完成施工。(7) Cover the surface layer with a layer of non-woven fabric, remove the non-woven fabric after the grass seeds germinate, and regularly sprinkle water for maintenance on sunny days to complete the construction.

实施例3Example 3

南方某地煤矸石堆场边坡,坡面比例1:1.5,拟采用本发明土工格室结构进行生态护坡。The slope of a coal gangue yard in a certain place in the south has a slope ratio of 1:1.5, and the geocell structure of the present invention is planned to be used for ecological slope protection.

隔离层与散粒体坡面之间有草毯,草毯的材料是由稻草编制而成。There is a grass blanket between the isolation layer and the granular body slope, and the material of the grass blanket is woven from straw.

隔离层的材料组成为(体积比):草纤维(10%),黏土(80%)与水泥(10%)混拌而成;所述草纤维长度为2-4cm,隔离层厚度4cm。The material composition of the isolation layer is (volume ratio): grass fiber (10%), clay (80%) and cement (10%) are mixed; the grass fiber length is 2-4cm, and the thickness of the isolation layer is 4cm.

种植土层埋设土工格室,并且种植土层厚度等于土工格室深度。The geocell is buried in the planting soil layer, and the thickness of the planting soil layer is equal to the depth of the geocell.

土工格室型号为TGLG-PE-100-450。Geocell model is TGLG-PE-100-450.

所述基层配方为(体积比):壤土93%,草纤维7%,保水剂0.1%,复合肥0.8%;面层配方为(体积比):壤土94%,草纤维6%,保水剂0.09%,复合肥0.6%,植物种子300g/m3;所述基层厚度9cm,面层厚度1cm;所述草纤维为稻草或麦草加工而成,长度为0.5-2cm。The base layer formula is (volume ratio): loam soil 93%, grass fiber 7%, water retention agent 0.1%, compound fertilizer 0.8%; the surface layer formula is (volume ratio): loam soil 94%, grass fiber 6%, water retention agent 0.09% %, compound fertilizer 0.6%, plant seeds 300g/m 3 ; the thickness of the base layer is 9cm, and the thickness of the surface layer is 1cm; the grass fiber is processed from straw or wheat straw, and the length is 0.5-2cm.

引水桩的尺寸为:外径为12cm,内径为10cm,高度为80cm的竹筒。The dimensions of the water diversion pile are: a bamboo tube with an outer diameter of 12cm, an inner diameter of 10cm and a height of 80cm.

引流片采用直径为12cm的竹子竖向一分为二而得到的竹片。The drainage piece is a bamboo piece obtained by vertically dividing a bamboo with a diameter of 12cm into two.

试验坡采用如下施工步骤对该堆场进行植被恢复和生态防护。The test slope adopts the following construction steps to restore vegetation and ecological protection of the yard.

(1)对原有堆体坡面进行整形,采用机械和人工方法进行清坡和回填修整;对于高大边坡实施分级放坡,并留设坡顶道路和多级马道;(1) Reshape the original pile slope, and use mechanical and manual methods to clear and backfill the slope; implement graded grading for tall and large side slopes, and leave slope top roads and multi-level horse tracks;

(2)在散粒体坡面上铺草帘或草毯的同时,钻孔安装引水桩,引水桩插入散粒体坡面深度为5cm,水平间距为1.5m,分层高度为1.5m,由引水桩固定草帘或草毯;(2) While laying grass curtains or grass blankets on the granular body slope, drill holes and install water diversion piles. The depth of the water diversion piles inserted into the granular body slope surface is 5cm, the horizontal spacing is 1.5m, and the layer height is 1.5m. The straw curtain or carpet is fixed by the diversion pile;

(3)在坡顶道路或马道上用后卸式汽车往下倾倒拌合好的隔离层材料,用机械或人工整平(3) On the slope top road or horse track, use the rear unloading vehicle to dump the mixed insulating layer material down, and use it to level it mechanically or manually.

(4)在隔离层上铺设土工格室,并由引水桩和短锚杆固定已拉开的土工格室;(4) Lay geocells on the isolation layer, and fix the opened geocells by diversion piles and short anchors;

(5)按配比配制、拌合好种植土层材料,采用湿喷客土喷播的方法往土工格室里喷射种植土层,先喷基层,再喷面层,使种植土层厚度等于土工格室深度;(5) Prepare and mix the planting soil layer materials according to the proportion, and spray the planting soil layer into the geocell by the method of wet spraying and seeding. cell depth;

(6)将引流片一端用扎丝固定,另一端插入带通孔的引水桩;(6) Fix one end of the drainage sheet with a wire tie, and insert the other end into a water diversion pile with a through hole;

(7)在面层上盖上一层无纺布,待草籽发芽后掀掉无纺布,晴天定期洒水养护,完成施工。(7) Cover the surface layer with a layer of non-woven fabric, remove the non-woven fabric after the grass seeds germinate, and regularly sprinkle water for maintenance on sunny days to complete the construction.

实施例4Example 4

北方某地煤矸石堆场边坡,坡面比例1:1.45,拟采用本发明三维网结构进行生态护坡。The slope of a coal gangue yard in a certain place in the north has a slope ratio of 1:1.45, and the three-dimensional network structure of the present invention is planned to be used for ecological slope protection.

隔离层的材料组成为(体积比):草纤维(20%),黏土(80%);所述草纤维长度为2-4cm,隔离层厚度5cm。The material composition of the isolation layer is (volume ratio): grass fiber (20%), clay (80%); the length of the grass fiber is 2-4cm, and the thickness of the isolation layer is 5cm.

种植土层埋有三维网,并由引水桩固定。Three-dimensional nets are buried in the planting soil layer and fixed by water diversion piles.

所述基层配方为(体积比):保水剂0.08%,复合肥0.9%,其他为壤土;所述面层内各组分按照体积百分比计分别为:保水剂0.08%,复合肥0.5%,其他为壤土,其中植物种子为280 g/m3The formula of the base layer is (volume ratio): water-retaining agent 0.08%, compound fertilizer 0.9%, and the others are loam; the components in the surface layer are respectively: water-retaining agent 0.08%, compound fertilizer 0.5%, other It is loam soil, in which the plant seeds are 280 g/m 3 .

引水桩的尺寸为:外径为10cm,内径为8cm,高度为70cm的竹筒。The dimensions of the water diversion pile are: a bamboo tube with an outer diameter of 10cm, an inner diameter of 8cm and a height of 70cm.

引流片采用直径为10cm的竹子一分为二而得到的竹片。The drainage piece is a bamboo piece obtained by dividing a bamboo with a diameter of 10cm into two.

试验坡采用如下施工步骤对该堆场进行植被恢复和生态防护。The test slope adopts the following construction steps to restore vegetation and ecological protection of the yard.

(1)对原有堆体坡面进行整形,采用机械和人工方法进行清坡和回填修整;对于高大边坡实施分级放坡,并留设坡顶道路和多级马道;(1) Reshape the original pile slope, and use mechanical and manual methods to clear and backfill the slope; implement graded grading for tall and large side slopes, and leave slope top roads and multi-level horse tracks;

(2)在散粒体坡面上铺草帘或草毯的同时,钻孔安装引水桩,引水桩插入散粒体坡面深度为4cm,引水桩的水平间距为1.5m,分层高度为1.5m,由引水桩固定草帘或草毯;(2) While laying straw curtains or grass blankets on the granular body slope, drill holes to install water diversion piles. The depth of the water diversion piles inserted into the granular body slope surface is 4cm, the horizontal spacing of the water diversion piles is 1.5m, and the layer height is 1.5m, the straw curtain or straw blanket is fixed by the water diversion pile;

(3)在坡顶道路或马道上用后卸式汽车往下倾倒拌合好的隔离层材料,用机械或人工整平;(3) On the slope top road or horse track, use the rear unloading vehicle to dump the mixed isolation layer material down, and use it to level it mechanically or manually;

(4)在隔离层上铺设三维网,并由引水桩固定三维网;(4) Lay three-dimensional nets on the isolation layer, and fix the three-dimensional nets by water diversion piles;

(5)按配比配制、拌合好种植土层材料,采用湿喷工艺喷射基材,分别施工基层和面层;(5) Prepare and mix the planting soil layer materials according to the proportions, spray the base material by the wet spraying process, and construct the base layer and the surface layer respectively;

(6)将引流片一端用扎丝固定,另一端插入带通孔的引水桩;(6) Fix one end of the drainage sheet with a wire tie, and insert the other end into a water diversion pile with a through hole;

(7)在面层上盖上一层无纺布,待草籽发芽后掀掉无纺布,晴天定期洒水养护,完成施工。(7) Cover the surface layer with a layer of non-woven fabric, remove the non-woven fabric after the grass seeds germinate, and regularly sprinkle water for maintenance on sunny days to complete the construction.

上述的实施例仅为本发明的优选技术方案,而不应视为对于本发明的限制,本申请中的实施例及实施例中的特征在不冲突的情况下,可以相互任意组合。本发明的保护范围应以权利要求记载的技术方案,包括权利要求记载的技术方案中技术特征的等同替换方案为保护范围。即在此范围内的等同替换改进,也在本发明的保护范围之内。The above-mentioned embodiments are only the preferred technical solutions of the present invention, and should not be regarded as limitations of the present invention. The embodiments and features in the present application may be arbitrarily combined with each other without conflict. The protection scope of the present invention shall take the technical solutions described in the claims, including the equivalent alternatives of the technical features in the technical solutions described in the claims, as the protection scope. That is, equivalent replacements and improvements within this scope are also within the protection scope of the present invention.

Claims (4)

1.一种散粒体边坡生态护坡结构,包括设于散粒体坡面(1)上的种植土层(2),其特征在于:所述种植土层(2)与散粒体坡面(1)之间设有隔离层(3),所述散粒体坡面(1)、隔离层(3)和种植土层(2)内插装有多个引水桩(4),种植土层(2)表面设有用于连通各引水桩(4)的引流片(5);所述引水桩(4)为竹桩材质的圆筒形结构,所述引流片(5)为弧形竹片结构,引流片(5)插装于引水桩(4)侧部的通孔(4.1)内,多个引水桩(4)和引流片(5)组合形成网状结构;所述种植土层(2)包括不含种子的基层(2.1)和含有种子的面层(2.2);1. A granular body slope ecological slope protection structure, comprising a planting soil layer (2) arranged on a granular body slope surface (1), characterized in that: the planting soil layer (2) and the granular body slope An isolation layer (3) is arranged between the surfaces (1), and a plurality of water diversion piles (4) are inserted into the granular body slope surface (1), the isolation layer (3) and the planting soil layer (2). The surface of the soil layer (2) is provided with diversion pieces (5) for communicating with the water diversion piles (4); the diversion piles (4) are cylindrical structures made of bamboo piles, and the diversion pieces (5) are arc-shaped Bamboo piece structure, the drainage piece (5) is inserted into the through hole (4.1) on the side of the water diversion pile (4), and a plurality of water diversion piles (4) and the drainage piece (5) are combined to form a network structure; the planting soil The layer (2) comprises a base layer (2.1) without seeds and a surface layer (2.2) with seeds; 所述基层(2.1)内各组分按照体积份数计分别为:壤土90-95份,草纤维5-10份,保水剂0.08-0.1份,复合肥0.6-0.8份;所述面层(2.2)内各组分按照体积份数计分别为:壤土91-94份,草纤维6-9份,保水剂0.08-0.1份,复合肥0.4-0.6份,植物种子为290-310 g/m3;所述草纤维为稻草或麦草加工而成,长度为0.5-2cm;或者,所述基层(2.1)内各组分按照体积百分比计分别为:保水剂0.08-0.12%,复合肥0.7-0.9%,其他为壤土;所述面层(2.2)内各组分按照体积百分比计分别为:保水剂0.08-0.1%,复合肥0.5-0.7%,其他为壤土,其中植物种子为280-300 g/m3The components in the base layer (2.1) are: 90-95 parts of loam, 5-10 parts of grass fiber, 0.08-0.1 part of water retention agent, and 0.6-0.8 part of compound fertilizer; the surface layer ( 2.2) In terms of parts by volume, the components are: 91-94 parts of loam, 6-9 parts of grass fiber, 0.08-0.1 parts of water retention agent, 0.4-0.6 parts of compound fertilizer, and 290-310 g/m2 of plant seeds 3 ; the grass fiber is processed from straw or wheat straw, and the length is 0.5-2cm; or, the components in the base layer (2.1) are respectively: water-retaining agent 0.08-0.12%, compound fertilizer 0.7- 0.9%, the others are loam soil; the components in the surface layer (2.2) are respectively: water retention agent 0.08-0.1%, compound fertilizer 0.5-0.7%, and the others are loam soil, of which plant seeds are 280-300 g/m 3 ; 所述隔离层(3)内各组分按照体积份数计分别为:草纤维8-10份,黏土60-80份,水泥10-15份,所述草纤维长度为2-4cm;或者,所述隔离层(3)内各组分按照体积份数计分别为:草纤维10-20份,黏土80-90份,所述草纤维长度为2-4cm。The components in the isolation layer (3) are respectively 8-10 parts by volume of grass fiber, 60-80 parts of clay, 10-15 parts of cement, and the length of the grass fiber is 2-4 cm; or, The components in the isolation layer (3) are respectively 10-20 parts by volume of grass fiber, 80-90 parts of clay, and the length of the grass fiber is 2-4 cm. 2.根据权利要求1所述的散粒体边坡生态护坡结构,其特征在于:所述种植土层(2)内还埋设有栅格状篱笆(6)或草笼(7)或土工格室(8)或三维网(9),以固定土壤防止泥土下滑和滑坡。2. The granular body slope ecological protection structure according to claim 1, characterized in that: a grid-shaped fence (6) or a grass cage (7) or a geogrid is also buried in the planting soil layer (2). A chamber (8) or a three-dimensional mesh (9) to fix the soil to prevent mud sliding and landslides. 3.根据权利要求1所述的散粒体边坡生态护坡结构,其特征在于:所述隔离层(3)与散粒体坡面(1)之间还设有草帘或草毯,所述草帘或草毯由稻草或麦草编制而成。3. The granular body slope ecological slope protection structure according to claim 1, characterized in that: a grass curtain or a grass blanket is further provided between the isolation layer (3) and the granular body slope surface (1), so The straw curtain or straw blanket is woven from straw or wheat straw. 4.一种权利要求1至3任一项所述散粒体边坡生态护坡结构的施工方法,其特征在于:它包括如下步骤:4. a construction method of the granular body slope ecological slope protection structure described in any one of claim 1 to 3, is characterized in that: it comprises the steps: 步骤1):对原有堆体坡面进行整形,采用机械和人工方法进行清坡和回填修整;对于高大边坡实施分级放坡,并留设坡顶道路和多级马道;Step 1): Reshape the original pile slope, and use mechanical and manual methods to clear the slope and backfill it; implement graded grading for tall and large slopes, and leave slope top roads and multi-level horse tracks; 步骤2):在散粒体坡面(1)上铺草帘或草毯的同时,钻孔安装引水桩(4),引水桩(4)按照一定的间距插入散粒体坡面(1),由引水桩(4)固定草帘或草毯;Step 2): While laying straw curtains or grass blankets on the granular body slope (1), drill holes to install water diversion piles (4), and the water diversion piles (4) are inserted into the granular body slope surface (1) at certain intervals , the straw curtain or straw blanket is fixed by the water diversion pile (4); 步骤3):在坡顶道路或马道上用后卸式汽车往下倾倒拌合好的隔离层(3)的材料,用机械或人工整平形成隔离层(3);Step 3): On the slope top road or horse track, the material of the mixed isolation layer (3) is poured down with a rear dump truck, and the isolation layer (3) is formed by mechanically or manually leveling; 步骤4):在引水桩(4)之间通过扎丝绑扎形成栅格状篱笆(6)或者在散粒体坡面(1)上紧挨坡面铺设多个草笼(7)或者铺设土工格室(8)或者铺设三维网(9);草笼(7)或土工格室(8)或三维网(9)用竹桩或短锚杆固定;Step 4): Between the water diversion piles (4), a grid-like fence (6) is formed by tying wires, or laying a plurality of grass cages (7) or laying geotextiles on the granular body slope (1) next to the slope. Cells (8) or laying three-dimensional nets (9); grass cages (7) or geocells (8) or three-dimensional nets (9) are fixed with bamboo stakes or short bolts; 步骤5):按配比配制、拌合好种植土层(2)的材料,铺设到散粒体坡面(1)上,先铺设基层(2.1),再铺设面层(2.2);Step 5): Prepare and mix the materials of the planting soil layer (2) according to the proportion, and lay them on the granular body slope (1), first lay the base layer (2.1), and then lay the surface layer (2.2); 步骤6):将引流片(5)与引水桩(4)互相连接;Step 6): Connect the diversion piece (5) and the diversion pile (4) to each other; 步骤7):在面层(2.2)上盖上一层无纺布,待草籽发芽后掀掉无纺布,晴天定期洒水养护,完成施工。Step 7): Cover the surface layer (2.2) with a layer of non-woven fabric, remove the non-woven fabric after the grass seeds germinate, and sprinkle water regularly for maintenance on sunny days to complete the construction.
CN202110795970.5A 2021-07-14 2021-07-14 Granular-body slope ecological slope protection structure and construction method Active CN113529754B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110795970.5A CN113529754B (en) 2021-07-14 2021-07-14 Granular-body slope ecological slope protection structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110795970.5A CN113529754B (en) 2021-07-14 2021-07-14 Granular-body slope ecological slope protection structure and construction method

Publications (2)

Publication Number Publication Date
CN113529754A CN113529754A (en) 2021-10-22
CN113529754B true CN113529754B (en) 2022-09-30

Family

ID=78127983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110795970.5A Active CN113529754B (en) 2021-07-14 2021-07-14 Granular-body slope ecological slope protection structure and construction method

Country Status (1)

Country Link
CN (1) CN113529754B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114080928A (en) * 2021-11-19 2022-02-25 衡阳县石荷岭绿色食品有限公司 Planting device for ecological restoration of plants

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080017249A (en) * 2007-07-10 2008-02-26 트랜스코리아개발 주식회사 Bio noxious soil and its manufacturing method and sloped greening method using the same
CN105862887B (en) * 2016-04-18 2017-12-15 江西理工大学 A kind of ion type rareearth mine ecological slope protection structure
CN206521728U (en) * 2017-02-27 2017-09-26 张磊 A kind of hydraulic engineering ecological protection slope
CN207228135U (en) * 2017-09-30 2018-04-13 中铁十六局集团第一工程有限公司 Horizontal hedge blocks native ecological slope protection structure
CN107460884B (en) * 2017-09-30 2023-06-02 中铁十六局集团第一工程有限公司 Grass cage reinforcement spray layer ecological slope protection structure and construction method thereof
CN208675708U (en) * 2018-06-19 2019-04-02 深圳文科园林股份有限公司 A kind of mine acidity refuse dump slope vegetation restoration structure
CN109723068B (en) * 2019-01-07 2024-06-11 浙江大学 Steep concrete frame beam slope protection system and construction method conducive to the growth of slope vegetation
CN110521503B (en) * 2019-08-07 2021-09-17 叶建军 Wet-spraying vegetation concrete ecological slope protection technology
CN213114153U (en) * 2020-08-12 2021-05-04 潘政权 Road surface water permeable brick
CN213114677U (en) * 2020-08-18 2021-05-04 李京南 Ecological slope protection structure of side slope is piled up to granular material

Also Published As

Publication number Publication date
CN113529754A (en) 2021-10-22

Similar Documents

Publication Publication Date Title
CN103410159B (en) Expansive soil cut slope support structure and construction method thereof
CN103806454B (en) A method for pollution prevention and vegetation restoration of metal sulfide ore solid waste storage yard
CN101818499B (en) Revegetation system on steep rocky slopes and implementing method thereof
CN203403426U (en) Supporting structure of expensive earth road cutting side slope
CN109723068B (en) Steep concrete frame beam slope protection system and construction method conducive to the growth of slope vegetation
CN106638630B (en) Flexible ceramsite board slope ecological afforestation equipment and its greening method
CN101649608B (en) Ecological slope protection structure
CN110552356B (en) Comprehensive treatment system for hanging slag on lower side slope of road in plateau area and construction method thereof
Broda et al. Reclamation of abandoned open mines with innovative meandrically arranged geotextiles
CN102409637A (en) A kind of ecological restoration method of water-fluctuating zone
CN107893422A (en) A kind of reinforcement type ecological slope protection structure and its construction method
CN206681021U (en) Multi-functional side slope reinforced structure
CN113250213A (en) Slope protection structure with irrigation function for soil-rock mixed side slope and construction method
CN111543233A (en) Construction method for planting seedlings in muddy saline-alkali soil in coastal island region
CN114182686A (en) Log frame and resource-recycling concrete composite structure ecological slope protection and its construction method
CN110424420A (en) Coarse granule composite soil high gradient slope control method
CN108411856B (en) Ecological restoration structure and method for river waste residue bank slope
CN113529754B (en) Granular-body slope ecological slope protection structure and construction method
CN111962459A (en) Urban debris flow channel type comprehensive treatment system for abandoned slag yard and construction method thereof
CN110725277A (en) A scour-resistant ecological management method for the riparian zone
CN110240280A (en) A kind of rainwater purification system of garden road greening isolation strip
CN209816870U (en) Conducive to slope vegetation growth steep concrete frame beam slope protection system
CN111484278A (en) Ecological concrete, ecological protection slope and construction method of ecological protection slope
CN207228135U (en) Horizontal hedge blocks native ecological slope protection structure
CN112931075B (en) Construction process of mining area foreign soil hanging net spray-seeding greening structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant