CN112287595B - Prediction method of post-grouting thickness of shield tunnel wall based on ground penetrating radar detection and machine learning - Google Patents
Prediction method of post-grouting thickness of shield tunnel wall based on ground penetrating radar detection and machine learning Download PDFInfo
- Publication number
- CN112287595B CN112287595B CN202010975476.2A CN202010975476A CN112287595B CN 112287595 B CN112287595 B CN 112287595B CN 202010975476 A CN202010975476 A CN 202010975476A CN 112287595 B CN112287595 B CN 112287595B
- Authority
- CN
- China
- Prior art keywords
- grouting
- ground penetrating
- penetrating radar
- shield tunnel
- steps
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000000149 penetrating effect Effects 0.000 title claims abstract description 67
- 238000000034 method Methods 0.000 title claims abstract description 48
- 238000001514 detection method Methods 0.000 title claims abstract description 21
- 238000010801 machine learning Methods 0.000 title claims abstract description 18
- 238000012360 testing method Methods 0.000 claims abstract description 19
- 238000007781 pre-processing Methods 0.000 claims abstract description 16
- 238000012549 training Methods 0.000 claims description 36
- 230000006870 function Effects 0.000 claims description 18
- 230000008569 process Effects 0.000 claims description 11
- 238000003066 decision tree Methods 0.000 claims description 9
- 238000012795 verification Methods 0.000 claims description 9
- 238000001914 filtration Methods 0.000 claims description 6
- 238000010606 normalization Methods 0.000 claims description 6
- 239000002002 slurry Substances 0.000 claims description 6
- 238000010276 construction Methods 0.000 claims description 4
- 239000011358 absorbing material Substances 0.000 claims description 3
- 238000005457 optimization Methods 0.000 claims description 3
- 238000010845 search algorithm Methods 0.000 claims description 3
- 239000002689 soil Substances 0.000 claims description 3
- 238000011897 real-time detection Methods 0.000 abstract 1
- 230000006872 improvement Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 230000001502 supplementing effect Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
- G06F30/27—Design optimisation, verification or simulation using machine learning, e.g. artificial intelligence, neural networks, support vector machines [SVM] or training a model
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01S—RADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
- G01S13/00—Systems using the reflection or reradiation of radio waves, e.g. radar systems; Analogous systems using reflection or reradiation of waves whose nature or wavelength is irrelevant or unspecified
- G01S13/88—Radar or analogous systems specially adapted for specific applications
- G01S13/89—Radar or analogous systems specially adapted for specific applications for mapping or imaging
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V3/00—Electric or magnetic prospecting or detecting; Measuring magnetic field characteristics of the earth, e.g. declination, deviation
- G01V3/12—Electric or magnetic prospecting or detecting; Measuring magnetic field characteristics of the earth, e.g. declination, deviation operating with electromagnetic waves
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F18/00—Pattern recognition
- G06F18/20—Analysing
- G06F18/21—Design or setup of recognition systems or techniques; Extraction of features in feature space; Blind source separation
- G06F18/214—Generating training patterns; Bootstrap methods, e.g. bagging or boosting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Remote Sensing (AREA)
- Evolutionary Computation (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geometry (AREA)
- Structural Engineering (AREA)
- Computer Hardware Design (AREA)
- General Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Radar, Positioning & Navigation (AREA)
- Architecture (AREA)
- Electromagnetism (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Civil Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Artificial Intelligence (AREA)
- Geology (AREA)
- Data Mining & Analysis (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Mining & Mineral Resources (AREA)
- Economics (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Geophysics (AREA)
- Medical Informatics (AREA)
- Development Economics (AREA)
- Software Systems (AREA)
- Pure & Applied Mathematics (AREA)
- Mathematical Optimization (AREA)
- Mathematical Analysis (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- Environmental & Geological Engineering (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
Abstract
The invention discloses a prediction method of post grouting thickness of a shield tunnel wall based on ground penetrating radar detection and machine learning, which utilizes an XGboost principle to simulate post grouting of the shield tunnel wall in a model test and collect data to construct a data set, constructs an XGBoost model after data preprocessing, and predicts and identifies a ground penetrating radar image acquired by real-time detection of the post grouting ground penetrating radar of the shield tunnel wall by writing a prediction module. The method has the advantages that the method is more attached to the actual condition of the post grouting of the shield tunnel wall, and the ground penetrating radar image of the post grouting of the shield tunnel wall can be effectively predicted, so that the possible dangerous situation can be predicted in advance.
Description
Technical Field
The invention relates to the field of shield tunnel wall post-grouting detection, in particular to a prediction method of shield tunnel wall post-grouting thickness based on ground penetrating radar detection and machine learning.
Background
The existing detection of grouting behind the shield tunnel wall mainly takes the detection of a ground penetrating radar as a main part, and the thickness and uniformity of grouting are detected through the ground penetrating radar device. However, the image of the ground penetrating radar is not a direct image of the underground structure, and the return signal is an image formed by electromagnetic wave signals, and analysis and explanation are required. And (5) checking the tunnel site by a detector, and recording and identifying the ground penetrating radar image of grouting behind the shield tunnel wall. The detection method is low in detection speed, extremely strong in experience dependence on detection personnel and high in subjectivity. Therefore, a rapid, effective and accurate detection method for radar images based on machine learning is urgently needed. This is where the present application requires significant improvement.
Disclosure of Invention
The invention aims to provide a prediction method of post grouting thickness of a shield tunnel wall based on ground penetrating radar detection and machine learning.
In order to solve the technical problems, the invention provides a prediction method of the post grouting thickness of a shield tunnel wall based on ground penetrating radar detection and machine learning, which comprises the following steps:
s1, acquiring signals and images in a shield tunnel by using a ground penetrating radar, and corresponding the ground penetrating radar signals to scanning positions to form a data set;
s2, simulating a model test of grouting behind a shield tunnel wall of the ground penetrating radar, acquiring a ground penetrating radar image of the shield tunnel with known grouting thickness, and constructing a data set;
s3, after preprocessing the data, establishing a prediction model of XGboost grouting thickness based on the ground penetrating radar image according to the characteristics of the data set;
s4, optimizing parameters of the prediction model of the XGboost grouting thickness;
s5, predicting a ground penetrating radar image acquired by the grouting ground penetrating radar in real time after the shield tunnel wall by using a prediction model of the XGboost grouting thickness after parameter optimization.
The step S1 includes the steps of:
s11, using a ground penetrating radar to scan and detect lining of the tail of a shield tunnel and grouting behind the wall of the shield tunnel under construction, wherein the ground penetrating radar is positioned close to the duct piece;
s12, recording the scanning position and the scanning path of the ground penetrating radar, collecting signals of the ground penetrating radar, and marking the corresponding position of each signal on the scanning path;
s13, numbering each acquired radar signal from 0;
and S14, corresponding the ground penetrating radar signal to the scanning position to form a data set.
The step S2 includes the steps of:
s21, selecting shield tunnel segments and grouting slurry for model test, and according to the distribution 1 of the segments and grouting: 1, making a model, placing a duct piece in the same soil, injecting the same slurry, and placing a wave-absorbing material under boundary condition treatment;
s22, the thickness of the grouting layer in the model is divided into three types of undergrouting, normal grouting and over grouting according to engineering ground conditions and engineering experience;
s23, performing a model test by using the ground penetrating radar, and scanning grouting layers with known thickness classifications;
s24, recording the scanning position and scanning path of the radar, collecting signals of the ground penetrating radar, marking the corresponding position of each signal on the scanning path, and dividing the signals into three types of undergrouting, normal grouting and over grouting.
The step S3 includes the steps of:
s31, carrying out data preprocessing on radar signals acquired in a model test and a shield tunnel, wherein the data preprocessing comprises the steps of drift removal, butterworth band-pass filtering, moving average, F-K offset and normalization in sequence, and the obtained radar signals are data between [ -1,1] and form a sample set;
s32, dividing a sample set into a training sample set I, a verification sample set and a test sample set according to a random mode for radar data collected by a preprocessed model test;
s33, calculating a loss function of the training sample set I in the current round according to the training sample set I:
in the method, in the process of the invention,for loss function->For training sample number, ++>For->Training samplesLoss of->For training the true tag value of the sample, +.>Is the firstiThe first sample is att-1Strong learner prediction value at multiple iterations,/->For the ith training sample->In the first placetA weak learner function during the training of the second iteration,/->And->For manually set coefficients +.>For the number of leaf nodes, +.>Is the first leaf node value;
s34, calculating an experience loss function of the current sample according to the training sample set IFirst and second partial derivatives based on a previous machine learning, and summing the first and second partial derivatives:
in the method, in the process of the invention,for loss function->To fall into->Training sample set of individual leaf nodes, +.>Is->Loss function pair of individual samples +.>First partial derivative of the predicted value of the individual samples, ->Is->Loss function pair of individual samples +.>Second partial derivative of the predicted value of the individual samples,>and->For manually set coefficients, empirical loss functionsLIs part of the loss function, i.e., the remainder of the regularization is removed;
s35, the number of passing wheels istThe ratio of =1, 2, the iteration of T, and establishing an XGboost prediction model.
The step S35 includes the steps of:
s351, calculate the firstThe individual samples are in the empirical loss function->Based on->Is>And second derivative->Calculate the sum of the first derivatives of all samples +.>Sum of second derivatives of all samples +.>,=1,2,…,;
S352, based on the current node attempting to split the decision tree, for all featureskCalculating a maximum score;
s354, if maximumIf the value is 0, the current decision tree is built, and the +.>,Is the firsttWheel training firstjThe values of the individual leaf nodes, obtaining weak learner->Updating strong learner->Enter the next round of weak learner iteration if max +>Not 0, go to step S352 to continueAn attempt is made to split the decision tree.
The step S352 includes the steps of:
S3522 sample is characterized bySequentially taking out the +.>And sequentially calculating the sum of the first derivatives and the second derivatives of the left subtree and the right subtree after the current sample is placed in the left subtree:
in the method, in the process of the invention,representing a numerical update->Is left toSum of all sample first derivatives of subtrees, < +.>Sum of all samples first derivatives of right subtree, +.>For the sum of the first derivatives of all samples, +.>Sum of all sample first derivatives of left subtree,/->Is the sum of the second derivatives of all samples of the right subtree, < ->Sum of second derivatives for all samples;And->The first derivative and the second derivative of the ith sample of the t-th round entering the left subtree are respectively;
s3523, updating the maximum score:
the step S4 includes the steps of:
s41, introducing K-fold cross verification when the XGBoost algorithm is trained, estimating a generalization error of a classifier, and evaluating the classification accuracy of the XGBoost algorithm under different parameters when only a training sample is possessed;
s42, searching the multidimensional array in parallel from different growth directions by adopting a grid search algorithm, and determining parameters of grid search.
The step S42 includes the steps of:
s421, determining a search range of parameters to be searched according to experience;
s422, setting a search step length of the searched parameter;
s423, calculating the classification accuracy of XGBoost according to a cross verification method for each group of values on the grid;
and S424, giving the classification accuracy of each group, and determining the optimal parameter value according to the classification accuracy.
The step S5 includes the steps of:
s51, preprocessing the ground penetrating radar data acquired in the S1, wherein the steps of data preprocessing sequentially comprise drift removal, butterworth band-pass filtering, moving average, F-K offset and normalization, and the obtained radar signals are data between [ -1,1 ];
s52, inputting the data into an established XGboost prediction model to obtain a prediction value of the grouting layer thickness classification.
The invention has the advantages that: the machine learning prediction method applied to the field of grouting detection behind the shield tunnel wall utilizes the XGboost principle to quickly, effectively and accurately identify the ground penetrating radar image; compared with the prior art, the prediction method is more attached to the actual condition of grouting behind the shield tunnel wall, and can effectively predict the ground penetrating radar image of grouting behind the shield tunnel wall, so that dangerous situations possibly occurring are predicted in advance, precious time is provided for timely supplementing grouting, the problem that grouting data behind the shield tunnel wall are difficult to interpret is effectively solved, and real-time feedback and guidance are provided for grouting construction.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention. In the drawings:
FIG. 1 is a flow chart of the invention S1-S5;
FIG. 2 is a flowchart illustrating the XGBoost model of S3;
FIG. 3 is a diagram illustrating the grid parameter search in S4 of the present invention;
fig. 4 is a flowchart illustrating the operation of the grid parameter search in S4 of the present invention.
Detailed Description
Embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
Fig. 1 shows a flow chart of an embodiment of the invention. As shown in fig. 1-4, the invention provides a prediction method of post grouting thickness of a shield tunnel wall based on ground penetrating radar detection and machine learning, which comprises the following steps:
s1, acquiring signals and images in a shield tunnel by using a ground penetrating radar, and corresponding the ground penetrating radar signals to scanning positions to form a data set, wherein the method specifically comprises the following steps of:
s11, using a ground penetrating radar to scan and detect lining of the tail of a shield tunnel and grouting behind the wall of the shield tunnel under construction, wherein the ground penetrating radar is positioned close to the duct piece;
s12, recording the scanning position and the scanning path of the ground penetrating radar, collecting signals of the ground penetrating radar, and marking the corresponding position of each signal on the scanning path;
s13, numbering each acquired radar signal from 0;
and S14, corresponding the ground penetrating radar signal to the scanning position to form a data set.
S2, simulating a model test of grouting behind a shield tunnel wall of the ground penetrating radar, acquiring a ground penetrating radar image of the shield tunnel with known grouting thickness, and constructing a data set, wherein the method specifically comprises the following steps of:
s21, selecting shield tunnel segments and grouting slurry for model test, and according to the distribution 1 of the segments and grouting: 1, making a model, placing a duct piece in the same soil, injecting the same slurry, and placing a wave-absorbing material under boundary condition treatment;
s22, the thickness of the grouting layer in the model is divided into three types of undergrouting, normal grouting and over grouting according to engineering ground conditions and engineering experience;
s23, performing a model test by using the ground penetrating radar, and scanning grouting layers with known thickness classifications;
s24, recording the scanning position and scanning path of the radar, collecting signals of the ground penetrating radar, marking the corresponding position of each signal on the scanning path, and dividing the signals into three types of undergrouting, normal grouting and over grouting.
S3, after preprocessing data, according to the characteristics of a data set, establishing a prediction model of XGboost grouting thickness based on a ground penetrating radar image, as shown in FIG. 2, specifically comprising the following steps:
s31, carrying out data preprocessing on radar signals acquired in a model test and a shield tunnel, wherein the data preprocessing comprises the steps of drift removal, butterworth band-pass filtering, moving average, F-K offset and normalization in sequence (the obtained radar signals are data between [ -1,1] and form a sample set;
s32, dividing a sample set into a training sample set I, a verification sample set and a test sample set according to a random mode for radar data collected by a preprocessed model test;
s33, calculating a loss function of the training sample set I in the current round according to the training sample set I:
in the method, in the process of the invention,for loss function->For training sample number, ++>For->Training samplesLoss of->For training the true tag value of the sample, +.>Is the firstiThe first sample is att-1Strong learner prediction value at multiple iterations,/->For the ith training sample->In the first placetA weak learner function during the training of the second iteration,/->And->For manually set coefficients +.>For the number of leaf nodes, +.>Is->A leaf node value;
s34, calculating an experience loss function of the current sample according to the training sample set IFirst and second partial derivatives based on a previous machine learning, and summing the first and second partial derivatives:
in the method, in the process of the invention,for loss function->To fall into->Training sample set of individual leaf nodes, +.>Is->Loss function pair of individual samples +.>First partial derivative of the predicted value of the individual samples, ->Is->Loss function pair of individual samples +.>Second partial derivative of the predicted value of the individual samples,>and->For manually set coefficients, empirical loss functionsLIs part of the loss function, i.e., the remainder of the regularization is removed;
s35, the number of passing wheels istIteration of =1, 2..t, establish XGboost predictionA model comprising the steps of:
s351, calculate the firstThe individual samples are in the empirical loss function->Based on->Is>And second derivative->Calculate the sum of the first derivatives of all samples +.>Sum of second derivatives of all samples +.>,=1,2,…,;
S352, based on the current node attempting to split the decision tree, for all featureskCalculating the maximum score, which specifically comprises the following steps:
S3522 sample is characterized bySequentially taking out the +.>And sequentially calculating the sum of the first derivatives and the second derivatives of the left subtree and the right subtree after the current sample is placed in the left subtree:
in the method, in the process of the invention,representing a numerical update->Sum of all sample first derivatives of left subtree,/->Sum of all samples first derivatives of right subtree, +.>For the sum of the first derivatives of all samples, +.>Sum of all sample first derivatives of left subtree,/->Is the sum of the second derivatives of all samples of the right subtree, < ->Sum of second derivatives for all samples;And->The first derivative and the second derivative of the ith sample of the t-th round entering the left subtree are respectively;
s3523, updating the maximum score:
s354, if maximumIf the value is 0, the current decision tree is built, and the +.>,Is the firsttWheel training firstjThe values of the individual leaf nodes, obtaining weak learner->Updating strong learner->Enter underA round of weak learner iteration if max +.>If not 0, then the process proceeds to step S352 to continue with the attempt to split the decision tree.
S4, optimizing parameters of the prediction model of the XGboost grouting thickness, as shown in fig. 3 and 4, specifically comprises the following steps:
s41, introducing K-fold cross verification when the XGBoost algorithm is trained, estimating a generalization error of a classifier, and evaluating the classification accuracy of the XGBoost algorithm under different parameters when only a training sample is possessed;
s42, searching the multidimensional array in parallel from different growth directions by adopting a grid search algorithm, and determining parameters of grid search, wherein the method comprises the following steps of:
s421, determining a search range of parameters to be searched according to experience;
s422, setting a search step length of the searched parameter;
s423, calculating the classification accuracy of XGBoost according to a cross verification method for each group of values on the grid;
and S424, giving the classification accuracy of each group, and determining the optimal parameter value according to the classification accuracy.
S5, predicting a ground penetrating radar image acquired by the grouting ground penetrating radar in real time after the shield tunnel wall by using a prediction model of the XGboost grouting thickness after parameter optimization, and specifically comprising the following steps:
s51, preprocessing the ground penetrating radar data acquired in the S1, wherein the steps of data preprocessing sequentially comprise drift removal, butterworth band-pass filtering, moving average, F-K offset and normalization, and the obtained radar signals are data between [ -1,1 ];
s52, inputting the data into an established XGboost prediction model to obtain a prediction value of the grouting layer thickness classification, namely outputting a classification label finally in FIG. 1.
The above description is only of the preferred embodiments of the present invention and is not intended to limit the present invention, and various modifications and variations may be made to the present invention by those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (6)
1. A prediction method of post grouting thickness of shield tunnel wall based on ground penetrating radar detection and machine learning comprises the following steps:
s1, acquiring signals and images in a shield tunnel by using a ground penetrating radar, and corresponding the ground penetrating radar signals to scanning positions to form a data set;
s2, simulating a model test of grouting behind a shield tunnel wall of the ground penetrating radar, acquiring a ground penetrating radar image of the shield tunnel with known grouting thickness, and constructing a data set;
s3, after preprocessing the data, establishing a prediction model of XGboost grouting thickness based on the ground penetrating radar image according to the characteristics of the data set;
the step S3 includes the steps of:
s31, carrying out data preprocessing on radar signals acquired in a model test and a shield tunnel, wherein the data preprocessing comprises the steps of drift removal, butterworth band-pass filtering, moving average, F-K offset and normalization in sequence, and the obtained radar signals are data between [ -1,1] and form a sample set;
s32, dividing a sample set into a training sample set I, a verification sample set and a test sample set according to a random mode for radar data collected by a preprocessed model test;
s33, calculating a loss function of the training sample set I in the current round according to the training sample set I:
in the method, in the process of the invention,for loss function->For training sample number, ++>For->Training samples->Loss of->For training the true tag value of the sample, +.>Is->The first sample is att-1Strong learner prediction value at multiple iterations,/->Is->Training samples->In the first placetA weak learner function during the training of the second iteration,/->Andfor manually set coefficients +.>For the number of leaf nodes, +.>Is->A leaf node value;
s34, calculating an experience loss function of the current sample according to the training sample set IFirst and second partial derivatives based on a previous machine learning, and summing the first and second partial derivatives:
in the method, in the process of the invention,for loss function->To fall into->Training sample set of individual leaf nodes, +.>Is->Loss function pair of individual samples +.>First partial derivative of the predicted value of the individual samples, ->Is->Loss function pair of individual samples +.>Second partial derivative of the predicted value of the individual samples,>and->For manually set coefficients, empirical loss functionsLIs part of the loss function, i.e., the remainder of the regularization is removed;
s35, the number of passing wheels istIteration of =1, 2..t, build XGboost prediction model;
s4, optimizing parameters of the prediction model of the XGboost grouting thickness;
the step S4 includes the steps of:
s41, introducing K-fold cross verification when the XGBoost algorithm is trained, estimating a generalization error of a classifier, and evaluating the classification accuracy of the XGBoost algorithm under different parameters when only a training sample is possessed;
s42, searching the multidimensional array in parallel from different growth directions by adopting a grid search algorithm, and determining parameters of grid search;
the step S42 includes the steps of:
s421, determining a search range of parameters to be searched according to experience;
s422, setting a search step length of the searched parameter;
s423, calculating the classification accuracy of XGBoost according to a cross verification method for each group of values on the grid;
s424, giving the classification accuracy of each group, and determining the optimal parameter value according to the classification accuracy;
s5, predicting a ground penetrating radar image acquired by the grouting ground penetrating radar in real time after the shield tunnel wall by using a prediction model of the XGboost grouting thickness after parameter optimization.
2. The prediction method of the post-grouting thickness of the shield tunnel wall based on ground penetrating radar detection and machine learning according to claim 1, wherein the prediction method is characterized by comprising the following steps: the step S1 includes the steps of:
s11, using a ground penetrating radar to scan and detect lining of the tail of a shield tunnel and grouting behind the wall of the shield tunnel under construction, wherein the ground penetrating radar is positioned close to the duct piece;
s12, recording the scanning position and the scanning path of the ground penetrating radar, collecting signals of the ground penetrating radar, and marking the corresponding position of each signal on the scanning path;
s13, numbering each acquired radar signal from 0;
and S14, corresponding the ground penetrating radar signal to the scanning position to form a data set.
3. The prediction method of the post-grouting thickness of the shield tunnel wall based on ground penetrating radar detection and machine learning according to claim 1, wherein the prediction method is characterized by comprising the following steps: the step S2 includes the steps of:
s21, selecting shield tunnel segments and grouting slurry for model test, and according to the distribution 1 of the segments and grouting: 1, making a model, placing a duct piece in the same soil, injecting the same slurry, and placing a wave-absorbing material under boundary condition treatment;
s22, the thickness of the grouting layer in the model is divided into three types of undergrouting, normal grouting and over grouting according to engineering ground conditions and engineering experience;
s23, performing a model test by using the ground penetrating radar, and scanning grouting layers with known thickness classifications;
s24, recording the scanning position and scanning path of the radar, collecting signals of the ground penetrating radar, marking the corresponding position of each signal on the scanning path, and dividing the signals into three types of undergrouting, normal grouting and over grouting.
4. The prediction method of the post-grouting thickness of the shield tunnel wall based on ground penetrating radar detection and machine learning according to claim 1, wherein the prediction method is characterized by comprising the following steps: the step S35 includes the steps of:
s351, calculate the firstThe individual samples are in the empirical loss function->Based on->Is>And second derivative->Calculate the sum of the first derivatives of all samples +.>Sum of second derivatives of all samples +.>,,;
S352, based on the current node attempting to split the decision tree, for all featureskCalculating a maximum score;
s354, if maximumIf the value is 0, the current decision tree is built, and the +.>,Is the firsttWheel training firstjThe values of the individual leaf nodes, obtaining weak learner->Updating strong learner->Enter the next round of weak learner iteration if max +>If not 0, then the process proceeds to step S352 to continue with the attempt to split the decision tree. />
5. The prediction method of the post-grouting thickness of the shield tunnel wall based on ground penetrating radar detection and machine learning according to claim 4, wherein the prediction method is characterized by comprising the following steps: the step S352 includes the steps of:
S3522 sample is characterized bySequentially taking out the +.>And sequentially calculating the sum of the first derivatives and the second derivatives of the left subtree and the right subtree after the current sample is placed in the left subtree:
in the method, in the process of the invention,representing a numerical update->Sum of all sample first derivatives of left subtree,/->Sum of all samples first derivatives of right subtree, +.>For the sum of the first derivatives of all samples,Sum of all sample first derivatives of left subtree,/->Is the sum of the second derivatives of all samples of the right subtree, < ->Sum of second derivatives for all samples;Andthe first derivative and the second derivative of the ith sample of the t-th round entering the left subtree are respectively;
s3523, updating the maximum score:
6. the prediction method of the post-grouting thickness of the shield tunnel wall based on ground penetrating radar detection and machine learning according to claim 1, wherein the prediction method is characterized by comprising the following steps: the step S5 includes the steps of:
s51, preprocessing ground penetrating radar data acquired in the S1, wherein the data preprocessing step comprises drift removal, butterworth band-pass filtering, moving average, F-K offset and normalization, and the obtained radar signals are data between [ -1,1 ];
s52, inputting the data into an established XGboost prediction model to obtain a prediction value of the grouting layer thickness classification.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010975476.2A CN112287595B (en) | 2020-09-16 | 2020-09-16 | Prediction method of post-grouting thickness of shield tunnel wall based on ground penetrating radar detection and machine learning |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010975476.2A CN112287595B (en) | 2020-09-16 | 2020-09-16 | Prediction method of post-grouting thickness of shield tunnel wall based on ground penetrating radar detection and machine learning |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112287595A CN112287595A (en) | 2021-01-29 |
CN112287595B true CN112287595B (en) | 2023-05-23 |
Family
ID=74419965
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010975476.2A Active CN112287595B (en) | 2020-09-16 | 2020-09-16 | Prediction method of post-grouting thickness of shield tunnel wall based on ground penetrating radar detection and machine learning |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112287595B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113326661B (en) * | 2021-06-17 | 2022-02-15 | 广西路桥工程集团有限公司 | RS-XGboost-based tunnel advanced drilling quantitative interpretation method and device |
CN113326660B (en) * | 2021-06-17 | 2022-11-29 | 广西路桥工程集团有限公司 | Tunnel surrounding rock extrusion deformation prediction method based on GA-XGboost model |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1975112A (en) * | 2006-12-14 | 2007-06-06 | 同济大学 | Shield tunnel subsidence control method based on exploring radar |
CN111025286A (en) * | 2019-11-01 | 2020-04-17 | 长安大学 | Ground penetrating radar map self-adaptive selection method for water damage detection |
CN111144636A (en) * | 2019-12-22 | 2020-05-12 | 同济大学 | Slope deformation prediction method |
CN111365015A (en) * | 2020-03-05 | 2020-07-03 | 中建交通建设集团有限公司 | Shield tunneling parameter feature extraction and attitude deviation prediction method based on XGboost |
-
2020
- 2020-09-16 CN CN202010975476.2A patent/CN112287595B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1975112A (en) * | 2006-12-14 | 2007-06-06 | 同济大学 | Shield tunnel subsidence control method based on exploring radar |
CN111025286A (en) * | 2019-11-01 | 2020-04-17 | 长安大学 | Ground penetrating radar map self-adaptive selection method for water damage detection |
CN111144636A (en) * | 2019-12-22 | 2020-05-12 | 同济大学 | Slope deformation prediction method |
CN111365015A (en) * | 2020-03-05 | 2020-07-03 | 中建交通建设集团有限公司 | Shield tunneling parameter feature extraction and attitude deviation prediction method based on XGboost |
Non-Patent Citations (2)
Title |
---|
"Real-time detection technology of synchronous grouting for shield tunnel and analysis of grouting effect";Xie Xiongyao el.;《2018 17th International Conference on Ground Penetrating Radar (GPR)》;20180823;全文 * |
"基于机器学习的地铁隧道施工扰动控制研究";王鹏;《现代隧道技术》;20191231;第56卷;全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN112287595A (en) | 2021-01-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ukhwah et al. | Asphalt pavement pothole detection using deep learning method based on YOLO neural network | |
KR101811270B1 (en) | Method and system for checking goods | |
CN114548278A (en) | In-service tunnel lining structure defect identification method and system based on deep learning | |
CN112287595B (en) | Prediction method of post-grouting thickness of shield tunnel wall based on ground penetrating radar detection and machine learning | |
CN115019171B (en) | Non-contact surrounding rock rapid partition grading method | |
CN112446350B (en) | Improved method for detecting cotton in YOLOv3 complex cotton field background | |
CN111210869A (en) | Protein cryoelectron microscope structure analysis model training method and analysis method | |
Jiang et al. | Development of a core feature identification application based on the Faster R-CNN algorithm | |
CN117741808A (en) | Geological crack detection method based on geological exploration | |
CN116468939A (en) | Intelligent classification method for tunnel face surrounding rock based on neural network | |
Fakhri et al. | Road crack detection using gaussian/prewitt filter | |
CN111783616A (en) | Data-driven self-learning-based nondestructive testing method | |
CN113095364B (en) | High-speed rail seismic event extraction method, medium and equipment using convolutional neural network | |
CN107437091A (en) | Multilayer limits the positive and negative class change detecting method of SAR image of Boltzmann machine | |
CN117349462B (en) | Remote sensing intelligent interpretation sample data set generation method | |
CN108663334A (en) | The method for finding soil nutrient spectral signature wavelength based on multiple Classifiers Combination | |
CN116466408B (en) | Artificial neural network superbedrock identification method based on aeromagnetic data | |
Valencia et al. | Blasthole Location Detection Using Support Vector Machine and Convolutional Neural Networks on UAV Images and Photogrammetry Models | |
CN117688313A (en) | Method for cooperatively processing mapping data by network | |
CN117496463A (en) | Learning method and system for improving road perception precision | |
CN115860396A (en) | Intelligent planning method based on land reserve analysis model | |
CN114724036A (en) | Ice crack detection method based on multi-scale learning | |
Vanitha et al. | A novel deep learning method for the identification and categorization of footpath defects based on thermography | |
CN116597296B (en) | Wheat seedling density estimation method based on deep learning and thermodynamic diagram | |
CN113963334B (en) | Vehicle track defect data repairing method for road side sensing unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |