CN110863674B - Integrated assembled steel construction building - Google Patents

Integrated assembled steel construction building Download PDF

Info

Publication number
CN110863674B
CN110863674B CN201910959260.4A CN201910959260A CN110863674B CN 110863674 B CN110863674 B CN 110863674B CN 201910959260 A CN201910959260 A CN 201910959260A CN 110863674 B CN110863674 B CN 110863674B
Authority
CN
China
Prior art keywords
fixed
support column
wallboard
clamping
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910959260.4A
Other languages
Chinese (zh)
Other versions
CN110863674A (en
Inventor
曹海洲
王霜
钱球
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Yuehui Construction Engineering Co ltd
Original Assignee
Guangdong Yuehui Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Yuehui Construction Engineering Co ltd filed Critical Guangdong Yuehui Construction Engineering Co ltd
Priority to CN201910959260.4A priority Critical patent/CN110863674B/en
Publication of CN110863674A publication Critical patent/CN110863674A/en
Application granted granted Critical
Publication of CN110863674B publication Critical patent/CN110863674B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/02Dwelling houses; Buildings for temporary habitation, e.g. summer houses
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • E04B1/34326Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by longitudinal elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • E04B1/5825Connections for building structures in general of bar-shaped building elements with a closed cross-section
    • E04B1/5831Connections for building structures in general of bar-shaped building elements with a closed cross-section of substantially rectangular form

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention relates to an integrated assembly type steel structure building which comprises a bottom plate, wall plates, supporting columns and a ceiling, wherein the supporting columns and the bottom plate are vertically fixed, the tops of the supporting columns are fixedly connected with the ceiling, the wall plates are arranged between the adjacent supporting columns, mounting grooves for mounting the wall plates are arranged on the opposite side surfaces of the adjacent supporting columns, the cross sections of the mounting grooves are U-shaped, the openings of the mounting grooves on the adjacent supporting columns are opposite, and the mounting grooves are arranged along the height direction of the supporting columns. The wallboard is fixed by the centre gripping between two mounting grooves for wall body vertical fixation is convenient simple on the bottom plate, need not adjust the wallboard many times, and then has improved the installation effectiveness of wallboard.

Description

Integrated assembled steel construction building
Technical Field
The invention relates to the field of building construction, in particular to an integrated assembly type steel structure building.
Background
The assembly type building can be divided into two major types, namely an assembly type concrete building and an assembly type steel structure building, wherein the assembly type concrete building is formed by prefabricating and forming building maintenance structures such as wallboards, floor slabs, beams and columns and main body structures in a factory and assembling and constructing on site; the fabricated steel structure building takes a steel structure as a main structure, and maintenance structures such as wallboards, floor slabs and the like adopt light steel systems or concrete slabs and the like.
When installing concrete wallboard, need support temporarily and fix the wallboard, the bracing to the bearing diagonal is used commonly, and the both ends of bracing are articulated with wall body, bottom plate respectively. In order to ensure that the wall board is in a vertical state, the vertical angle of the wall board also needs to be adjusted, the length of the inclined support needs to be adjusted manually, when the feeling is almost reached, the verticality of the wall body is measured by using a measuring tool, and if the verticality requirement is not reached, the adjustment is continued until the requirement is reached, so that the installation efficiency of the wall board is reduced.
Disclosure of Invention
The invention aims to provide an integrated assembly type steel structure building, which is convenient for vertically fixing a wallboard and improves the installation efficiency of the wallboard.
The above object of the present invention is achieved by the following technical solutions:
the utility model provides an integrated assembled steel construction building, includes bottom plate, wallboard, support column and ceiling, support column and bottom plate vertical fixation, the top and the ceiling fixed connection of support column, the wallboard is installed between adjacent support column, and is adjacent be equipped with the mounting groove that is used for installing the wallboard on the relative side of support column, the transversal U type of personally submitting of mounting groove, the opening of mounting groove is relative on the adjacent support column, and the mounting groove sets up along the direction of height of support column.
Through adopting above-mentioned technical scheme, the support column vertical fixation is on the bottom plate, and the length direction and the bottom plate of mounting groove are perpendicular, and the wallboard is fixed by the centre gripping between two mounting grooves, because the length direction and the bottom plate of two mounting grooves are perpendicular, and two mounting groove centre gripping are fixed in the both sides of wallboard for wall body vertical fixation is on the bottom plate, and is convenient simple, need not install the bearing diagonal, does not need to carry out vertical measurement and regulation bearing diagonal to the wallboard many times, and then has improved the installation effectiveness of wallboard.
The invention is further configured to: the side of the support column is provided with a fixed plate and a movable plate, the fixed plate and the movable plate are located on the same side of the support column, the fixed plate and the support column are fixedly connected, the movable plate is hinged to the support column, the fixed plate and the movable plate are surrounded to form the mounting groove, and the fixed plate is provided with a fixing part for fixing the movable plate.
Through adopting above-mentioned technical scheme, open the fly leaf, can follow the side-mounting wallboard, the wallboard is placed in the mounting groove, the side and the fixed plate butt of wallboard, then rotate the fly leaf, fly leaf and wallboard butt, then make fixed plate and fly leaf press from both sides tight wallboard through the mounting, and then fix the wallboard in the mounting groove.
The invention is further configured to: the movable plate is provided with a hinge which is fixedly connected with the movable plate and the support column respectively.
Through adopting above-mentioned technical scheme, through the hinge setting for the fly leaf can rotate on the support column.
The invention is further configured to: the mounting includes clamping screw and nut, clamping screw and fixed plate fixed connection, nut and clamping screw threaded connection, be equipped with the recess on the fly leaf, be equipped with the opening that supplies clamping screw to pass through in the recess, the interior circle diameter of nut is greater than the width of opening.
Through adopting above-mentioned technical scheme, the wallboard is placed in the mounting groove, rotates the fly leaf, and in clamping screw followed the opening and then the recess, then screwed up the nut, nut extrusion fly leaf for fly leaf and fixed plate press from both sides tight wallboard, realize fixing the wallboard.
The invention is further configured to: the both sides of wallboard are fixed with the sand grip, sand grip and mounting groove joint are equipped with the connecting piece on the sand grip, the connecting piece is the L type, and the connecting piece lock joint is on clamping screw.
Through adopting above-mentioned technical scheme, the distance between two mounting groove bottoms is greater than the width of wallboard, reserves the space for the installation of wallboard, conveniently puts into the mounting groove with the wall body in. The sand grip joint is gone into in the mounting groove, and the lateral surface and the fly leaf of wall body flush, and the connecting piece lock joint can carry on spacingly to the wall body on clamping screw for the both sides of wall body can't slide.
The invention is further configured to: and sealing cement is filled in the mounting groove.
Through adopting above-mentioned technical scheme, the distance between two mounting grooves bottoms is greater than the width of wallboard, during the installation, has the space between sand grip and the mounting groove, through filling sealing cement, can increase the connection leakproofness of wall body.
The invention is further configured to: the ceiling comprises a top plate and a mounting frame, the mounting frame comprises a supporting rod, a fixing rod, a connecting rod and a center column, the supporting rod is fixedly connected with a supporting column, the fixing rod is fixedly connected with the supporting rod, the end part of the supporting rod is far away from the center column and the fixing rod, first clamping grooves are formed in two sides of the center column, one end of the connecting rod is fixed with a first clamping block, the first clamping block is connected with the first clamping groove in a clamped mode, a second clamping block is fixed to the other end of the connecting rod, a connecting seat is hinged to the end part of the supporting rod, a second clamping groove is formed in the connecting seat, the second clamping block is connected with the second clamping groove in a clamped mode, the first clamping block and the second clamping block are in a T-shaped.
Through adopting above-mentioned technical scheme, in first fixture block card advanced first draw-in groove, the locating part carried on spacingly to first fixture block, and first fixture block can't come out from first draw-in groove, and in second fixture block card advanced the second draw-in groove for the connecting rod is fixed on bracing piece and center post, and the roof is fixed on the connecting rod, and bracing piece and support column are fixed, and then fix whole ceiling.
The invention is further configured to: the locating part is a bolt, the bolt penetrates through the first clamping groove, and the bolt is abutted to the first clamping block.
Through adopting above-mentioned technical scheme, the bolt passes first draw-in groove, can intercept first fixture block for first fixture block can't come out from the opening of first draw-in groove.
The invention is further configured to: the connecting seat is provided with a locking stud which penetrates through the connecting seat and the supporting rod.
Through adopting above-mentioned technical scheme, locking double-screw bolt runs through connecting seat and bracing piece for the connecting seat can't continue to rotate on the bracing piece, makes connecting seat and bracing piece connect stably, supports more firmly.
In conclusion, the invention has the following beneficial effects:
1. the wallboard is fixed by the centre gripping between two mounting grooves for the wall body vertical fixation is on the bottom plate, and is convenient simple, need not install the bearing diagonal, need not carry out the vertical measurement and adjust the bearing diagonal to the wallboard many times, and then has improved the installation effectiveness of wallboard.
2. Open the fly leaf, can follow side-mounting wallboard, the wallboard is placed in the mounting groove, the both sides and the fixed plate butt of wallboard, then rotate the fly leaf, fly leaf and wallboard butt screw up clamping screw, make fixed plate and fly leaf press from both sides tight wallboard, and then fix the wallboard in the mounting groove.
3. In first fixture block card advanced first draw-in groove, the locating part carries on spacingly to first fixture block, and first fixture block can't come out from first draw-in groove, and the second fixture block card advances in the second draw-in groove for the connecting rod is fixed on bracing piece and center post, and the roof is fixed on the connecting rod, and bracing piece and support column are fixed, and then fix whole ceiling.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of a support column;
FIG. 3 is a cross-sectional view of a wall panel and a support post;
FIG. 4 is an exploded view of the mounting bracket;
FIG. 5 is an enlarged schematic view of portion A of FIG. 4;
fig. 6 is an enlarged schematic view of a portion B in fig. 4.
In the figure: 1. a base plate; 2. a support pillar; 21. a fixing plate; 22. a movable plate; 23. a hinge; 24. fixing the screw rod; 25. a nut; 26. a groove; 27. a port; 28. mounting grooves; 3. a wallboard; 31. a convex strip; 32. a connecting member; 33. sealing the daub; 4. a ceiling; 5. a top plate; 6. a mounting frame; 61. a support bar; 62. fixing the rod; 63. a connecting rod; 631. a first clamping block; 632. a second fixture block; 64. a central column; 7. a first card slot; 71. a bolt; 8. a connecting seat; 81. a second card slot; 82. locking the stud; 83. and a limiting screw rod.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1 and 2, the integrated assembly type steel structure building disclosed by the invention comprises a bottom plate 1, wherein a plurality of support columns 2 are vertically fixed on the bottom plate 1, and the support columns 2 are square columns. The opposite side of adjacent support column 2 is equipped with fixed plate 21 and movable plate 22, and the length of fixed plate 21, movable plate 22 is the same with the height of support column 2, and fixed plate 21 and support column 2 welded fastening, fixed plate 21 and movable plate 22 are located the same side of support column 2, are provided with hinge 23 on the movable plate 22, and hinge 23 respectively with movable plate 22, support column 2 welded fastening, movable plate 22 passes through hinge 23 and support column 2 articulates. The movable plate 22 is provided to be rotatable on the support column 2 by a hinge 23.
The side of the fixed plate 21 facing the movable plate 22 is fixed with four fixing screws 24, the four fixing screws 24 are perpendicular to the fixed plate 21, and the end of the fixing screw 24 is connected with a nut 25 in a threaded manner. The side of the movable plate 22 away from the fixed plate 21 is provided with a groove 26, the number and the position of the groove 26 correspond to those of the fixing screws 24, a through hole 27 for the fixing screw 24 to pass through is formed in the groove 26, and the direction of the through hole 27 is the direction away from the support column 2. Nut 25 is located in recess 26 and the inner circular diameter of nut 25 is greater than the width of through opening 27.
The nut 25 is tightened, the nut 25 presses the movable plate 22 in the direction of the fixed plate 21, the hinge 23 has traction on the movable plate 22, and the two forces interact with each other to fix the movable plate 22 and the support column 2.
Referring to fig. 2 and 3, a mounting groove 28 is defined between the fixed plate 21 and the movable plate 22, the cross section of the mounting groove 28 is U-shaped, the openings of the mounting grooves 28 on adjacent supporting columns 2 are opposite, and the mounting groove 28 is arranged along the height direction of the supporting column 2. Install wallboard 3 between two relative mounting grooves 28, the distance between two mounting grooves 28 bottoms is greater than wallboard 3's whole width, and the distance between two mounting grooves 28 tops is less than wallboard 3's whole width, and it has sealing cement 33 to fill between mounting groove 28 and the wallboard 3. The two sides of the wall plate 3 are integrally formed with protruding strips 31, the thickness of the protruding strips 31 is slightly larger than the width of the mounting groove 28, so that the protruding strips 31 are clamped in the mounting groove 28, the nut 25 is screwed, and the protruding strips 31 can be clamped by the movable plate 22 and the fixed plate 21. The convex strip 31 is fixed with a connecting piece 32, the connecting piece 32 is L-shaped, the number and the position of the connecting piece 32 correspond to those of the fixing screw 24, and the connecting piece 32 is buckled on the fixing screw 24.
Opening movable plate 22, wallboard 3 can be installed from the side, the protruding strip 31 of wallboard 3 both sides is placed in mounting groove 28, protruding strip 31 and fixed plate 21 butt, then rotate movable plate 22, movable plate 22 and protruding strip 31 butt, tighten nut 25, make fixed plate 21 and movable plate 22 clamp protruding strip 31, and then fix wallboard 3 in mounting groove 28. Two mounting grooves 28 centre gripping are fixed in the both sides of wallboard 3 for the wall body vertical fixation is on bottom plate 1, and is convenient simple, need not install the bearing diagonal, need not carry out the vertical measurement and adjust the bearing diagonal to wallboard 3 many times, and then has improved the installation effectiveness of wallboard 3. When the installation, there is the space between sand grip 31 and the mounting groove 28, through filling sealed clay 33, has increased the connection leakproofness of wall body and mounting groove 28. The convex strip 31 is clamped into the mounting groove 28, the outer side surface of the wall body is flush with the movable plate 22, and the connecting piece 32 is clamped on the fixing screw rod 24 and can limit the wall body, so that the two sides of the wall body cannot slide.
Referring to fig. 1 and 4, a ceiling 4 is fixed to the top of the support column 2, and the ceiling 4 includes a ceiling plate 5 and a mounting bracket 6. Mounting bracket 6 has threely, and mounting bracket 6 includes bracing piece 61, dead lever 62, connecting rod 63 and center post 64, and the both ends of bracing piece 61 respectively with two support column 2 welded fastening, and dead lever 62 welded fastening is in the middle part of bracing piece 61, and dead lever 62 vertical fixation is on the side that bracing piece 61 deviates from the erection column, and center post 64 and dead lever 62 keep away from the end fixed connection of bracing piece 61.
Referring to fig. 4 and 5, connecting rod 63 is connected between bracing piece 61 and center post 64 in the slope, and first draw-in groove 7 has been seted up to center post 64's both sides, and the cross-section of first draw-in groove 7 is the T type, and the one end welded fastening of connecting rod 63 has first fixture block 631, and first fixture block 631 and connecting rod 63 slope set up, and first fixture block 631 is the T type, and first fixture block 631 and first draw-in groove 7 joint wear to be equipped with bolt 71 in the second draw-in groove 81, the top surface of bolt 71 and second fixture block 632 butt.
Referring to fig. 4 and 6, a second latch 632 is fixed to the other end of the connecting rod 63, the second latch 632 is perpendicular to the connecting rod 63, and the second latch 632 is T-shaped. Articulated on the tip of bracing piece 61 have a connecting seat 8, have seted up second draw-in groove 81 on the connecting seat 8, and the cross-section of second draw-in groove 81 is the T type, and second fixture block 632 and second draw-in groove 81 joint wear to be equipped with stop screw 83 in the second draw-in groove 81, stop screw 83 and second fixture block 632's top surface butt.
In first fixture block 631 blocked into first draw-in groove 7, bolt 71 passed first draw-in groove 7, can intercept first fixture block 631 for first fixture block 631 can't come out from the opening of first draw-in groove 7. The second block 632 is clamped into the second clamping groove 81, the limit screw 83 limits the second block 632, and the second block 632 cannot come out of the second clamping groove 81, so that the connecting rod 63 is fixed on the supporting rod 61 and the central column 64, the top plate 5 is fixed on the connecting rod 63, the supporting rod 61 and the supporting column 2 are fixed, and the whole ceiling 4 is fixed.
Referring to fig. 6, the connecting base 8 is provided with a locking stud 82, and the locking stud 82 penetrates through the connecting base 8 and the support rod 61. Locking stud 82 runs through connecting seat 8 and bracing piece 61 for connecting seat 8 can't continue to rotate on bracing piece 61, makes connecting seat 8 and bracing piece 61 connect stably, and it is more firm to support.
The implementation principle of the embodiment is as follows: support column 2 vertical fixation is on bottom plate 1, open movable plate 22, hoist wallboard 3 through the loop wheel machine, from side-mounting wallboard 3, adjustment wallboard 3, the sand grip 31 of wallboard 3 both sides is placed in mounting groove 28, sand grip 31 and fixed plate 21 butt put down wallboard 3, connecting piece 32 lock joint is on clamping screw 24, then rotate movable plate 22, movable plate 22 and sand grip 31 butt, tighten nut 25 makes fixed plate 21 and movable plate 22 press from both sides tight sand grip 31, and then fixes wallboard 3 in mounting groove 28. Two mounting grooves 28 centre gripping are fixed in the both sides of wallboard 3 for the wall body vertical fixation is on bottom plate 1, and is convenient simple, need not install the bearing diagonal, need not carry out the vertical measurement and adjust the bearing diagonal to wallboard 3 many times, and then has improved the installation effectiveness of wallboard 3.
And the gap between the convex strip 31 and the mounting groove 28 is filled with sealing cement 33, so that the connection sealing performance of the wall body and the mounting groove 28 is improved. The both ends of bracing piece 61 respectively with two support column 2 welded fastening, with dead lever 62 welded fastening at the middle part of bracing piece 61, again with center post 64 welded fastening at the top of dead lever 62, first fixture block 631 blocks into in first draw-in groove 7, second fixture block 632 blocks into in second draw-in groove 81, bolt 71 passes first draw-in groove 7 and screws up bolt 71, stop screw 83 passes second draw-in groove 81 and screws up bolt 71, locking stud 82 passes connecting seat 8 and bracing piece 61 and screws up locking stud 82, make connecting rod 63 slope fix between bracing piece 61 and center post 64, fix roof 5 on connecting rod 63 at last, accomplish the installation.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (8)

1. An integrated assembled steel structure building, includes bottom plate (1), wallboard (3), support column (2) and ceiling (4), support column (2) and bottom plate (1) vertical fixation, the top and ceiling (4) fixed connection of support column (2), install between adjacent support column (2) wallboard (3), its characterized in that: it is adjacent be equipped with mounting groove (28) that are used for installing wallboard (3) on the relative side of support column (2), the transversal U type of personally submitting of mounting groove (28), the opening of mounting groove (28) is relative on adjacent support column (2), and the direction of height setting along support column (2) is gone up in mounting groove (28), be equipped with fixed plate (21) and fly leaf (22) on the side of support column (2), fixed plate (21) and fly leaf (22) are located the same side of support column (2), and fixed plate (21) and support column (2) fixed connection, fly leaf (22) and support column (2) are articulated, enclose between fixed plate (21) and fly leaf (22) mounting groove (28), be equipped with the mounting that is used for fixed fly leaf (22) on fixed plate (21).
2. An integrally assembled steel structural building according to claim 1, wherein: the movable plate (22) is provided with a hinge (23), and the hinge (23) is fixedly connected with the movable plate (22) and the supporting column (2) respectively.
3. An integrally assembled steel structural building according to claim 1, wherein: the mounting includes clamping screw (24) and nut (25), clamping screw (24) and fixed plate (21) fixed connection, nut (25) and clamping screw (24) threaded connection, be equipped with recess (26) on fly leaf (22), be equipped with opening (27) that supply clamping screw (24) to pass through in recess (26), the interior circle diameter of nut (25) is greater than the width of opening (27).
4. An integrally assembled steel structural building according to claim 3, wherein: the both sides of wallboard (3) are fixed with sand grip (31), sand grip (31) and mounting groove (28) joint are equipped with connecting piece (32) on sand grip (31), connecting piece (32) are the L type, and connecting piece (32) lock joint is on clamping screw (24).
5. An integrally assembled steel structural building according to claim 4, wherein: and the mounting groove (28) is filled with sealing cement (33).
6. An integrally assembled steel structural building according to claim 1, wherein: the ceiling (4) comprises a top plate (5) and a mounting frame (6), the mounting frame (6) comprises a support rod (61), a fixed rod (62), a connecting rod (63) and a center column (64), the support rod (61) is fixedly connected with a support column (2), the fixed rod (62) is fixedly connected with the support rod (61), the end part of the support rod (61) is far away from the center column (64) and the fixed rod (62), first clamping grooves (7) are formed in two sides of the center column (64), a first clamping block (631) is fixed at one end of the connecting rod (63), the first clamping block (631) is clamped with the first clamping groove (7), a second clamping block (632) is fixed at the other end of the connecting rod (63), a connecting seat (8) is hinged to the end part of the support rod (61), a second clamping groove (81) is formed in the connecting seat (8), and the second clamping block (632) is clamped with the second clamping, first fixture block (631) and second fixture block (632) are the T type, are equipped with in first draw-in groove (7) and carry out spacing locating part to first fixture block (631), roof (5) and connecting rod (63) fixed connection.
7. An integrally assembled steel structural building according to claim 6, wherein: the limiting piece is a bolt (71), the bolt (71) penetrates through the first clamping groove (7), and the bolt (71) is abutted to the first clamping block (631).
8. An integrally assembled steel structural building according to claim 6, wherein: the connecting seat (8) is provided with a locking stud (82), and the locking stud (82) penetrates through the connecting seat (8) and the supporting rod (61).
CN201910959260.4A 2019-10-10 2019-10-10 Integrated assembled steel construction building Active CN110863674B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910959260.4A CN110863674B (en) 2019-10-10 2019-10-10 Integrated assembled steel construction building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910959260.4A CN110863674B (en) 2019-10-10 2019-10-10 Integrated assembled steel construction building

Publications (2)

Publication Number Publication Date
CN110863674A CN110863674A (en) 2020-03-06
CN110863674B true CN110863674B (en) 2020-12-01

Family

ID=69652213

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910959260.4A Active CN110863674B (en) 2019-10-10 2019-10-10 Integrated assembled steel construction building

Country Status (1)

Country Link
CN (1) CN110863674B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111851749B (en) * 2020-08-18 2022-01-11 常熟雅致模块化建筑有限公司 High-stability temporary building convenient to disassemble
CN111894139B (en) * 2020-09-05 2021-12-28 义乌市今朝创意设计有限公司 Modularized steel structure board room capable of being rapidly installed and disassembled

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997005341A1 (en) * 1995-07-28 1997-02-13 Pagano Engineering S.R.L. Bidimensional prefabrication system for civil and industrial buildings made up of modular equippable walls having a wood load bearing structure, relevant fixtures for the realisation of the prefabrication components, and prefabrication components
CN2627085Y (en) * 2003-08-14 2004-07-21 王福河 House fabricated by pillaret and joist hollow load-bearing wall panel
CN201756833U (en) * 2010-06-22 2011-03-09 三门峡富达水泥制品有限责任公司 Assembling type fence in concrete
CN104563288A (en) * 2014-10-30 2015-04-29 徐曼 Reinforced concrete frame gridding slab prefabricated energy-saving house
CN205857388U (en) * 2016-07-14 2017-01-04 福建未来家冠鑫实业有限公司 A kind of assembled container
WO2017134314A1 (en) * 2016-02-03 2017-08-10 Aberto Corral Arquitecto, S.L. Improved construction method for producing buildings using a prefabricated structure
CN207160247U (en) * 2017-06-27 2018-03-30 姚轩轩 A kind of pin-connected panel moveable house

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1997005341A1 (en) * 1995-07-28 1997-02-13 Pagano Engineering S.R.L. Bidimensional prefabrication system for civil and industrial buildings made up of modular equippable walls having a wood load bearing structure, relevant fixtures for the realisation of the prefabrication components, and prefabrication components
CN2627085Y (en) * 2003-08-14 2004-07-21 王福河 House fabricated by pillaret and joist hollow load-bearing wall panel
CN201756833U (en) * 2010-06-22 2011-03-09 三门峡富达水泥制品有限责任公司 Assembling type fence in concrete
CN104563288A (en) * 2014-10-30 2015-04-29 徐曼 Reinforced concrete frame gridding slab prefabricated energy-saving house
WO2017134314A1 (en) * 2016-02-03 2017-08-10 Aberto Corral Arquitecto, S.L. Improved construction method for producing buildings using a prefabricated structure
CN205857388U (en) * 2016-07-14 2017-01-04 福建未来家冠鑫实业有限公司 A kind of assembled container
CN207160247U (en) * 2017-06-27 2018-03-30 姚轩轩 A kind of pin-connected panel moveable house

Also Published As

Publication number Publication date
CN110863674A (en) 2020-03-06

Similar Documents

Publication Publication Date Title
CN110863674B (en) Integrated assembled steel construction building
US3913287A (en) Structural system
US20170037653A1 (en) Clamps for panel-type fences
FI95955B (en) Facade device comprising a fastening and adjustment device for three-dimensional alignment of flat facade elements
CN216665010U (en) Reinforcing and supporting device for construction of flat slab frame column
CN212176052U (en) Assembled steel construction vestibule
CN110593562B (en) Steel frame shaping building template system
CN209082789U (en) A kind of building body curtain wall construction
GB2255576A (en) Masonry support.
CN220521544U (en) Connecting structure for concrete column and large-span beam body
CN220580531U (en) Leak protection thick liquid post mould is used in house construction
CN220080421U (en) Assembled building curtain wall
CN219548503U (en) Assembled building convenient to installation
JPH0735924Y2 (en) Pillar mounting material
CN215948622U (en) High-strength assembly type floor system
CN220790527U (en) Support structure for cantilever frame
CN221703203U (en) Positioning device for steel structure installation
CN114293831B (en) Composite intermediate wall system and installation method thereof
CN215802424U (en) Assembled exterior wall system and assembling mechanism thereof
CN212802721U (en) A coincide roof beam strutting arrangement for prefabricated building
US20240175269A1 (en) Building Reinforcement with Adjustable Cladding Supporting Framework
CN209837279U (en) Assembled steel house room
KR200208378Y1 (en) Apparatus of construction in slate and bearing wall applied to the concrete architectural structure
JP3100101B2 (en) Architectural basic structure
GB2370294A (en) Sill assembly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant