CN111119940B - Grouting construction treatment method - Google Patents

Grouting construction treatment method Download PDF

Info

Publication number
CN111119940B
CN111119940B CN202010017899.3A CN202010017899A CN111119940B CN 111119940 B CN111119940 B CN 111119940B CN 202010017899 A CN202010017899 A CN 202010017899A CN 111119940 B CN111119940 B CN 111119940B
Authority
CN
China
Prior art keywords
grouting
pressure
slurry
construction
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010017899.3A
Other languages
Chinese (zh)
Other versions
CN111119940A (en
Inventor
王伟东
张绍宽
孙善辉
张昆
黄巍
顾学建
刘志权
李伟杰
张忠杰
管蕾
杨韦一
吴孔勇
赵洪彬
张燕影
曹晓飞
段赛
张志康
陈希
袁基林
高长伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN202010017899.3A priority Critical patent/CN111119940B/en
Publication of CN111119940A publication Critical patent/CN111119940A/en
Application granted granted Critical
Publication of CN111119940B publication Critical patent/CN111119940B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/24Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing alkyl, ammonium or metal silicates; containing silica sols
    • C04B28/26Silicates of the alkali metals
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00474Uses not provided for elsewhere in C04B2111/00
    • C04B2111/00724Uses not provided for elsewhere in C04B2111/00 in mining operations, e.g. for backfilling; in making tunnels or galleries
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/70Grouts, e.g. injection mixtures for cables for prestressed concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention belongs to the technical field of buildings, and discloses a grouting construction processing method, which comprises the steps of determining grouting parameters according to actual conditions; slurry diffusion radius, and deep hole grouting is that R is 500 mm; grouting pressure, wherein the initial pressure of deep hole grouting is 0.3-0.75 MPa, the final pressure is 1.0MPa, and grouting can be stopped when the grouting amount per minute is less than 3L or the grouting pressure gradually rises in the final pressure state; grouting slurry, wherein double-fluid slurry is used as a grouting material, and the setting time of the slurry is within 1-2 minutes; the existing structure is adopted as a grout stopping wall, and construction treatment of the grout stopping wall is carried out; and (3) forming a grouting hole by adopting a ZLJ-2500 type drilling machine, and performing hole leading construction and grouting construction by adopting a phi 42 hollow drill rod. The grouting construction treatment method has the advantages of simple process flow, convenient operation, grouting pressure meeting design requirements, large slurry diffusion range, good grouting effect and no water seepage and slurry seepage phenomenon.

Description

Grouting construction treatment method
Technical Field
The invention belongs to the technical field of buildings, and particularly relates to a grouting construction processing method.
Background
Currently, the current state of the art commonly used in the industry is such that: grouting the outer rock soil layer close to the tunnel structure through the grouting pipes which are pre-buried in the tunnel box culvert structure or the basement structure wall, plate or the shield tunnel pipe sheet, and after the grouting pipes are withdrawn, slurry or underground water which is not solidified outside the tunnel or the basement enters the tunnel along with the pre-buried grouting pipes of the opening, so that slurry leakage and water seepage of the inner wall of the structure are caused. Measures should be taken to perform the plugging.
In order to solve the above problems, there are related art patents as follows:
there is a grouting plugging device and a plugging method thereof (201910474102.X), and a grouting plugging device is disclosed, which comprises a grouting channel and two plugging bags, wherein the two plugging bags are a front plugging bag and a rear plugging bag, the grouting channel is sequentially communicated with the two plugging bags, the parts of the grouting channel in the two plugging bags are provided with discharge ports, a distance is reserved between the two plugging bags, the part of the grouting channel between the two plugging bags is provided with a blast valve, and the bag walls of the plugging bags can enable water to pass but can not enable slurry to pass. The invention also discloses a plugging method using the grouting plugging device. In the above, two plugging bags are used for plugging, so that the plugging effect is poor and slurry leakage is easy to occur in the grouting construction of the tunnel.
A grouting water plugging method for a submarine tunnel (CN200910244941.9) disclosed in the prior patent, which comprises the following steps performed in sequence: 1) taking the length of every 2-3 m as a section along the excavation direction of the submarine tunnel (1), and reserving or manually arranging a grout stop wall (2) at the face right in front of the submarine tunnel; 2) for example, as a grout stopping wall (2) arranged manually, during the solidification of the grout stopping wall (2), surrounding rocks around the grout stopping wall (2) and outside a support (3) are separated from a set grouting hole by a rock drilling machine, and then a grouting pipe is inserted into the hole and grouting is carried out to reinforce the surrounding rocks; 3) according to the geological survey data in front of the tunnel face and the comprehensive result of advanced geological forecast, the stratum in front of the tunnel face is reinforced on the grout stop wall (2) by adopting a full-face grouting, peripheral curtain grouting or local grouting mode; 4) and then, continuously excavating to the next section, and repeating the steps 1) to 3) until the excavation process of the whole submarine tunnel (1) is completed. In the grouting process, the grouting pressure cannot meet the design requirement, the slurry diffusion range is small, and the grouting effect is poor.
In summary, the problems of the prior art are as follows:
(1) the traditional grouting construction method has poor plugging effect and is easy to leak slurry.
(2) The grouting pressure of the traditional grouting construction method cannot meet the design requirement, the slurry diffusion range is small, and the grouting effect is poor.
Disclosure of Invention
Aiming at the problems in the prior art, the invention provides a grouting construction treatment method.
The invention is realized in such a way that a grouting construction processing method, the grouting construction processing method and the grouting construction processing method comprise the following steps:
determining grouting parameters according to actual conditions; slurry diffusion radius, and deep hole grouting is that R is 500 mm; grouting pressure, wherein the initial pressure of deep hole grouting is 0.3-0.75 MPa, the final pressure is 1.0MPa, and grouting can be stopped when the grouting amount per minute is less than 3L or the grouting pressure gradually rises in the final pressure state; grouting slurry, wherein double-fluid slurry is used as a grouting material, and the setting time of the slurry is within 1-2 minutes;
step two, adopting the existing structure as a grout stopping wall, and carrying out construction treatment on the grout stopping wall;
thirdly, forming a hole in the grouting hole by adopting a ZLJ-2500 type drilling machine, and performing hole leading construction by adopting a phi 42 hollow drill rod;
fourthly, grouting construction is carried out;
in the first step, the double-slurry comprises: the double-liquid slurry is prepared from cement slurry and water glass diluent according to the mass ratio of 1: 1 are matched; wherein the water-cement ratio of the cement paste is 1.5: 1; the consumption of each cubic piece of water glass of the water glass diluent is 332 kg, and the consumption of each cubic piece of water glass is 997 kg; wherein the cement paste is prepared from cement and water according to a mass ratio of 1: 1 are matched;
in the first step, according to the actual situation, the grouting parameters further include:
when the construction tunnel geology is conglomerate or sandstone with mudstone, grouting parameters are distributed on the 1m multiplied by 1m quincunx of the primary support surface by radial grouting pipes; P.O 42.5 cement is used as the slurry, and the water cement ratio is controlled to be 1: 1; the grouting pressure is selected to be 1.5-2 MPa finally, the diffusion radius is 1.1-1.5 m, and the setting time of the slurry is controlled to be 10-15 s;
when the construction tunnel geology is an impact layer, the grouting pressure is designed to be 1.1-1.3 times of the water pressure at the injected point according to the stratum condition and the bearing capacity of the well wall structure; the grouting material is mainly single-liquid cement slurry, and the water-cement ratio of the grouting material to the cement slurry is 0.75: 1-1: 1, adopting P.O 42.5 ordinary portland cement; the cement paste is prepared by mixing cement paste, water glass, a filler and a solvent, wherein the cement paste is prepared from water glass double-liquid slurry, the concentration of the water glass is 38-40 degrees Be, the modulus of the water glass is 2.8-3.2, and the proportion of the cement paste to the double-liquid slurry is as follows: the volume ratio of the water glass is 3: 1;
when the geology of the construction tunnel is skarn, the grouting pressure is composed of the pressure of a grouting pump and the dead weight pressure 2 of the grout; grouting pressure control principle: when the self-weight pressure of the slurry is less than 2 times of the hydrostatic pressure, taking the value of 2 times of the hydrostatic pressure as the grouting pressure; when the self-weight pressure of the slurry is greater than 2 times of the hydrostatic pressure, the reading of a surface pressure gauge is controlled to be 0.5-1.0 MPa; the aperture of each grouting hole is 7mm, and the length of each grouting section is 25-40 m;
when the construction tunnel geology is surrounding rock and the crack is developed perfectly, cement slurry: water glass 1: 1, preferably setting the double-slurry for about 15s, and adjusting the slurry proportion according to the field test condition, wherein the grouting pressure is 0.3-0.5 MPa higher than the water pressure;
when the construction tunnel geology is a water-rich sandy gravel stratum, the CS double-fluid slurry water-cement ratio parameter is 1: 1-0.8: 1, the concentration of water glass is 38-42 DEG Be, the mixing amount of the water glass is 8% -10%, and the distance between grouting holes is 1.6-2.0 m;
when the construction tunnel geology is a weathered rock stratum, the water-cement ratio is 1: 1-0.5: 1, adding an expanding agent and a water reducing agent, and adopting pure-pressure grouting with the grouting pressure of 0.5-1.0 MPa;
in the fourth step, after grouting construction is finished, the grouting finishing standard is as follows:
(1) when the grouting hole reaches the designed hole depth, the pressure gradually rises in the grouting process, the flow gradually decreases, and when the pressure reaches the grouting final pressure, grouting can be finished;
(2) and (4) when the grouting hole reaches the designed hole depth, the grouting pressure cannot reach the designed final pressure, the grouting amount reaches 2.0 times of the designed grouting amount, and grouting can be finished.
Further, in the first step, when the construction tunnel is geological gravels, sandstone mud-rock or skarn, grouting is performed according to the sequence of pouring the inner ring and the outer ring of the hole, and the construction is performed gradually downwards from the vault, wherein the water holes are reserved after the water holes are reserved.
Further, in the first step, when the construction tunnel is a geological impact layer, grouting is performed at intervals from bottom to top in the same circle according to the sequence of an outer circle and an inner circle, and when the water inflow rate of a drilled hole is more than or equal to 50L/min, the injection speed is 80-150L/min; and when the water inflow is less than or equal to 50L/min, the injection speed is 35-80L/min, and construction is gradually carried out downwards from the vault.
Further, in the first step, when the construction tunnel geology is surrounding rocks, the grouting sequence adopts a jump hole grouting sequence from sparse to dense grouting sequence, and the two sides are arranged in the middle.
Further, in the second step, temporary plugging is performed after the construction in the tunnel, the plugging form is the same as that of permanent plugging of the tunnel, and the plugging thickness is not less than 500 mm. The grouting pipe mounted on the grout stopping wall should be provided with a protective sleeve cap to prevent the grouting pipe from being blocked by concrete.
Further, in the third step, the method for hole guiding construction includes:
(1) the drilling machine is positioned according to the specified position, the angle of the drill rod is adjusted, and the drilling machine is fixed after the drill rod is aligned with the hole position;
(2) carrying out water absorption test check on the grouting system by using the pressure 1.5-2.0 times of the final grouting pressure, and checking whether the pipeline system can resist pressure and has water leakage; checking whether the pipeline connection is correct; checking whether the equipment condition is normal;
(3) adopting retreating type grouting construction for the grouting pipe, drilling holes in sections, wherein the length of each section is 2.0m, and drilling holes between the two sections by adopting a double-hole special joint and a special drill bit; the length of each grouting pipe is 10m, and the grouting positions of adjacent surfaces are staggered;
(4) controlling the depth of a drill rod according to the grouting length and the grouting range requirement, enabling the drill rod to run at a slow speed, monitoring the influence of the stratum on a drilling machine in real time, determining drilling parameters under the stratum condition, closely monitoring the overflow water outlet condition, and immediately stopping drilling when a large amount of overflow occurs;
(5) the deviation of the hole positions of the drill holes is not more than 200mm, and the deviation rate of the formed holes is not more than 1 percent; recording drilling details during drilling, wherein the drilling records comprise but are not limited to drilling footage, starting and stopping depth, soil layer properties and underground water condition;
(6) and (3) withdrawing the drill rod: and (4) retreating at the uniform speed of not more than 200mm every time, controlling the retreating speed, and cleaning the retreated drill rod in time for later use.
Further, in the fourth step, the grouting construction method specifically comprises the following steps:
keeping the withdrawal amplitude of the drill rod to be 15-20 cm; confirming the grouting speed according to the formation pore and communication condition and the formation compactness condition; and (5) grouting at constant speed by using a hydraulic double-liquid grouting pump until the standard of grouting ending is reached.
Furthermore, in the fourth step, local slurry leakage and slurry running can be processed by filling cracks with hemp fibers, adjusting the slurry ratio, shortening the slurry setting time, grouting shallow holes, solidifying and the like. And (4) stopping grouting when the grouting pressure suddenly rises, and checking whether the pipeline is blocked or not and whether a pressure gauge has a fault or not. When the slurry inlet amount is large and the pressure is not increased for a long time, the slurry can be treated by methods of increasing the slurry concentration, reducing the grouting pressure, or intermittently grouting and the like.
Further, when the construction tunnel is a geological gravelly rock, sandstone included mudstone, skarn or an impact layer, the grouting end standard is as follows:
the pressure of single-hole grouting reaches the expected requirement, the time exceeds 10min, the speed is only 25% of the initial speed, and the grouting can be stopped when the grouting amount reaches 80% of the designed amount; all grouting holes meet the requirements for the single holes, whether the tunnel face is bulged or not is observed, and grouting construction can be stopped after the water yield and the sand carrying amount meet the design and standard requirements.
Further, when the construction tunnel geology is surrounding rock, stopping grouting after the grouting final pressure is reached and the pressure is maintained for 3-5 min when the grouting end standard is met; when the construction tunnel geology is weathered rock, the grout is poured into the hole opening, and the grouting is not absorbed any more after 3 times of continuous repeated pouring, so that the grouting can be finished; grouting can be stopped when grouting pressure is maintained stably for more than 30min, grouting pressure is suddenly increased, and grouting is carried out on the ground or no grouting is carried out.
In summary, the advantages and positive effects of the invention are: the grouting construction treatment method has the advantages of simple process flow, convenient operation, grouting pressure meeting design requirements, large slurry diffusion range, good grouting effect and no water seepage and slurry seepage phenomenon.
The slurry diffusion radius is 500mm for deep hole grouting, so that the grouting effect can be improved, and the slurry diffusion radius is designed according to the construction condition, so that the grouting effect can be ensured. When the slurry inlet amount per minute is less than 3L or the grouting pressure is gradually increased in the final pressure state, the grouting can be stopped;
the grouting material of the grouting slurry is cement-water glass slurry, the setting time of the slurry is within 1-2 minutes, and the slurry can be quickly set; meanwhile, the cement-water glass slurry overcomes the defects of long setting time, difficult control, low concretion rate under the condition of flowing water and the like of single-liquid cement slurry, improves the effect of cement grouting, and enlarges the range of cement grouting; the slurry is suitable for tunnel heavy water burst, mud burst plugging and splitting consolidation of karst runoff plastic granular soil, and the mixed slurry can be used in a stratum with high groundwater flow velocity to achieve the purpose of rapid plugging; the grouting material can also be used for seepage prevention and reinforcement grouting, and is a main grouting material in tunnel construction; the slurry has good controllability, the gel time can be accurately controlled within a range of a few seconds to dozens of minutes, and the calculus rate of the slurry after coagulation is high.
According to the single-hole grouting finishing standard, the grouting holes reach the designed hole depth, the pressure gradually rises in the grouting process, the flow gradually decreases, and when the pressure reaches the grouting final pressure, the single-hole grouting can be finished; the grouting pressure can not reach the design final pressure, the grouting amount reaches 2.0 times of the design grouting amount, the single-hole grouting can be finished, the grouting termination mode can also be used, and the grouting can be saved and the corresponding grouting cost can be reduced by a single-hole grouting method.
Drawings
Fig. 1 is a flowchart of a grouting construction processing method provided in an embodiment of the present invention.
Fig. 2 is a plan view of deep hole grouting and hole distribution provided by the embodiment of the invention.
Fig. 3 is a cross sectional view of interval front line deep hole grouting and hole distribution provided by the embodiment of the invention.
Fig. 4 is a cross-sectional view of a deep hole grouting arrangement of an unearthed channel provided by an embodiment of the invention.
Fig. 5 is a cross-sectional view of interval front line deep hole grouting arrangement provided by the embodiment of the invention.
Fig. 6 is a cross-sectional schematic view of deep hole grouting and hole arrangement of the unearthing channel provided by the embodiment of the invention.
Fig. 7 is a cross-sectional view of a deep hole grouting arrangement of a unearthed channel provided by an embodiment of the invention.
Fig. 8 is a graph of grouting pressure versus slurry penetration diffusion radius variation provided by an embodiment of the present invention.
Fig. 9 is a schematic diagram of water seepage due to slurry seepage in a grouting construction process in the prior art according to an embodiment of the present invention.
FIG. 10 is a schematic diagram of water seepage due to slurry seepage during an improved grouting construction process according to an embodiment of the invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail with reference to the following embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
The technical solution of the present invention will be described in detail below with reference to the accompanying drawings.
As shown in fig. 1, a grouting construction processing method provided in an embodiment of the present invention includes:
s101: determining grouting parameters according to actual conditions; slurry diffusion radius, and deep hole grouting is that R is 500 mm; grouting pressure, wherein the initial pressure of deep hole grouting is 0.3-0.75 MPa, the final pressure is 1.0MPa, and grouting can be stopped when the grouting amount per minute is less than 3L or the grouting pressure gradually rises in the final pressure state; grouting slurry, wherein double-fluid slurry is used as a grouting material, and the setting time of the slurry is within 1-2 minutes;
s102: the existing structure is adopted as a grout stopping wall, and construction treatment of the grout stopping wall is carried out;
s103: forming a grouting hole by adopting a ZLJ-2500 type drilling machine, and performing hole leading construction by adopting a phi 42 hollow drill rod;
s104: and (6) grouting construction is carried out.
In S101 provided by the embodiment of the invention, the double-fluid slurry is prepared by mixing cement slurry and water glass diluent according to a mass ratio of 1: 1 are matched; wherein the water-cement ratio of the cement paste is 1.5: 1; the consumption of each cubic piece of water glass of the water glass diluent is 332 kg, and the consumption of each cubic piece of water glass is 997 kg; wherein the cement paste is prepared from cement and water according to a mass ratio of 1: 1 are matched;
in S101 provided in the embodiment of the present invention, according to an actual situation, the grouting parameters further include:
when the construction tunnel geology is conglomerate or sandstone with mudstone, grouting parameters are distributed on the 1m multiplied by 1m quincunx of the primary support surface by radial grouting pipes; P.O 42.5 cement is used as the slurry, and the water cement ratio is controlled to be 1: 1; the grouting pressure is selected to be 1.5-2 MPa finally, the diffusion radius is 1.1-1.5 m, and the setting time of the slurry is controlled to be 10-15 s;
when the construction tunnel geology is an impact layer, the grouting pressure is designed to be 1.1-1.3 times of the water pressure at the injected point according to the stratum condition and the bearing capacity of the well wall structure; the grouting material is mainly single-liquid cement slurry, and the water-cement ratio of the grouting material to the cement slurry is 0.75: 1-1: 1, adopting P.O 42.5 ordinary portland cement; the cement paste is prepared by mixing cement paste, water glass, a filler and a solvent, wherein the cement paste is prepared from water glass double-liquid slurry, the concentration of the water glass is 38-40 degrees Be, the modulus of the water glass is 2.8-3.2, and the proportion of the cement paste to the double-liquid slurry is as follows: the volume ratio of the water glass is 3: 1;
when the geology of the construction tunnel is skarn, the grouting pressure is composed of the pressure of a grouting pump and the dead weight pressure 2 of the grout; grouting pressure control principle: when the self-weight pressure of the slurry is less than 2 times of the hydrostatic pressure, taking the value of 2 times of the hydrostatic pressure as the grouting pressure; when the self-weight pressure of the slurry is greater than 2 times of the hydrostatic pressure, the reading of a surface pressure gauge is controlled to be 0.5-1.0 MPa; the aperture of each grouting hole is 7mm, and the length of each grouting section is 25-40 m;
when the construction tunnel geology is surrounding rock and the crack is developed perfectly, cement slurry: water glass 1: 1, preferably setting the double-slurry for about 15s, and adjusting the slurry proportion according to the field test condition, wherein the grouting pressure is 0.3-0.5 MPa higher than the water pressure;
when the construction tunnel geology is a water-rich sandy gravel stratum, the CS double-fluid slurry water-cement ratio parameter is 1: 1-0.8: 1, the concentration of water glass is 38-42 DEG Be, the mixing amount of the water glass is 8% -10%, and the distance between grouting holes is 1.6-2.0 m;
when the construction tunnel geology is a weathered rock stratum, the water-cement ratio is 1: 1-0.5: 1, adding an expanding agent and a water reducing agent, and adopting pure-pressure grouting with the grouting pressure of 0.5-1.0 MPa;
in S101 provided by the embodiment of the present invention, when the construction tunnel is geological gravels, sandstone with mudstones, or skarns, grouting is performed in the order of first inner ring and then outer ring hole grouting, and construction is performed gradually downward from the vault, with no water hole and then water hole.
In S101 provided by the embodiment of the invention, when the construction tunnel is a geological impact layer, grouting is performed at intervals from bottom to top in the same circle according to the sequence of an outer circle to an inner circle, and when the water inflow rate of a drilled hole is more than or equal to 50L/min, the injection speed is 80-150L/min; and when the water inflow is less than or equal to 50L/min, the injection speed is 35-80L/min, and construction is gradually carried out downwards from the vault.
In S101 provided by the embodiment of the invention, when the construction tunnel geology is surrounding rock, the grouting sequence adopts a jump hole grouting sequence from sparse to dense grouting sequence, and the two sides are arranged at first and then the middle is arranged at last.
In step S104 provided by the embodiment of the present invention, after the grouting construction is completed, the standard of the grouting completion is as follows:
(1) when the grouting hole reaches the designed hole depth, the pressure gradually rises in the grouting process, the flow gradually decreases, and when the pressure reaches the grouting final pressure, grouting can be finished;
(2) and (4) when the grouting hole reaches the designed hole depth, the grouting pressure cannot reach the designed final pressure, the grouting amount reaches 2.0 times of the designed grouting amount, and grouting can be finished.
In step two of S102 provided by the embodiment of the present invention, temporary plugging is performed after the construction in the tunnel, the plugging form is the same as that of permanent plugging of the tunnel, and the plugging thickness is not less than 500 mm. The grouting pipe mounted on the grout stopping wall should be provided with a protective sleeve cap to prevent the grouting pipe from being blocked by concrete.
In S103 provided by the embodiment of the present invention, a method for performing hole guiding construction includes:
(1) the drilling machine is positioned according to the specified position, the angle of the drill rod is adjusted, and the drilling machine is fixed after the drill rod is aligned with the hole position;
(2) carrying out water absorption test check on the grouting system by using the pressure 1.5-2.0 times of the final grouting pressure, and checking whether the pipeline system can resist pressure and has water leakage; checking whether the pipeline connection is correct; checking whether the equipment condition is normal;
(3) adopting retreating type grouting construction for the grouting pipe, drilling holes in sections, wherein the length of each section is 2.0m, and drilling holes between the two sections by adopting a double-hole special joint and a special drill bit; the length of each grouting pipe is 10m, and the grouting positions of adjacent surfaces are staggered;
(4) controlling the depth of a drill rod according to the grouting length and the grouting range requirement, enabling the drill rod to run at a slow speed, monitoring the influence of the stratum on a drilling machine in real time, determining drilling parameters under the stratum condition, closely monitoring the overflow water outlet condition, and immediately stopping drilling when a large amount of overflow occurs;
(5) the deviation of the hole positions of the drill holes is not more than 200mm, and the deviation rate of the formed holes is not more than 1 percent; recording drilling details during drilling, wherein the drilling records comprise but are not limited to drilling footage, starting and stopping depth, soil layer properties and underground water condition;
(6) and (3) withdrawing the drill rod: and (4) retreating at the uniform speed of not more than 200mm every time, controlling the retreating speed, and cleaning the retreated drill rod in time for later use.
In S104 provided by the embodiment of the present invention, the grouting construction method specifically includes:
keeping the withdrawal amplitude of the drill rod to be 15-20 cm; confirming the grouting speed according to the formation pore and communication condition and the formation compactness condition; and (5) grouting at constant speed by using a hydraulic double-liquid grouting pump until the standard of grouting ending is reached.
In S104 provided by the embodiment of the invention, local slurry leakage and slurry running can be processed by filling cracks with hemp fibers, adjusting the slurry ratio, shortening the slurry setting time, grouting shallow holes, consolidating and the like. And (4) stopping grouting when the grouting pressure suddenly rises, and checking whether the pipeline is blocked or not and whether a pressure gauge has a fault or not. When the slurry inlet amount is large and the pressure is not increased for a long time, methods such as increasing the slurry concentration, reducing the grouting pressure, or intermittently grouting can be adopted for treatment;
finishing grouting standard; when the construction tunnel is a geological gravelly rock, sandstone included mudstone, skarn or an impact layer, the grouting end standard is as follows:
the pressure of single-hole grouting reaches the expected requirement, the time exceeds 10min, the speed is only 25% of the initial speed, and the grouting can be stopped when the grouting amount reaches 80% of the designed amount; all grouting holes meet the requirements for the single holes, whether the tunnel face is bulged or not is observed, and grouting construction can be stopped after the water yield and the sand carrying amount meet the design and standard requirements;
when the construction tunnel geology is surrounding rock, stopping grouting after the grouting final pressure is reached and the pressure is maintained for 3-5 min; when the construction tunnel geology is weathered rock, the grout is poured into the hole opening, and the grouting is not absorbed any more after 3 times of continuous repeated pouring, so that the grouting can be finished; grouting can be stopped when grouting pressure is maintained stably for more than 30min, grouting pressure is suddenly increased, and grouting is carried out on the ground or no grouting is carried out.
The technical scheme and the technical effect of the invention are further explained by combining the specific embodiments.
Example 1:
firstly, grouting parameters:
1. slurry diffusion radius: grouting the deep hole with R being 500 mm;
2. grouting pressure: the initial pressure of deep hole grouting is 0.3-0.75 MPa, the final pressure is 1.0MPa, and grouting can be stopped when the grouting amount per minute is less than 3L or the grouting pressure gradually rises in the final pressure state;
3. grouting slurry: the grouting material is cement-water glass slurry, and the setting time of the slurry is within 1-2 minutes;
secondly, constructing a grout stopping wall:
1. the initial section of slip casting adopts current structure as the effect of grout stopping wall.
2. And performing temporary plugging after construction in the tunnel, wherein the plugging form is the same as that of permanent plugging of the tunnel, and the plugging thickness is not less than 500 mm.
Thirdly, hole guiding construction:
the grouting hole is formed by adopting a ZLJ-2500 type drilling machine, the drill rod is a phi 42 hollow drill rod, the drilling machine is positioned according to a specified position, the angle of the drill rod is adjusted under the guidance of a technician, and the drilling machine cannot be displaced after aligning with the hole position.
The grouting pipe adopts retreating type (WSS) grouting construction and is drilled in sections, the length of each section is 2.0m, and a double-hole special joint and a special drill bit are adopted between the two sections for drilling. The length of each grouting pipe is 10m, and the grouting positions of adjacent surfaces are staggered.
According to the requirements of grouting length and grouting range, the depth of a drill rod is strictly controlled, the drill rod is slowly operated, the influence condition of the stratum on a drilling machine is controlled, so as to determine drilling parameters under the stratum condition.
The deviation of the hole positions of the drill holes is not more than 200mm, and the deviation rate of the formed holes is not more than 1%.
In the drilling process, drilling detailed records including drilling footage, starting and stopping depth, soil layer properties, underground water condition and the like are required to be made.
And (3) withdrawing the drill rod: and strictly controlling the withdrawal speed, wherein the withdrawal speed is not more than 200mm every time, the drill rod is withdrawn at the uniform speed, and the withdrawn drill rod is cleaned in time for later use.
Fourthly, grouting construction:
1. the drill rod withdrawal amplitude is as follows: about 15-20 cm;
2. grouting speed: the grouting speed is temporarily set to be not more than 10-20L per minute due to the relation between the formation pore space and communication condition and the formation compactness;
3. finishing standard of single-hole grouting:
firstly, the grouting hole reaches the designed hole depth, the pressure gradually rises in the grouting process, the flow gradually decreases, and when the pressure reaches the grouting final pressure, the single-hole grouting can be finished;
secondly, the grouting hole reaches the designed hole depth, the grouting pressure cannot reach the designed final pressure, the grouting amount reaches 2.0 times of the designed grouting amount, single-hole grouting can be finished, and the method can also be used as a grouting termination mode.
4. Slurry:
Figure GDA0003068869770000111
the technical solution of the present invention will be further described with reference to the following experiments.
In the test, a pneumatic grouting pump is selected, the grouting amount is 0-32L/min, and the maximum grouting pressure is 4 MPa; air (a)The air supply rate of the compressor is 0.11m3Min, wind pressure 0.6 MPa.
In this test, three different geological conditions are selected respectively as follows: weathered rock formations, skarns, conventional earth formations; wherein, the prismatic is a conventional soil layer, the circular is a weathered rock layer, and the triangle is skarn.
As can be seen from the graph of fig. 8, the variation of the grouting pressure and the grout penetration diffusion radius, the grout penetration diffusion in the weathered rock formation and the skarn gradually increases to a peak value and then decreases as the grouting pressure increases.
The slurry permeation and diffusion of the conventional soil layer are gradually increased along with the increase of the grouting pressure.
Through comparison between the graph in fig. 10 and the graph in fig. 9, the technical scheme of the invention can effectively prevent the problems of water seepage and slurry seepage in the grouting construction process.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents and improvements made within the spirit and principle of the present invention are intended to be included within the scope of the present invention.

Claims (10)

1. The grouting construction processing method is characterized by comprising the following steps:
determining grouting parameters according to actual conditions; slurry diffusion radius, and deep hole grouting is that R is 500 mm; grouting pressure, wherein the initial pressure of deep hole grouting is 0.3-0.75 MPa, the final pressure is 1.0MPa, and grouting can be stopped when the grouting amount per minute is less than 3L or the grouting pressure gradually rises in the final pressure state; grouting slurry, wherein double-fluid slurry is used as a grouting material, and the setting time of the slurry is within 1-2 minutes;
step two, adopting the existing structure as a grout stopping wall, and carrying out construction treatment on the grout stopping wall;
thirdly, forming a hole in the grouting hole by adopting a ZLJ-2500 type drilling machine, and performing hole leading construction by adopting a phi 42 hollow drill rod;
fourthly, grouting construction is carried out;
in the first step, the double-slurry comprises: the double-liquid slurry is prepared from cement slurry and water glass diluent according to the mass ratio of 1: 1 are matched; wherein the water-cement ratio of the cement paste is 1.5: 1; the consumption of each cubic piece of water glass of the water glass diluent is 332 kg, and the consumption of each cubic piece of water glass is 997 kg; wherein the cement paste is prepared from cement and water according to a mass ratio of 1: 1 are matched;
in the first step, according to the actual situation, the grouting parameters further include:
when the construction tunnel geology is breccia or sandstone with mudstone, the grouting parameter radial grouting pipes are arranged in a 1m multiplied by 1m quincunx shape on the primary support surface; P.O 42.5 cement is used as the slurry, and the water cement ratio is controlled to be 1: 1; the grouting pressure is selected to be 1.5-2 MPa finally, the diffusion radius is 1.1-1.5 m, and the setting time of the slurry is controlled to be 10-15 s;
when the construction tunnel geology is a build-up layer, the grouting pressure is designed to be 1.1-1.3 times of the water pressure at the injection point according to the stratum condition and the bearing capacity of the well wall structure; the grouting material is mainly single-liquid cement slurry, and the water-cement ratio of the grouting material to the cement slurry is 0.75: 1-1: 1, adopting P.O 42.5 ordinary portland cement; the cement paste is prepared by mixing cement paste, water glass, a filler and a solvent, wherein the cement paste is prepared from water glass double-liquid slurry, the concentration of the water glass is 38-40 degrees Be, the modulus of the water glass is 2.8-3.2, and the proportion of the cement paste to the double-liquid slurry is as follows: the volume ratio of the water glass is 3: 1;
when the geology of the construction tunnel is skarn, the grouting pressure is composed of the pressure of a grouting pump and the dead weight pressure 2 of the grout; grouting pressure control principle: when the self-weight pressure of the slurry is less than 2 times of the hydrostatic pressure, taking the value of 2 times of the hydrostatic pressure as the grouting pressure; when the self-weight pressure of the slurry is greater than 2 times of the hydrostatic pressure, the reading of a surface pressure gauge is controlled to be 0.5-1.0 MPa; the aperture of each grouting hole is 7mm, and the length of each grouting section is 25-40 m;
when the construction tunnel geology is surrounding rock and the crack is developed perfectly, cement slurry: the volume ratio of the water glass is 1: 1, setting the double-slurry for 15s, adjusting the slurry proportion according to the field test condition, wherein the grouting pressure is 0.3-0.5 MPa higher than the water pressure;
when the construction tunnel geology is a water-rich sandy gravel stratum, the water-glass double-liquid-slurry water-cement ratio parameter is 1: 1-0.8: 1, the concentration of water glass is 38-42 DEG Be, the mixing amount of the water glass is 8% -10%, and the distance between grouting holes is 1.6-2.0 m;
when the construction tunnel geology is a weathered rock stratum, the water-cement ratio is 1: 1-0.5: 1, adding an expanding agent and a water reducing agent, and adopting pure-pressure grouting with the grouting pressure of 0.5-1.0 MPa;
in the fourth step, after grouting construction is finished, the grouting finishing standard is as follows:
(1) when the grouting hole reaches the designed hole depth, the pressure gradually rises in the grouting process, the flow gradually decreases, and when the pressure reaches the grouting final pressure, grouting can be finished;
(2) and (4) when the grouting hole reaches the designed hole depth, the grouting pressure cannot reach the designed final pressure, the grouting amount reaches 2.0 times of the designed grouting amount, and grouting can be finished.
2. The grouting construction processing method according to claim 1, wherein in the first step, when the construction tunnel is geological breccia, sandstone mud-rock or skarn, the grouting is performed in the order of first inner ring and then outer ring, and the construction is performed from the vault gradually downwards with no water hole and then water hole.
3. The grouting construction treatment method according to claim 1, wherein in the first step, when the construction tunnel is a geological deposit, grouting is performed at intervals from bottom to top in the same circle in the sequence of outer circle to inner circle, and when the water inflow rate of drilling is more than or equal to 50L/min, the injection speed is 80-150L/min; and when the water inflow is less than or equal to 50L/min, the injection speed is 35-80L/min, and construction is gradually carried out downwards from the vault.
4. The grouting construction processing method as claimed in claim 1, wherein in the first step, when the geological structure of the construction tunnel is surrounding rock, the grouting sequence adopts a jump hole grouting sequence from sparse to dense grouting sequence, wherein the two sides are arranged first and the middle is arranged later.
5. The grouting construction processing method of claim 1, wherein in the second step, temporary plugging is performed after the construction in the tunnel, the plugging form is the same as that of permanent plugging of the tunnel, the plugging thickness is not less than 500mm, and a grouting pipe arranged on the grout stopping wall is provided with a protective sleeve cap to prevent the grouting pipe from being plugged by concrete.
6. The grouting construction processing method according to claim 1, wherein in the third step, a method for conducting hole guiding construction comprises the following steps:
(1) the drilling machine is positioned according to the specified position, the angle of the drill rod is adjusted, and the drilling machine is fixed after the drill rod is aligned with the hole position;
(2) carrying out water absorption test check on the grouting system by using the pressure 1.5-2.0 times of the final grouting pressure, and checking whether the pipeline system can resist pressure and has water leakage; checking whether the pipeline connection is correct; checking whether the equipment condition is normal;
(3) adopting retreating type grouting construction for the grouting pipe, drilling holes in sections, wherein the length of each section is 2.0m, and drilling holes between the two sections by adopting a double-hole special joint and a special drill bit; the length of each grouting pipe is 10m, and the grouting positions of adjacent surfaces are staggered;
(4) controlling the depth of a drill rod according to the grouting length and the grouting range requirement, enabling the drill rod to run at a slow speed, monitoring the influence of the stratum on a drilling machine in real time, determining drilling parameters under the stratum condition, closely monitoring the overflow water outlet condition, and immediately stopping drilling when a large amount of overflow occurs;
(5) the deviation of the hole positions of the drill holes is not more than 200mm, and the deviation rate of the formed holes is not more than 1 percent; recording drilling details in the drilling process, wherein the drilling records comprise but are not limited to drilling footage, starting and stopping depth, soil layer properties and underground water conditions;
(6) and (3) withdrawing the drill rod: and (4) retreating at the uniform speed of not more than 200mm every time, controlling the retreating speed, and cleaning the retreated drill rod in time for later use.
7. The grouting construction processing method according to claim 1, wherein in the fourth step, the grouting construction method specifically comprises:
keeping the withdrawal amplitude of the drill rod to be 15-20 cm; confirming the grouting speed according to the formation pore and communication condition and the formation compactness condition; and (5) grouting at constant speed by using a hydraulic double-liquid grouting pump until the standard of grouting ending is reached.
8. The grouting construction treatment method according to claim 7, wherein in the fourth step, local slurry leakage and slurry running can be carried out by filling cracks with hemp fibers, adjusting slurry proportion, shortening slurry setting time and carrying out shallow hole grouting consolidation treatment; stopping grouting when the grouting pressure suddenly rises, and checking whether a pipeline is blocked and whether a pressure gauge has a fault or not; when the slurry inlet amount is large and the pressure is not increased for a long time, the slurry concentration can be increased, the grouting pressure can be reduced or an intermittent grouting method can be adopted for treatment.
9. The grouting construction processing method according to claim 7, wherein when the construction tunnel is geological breccia, sandstone included mudstone, skarn or alluvial deposit, the grouting end standard is:
the pressure of single-hole grouting reaches the expected requirement, the time exceeds 10min, the speed is only 25% of the initial speed, and the grouting can be stopped when the grouting amount reaches 80% of the designed amount; all grouting holes meet the requirements for the single holes, whether the tunnel face is bulged or not is observed, and grouting construction can be stopped after the water yield and the sand carrying amount meet the design and standard requirements.
10. The grouting construction processing method according to claim 7, wherein when the construction tunnel geology is surrounding rock, grouting is stopped after the grouting final pressure is reached and the pressure is maintained for 3-5 min when the grouting end standard is met; when the construction tunnel geology is weathered rock, the grout is poured into the hole opening, and the grouting is not absorbed any more after 3 times of continuous repeated pouring, so that the grouting can be finished; grouting can be stopped when grouting pressure is maintained stably for more than 30min, grouting pressure is suddenly increased, and grouting is carried out on the ground or no grouting is carried out.
CN202010017899.3A 2020-01-08 2020-01-08 Grouting construction treatment method Active CN111119940B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010017899.3A CN111119940B (en) 2020-01-08 2020-01-08 Grouting construction treatment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010017899.3A CN111119940B (en) 2020-01-08 2020-01-08 Grouting construction treatment method

Publications (2)

Publication Number Publication Date
CN111119940A CN111119940A (en) 2020-05-08
CN111119940B true CN111119940B (en) 2021-07-06

Family

ID=70487517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010017899.3A Active CN111119940B (en) 2020-01-08 2020-01-08 Grouting construction treatment method

Country Status (1)

Country Link
CN (1) CN111119940B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113006733A (en) * 2021-03-08 2021-06-22 中铁十八局集团第一工程有限公司 Deep grouting process for ground surface
CN113236300A (en) * 2021-05-24 2021-08-10 中铁建华南建设有限公司 Advanced grouting method for shield construction
CN113638744B (en) * 2021-08-25 2023-11-10 中铁四局集团有限公司 Method for treating joint defects of underground continuous wall of water-rich soft soil stratum
CN113832976A (en) * 2021-10-19 2021-12-24 中科院广州化灌工程有限公司 Double-liquid grouting device for foundation pit engineering plugging and emergency rescue and construction method
CN114293602A (en) * 2021-11-08 2022-04-08 浙江绿城房屋服务系统有限公司 Basement structure bottom plate leakage plugging repair method
CN114164833A (en) * 2021-12-07 2022-03-11 中交第一航务工程局有限公司 Deep hole guiding and grouting process under complex geological conditions of water-rich sand layer
CN114320363B (en) * 2021-12-20 2023-11-14 北京城建道桥建设集团有限公司 Construction method for large-section deep hole grouting of complex stratum in water-rich region

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101638987A (en) * 2009-07-24 2010-02-03 中铁二十一局集团有限公司 Tunnel construction method for crossing high-pressure water-enriched fracture zone with curtain grouting and grout stopping wall
CN101709651A (en) * 2009-12-21 2010-05-19 中铁隧道勘测设计院有限公司 Grouting water blocking method for undersea tunnel
CN101798930A (en) * 2010-03-24 2010-08-11 中铁十二局集团有限公司 Rapid construction method of high-pressure water-rich fault zone of tunnel
CN101832142A (en) * 2010-02-11 2010-09-15 中铁十二局集团有限公司 Tunnel information tracing accurate grouting method
CN103982201A (en) * 2014-05-22 2014-08-13 北京中铁瑞威工程检测有限责任公司 Advanced detection, grouting reinforcement and excavation method of wide separation fracture of high-pressure water-rich tunnel
CN105041325A (en) * 2015-07-13 2015-11-11 长沙理工大学 Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN108798718A (en) * 2018-07-09 2018-11-13 中铁十七局集团第四工程有限公司 Subsequent grouting method is held before tunnel
CN109441486A (en) * 2018-11-30 2019-03-08 中铁隧道集团二处有限公司 The grouting method reinforced for tunnel grouting

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101638987A (en) * 2009-07-24 2010-02-03 中铁二十一局集团有限公司 Tunnel construction method for crossing high-pressure water-enriched fracture zone with curtain grouting and grout stopping wall
CN101709651A (en) * 2009-12-21 2010-05-19 中铁隧道勘测设计院有限公司 Grouting water blocking method for undersea tunnel
CN101832142A (en) * 2010-02-11 2010-09-15 中铁十二局集团有限公司 Tunnel information tracing accurate grouting method
CN101798930A (en) * 2010-03-24 2010-08-11 中铁十二局集团有限公司 Rapid construction method of high-pressure water-rich fault zone of tunnel
CN103982201A (en) * 2014-05-22 2014-08-13 北京中铁瑞威工程检测有限责任公司 Advanced detection, grouting reinforcement and excavation method of wide separation fracture of high-pressure water-rich tunnel
CN105041325A (en) * 2015-07-13 2015-11-11 长沙理工大学 Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN108798718A (en) * 2018-07-09 2018-11-13 中铁十七局集团第四工程有限公司 Subsequent grouting method is held before tunnel
CN109441486A (en) * 2018-11-30 2019-03-08 中铁隧道集团二处有限公司 The grouting method reinforced for tunnel grouting

Also Published As

Publication number Publication date
CN111119940A (en) 2020-05-08

Similar Documents

Publication Publication Date Title
CN111119940B (en) Grouting construction treatment method
CN110230309B (en) Karst area bridge karst cave pile foundation construction method
AU2020101047A4 (en) Method for filling underground cavity in bedrock by grouting and hydraulic filling device
CN205172598U (en) Pipe curtain spouts a supporting construction soon
CN110735653A (en) deep-hole retreating type grouting water plugging construction method for igneous rock water-rich fault
CN106759297A (en) A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits
CN109881696B (en) HPPG (high Performance Poly propylene glycol) bottom sealing construction method
CN112049115A (en) Anti-seepage treatment method for deep foundation pit excavation of water-rich silt stratum
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN105484269B (en) Foundation pit enclosure structure seepage prevention and treatment construction method under blasting condition
CN111593726A (en) Joint reinforcement method for underground tunnel penetrating sensitive pipeline of water-rich stratum and butt joint of existing structure MJS + artificial freezing
CN108265706A (en) Engineering pile in karst cave geology and pile forming process
CN110130936A (en) It dashes forward in a kind of shield tunneling process and meets the construction method of untreated solution cavity or crack
CN107338789A (en) A kind of construction method of down-the-hole percussion triple-pipe high pressure jet grouting stake
CN110469332A (en) A kind of advance support consolidation method passing through Debris Flow Deposition body tunnel
CN110847929B (en) Tunnel portal section pre-reinforcing and excavating construction method based on partition blasting
CN110700860B (en) Construction method of soil-stone boundary tunnel crossing loess valley
CN108005662A (en) A kind of processing method of underground water seal cave depot bank area geology crushed zone
CN110685272A (en) Method for treating soft foundation settlement overrun by utilizing inclined-hole cloth bag pile
CN102995647A (en) Underground water control method used for grouting and seepage insulation of pile hole
CN113089655A (en) Construction method in three-pipe rotary spraying pile pit in flowing water environment
CN102979105A (en) Underground water control method of wellhole grouting and seepage insulation
CN111560964A (en) Construction method of rear anti-seepage system of foundation pit
CN114808923B (en) Cave grouting construction treatment method
CN205296194U (en) Rich irrigated land layer undercut tunnel interlock pipe curtain

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant