CN1112180A - 建筑的建造方法 - Google Patents
建筑的建造方法 Download PDFInfo
- Publication number
- CN1112180A CN1112180A CN95102468A CN95102468A CN1112180A CN 1112180 A CN1112180 A CN 1112180A CN 95102468 A CN95102468 A CN 95102468A CN 95102468 A CN95102468 A CN 95102468A CN 1112180 A CN1112180 A CN 1112180A
- Authority
- CN
- China
- Prior art keywords
- construction method
- building
- composite plate
- cushion block
- composite
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/0007—Base structures; Cellars
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/02—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
- E04B1/10—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of wood
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Wood Science & Technology (AREA)
- Building Environments (AREA)
Abstract
在建造一例如房子A的建筑,若干诸如Pa…的
组合件是由规定厚度的复合板对2a…和3a…用规
定宽度的垫块4a…以固定的间隔隔开所组成,复合
组件只用于构成一面墙ω…和一分开上下层的天花
板c。开始建造房子A前,在房子A的地面E上由
混凝土建成一平基础面24,若干竖直支撑件21在其
底面有锚板21c,锚板21c紧固到基础面24,竖直支
撑件21…还包括位于其顶部用来紧固到底基23上
的挡板21j,一包覆板22装在挡板21j的侧面盖住底
基23和基础24之间的间隙。
Description
本发明与诸如房屋之类建造的建造方法有关。
在诸如房屋之类建筑的建造方法中,常规的建造方法和预制的建造方法是众所周知的。
一个常规建造方法的实例可在已公开的日本专利申请No.HEI-4-222735/1992中找到。上述所指的建造方法是一传统的木架建造方法,其中的诸如柱和梁的建筑构件是在建造工地上直接装配,然后再安装墙壁和天花板等。相反,预制的建造方法牵涉到在工厂内对房屋建筑构件的批量生产,然后再把这些构件搬到工地进行装配,这种方法一般有壁板系统和框架结构系统。一个壁板系统的实例可在已公开的日本专利申请No HEI-4-309636/1992中找到。壁板系统牵涉到在工地上架设预制板以形成墙和天花板等。相反,一个框架结构系统的实例可在已公开的日本专利申请No HEI-4-285242/1992中找到。框架结构系统牵涉到预制由结构钢制成在工地进行装配的诸如柱和梁等房屋建筑构件随后预制壁板就地进行安装。
然而上述现有建造方法有下列问题,首先,常规建造方法牵涉到多种在工地现场由木工进行装配的矩形木材和木板,因此增加了现场的技术工作量,从而增加了建造的成本和时间,也很难达到高标准的隔热和隔音。第二,作为预制建造方法之一的壁板系统牵涉到工厂制备壁板用于现场装配,就会有批量生产的优点,但是此系统牵涉到要制备多种壁板,诸如门窗框,木板的隔热板,结果其总的材料成本和隔热和隔音效果仍然近乎等同于常规方法的成本和效果,此类壁板也难于装运因此运输费昂贵。第三作为另一个预制建造方法,框架结构系统牵涉到现场装配和架设诸如柱和梁的房屋建筑构件,因此这种建造方法在安装建筑构件的时间和成本以及隔音、隔热方面几乎等同于常规方法。
此外,载有建筑附加结构的连续基础在上述公开的日本专利申请NO HEI-4-309636/1992中公布,该基础在沟挖好后立即用混凝土灌充到地下沟进行浇铸。
该基础有如下的一个问题,首先建造该基础需要大量费力的工作诸如开沟,回填以及架设和使混凝土框架脱模,所以增加了建造的时间和成本,第二因为架设需要专门的技巧这样就牵涉到熟练工人,这就时常引起技术工人短缺以及工程质量不稳定,而且一旦基础造好,完成的连续基础很难改变并且不能对基础作适应性的高度改变或难于定位通气孔。
因此,本发明的目的是提供一又快又容易地建造建筑的方法,从而大大地节省时间和建筑成本包括材料的成本。
本发明的另一目的是提供一用于建造一能改进隔热和隔音的建筑方法。
本发明还有一目的是提供一可容易地建造具有连续基础的建筑的方法,从而减小了现场的技术工作量因此也就克服了缺乏熟练工人的问题,这就改善了基础的质量和一致性。即使在基础完工以后,基础设计仍考虑到能对基础高度作修改以及基础通气孔的定位。
根据上述这些发明目的,例如建造一房子A,本发明具有以下特点:各有规定厚度复合板对运到工地并分别标号为2a和3a,2b和3b,2c和3c…2m和3m。在复合板之间装有固定宽度且标号分别为4a…,4b…,4c…,5m…的垫块,这样标号为Pa…Qm…的复合组件是用以固定间隔隔开的且标号为2a和3a……2m和3m的复合板对造成的。这些复合组件Pa…Qm…只用来组成墙w…和/或分开上层楼和下层楼的天花板C。
在此情况下,复合板2a…,3a…可以是木材芯的胶合板B或由木屑和胶水粘结一起制成的木屑板,它们各有20-40毫米的厚度。用在墙W内的垫块4a…,4b…,4c是由方形断面的矩形棒材制成。用在天花板C的垫板5m是由切成固定宽度的复合板条制成然后装配一起形成的一格栅结构。
在房屋开始建造以前,一由混凝土制成的平基础面24建在所建房子的地面E上,若干个直立支柱21在其固定到基础面24的下端有锚板21。支柱21在其上端还包括紧固到一底基23上作为房屋A最外部构件,的挡板21j于是一包覆板22连到支柱21的侧向以挡住底基23和基础面24之间的间隙,这样就提供了一连续的基础20。在此情况下,使支柱21在上段21x和下段21y之间允许伸缩,在支柱21的高度按需要调整后,上段21x和下段21y用焊接紧固在一起,包覆板22是一预浇的混凝土板。
图1是一个用本发明建造方法所建造的建筑剖视图;
图2是一示出部分建筑的前剖视图;
图3是一示出部分建筑的平面剖视图;
图4是一示出建筑部分屋顶的前剖视图;
图5是一去掉用于建筑中部分木材芯胶合板的透视图;
图6是一分开建筑上下层楼部分天花板的透视图;
图7是一示出用于建筑的连续基础部分的放大剖视图;
图8是一连续基础的透视图;
图9是一示出用于建筑的柱上下段的前剖视图;
图10是一示出复合板安装定位的建筑剖视图。
下文结合附图详细叙述本发明的最佳实施例。
作为最佳实施例的房屋A(建筑)的建造构件,规定厚度的复合板以及固定宽度的垫块4a,4b,4c…5m都运到施工现场,如图1所示。
复合板约20至40毫米厚或如图5所示的木材芯胶合板B最好为30毫米厚,木材芯胶合板B是由一木质矩形杆12粘在一起以形成一木材芯11,木材芯11则在其外面上盖上二外层的面板13,14所覆盖的木材芯11则夹在前饰面板15和后饰面板16之间,胶合板在强度和木材利用率上是很好的。
垫块4a…是每边为6厘米宽的方形断面的矩形杆,而垫板5m…则是切成规定宽度的木材芯胶合板B的条板。
参照图1到图10将介绍优先实施例的建造方法,首先参阅图1和图7至图10,建造一连续的基础20,在建造连续的基础20之前,把若干支柱21…和若干包覆板(预浇混凝土板)22…运到现场。
各支柱21有一上段21x和一下段21y,上段21x是由一方断面的矩形钢管制成,上段21x有一位于顶部成一体的挡板21j以紧固到一房屋A的底基23上,下段21y也是由一方断面的矩形钢管制成,就像上段21x一样。在此情况下,下段21y是由比上段21x较小断面的钢管制成,这样下段21x能插到上段21x内从而允许整个支柱21y进行膨胀和收缩。下段21y还有一位于其底部的锚板21c,该锚板21c如下文所述成一体地紧固到基础面24上。
包覆板22呈具有规定宽度的平坦矩形而且在外观上近似常规的连续基础。包覆板22可在需要处开通气孔22c…(见图10)。
在建造连续基础20的过程中,在要建造房屋A的地面E处挖掘或填充以构成水准面,在已完成的挖掘面上铺放石子24s并盖上钢筋25…,然后倒入混凝土以提供一平的基础面24,于是把各个支柱21…的锚板21c…在所需的地方固定到基础面24上,在倒入混凝土前,为了把锚板紧固到基础面24上,锚板21c…可直接连到钢筋25…上,也可用其他方法,锚螺栓26…可通过焊接等方法紧固到钢筋25…上,于是通过锚螺栓26…和一插入锚板21c的螺栓孔42…的螺母27…,把锚板21c…紧固到钢筋25…上,如果不用钢筋25…则混凝土分二个阶段倒入,先倒入一第一部分混凝土,把锚螺栓埋入混凝土内,通过锚螺栓26…和插入锚板21c…上螺栓孔内的螺母27则锚板21c…就紧固在混凝土内,然后再倒入第二部分混凝土。
通过相对于下段21y…滑动上段21x…就能调节各支柱21…以取得所要的高度,同时,在最后把上下段用焊接连在一起之前,暂时用装配螺栓k把上下段21x…,21y…固定在一起。
房屋A的底基23连到支柱21…的挡板21j,通过螺栓和插入挡板21j上螺栓孔41…的螺母28,地基石23就连到了挡板21j上。如果需要,除了支柱21…外,中间支柱29可以安装在底基23和基础面24之间,为的是挡住底基23下垂。
包覆板22用螺栓s之类连到支柱21…的侧面为的是盖住房屋A界面处的底基23和基础面24之间的间隙。
如上所述,连续基础20消除了繁重体力的现场施工,诸如开沟和回填土E以及竖立和混凝土框架的脱模,这就减小建造的时间和成本且不需要高超的技巧从而克服了技术工人的短缺而且改进了施工的质量和一致性。连续基础20在高度上易于调节且在外观上可做到与常规连续基础相类似。包覆板22上的通气孔22c易于改变基位置。
现在可由以下步骤进行建造房屋A:如上所述,附图所示的复合板2a…,3a…,2m…,3m…,都是切割成规定尺寸的木材芯胶合板B。复合板2a…,3a…,2m…,3m…,以及垫块4a…,5m…都用钉子(或木螺丝)T紧固在一起等分,而且在需要处可用胶水粘合,地板31用钉子或木螺丝紧固到底基23上,地板31可以是一个木材芯胶合板13。
复合板2a用钉子或木螺丝紧固到底基23的外侧,若干个垫块4a…随后紧固到复合板2a至少包括二端的内面上,然后复合板3a紧固到垫块4a…上,这样一对复合板2a和3a就被垫块4a…以规定的间隔相互隔开,故提供具有一对以固定间隔隔开的复合板2a和3a组成的复合组件pa以便形成一墙壁(外墙)w。如图1和图2所示,在此情况下,位于房屋A最外侧的复合板2a可以向上延伸超过内板3a。
现在再回房屋A的内部,一垫块46紧固到地板31上,而一对复合板2b和3b也紧固到地板31上,如此,一对复合板2b和3b就由横向放置间隙中的垫块46隔开,在复合板对2b和3b之间在需要处,至少包括复合板2b和3b的顶部和底部,安装一排垫块4b,这就提供了以规定间隔隔开的复合板2b和3b对所组成的复合组件pb以便形成一墙壁(内墙)w。
一旦装上用作复合板对2a和3a,2b和3b之间的间隙限制件和连接件的垫块4a…和4b…,复合板对2a和3a,2b和3b…可担当起墙和柱的作用,这就使房屋强度增强且起到隔热和隔音。
而图3是一墙w的前剖视图,若干墙w有不同方向的走向,也就是复合组件pa和pg…用与垫块4a相同材料制成的接头4v进行相互连接。接头4v在复合板2a…和3a…,垫块4a…和5m…,以及复合板2m和3m之间沿垂直方向安装。
用来分开上下楼板的天花板c建在墙w的顶面,一复合板3m放置并紧固到墙w的顶面,垫板5m…也紧固到墙w的顶面,垫板5m…是按规定宽度在木材芯胶合板B上切成的片条且安装成格栅结构。在此情况下,垫板5m…用与垫块4a相同材料制成的连接件4m进行相互连接,于是一复合板2m放置并紧固到垫板5m…上,这样一装有一对此规定间隔隔开的复合板2m和3m的复合组件Qm…形成一分开上下楼层的天花板c。
一如图1所示在上排内复合板2m之间的接头F相对于下排内复合板3m之间的接头是错开的,复合板2m之间的接头F和复合板3m之间的接头F都由与垫块4a相同材料制成的支柱4s支撑,所以天花板c具有相当于墙w的强度和隔垫(隔音)效果,而复合板2m则起到上层(二层楼)地板的作用。
这样,就不需要常规的建筑构件诸如柱和梁并且只需通过把复合组件Pa…和Qm…连在一起则完整的墙w…和分开上下层的天花板c就安装就位以便提供房屋的一层楼。在此情况下,复合板2a…,3a…,2m…,3m…,以及垫块4a…,5m…在运到现场前都切割成各种形状,在工地上,建筑工人而不是木工用钉子T…(或木螺丝)可容易地建起墙w…,分开上下层的天花板c以及地板和下文所述的屋顶部分,故而现场的技术工作减到最小以致大大地节约了建造时间和成本。
盖第二层楼以盖上文所述的第一层楼相似的方式进行,在此情况下,复合板2m可认为近似于一层楼的地板31,一接头4x在复合板下侧的边缘紧固到复合板2m上,该接头是由与垫块4a相同的材料制成,这样接头4x起到底基23相同的功能而一复合板2c则紧固到接头4x的外侧。若干垫块4c…紧固到复合板2c的需要处,但至少包括两端的内面,然后垫块4c紧固到一复合板3c以提供一复合组件Pc,其中一对复合板2c和3c用垫块4c隔开,复合组件Pc组成了二层楼的一个墙w,此情况如图1和图2所示,位于房屋A最外面的复合板2c做成向下延伸超过相对的复合板3c。复合板2c则紧靠着一层楼复合板2c的顶缘(请见图1)一位于复合板2a和2c之间并在其内面上的连接处由一挡块4y所支撑,而一垫块4z则紧固在连接处的下方。在二层楼的其它构件可以按一层楼的相似方式建造,当要盖三层楼房时,其三层楼可按同样方式建造。
图4示出一层顶R,屋顶R的屋顶板32和二层楼的天花板33都可用上述的木材芯胶合板B制成,一防水的屋顶覆盖层34安装在屋顶板32的顶面上。一雨槽36安在外墙的顶部。在一些附图中示出一防水包覆板35用于覆盖形成房屋A外墙的复合板2a…。
图10示出用于二层楼房屋A的诸如2a…和3a…复合板的安装位置,图10也示出复合板2d,2e,2f,3d,3e和3f以及复合组件Pd,Pe和Pf。
已经按附图中所示出的有关最佳实施例对本发明作了叙述,本发明并不局限于其特定的实施例,例如在上述的复合板是一木材芯胶合板的同时也可以是任何其它建筑板,诸如木屑用胶水粘在一起的木屑板。同样,在所述复合组件用于墙壁和分开上下层楼板的天花板的同时复合组件也可只用作墙或只用作分开上下层楼板的天花板,而且在最佳实施例指的是一房屋建筑时,本发明也可应用到其它形式的建筑。在连续基础应用的优先方法中,支撑件是用矩形钢管制成,但也可以是任何其他金属矩形管或非金属矩形管,上述的支撑件允许有伸缩,它可以是一整体件也可以有任何其它形状而不一定是矩形。优先方法的基础平面用混凝土制成,也可以用沙浆或任何其它相似材料。该基础平面既可以覆盖整个建筑面也可以覆盖部分建筑面,而上述的包覆板是一预浇混凝土板的同时也可以是诸如金属板合成树脂板的任何其它预制包覆板。应当理解为在不偏离本发明的精神和保护范围前提下可以对建造的细节包括布置、形式、材料、用料量进行各种变化。
Claims (19)
1、一建筑的建造方法,其特征在于若干复合组件是由规定厚度的“复合板对”用规定宽度的垫块以固定的间隔隔开所组成,其中上述若干复合组件只用来组成至少一面墙和或一面分开上下层的天花板。
2、根据权利要求1所述的一建筑的建造方法,其特征在于复合板是一木材芯胶合板。
3、根据权利要求1所述的一建筑的建造方法,其特征在于复合板是一木屑用胶水粘结制成的建筑板。
4、根据权利要求1,2和3中任一项所述的一建筑的建造方法,其特征在于复合板有约20至40毫米厚度。
5、根据权利要求1,2,3和4中任一项所述的一建筑的建造方法,其特征在于用在墙内的垫块是方形截面的矩形杆。
6、根据权利要求1,2,3和4中任一项所述的一建筑的建造方法,其特征在于用在天花板内的垫块是按规定宽度切割的复合板条。
7、根据权利要求6所述的一建筑的建造方法,其特征在于由垫块装配而组成一格栅形式。
8、根据权利要求1,2,3,4,5,6和7中任一一项所述的一建筑的建造方法,其特征在于该建造方法用于建造一房屋。
9、一建筑的建造方法,其特征在于在所要建造的建筑的地面上构造一平的混凝土基础面,和在其底部具有固定入上述基础面的锚板的若干竖直支撑件,上述竖直支撑件包括位于其顶部用来紧固到沿建筑边缘走向的底基上的挡板和一随后安装在上述竖直支撑件侧面的包复来盖住底基和基础面之间的间隙以便提供一完整的连续基础,其中若干复合组件是由规定厚度的“复合板对”用规定宽度的垫块以固定的间隔隔开所组成,其中上述若干复合组件只用来组成至少一面墙和/或一面分开上下层的天花板。
10、根据权利要求9所述的一建筑的建造方法,其特征在于复合板是一木材芯胶合板。
11、根据权利要求9所述的一建筑的建造方法,其特征在于复合板是一由木屑用胶水粘结制成的建筑板。
12、根据权利要求9,10和11中任一项所述的一建筑的建造方法,其特征在于复合板有约20至40毫米厚度。
13、根据权利要求9,10和11中任一项所述的一建筑的建造方法,其特征在于用在墙内的垫块是方形截面的矩形杆。
14、根据权利要求9,10,11和12中任一项所述的一建筑的建造方法,其特征在于用在天花板内的垫块是按规定宽度切割的复合板条。
15、根据权利要求14所述的一建筑的建造方法,其特征在于由垫块装配而组成一格栅形式。
16、根据权利要求9,10,11,12,13,14和15中任一项所述的一建筑的建造方法,其特征在于该建造方法用于建造一房屋。
17、根据权利要求9所述的一建筑的建造方法,其特征在于由上下段组成的竖直支撑件为了膨胀和收缩而相互间滑动,在竖直支撑件的高度按要求调节后上下段就用焊接等方法连在一起。
18、根据权利要求9所述的一建筑的建造方法,其特征在于竖直支撑件是用矩形金属管制成。
19、根据权利要求9所述的一建筑的建造方法,其特征在于包覆板是一混凝土板。
Applications Claiming Priority (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP6058234A JPH07247555A (ja) | 1994-03-02 | 1994-03-02 | 布基礎及びその施工方法 |
JP58234/94 | 1994-03-02 | ||
JP58234/1994 | 1994-03-02 | ||
JP60301/1994 | 1994-03-04 | ||
JP06030194A JP3163468B2 (ja) | 1994-03-04 | 1994-03-04 | 住 宅 |
JP60301/94 | 1994-03-04 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1112180A true CN1112180A (zh) | 1995-11-22 |
CN1073657C CN1073657C (zh) | 2001-10-24 |
Family
ID=26399288
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN95102468A Expired - Fee Related CN1073657C (zh) | 1994-03-02 | 1995-03-02 | 建筑的建造方法 |
Country Status (6)
Country | Link |
---|---|
US (1) | US5634315A (zh) |
KR (1) | KR0173506B1 (zh) |
CN (1) | CN1073657C (zh) |
AU (1) | AU700029B2 (zh) |
CA (1) | CA2143778C (zh) |
GB (1) | GB2287047B (zh) |
Families Citing this family (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6085470A (en) * | 1997-07-02 | 2000-07-11 | Bigelow; William H. | Portable building |
US6295766B1 (en) | 1999-03-25 | 2001-10-02 | William H. Bigelow | Building construction |
US5864992A (en) * | 1997-07-02 | 1999-02-02 | Bigelow; William H. | Roof and portable building |
US6088969A (en) * | 1997-07-02 | 2000-07-18 | Porta-Kamp Mfg. Co. | Roof and portable building |
US6332298B1 (en) | 1997-07-02 | 2001-12-25 | William H. Bigelow | Portable building construction |
US6330775B1 (en) | 1999-07-20 | 2001-12-18 | Richard L. Hubbard | Prefabricated building wall structure |
US6269607B1 (en) * | 1999-12-06 | 2001-08-07 | Harold Ringlein | Method of insulation and framing |
AT413713B (de) * | 2000-09-14 | 2006-05-15 | Jandl Adolf | Gebäude |
US7062885B1 (en) | 2002-02-26 | 2006-06-20 | Dickenson Jr George H | Foundation wall, construction kit and method |
EP1880062A1 (en) * | 2005-04-15 | 2008-01-23 | David Charles Bishop | Ring beam structure and method of constructing a timber frame |
US8590262B1 (en) | 2009-08-14 | 2013-11-26 | EnergySmart Building Method, LLC | Energy efficient building construction |
US8490355B2 (en) * | 2010-08-24 | 2013-07-23 | James Walker | Ventilated structural panels and method of construction with ventilated structural panels |
US10822790B2 (en) * | 2010-08-24 | 2020-11-03 | Innovative Structural Building Products, Llc | Frameless construction using single and double plenum panels |
US9050766B2 (en) | 2013-03-01 | 2015-06-09 | James Walker | Variations and methods of producing ventilated structural panels |
US9091049B2 (en) * | 2010-08-24 | 2015-07-28 | James Walker | Ventilated structural panels and method of construction with ventilated structural panels |
US8534018B2 (en) * | 2010-08-24 | 2013-09-17 | James Walker | Ventilated structural panels and method of construction with ventilated structural panels |
US9604428B2 (en) | 2010-08-24 | 2017-03-28 | James Walker | Ventilated structural panels and method of construction with ventilated structural panels |
DE202011110614U1 (de) | 2011-08-18 | 2015-03-18 | Huber & Sohn GmbH & Co. KG | Wandaufbau für tragende Wände im mehrgeschossigen Gebäude |
US11371242B2 (en) | 2020-02-07 | 2022-06-28 | Joshua MAY | Machine walls |
US11585091B2 (en) | 2020-02-07 | 2023-02-21 | Mw Enterprises Llc | Modular wall sections with electrical, plumbing and structural ground connectors |
Family Cites Families (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2396828A (en) * | 1942-10-28 | 1946-03-19 | Carpenter Miles Harold | Building construction |
US3355852A (en) * | 1963-11-12 | 1967-12-05 | Fire Trol Corp | Fireproof building column assemblies |
GB1120741A (en) * | 1965-03-01 | 1968-07-24 | George Harold Weinrott | Building construction and residential building |
US3540175A (en) * | 1968-09-09 | 1970-11-17 | Ralph A Hawn | Deck for mobile homes |
US3662507A (en) * | 1970-03-11 | 1972-05-16 | Arthur J Espeland | Preformed building wall construction |
JPS4736621A (zh) * | 1971-04-15 | 1972-11-29 | Misawa Homes Co | |
JPS4985812A (zh) * | 1972-06-09 | 1974-08-16 | ||
SE380860B (sv) * | 1973-09-28 | 1975-11-17 | O Jonsson | Anordning for att montera och brandsektionera ytterveggar med sandwichelement |
US4198797A (en) * | 1978-05-01 | 1980-04-22 | Soble Bernard D | Method and fixture for lateral and longitudinal positioning of mobile or modular home units |
US4165591A (en) * | 1978-06-30 | 1979-08-28 | Fitzgibbon Chester M | Component type building construction system |
US4229919A (en) * | 1979-02-12 | 1980-10-28 | Oakwood Manufacturing, Inc. | Kit of components for interconnecting structural members, and method of utilizing same |
US4280307A (en) * | 1979-03-14 | 1981-07-28 | Alphonso Griffin | Pre-engineered construction system utilizing prefabricated members |
US4615155A (en) * | 1985-07-08 | 1986-10-07 | Chamberlain Sam R | Modular building construction |
US5402614A (en) * | 1990-08-24 | 1995-04-04 | Jewell; Everett G. | Foundation, a footing of a foundation and a method of constructing a foundation for a light gauge steel building structure |
JPH04222735A (ja) * | 1990-12-26 | 1992-08-12 | Fuji Kagaku Kogyo Kk | 木造住宅における外断熱施工法 |
US5311712A (en) * | 1991-03-08 | 1994-05-17 | Accousti William J | Building with casing system construction and construction method thereof |
JPH0754017B2 (ja) * | 1991-03-14 | 1995-06-07 | ナショナル住宅産業株式会社 | 棟の構造 |
JP2849228B2 (ja) * | 1991-04-08 | 1999-01-20 | ダウ化工株式会社 | 建築用パネル、当該建築用パネルからなる木造建築物およびその構築工法 |
US5228249A (en) * | 1991-04-12 | 1993-07-20 | Campbell Carl W | Wooden foundation wall and method |
-
1995
- 1995-02-23 US US08/393,398 patent/US5634315A/en not_active Expired - Fee Related
- 1995-02-24 AU AU13456/95A patent/AU700029B2/en not_active Ceased
- 1995-02-28 GB GB9503966A patent/GB2287047B/en not_active Expired - Fee Related
- 1995-03-02 CN CN95102468A patent/CN1073657C/zh not_active Expired - Fee Related
- 1995-03-02 CA CA002143778A patent/CA2143778C/en not_active Expired - Fee Related
- 1995-03-02 KR KR1019950004274A patent/KR0173506B1/ko not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
GB2287047A (en) | 1995-09-06 |
AU700029B2 (en) | 1998-12-17 |
AU1345695A (en) | 1995-09-07 |
US5634315A (en) | 1997-06-03 |
KR0173506B1 (ko) | 1999-02-18 |
CA2143778C (en) | 2001-05-01 |
GB2287047B (en) | 1997-08-13 |
GB9503966D0 (en) | 1995-04-19 |
CN1073657C (zh) | 2001-10-24 |
CA2143778A1 (en) | 1995-09-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1073657C (zh) | 建筑的建造方法 | |
US5353560A (en) | Building structure and method of use | |
US5765333A (en) | Unitized post and panel building system | |
US7958687B2 (en) | Concrete panel construction system | |
US5697189A (en) | Lightweight insulated concrete wall | |
US6085479A (en) | Premanufactured structural building panels | |
US8769891B2 (en) | Building method using multi-storey panels | |
US6363674B1 (en) | Premanufactured structural building panels | |
US6588161B2 (en) | Laminated construction elements and method for constructing an earthquake-resistant building | |
US20100192495A1 (en) | Thin stone or brick veneer wall system and clips therefor | |
JP2001227058A (ja) | 建築パネル | |
US9068350B2 (en) | Building module, a method for making same, and a method for using same to construct a building | |
US5617700A (en) | Prefabricated building panel | |
US5311712A (en) | Building with casing system construction and construction method thereof | |
AU674665B2 (en) | Improved building structure and method of use | |
US5950396A (en) | Method and apparatus for producing and erecting precast concrete walls using sawing | |
EP0195662A2 (en) | Supporting structure for cladding panels | |
US20060254208A1 (en) | Paneling system and method | |
KR20010012388A (ko) | 모듈라 샌드위치 패널과 주택건축방법 | |
JP2662716B2 (ja) | 竹製ユニットハウスの組立工法 | |
US20080196336A1 (en) | Fiber reinforced concrete exterior wall system | |
US20080196354A1 (en) | Fiber Reinforced Concrete Exterior Wall System | |
FR2610022A1 (fr) | Systeme constructif, par cadres bois modulaires, formant structures, et leur procede de montage | |
US20090205282A1 (en) | Wall system | |
JP2769108B2 (ja) | 木質ユニットハウスの組立工法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |