CN111851989A CN202010883034.5A CN202010883034A CN111851989A CN 111851989 A CN111851989 A CN 111851989A CN 202010883034 A CN202010883034 A CN 202010883034A CN 111851989 A CN111851989 A CN 111851989A
Authority
CN
China
Prior art keywords
springboard
scaffold
arc
frame
clamping piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010883034.5A
Other languages
Chinese (zh)
Inventor
蒋先龙
聂祥维
常晓
姚德剑
黄宝兴
肖坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN202010883034.5A priority Critical patent/CN111851989A/en
Publication of CN111851989A publication Critical patent/CN111851989A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/28Clips or connections for securing boards

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Ladders (AREA)

Abstract

The invention discloses a scaffold gangboard and an installation method thereof. The scaffold gangboard comprises a rectangular gangboard frame and a plurality of longitudinal rods and transverse rods which are respectively perpendicular to the long sides and the short sides of the gangboard frame, one end of each longitudinal rod is arranged on one long side of the gangboard frame, the other end of each longitudinal rod exceeds the other long side, and the exceeding ends of at least two longitudinal rods in the plurality of longitudinal rods are provided with threads; two ends of the cross rod are respectively arranged on two short sides of the frame of the springboard; one end of the longitudinal rod with the thread is provided with a movable clamping piece with an arc, the movable clamping piece with the arc is provided with a through hole corresponding to the position of the longitudinal rod and is fastened to the longitudinal rod through a nut, and the outer side of the long edge of the springboard frame where the other end of the longitudinal rod is located is provided with a fixed clamping piece with the arc; the length of the longitudinal rod is greater than the distance between the adjacent large cross rods of the scaffold; one short edge of the springboard frame is provided with a springboard connecting piece. The stability of the scaffold gangboard is greatly improved.

Description

Scaffold gangboard and mounting method thereof
Technical Field
The invention belongs to the field of safety protection of temporary buildings, and particularly relates to a scaffold gangboard and an installation method thereof.
Background
Scaffolds are various supports that are temporarily set up for workers to operate and solve vertical and horizontal transportation in the construction process of building works. The springboard is erected on a scaffold and serves as the most common temporary operation platform in the construction of constructional engineering. However, many workers in the country step on the ground every year or a serious safety accident is caused by unstable placement of the steel fence pieces used as the gangway, so that reinforcement measures must be taken to avoid the safety accident. These ordinary springboards are relatively troublesome to fix and inconvenient to install.
Patent application CN 201120492975 discloses a steel springboard for scaffold, wherein U-shaped hooks for fixing the steel springboard are arranged on two end faces of the steel springboard. However, the side of the steel springboard is not provided with a reinforcing measure, and the steel springboard is only suitable for the scaffold with a fixed distance between the small vertical rods due to the U-shaped hook and cannot be adjusted.
Disclosure of Invention
Aiming at the technical problems, the invention provides a scaffold gangboard and an installation method thereof, so that the gangboard is combined with a steel pipe of a scaffold, the stability of the gangboard is enhanced, and the risk caused by potential safety hazards is reduced.
The invention adopts the following technical scheme:
a scaffold gangboard comprises a rectangular gangboard frame, a plurality of longitudinal rods and transverse rods, wherein the longitudinal rods and the transverse rods are respectively perpendicular to the long sides and the short sides of the gangboard frame; two ends of the cross rod are respectively arranged on two short sides of the frame of the springboard; one end of the longitudinal rod with the thread is provided with a movable clamping piece with an arc, the movable clamping piece with the arc is provided with a through hole corresponding to the position of the longitudinal rod and is fastened to the longitudinal rod through a nut, and the outer side of the long edge of the springboard frame where the other end of the longitudinal rod is located is provided with a fixed clamping piece with the arc; the length of the longitudinal rod is greater than the distance between the adjacent large cross rods of the scaffold; one short edge of the springboard frame is provided with a springboard connecting piece.
Compared with the prior art, the scaffold gangboard has the advantages that:
the springboard connecting piece can be used for connecting adjacent scaffold springboards in the length direction, so that the extension of the springboards and the reinforcement among the springboards are realized; take the fixing clip of circular arc to take to establish and realize consolidating on the outside sheer pole of scaffold, the activity clip of taking the circular arc can be adjusted according to the interval of the sheer pole of scaffold, adapts to the scaffold of different sheer pole intervals to stabilize the joint and realize consolidating on inboard sheer pole, the stability of scaffold springboard has obtained very big improvement.
Preferably, the further technical scheme of the invention is as follows:
the long edge that the vertical pole surpassed is equipped with the trompil of a plurality of equipartitions, and the vertical pole passes through the trompil setting on two long edges of springboard frame.
The exceeding ends of the three longitudinal rods are provided with threads, one longitudinal rod is arranged in the middle of the side frame of the springboard, and the other two longitudinal rods are respectively arranged at the two ends of the side frame of the springboard.
The fixed clamping piece with the circular arc and the movable clamping piece with the circular arc have the same structure and are of rectangular block structures, one side of the lower portion of each rectangular block structure is provided with a circular arc structure with the radius being the same as that of the large cross bar of the scaffold, the arc length of each circular arc structure is 40% -50% of the outer circumference of the large cross bar, and the through hole of the movable clamping piece with the circular arc is arranged above the circular arc structure.
The springboard connecting piece is an L-shaped buckle.
A gasket is arranged between the movable clamping piece with the arc and the nut.
The mounting method of the scaffold gangboard is implemented by the following steps: firstly, one side of a springboard, which is provided with a fixed clamping piece with an arc, is lapped on a large cross bar at the outer side of a scaffold to realize clamping, then one side of a longitudinal rod, which exceeds a long edge, is lapped on a large cross beam at the inner side of the scaffold, a movable clamping piece with the arc penetrates on the longitudinal rod until the movable clamping piece with the arc is clamped on the large cross beam at the inner side, and all the movable clamping pieces with the arc are locked through nuts; and then connecting the other springboard with the springboard through the springboard connecting piece, and repeating the steps until the layer of scaffold springboard is fully paved.
Compared with the prior art, the method for installing the scaffold gangboard has the advantages that:
the reinforcing of the springboard is realized, the safety of the springboard is enhanced, the installation and the operation are simple and convenient, and the time and the labor cost are saved.
Further, a gasket is added between the movable clamping piece with the arc and the nut.
Drawings
Fig. 1 is a schematic structural view of a scaffold ramp of the present invention;
FIG. 2 is a front view of an L-shaped clip attached to a frame of a gangway;
FIG. 3 is a schematic structural view of a fixed clip member with a circular arc;
FIG. 4 is a schematic structural view of a movable clamp with an arc;
FIG. 5 is a cross-sectional view of a movable catch with an arc;
FIG. 6 is a top view of two gangway boards connected to a scaffold;
description of reference numerals:
a springboard frame 1; a cross bar 2; a longitudinal bar 3; an L-shaped buckle 4; a fixed fastener 5 with an arc; a movable clamping piece 6 with an arc; a thread 7; a nut 8; a gasket 9; a through hole 10; a large cross bar 11 outside the through hole; an inner crossbar 12.
Detailed Description
The invention will be further described with reference to specific embodiments. It is to be understood that the following description is only for purposes of clearly illustrating the present invention and is not to be taken in a limiting sense.
Referring to fig. 1 to 6, the scaffold gangboard is composed of a gangboard frame 1, cross bars 2, longitudinal bars 3 and the like. The springboard frame 1 is of a rectangular structure, and two ends of the cross rod 2 are respectively and vertically welded to the inner sides of two short edges of the springboard frame 1. Two L-shaped buckles 4 are welded above one of the short edges of the springboard frame 1, as shown in fig. 2, and are used for connecting adjacent springboards. The long limit of one side of springboard frame 1 is equipped with the trompil of a plurality of equipartitions, and the diameter of trompil matches with the diameter of vertical pole 3, supplies vertical pole 3 to pass in the trompil. After the vertical rod 3 passes through the opening, one end of the vertical rod is vertically welded on the long edge of the springboard frame 1 which is not provided with the opening, and the other end of the vertical rod exceeds the long edge provided with the opening. Three longitudinal rods 3 with threads 7 are arranged at the positions beyond the ends, one longitudinal rod is positioned in the middle of the springboard frame 1, and the other two longitudinal rods 3 are respectively arranged at the two ends of the springboard frame 2. Taking the vertical rod positioned at the middle position as an example, one end of the vertical rod 3 provided with threads is provided with a movable clamping piece 6 with an arc, and as shown in fig. 3 and 4, the movable clamping piece 6 with the arc is fastened through a nut 8 and a gasket 9; and a fixing clamping piece 5 with an arc is arranged on the outer side of the long edge where the other end of the longitudinal rod 3 is positioned, as shown in figure 2. The fixed clamping piece 5 with the circular arc and the movable clamping piece 6 with the circular arc have basically the same structure, and the movable clamping piece 6 with the circular arc is provided with a through hole 10 corresponding to the position of the longitudinal rod 3. The movable clamping piece 6 with the circular arc is taken as an example for explanation, and is a rectangular block structure, a circular arc structure with the radius the same as that of the large cross bar of the scaffold is formed at the left lower side of the rectangular block structure through cutting, the circle center of the circular arc structure is superposed with the circle center of the large cross bar of the scaffold, and the arc length of the circular arc structure is 40% -50% of the outer circumference of the large cross bar, so that the circular arc structure and the large cross bar of the scaffold can be effectively and firmly clamped together. The through hole 10 of the movable clamping piece 6 with the circular arc is arranged above the circular arc structure.
On the other hand, the method for installing the scaffold gangboard is implemented by the following steps:
firstly, one side of a springboard, which is provided with a fixed clamping piece 5 with an arc, is lapped on an outer side large cross bar 11 of a scaffold, the fixed clamping piece 5 with the arc is firmly clamped with the outer side large cross bar 11, then one side of a longitudinal rod 3, which exceeds a long edge, is lapped on an inner side large cross bar 12 of the scaffold, a movable clamping piece 6 with the arc is penetrated on a longitudinal rod 2, the position of the movable clamping piece 6 with the arc is adjusted according to the distance between the outer side large cross bar 11 and the inner side large cross bar 12 until the movable clamping piece 6 with the arc is clamped on the inner side large cross bar 12, gaskets 9 are arranged on the outer sides of all the movable clamping pieces 6 with the arc, nuts 8 are screwed on the outer sides of the gaskets 9 and fastened, and the installation of the spring; and then connecting the other springboard with the springboard through a springboard connecting piece 4, repeating the steps, and paving along the long edge direction until the springboard of the layer of scaffold is fully paved. Fig. 6 to fig. only show two adjacent gangway boards connected to the scaffold.
The springboard is simple to manufacture, the stability and the safety of the springboard are greatly improved by reinforcing the three surfaces, the installation and the operation are simple and convenient, time and labor are saved, and the springboard can adapt to scaffolds with different large cross rod distances.
The foregoing is only a preferred embodiment of the present invention. Various modifications and equivalent changes may be made by those skilled in the art without departing from the spirit and scope of the present invention, and such modifications and changes are intended to be included within the scope of the present invention.

Claims (8)

1. The utility model provides a scaffold gangboard, includes rectangular shape's gangboard frame, its characterized in that: the springboard frame is characterized by further comprising a plurality of longitudinal rods and transverse rods which are perpendicular to the long sides and the short sides of the springboard frame respectively, one ends of the longitudinal rods are arranged on one long side of the springboard frame, the other ends of the longitudinal rods exceed the other long side, and the exceeding ends of at least two longitudinal rods in the plurality of longitudinal rods are provided with threads; two ends of the cross rod are respectively arranged on two short sides of the frame of the springboard; one end of the longitudinal rod with the thread is provided with a movable clamping piece with an arc, the movable clamping piece with the arc is provided with a through hole corresponding to the position of the longitudinal rod and is fastened to the longitudinal rod through a nut, and the outer side of the long edge of the springboard frame where the other end of the longitudinal rod is located is provided with a fixed clamping piece with the arc; the length of the longitudinal rod is greater than the distance between the adjacent large cross rods of the scaffold; one short edge of the springboard frame is provided with a springboard connecting piece.
2. The scaffold ramp of claim 1, wherein: the long edge that the vertical pole surpassed is equipped with the trompil of a plurality of equipartitions, and the vertical pole passes through the trompil setting on two long edges of springboard frame.
3. The scaffold ramp of claim 1, wherein: the exceeding ends of the three longitudinal rods are provided with threads, one longitudinal rod is arranged in the middle of the side frame of the springboard, and the other two longitudinal rods are respectively arranged at the two ends of the side frame of the springboard.
4. The scaffold ramp of claim 1, wherein: the fixed clamping piece and the movable clamping piece with the circular arc have the same structure and are of rectangular block structures, one side of the lower portion of each rectangular block structure is provided with a circular arc structure with the radius the same as that of the large cross bar of the scaffold, the arc length of each circular arc structure is 40% -50% of the outer circumference of the large cross bar, and the through hole of the movable clamping piece with the circular arc is arranged above the circular arc structure.
5. The scaffold ramp of claim 1, wherein: the springboard connecting piece is an L-shaped buckle.
6. The scaffold ramp of claim 1, wherein: a gasket is arranged between the movable clamping piece with the arc and the nut.
7. The method is implemented by the following steps: firstly, one side of a springboard, which is provided with a fixed clamping piece with an arc, is lapped on a large cross bar at the outer side of a scaffold to realize clamping, then one side of a longitudinal rod, which exceeds a long edge, is lapped on a large cross beam at the inner side of the scaffold, a movable clamping piece with the arc penetrates on the longitudinal rod until the movable clamping piece with the arc is clamped on the large cross beam at the inner side, and all the movable clamping pieces with the arc are locked through nuts; and then connecting the other springboard with the springboard through the springboard connecting piece, and repeating the steps until the layer of scaffold springboard is fully paved.
8. A method of installing a scaffold ramp according to claim 7, wherein: and a gasket is added between the movable clamping piece with the arc and the nut.
CN202010883034.5A 2020-08-28 2020-08-28 Scaffold gangboard and mounting method thereof Pending CN111851989A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010883034.5A CN111851989A (en) 2020-08-28 2020-08-28 Scaffold gangboard and mounting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010883034.5A CN111851989A (en) 2020-08-28 2020-08-28 Scaffold gangboard and mounting method thereof

Publications (1)

Publication Number Publication Date
CN111851989A true CN111851989A (en) 2020-10-30

Family

ID=72968313

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010883034.5A Pending CN111851989A (en) 2020-08-28 2020-08-28 Scaffold gangboard and mounting method thereof

Country Status (1)

Country Link
CN (1) CN111851989A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR970006020U (en) * 1995-07-29 1997-02-21 한준수 Scaffolding for architectural railings
CN201003277Y (en) * 2007-01-11 2008-01-09 田庄 Architectural shelf board
CN203160676U (en) * 2013-04-12 2013-08-28 山东电力建设第二工程公司 Scaffold frame plate fixing device
CN103410304A (en) * 2013-05-23 2013-11-27 浙江中交科技有限公司 Novel scaffold system
CN204590565U (en) * 2015-05-04 2015-08-26 中冶建工集团有限公司 Scaffold floor and apply the scaffold that this scaffold floor sets up
CN105484488A (en) * 2015-12-16 2016-04-13 华北冶建工程建设有限公司 Steel reinforcing bar scaffold board convenient and fast to assemble
KR20170108292A (en) * 2016-03-17 2017-09-27 한국남동발전 주식회사 Horizontal type foothold for boiler main tube of thermal power plants
CN212249150U (en) * 2020-08-28 2020-12-29 中国二十二冶集团有限公司 Scaffold gangboard

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR970006020U (en) * 1995-07-29 1997-02-21 한준수 Scaffolding for architectural railings
CN201003277Y (en) * 2007-01-11 2008-01-09 田庄 Architectural shelf board
CN203160676U (en) * 2013-04-12 2013-08-28 山东电力建设第二工程公司 Scaffold frame plate fixing device
CN103410304A (en) * 2013-05-23 2013-11-27 浙江中交科技有限公司 Novel scaffold system
CN204590565U (en) * 2015-05-04 2015-08-26 中冶建工集团有限公司 Scaffold floor and apply the scaffold that this scaffold floor sets up
CN105484488A (en) * 2015-12-16 2016-04-13 华北冶建工程建设有限公司 Steel reinforcing bar scaffold board convenient and fast to assemble
KR20170108292A (en) * 2016-03-17 2017-09-27 한국남동발전 주식회사 Horizontal type foothold for boiler main tube of thermal power plants
CN212249150U (en) * 2020-08-28 2020-12-29 中国二十二冶集团有限公司 Scaffold gangboard

Similar Documents

Publication Publication Date Title
CN103410304A (en) Novel scaffold system
CN111809850A (en) Method for mounting basket diagonal draw bar type cantilever frame
CN212249150U (en) Scaffold gangboard
CN204571823U (en) The vertical cat ladder of a kind of assembly type
CN204752026U (en) Tower crane escape way
CN111851989A (en) Scaffold gangboard and mounting method thereof
CN211470603U (en) Telescopic tower crane passageway
KR200482903Y1 (en) Lifeline mounting pole
CN217399422U (en) Edge protection structure for hoisting and welding construction of suspension bridge steel truss stiffening beam
CN208162919U (en) A kind of detachable equipment assembly platform
CN219684325U (en) Steel column side column welding platform
CN215631489U (en) Building templates operation platform
CN213571565U (en) Assembled bridge floor protection device
CN210316466U (en) Lifting scaffold board and protective net system
CN211081084U (en) Tool type pole holding safety protection device
CN113202281A (en) Building templates operation platform
CN220133555U (en) Connection structure for steel tube bundle door and window construction enclosure and quick-mounting enclosure device thereof
CN206071080U (en) A kind of scalable faces side protection tool
CN221664328U (en) Edge protection device suitable for steel structure system steel bar truss building carrier plate
CN215907533U (en) Steel fence wind-proof and overturn-proof device for gale area
CN220790697U (en) Quick-mounting clamping type guardrail
CN220245381U (en) Can have enough to meet need tower crane operation platform
CN217352125U (en) Bailey bridge builds with channel-section steel assembled steel landing stage railing
CN211691508U (en) Base capable of being used reversely and used for fixing concrete pump pipe
CN216195445U (en) Connecting structure of secondary beam and main beam of steel-concrete structure building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination