CN110409845A - A kind of discharging platform and its construction method of automatic moving - Google Patents

A kind of discharging platform and its construction method of automatic moving Download PDF

Info

Publication number
CN110409845A
CN110409845A CN201910706695.8A CN201910706695A CN110409845A CN 110409845 A CN110409845 A CN 110409845A CN 201910706695 A CN201910706695 A CN 201910706695A CN 110409845 A CN110409845 A CN 110409845A
Authority
CN
China
Prior art keywords
support frame
charging carriage
floor
outrigger
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910706695.8A
Other languages
Chinese (zh)
Other versions
CN110409845B (en
Inventor
李迥
董春山
陈旦波
严军波
赵强
陈彦红
蒋成杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shunyuan Construction (group) Co Ltd
Original Assignee
Shunyuan Construction (group) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shunyuan Construction (group) Co Ltd filed Critical Shunyuan Construction (group) Co Ltd
Priority to CN201910706695.8A priority Critical patent/CN110409845B/en
Publication of CN110409845A publication Critical patent/CN110409845A/en
Application granted granted Critical
Publication of CN110409845B publication Critical patent/CN110409845B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/166Landings, receiving platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention provides a kind of discharging platform of automatic moving and its construction methods, including support frame and charging carriage, support frame one end is fixed with existing building floor construction, the other end is extend out to outside floor construction, and the direction along building floor outside lateral floor construction is laid with U-shaped slideway on the support frame;The bottom of charging carriage is equipped with directive wheel, charging carriage can move in arbitrary region in floor, collection for the turnover material of arbitrary region in floor, and the directive wheel of charging carriage can be moved along U-shaped slideway, for the turnover material of collection by being delivered to outside floor construction on the inside of floor construction, to be realized the transfer for the turnover material that the charging carriage is collected.The present invention can mitigate the labor intensity that circulation material is collected charging carriage by construction worker, improve the understructure flooring constructed and be scattered the efficiency that circulation material collects, the especially big building of floor area.

Description

A kind of discharging platform and its construction method of automatic moving
Technical field
The present invention relates to building engineering fields, and in particular, to a kind of discharging platform and its construction method of automatic moving.
Background technique
Overhanging unloading platform be in the realm of building construction circulation material be transferred to from the lower floor constructed it is to be onstructed upper The most important transfer device of floor, this device mainly using the prominent floor outer edge of lower floor is mounted on, overhang at present Discharging platform itself is immovable, and corresponding construction circulation material is manually transported to transfer platform from building by operator, Then circulation material is transported to by floor to be onstructed by vertical transportation machinery derrick crane, this overhanging unloading platform is in week Turning to be all made of in the carrying of material manually will collect and be transported to discharging platform in lower floor, on the one hand carry relatively time-consuming expense Power, work efficiency is very low, exists simultaneously the security risks such as eminence junk and the high falling in high-rise working, on the other hand, overhang steel Platform seldom uses modular form, and the connection between all components is all using welded connecting, and the welding procedure of use will hang Main outrigger and the secondary beam etc. for choosing discharging platform connect, and are limited by welding procedure, the cantilever steel platform for material unloading being processed into Technique is cumbersome, and control of acceptance is not perfect, and production assurance is difficult, and product maintenance is also without specific effectively regulation, product weight The management the such as multiple component of non-standard component form dismounts using having certain limitation, relative complex, and component is recycled and recycled Also inconvenient, do not meet the theme of current national the authorities green construction advocated and environmental protection and energy saving.
Through retrieving, the Chinese patent of Publication No. 203755680U discloses a kind of reduction formula discharging platform, including fixation The front end of frame and movable frame, the first H profile steel of fixed frame is equipped with the first idler wheel and first side guide roller;Activity The rear end of second H profile steel of frame is equipped with the second idler wheel, and the second idler wheel is contacted with the inside edge of a wing of the first H profile steel beam, and first Idler wheel is contacted with the outer side wing edge of the second H profile steel beam;Loading base, slope bottom plate and can are equipped between two the second H profile steel beams The movable floor of overturning, the foot-operated rotating mechanism of the rear end adjustment movable floor position of the second H profile steel beam.
The Chinese patent of Publication No. CN107082354A discloses a kind of self-tipping type transport cage and its construction method, It includes: cage ontology that self-tipping type, which transports cage, including bottom plate and four cycle side plates set on bottom plate is gone along with sb. to guard him, towards floor in side plate Side forms opening;The second end of track extends cage ontology by opening, and the second end of track stops building in cage ontology It is erected on floor after layer;And for the mobile cushion cap that material is shelved, it is installed on track and can be along track and can be along track Sliding.Although the cage body of the patent can be slided with mobile cushion cap along track, only unidirectional to slide along track, and The distance of sliding is very limited, that is, is only limited to track-bound, the circulation material of other positions still needs to pass through manpower in floor It collects and in manual handling to cage ontology, but the problem of patent is deposited is to waste a large amount of tower cranes in the fixed construction of installation to provide The problem of source, when installation fee, delay the duration.
The above patent the problem is that: the movement of discharging platform or sliding scale are all limited, are confined to the small model of track Interior adjustment is enclosed, for the big building of special floor area in floor, still not aspect in terms of the transhipment of circulation material is had enough to meet the need Material bulk cargo collects, and for operator still using manually collecting and being transported in discharging platform one by one, workers carry's labour is strong Degree does not reduce still, and reducing labor intensity, aspect is still unobvious, and it is still to be improved to collect effect.
Summary of the invention
For the defects in the prior art, the object of the present invention is to provide a kind of discharging platform of automatic moving and its constructions Method.
First aspect according to the present invention provides a kind of discharging platform of automatic moving, including support frame and charging carriage, Support frame as described above one end is fixed with existing building floor construction, and the other end is extend out to outside floor construction;
Direction on support frame as described above along building floor outside lateral floor construction is laid with U-shaped slideway;
The bottom of the charging carriage is equipped with directive wheel, moves the charging carriage in arbitrary region in floor, real The collection of the turnover material of arbitrary region in existing floor;And the directive wheel of the charging carriage can be along the U-shaped slideway side To movement, realize the turnover material of collection by being delivered to outside floor construction on the inside of floor construction;Realize that the charging is small The transfer for the turnover material that vehicle is collected.
Preferably, support frame as described above includes the first support frame outrigger, the second support frame outrigger, stull, diagonal brace;Wherein, institute State the first support frame outrigger, one end of the second support frame outrigger is fixed on the inside of the floor construction, the other end is extend out to Outside the floor construction;
Laterally spaced arrangement is multiple along its length between the first support frame outrigger and the second support frame outrigger The stull, the both ends of the stull are welded on the first support frame outrigger and the second support frame outrigger respectively, pass through The stull connects the first support frame outrigger and the second support frame outrigger forms whole force structure;
The diagonal brace is set to the lower section of the first support frame outrigger, described second support frame outrigger one end, described oblique The bottom of the first support frame outrigger, the second support frame outrigger is fixed in one end of support, and the other end is fixed on lower floor On the outside of side bar, it is used to support superstructure.
Preferably, the U-shaped slideway is set to the top of the first support frame outrigger Yu the second support frame outrigger, Charging carriage of the U-shaped slideway for collection material is mobile.
Preferably, the charging carriage includes pedestal, enclosing, wherein the enclosing is detachable to be set to the pedestal Top, the bottom of the enclosing is fixed on three peripheries of the pedestal, and forming the enclosing and the pedestal has one The accommodation space for opening wide side, for accommodating the turnover material collected;
The bottom of the pedestal is equipped with directive wheel, moves the charging carriage along any direction or along the U-shaped slideway It is mobile;
Hanging ring is set on the periphery of the pedestal, for connecting handling apparatus, realizes that collect turnover material is turned by This floor Move to designated floor.
Preferably, the support platform that the pedestal is assemblied to form by two longitudinal rods and multiple transverse bars, the support are flat Backing plate is set above platform, for shelving circulation material;The laterally spaced arrangement transverse bar, institute between two longitudinal rods The both ends for stating transverse bar are connect with two longitudinal rods of two sides respectively;The enclosing by multiple upright bars, multiple horizon bars and Close mesh safety net is protected to be assemblied to form, wherein the bottom of the upright bar is respectively perpendicular on three sides for being fixed on the pedestal, phase By the horizon bar lateral connection between adjacent upright bar level, one is surrounded on the top of the base with two long The U-shaped fence on side and a short side is arranged one layer of close mesh safety net of protection in the outside of the U-shaped fence, makes the U-shaped fence The accommodation space with openings at one side is formed with the pedestal, the opening is the handling material mouth of the charging carriage.
Preferably, support frame as described above, which is equipped with, stops block, described one end for stopping block and being horizontally set at the U-shaped slideway On, for preventing the forward movement of the charging carriage.
Preferably, limiting device is additionally provided on support frame as described above, the limiting device is located at the outside of the floor construction The end of support frame as described above, and it is located at the outside for stopping block, the limiting device is for preventing the charging carriage outside It is mobile.
Preferably, the limiting device includes the first limit upright bar, the second limit upright bar, limit cross bar, wherein described the The bottom of one limit upright bar is fixed on the first support frame outrigger, and the second limit bottom of upright rod is fixed on described second On support frame outrigger, the limit cross bar is horizontally set between the first limit upright bar, the second limit upright bar, described The both ends for limiting cross bar are connect with the first limit upright bar, the second limit upright bar respectively.
Preferably, the first railing and the second railing, first railing and second railing are set on support frame as described above Be respectively arranged at the outside of the first support frame outrigger, the second support frame outrigger, for prevent the charging carriage by U-shaped slideway two sides are gone out.
The second aspect of the invention provides a kind of construction method of the discharging platform of automatic moving, including,
Architectural Structure Design drawing is used according to being intended that, is supported the design of frame and charging carriage, and carry out the support The safety analysis of frame calculates;
According to the design of support frame as described above, the processing of corresponding prefabricated components is carried out, and carries out each prefabricated components It is assembled;
Support frame as described above is lifted to floor scene, consolidation process is carried out, coagulation is fixed in one end of support frame as described above On Tulou plate, the other end is extend out to outside floor construction;On support frame as described above along floor construction outside lateral floor construction It is equipped with U-shaped slideway;
The processing of each prefabricated components of charging carriage is carried out according to the design of charging carriage, and is carried out each described pre- The assembly of component processed;
The charging carriage is placed into floor, the charging carriage can be in floor arbitrarily by the directive wheel of bottom It is moved in region, realizes the collection of the turnover material of arbitrary region in floor, and the directive wheel of the charging carriage can edge U-shaped slideway direction is mobile, and after charging carriage fills circulation material, the charging carriage is moved to support frame as described above On, the charging carriage is moved outwardly to the support frame other than floor structure along the U-shaped slideway, reaches predetermined position;It realizes The transfer for the turnover material that the charging carriage is collected.
Compared with prior art, the present invention have it is following at least one the utility model has the advantages that
In the above-mentioned platform of the present invention, by the way that U-shaped slideway is arranged on supporting frame, charging carriage bottom is equipped with directive wheel, So that charging carriage is moved to building external by the inside of building floor structure, tower crane is facilitated to hang the circulation material on charging carriage Superstructure is transported to, for superstructure form bracing system construction usage, realizes the transfer for the turnover material that charging carriage is collected; Further, charging carriage, can also be in building after lower U-shaped slideway in addition to can be along support frame U-shaped slideway toward other than moving inside and outside floor It is moved in layer, realizes charging carriage moving range and be expanded to entire floor, charging carriage walking can be allowed to dissipate to circulation material Circulation material entrucking on the spot is realized in cloth position, is carried out by installation personnel onto the U-shaped slideway of supporting frame after filling.
In the above-mentioned construction method of the present invention, through analytical technology application this technology, same area structure floor circulation material is received Collection transhipment, can save labour 40%, save the time 60%;Construction worker can be mitigated, circulation material is collected into charging carriage Labor intensity, improve the understructure flooring constructed and be scattered the efficiency that circulation material collects, while circulation material can be It is tired before into support frame to tie, facilitate the handling of the vertical transportation machineries such as tower crane, economic effect is good, has very big popularization Application value.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other feature of the invention, Objects and advantages will become more apparent upon:
Fig. 1 is the side elevational view of one embodiment of the present invention;
Fig. 2 is the front elevation view of one embodiment of the present invention;
Fig. 3 is the top view of the support frame of one embodiment of the present invention;
Fig. 4 is the structural schematic diagram of the charging carriage of one embodiment of the present invention;
Fig. 5 is the general structure schematic diagram of the device of one embodiment of the present invention;
Figure acceptance of the bid note is expressed as: the first support frame outrigger 1a, the second support frame outrigger 1b, stull 2, diagonal brace 3, U-shaped Slideway 4, first limits upright bar 5a, the second limit upright bar 5b, limit cross bar 6, stops block 7, horizontal anchoring piece 8, transition plates 9, dress Trolley 10, enclosing 102, longitudinal rod 103, transverse bar 104, backing plate 105, upright bar 106, horizontal rod 107, is indulged pedestal 101 To horizon bar 108, guide wheel bracket 109, directive wheel 110, hanging ring 111, the close mesh safety net 112 of protection, support frame 201.
Specific embodiment
The present invention is described in detail combined with specific embodiments below.Following embodiment will be helpful to the technology of this field Personnel further understand the present invention, but the invention is not limited in any way.It should be pointed out that the ordinary skill of this field For personnel, without departing from the inventive concept of the premise, various modifications and improvements can be made.These belong to the present invention Protection scope.
Hereinafter, " first ", " second " are only used for facilitating description, be not understood to indicate or imply relative importance or Implicitly indicate the quantity of indicated technical characteristic." first " is defined as a result, the feature of " second " can be expressed or imply Ground includes one or more of the features.In the description of the present embodiment, unless otherwise indicated, the meaning of " plurality " is two Or it is more than two.
Shown in referring to Fig.1, the discharging platform structural schematic diagram of the automatic moving in one embodiment of the invention includes branch in figure Support 201 and charging carriage 10,201 one end of support frame are fixed with existing building floor construction, and the other end extend out to floor construction Outside, direction on support frame 201 along building floor structure outside lateral floor construction is laid with U-shaped slideway.It charges small The bottom of vehicle 10 is equipped with directive wheel 110, moves charging carriage 10 in arbitrary region in floor, realizes arbitrary region in floor Turnover material collection.And the directive wheel 110 of charging carriage 10 can be moved along U-shaped slideway direction, make the turnover material collected Building external is moved to by the inside of building floor structure, tower crane is facilitated to tie the circulation material handling on charging carriage to upper layer Structure realizes the transfer for the turnover material that charging carriage is collected for superstructure form bracing system construction usage.Such as certain It can be using existing handling apparatus such as vertical transportation machinery such as tower cranes in embodiment.
In one embodiment, referring to shown in Fig. 2, Fig. 3, support frame 201 includes the first support frame outrigger 1a, second Support outrigger 1b, stull 2, diagonal brace 3, wherein the first support frame outrigger 1a, the second support frame outrigger 1b one end be fixed on floor On the inside of structure, the other end extend out to the outside of floor construction.Specifically, by the first support frame outrigger 1a, the second support frame outrigger One end of 1b and floor construction are fixed using horizontal anchoring piece 8, and horizontal anchoring piece 8 can be using the spiral shell for passing through concrete floor Bolt is equipped with washer at the both ends of bolt anchoring floor.Along length between first support frame outrigger 1a and the second support frame outrigger 1b The laterally spaced multiple stulls 2 of arrangement in direction, the both ends of stull 2 are welded in the first support frame outrigger 1a and the second support frame outrigger respectively On 1b, the first support frame outrigger 1a and the second support frame outrigger 1b is connected by stull 2 and forms whole force structure.
In the specific implementation, 2 spacing distance of adjacent crossbrace can be set to 500mm, which tie frame body integrally Structure is more stable.It is of course also possible to according to the actual situation, other spacing distances be arranged.
Diagonal brace 3 is set to the lower section of the first support frame outrigger 1a, second one end support frame outrigger 1b, which is located at floor knot Outside structure, one end of diagonal brace 3 is fixed on to the bottom of the first support frame outrigger 1a, the second support frame outrigger 1b, the other end is solid On the outside of lower floor side bar, play the role of supporting superstructure.In the specific implementation, diagonal brace 3 can use 2 slots Steel one end of two channel steels is respectively welded in the first support frame outrigger 1a, second to side for channel steel U-shaped opening when setting The bottom of support frame outrigger 1b, the other end are welded with steel plate pre-buried on the outside of lower floor side bar respectively.In existing building floor Stable support frame structure is formd in structure.
U-shaped slideway 4 is set to the top of the first support frame outrigger 1a and the second support frame outrigger 1b, the bottom of U-shaped slideway 4 Top with the first support frame outrigger 1a, the second support frame outrigger 1b is using being welded to connect, and U-shaped slideway 4 is for collection material Charging carriage is mobile.
It in other preferred embodiments, referring to Figure 5, is additionally provided on support frame 201 and stops block 7, stop block 7 laterally It is fixed on one end of U-shaped slideway, and is located at one end outside floor construction, block 7 will be stopped and be clamped in the first support frame outrigger Between 1a, the second support frame outrigger 1b, for preventing charging carriage 10 from continuing to be displaced outwardly.Limit is additionally provided on support frame 201 Device, limiting device is located at the end of the exterior support frame 201 of floor construction, and is located at the outside for stopping block 7, and limiting device is used In preventing charging carriage 10 to be displaced outwardly.It stops block 7 and is located at support frame outrigger outer end, and be located within limiting device, for filling Trolley 10 buffers during being displaced outwardly, and the continuation of charging carriage 10 is prevented to move outward, to realize charging carriage 10 Braking.
As another preferred embodiment, limiting device includes the first limit upright bar 5a, the second limit upright bar 5b, limit Cross bar 6, wherein the bottom of the first limit upright bar 5a is fixed on the first support frame outrigger 1a, specifically can be vertical by the first limit The bottom of bar 5a is welded in one end of the first support frame outrigger 1a, and the second support frame outrigger is fixed in the second limit bottom upright bar 5b On 1b, the second limit bottom upright bar 5b is welded on the second support frame outrigger 1b, limit cross bar 6 is horizontally set at the first limit Between upright bar 5a, the second limit upright bar 5b, the both ends for limiting cross bar 6 limit upright bar 5b with the first limit upright bar 5a, second respectively It is connected using steel tube fastener.
In other preferred embodiments, it is additionally provided with safeguard structure, i.e. the first railing and the second railing on support frame 201, makees For a preferred embodiment, the first limit upright bar 5a and the second limit upright bar 5b are connected to be formed in an angle degree by two steel poles The shape of one long side and a short side.Wherein, the first support frame outrigger 1a's be fixed in one end of the short side of the first limit upright bar 5a By the bottom of close end, the outer side edges of the first support frame outrigger 1a are fixed in one end of long side, are formed and are chosen positioned at the first support frame Safeguard structure on the outside of beam 1a, i.e. the first railing.The second support frame outrigger is fixed in one end of the short side of second limit upright bar 5b The outer side edges of the second support frame outrigger 1b are fixed in the bottom by close end of 1b, long side one end, are formed and are located at the second support frame Safeguard structure on the outside of outrigger 1b, i.e. the second railing.First railing and the second railing are for preventing charging carriage 10 by U-shaped slideway 4 two sides are gone out.
As another preferred embodiment, support frame 201 further includes setting transition plates 9, and transition plates 9 is located at existing building One end of first support frame outrigger 1a, the second support frame outrigger 1b on the inside of floor, transition plates 9 are with a gradient.Transition plates 9 is high One end contacted with the first support frame outrigger 1a, the second support frame outrigger 1b, can be by transition plates 9 by ground by charging carriage 10 Face is moved on U-shaped slideway 4.Charging carriage 10 can also be moved on U-shaped slideway 4 by artificial mode, it is relatively labor-saving, It is convenient to use.
In other preferred embodiments, referring to shown in Fig. 4, charging carriage 10 includes pedestal 101, enclosing 102, hanging ring 111, Wherein, 101 top of pedestal is fixed in the bottom of enclosing 102, and enclosing 102 and pedestal 101 form and accommodate platform.In charging carriage 10 On two hanging rings 111 are at least set, hanging ring 111 is set on two sides of pedestal 101, and two hanging rings 6 respectively correspond setting On opposite two side of pedestal 101, for being connect with hanging apparatus;Hanging ring 111 there are four setting in the present embodiment, makes to charge Further held stationary of the trolley 10 in hoisting process.The bottom of pedestal 101 is set there are four guide wheel bracket 109, is being oriented to Wheel support 109 installs directive wheel 110, moves charging carriage 10 along U-shaped slideway 4.
As preferred embodiment, branch that pedestal 101 is assemblied to form by two longitudinal rods 103 and multiple transverse bars 104 Support platform, the laterally spaced arrangement transverse bar 104 between two longitudinal rods 103, the both ends of transverse bar 104 respectively with two sides two A longitudinal rod 103 connects.Backing plate 105 is set above support platform, for shelving circulation material.In one embodiment, Longitudinal rod 103, transverse bar 104 use steel pipe, and the both ends of transverse bar 104 use fastener with two longitudinal rods 103 of two sides respectively Connection, can also be using the other connecting components that can be used for steel pipe connection in the prior art.
Enclosing 102 is set in the top of pedestal 101, enclosing 102 is set along three peripheries of pedestal 101, enclosing 102 is by more A upright bar 106, multiple horizon bars and the close mesh safety net 112 of protection are assemblied to form, wherein the bottom of upright bar 106 is respectively perpendicular solid Due on three sides of pedestal 101, pass through horizon bar lateral connection between adjacent 106 level of upright bar, in the top of pedestal 101 The U-shaped fence with two long sides and a short side is surrounded, one layer of close mesh safety net of protection is set in the outside of U-shaped fence 112, so that U-shaped fence and pedestal 101 is formed the accommodation space with openings at one side, the loading and unloading being open as charging carriage 10 Mouthful.Using protecting close mesh safety net 112 that can prevent charging carriage 10 in the process of moving, falling for turnover material is caused, Play the role of going along with sb. to guard him, it is particularly possible to prevent the lesser material of the particles such as dust from shedding outward.In one embodiment, upright bar 106, horizon bar is all made of steel pipe, wherein horizon bar may include different length steel pipe, can be divided into horizontal rod 107, longitudinal direction Horizon bar 108 is separately connected horizontal rod 107 or longitudinal water according to the distance between adjacent upright bar 106 in the specific implementation Flat bar 108 is formed multiple-layer horizontal bar 12 in the short transverse of upright bar 106, is connected in the stitching portion of each rod piece using fastener.
Four hanging rings 111 correspond to the outside for being fixedly connected on two longitudinal rods 103 of charging carriage 10, and position two-by-two respectively In the outside of enclosing 102.
The structure feature of discharging platform based on the unloading of above-mentioned automatic moving, also provides a kind of discharging platform of automatic moving Construction method embodiment, the construction method of the embodiment the following steps are included:
Step 1: using Architectural Structure Design drawing according to being intended that, it is supported the design of frame 201 and charging carriage 10, and The safety analysis for being supported frame 201 calculates;In order to meet the needs that circulation material in structure construction is collected and transported, support frame 201 design should have enough stiffness and strength, while meet the security needs of walking that need of charging carriage 10, design load Value meets the requirement of code for structural design.
Step 2: carrying out the processing of corresponding prefabricated components, and carry out each prefabricated components according to the design of support frame 201 Assembly;By the lifting of support frame 201 to floor scene, the first support frame outrigger 1a, the second support frame of support frame 201 are chosen On one end fixing concrete floor of beam 1b, the other end extend out to the outside of floor construction, and extend out to building by the support of diagonal brace 3 One end of diagonal brace 3 and the bottom of the first support frame outrigger 1a, the second support frame outrigger 1b are consolidated in one end of the outside of hardened structure Fixed, the other end is fixed on the outside of lower floor side bar.
Step 3: carrying out the processing of each prefabricated components of charging carriage 10 according to the design of charging carriage 10, and carry out each The assembly of a prefabricated components;This step in the specific implementation, first can carry out charging carriage 10 according to the design of charging carriage 10 The material of component prepares and preliminary working, and carries out the preassembling test of material platform, further according to preassembling as a result, further adjustment is expected The processing quality of the component of platform, and re-start the prefabricated components assembling of charging carriage 10.It is completed and then pacifies in material platform The hanging ring 111 of charging carriage 10 is filled, while carrying out the preparation before the integral hoisting of material platform.
Step 4: charging carriage 10 is placed into floor, the bottom of charging carriage 10 is equipped with directive wheel 110, makes to charge Trolley 10 moves in arbitrary region in floor, facilitates operator that circulation material is transferred in charging carriage 10, is charging After trolley 10 fills circulation material, charging carriage 10 is moved on the support frame 201 in floor, realizes any area in floor The collection of the turnover material in domain.
Step 5: charging carriage 10 is moved to floor inner support frame after having enough to meet the need the collection of material in completing step 4 In 201 U-shaped slideway 4, the directive wheel 110 of charging carriage 10 can be moved along 4 direction of U-shaped slideway, later, will be continued using manpower It pushes charging carriage 10 to move outward along the continuation of U-shaped slideway 4, stops block 7 until the directive wheel 110 of front collides, deceleration stops Get off, so that charging carriage 10 is moved fully to floor construction on outer support frame 201, to make the turnover material collected by building floor The inside of structure is moved to building external, realizes that circulation material is lifted into a floor in structure.In this step, material platform lifting is used Integral hoisting device for rapid first carries out examination and hangs, it is ensured that can formally be lifted, will be filled after 10 held stationary of charging carriage before lifting Circulation material handling on trolley realizes charging carriage for superstructure form bracing system construction usage to superstructure The transfer of the turnover material of collection.Integral hoisting device for rapid is placed into outside support frame 201, and is located at the first limit upright bar 5a and the Within two limit upright bar 5b, limit cross bar 6 (these limiting components buffer during being displaced outwardly for charging carriage 10, and Charging carriage 10 is prevented to continue to move outward).Then charging carriage 10 and its circulation material collected are transported by hanging apparatus To designated floor and position.
In the specific implementation, to save construction cost, support frame 201 can be recycled the present embodiment, and completing, charging is small Vehicle 10 and the turnover material of carrying are hoisted in designated floor and then disassembly support frame 201, by the support frame 201 of disassembly It is mounted on designated floor, then charging carriage 10 is cooperated to use, completes the collection and transfer of the turnover material of the floor.It can also be Required floor installs support frame 201 respectively, keeps work progress more convenient using which, saves demounting procedure, but exists The biggish defect of construction cost.
The material that the above embodiment of the present invention can be realized any position in building is collected, and can mitigate construction worker will have enough to meet the need Material collects the labor intensity of charging carriage, improves the understructure flooring constructed and is scattered the efficiency that circulation material collects, The especially big building of floor area, meanwhile, cost can be greatlyd save.
Specific embodiments of the present invention are described above.It is to be appreciated that the invention is not limited to above-mentioned Particular implementation, those skilled in the art can make various deformations or amendments within the scope of the claims, this not shadow Ring substantive content of the invention.

Claims (10)

1. a kind of discharging platform of automatic moving, including support frame and charging carriage, support frame as described above one end and existing building building Hardened structure is fixed, and the other end is extend out to outside floor construction, which is characterized in that
Direction on support frame as described above along building floor outside lateral floor construction is laid with U-shaped slideway;
The bottom of the charging carriage is equipped with directive wheel, and the charging carriage can move in arbitrary region in floor, is used for building The collection of the turnover material of arbitrary region in layer, and the directive wheel of the charging carriage can be moved along the U-shaped slideway, be used In the turnover material collected to be delivered to outside floor construction by floor construction inside, realize what the charging carriage was collected The transfer of the turnover material.
2. a kind of discharging platform of automatic moving according to claim 1, which is characterized in that
Support frame as described above includes the first support frame outrigger, the second support frame outrigger, stull, diagonal brace;Wherein, first support frame Outrigger, the second support frame outrigger one end be fixed on the inside of the floor construction, the other end extend out to the floor construction It is external;
Laterally spaced arrangement is multiple described along its length between the first support frame outrigger and the second support frame outrigger Stull, the both ends of the stull are welded in respectively on the first support frame outrigger and the second support frame outrigger, by described Stull connects the first support frame outrigger and the second support frame outrigger forms whole force structure;
The diagonal brace is set to the lower section of the first support frame outrigger, described second support frame outrigger one end, the diagonal brace The bottom of the first support frame outrigger, the second support frame outrigger is fixed in one end, and the other end is fixed on lower floor side bar Outside is used to support superstructure.
3. a kind of discharging platform of automatic moving according to claim 2, which is characterized in that
The U-shaped slideway is set to the top of the first support frame outrigger Yu the second support frame outrigger, the U-shaped slideway Charging carriage for collection material is mobile.
4. a kind of discharging platform of automatic moving according to claim 1, which is characterized in that
The charging carriage includes pedestal, enclosing, wherein the detachable top for being set to the pedestal of the enclosing, it is described The bottom of enclosing is fixed on three peripheries of the pedestal, and the enclosing and the pedestal is made to form the receiving with a unlimited side Space, for accommodating the turnover material collected;
The bottom of the pedestal is equipped with directive wheel, and the charging carriage is made to move along any direction or move along the U-shaped slideway;
Hanging ring is set on the periphery of the pedestal, for connecting handling apparatus, realizes that collect turnover material is transferred to by This floor Designated floor.
5. a kind of discharging platform of automatic moving according to claim 4, which is characterized in that the pedestal is by two longitudinal directions The support platform that bar and multiple transverse bars are assemblied to form, backing plate is arranged in the support platform top, for shelving circulation material;In The laterally spaced arrangement transverse bar between two longitudinal rods, the both ends of the transverse bar are respectively and described in two of two sides Longitudinal rod connection;The enclosing is assemblied to form by multiple upright bars, multiple horizon bars and the close mesh safety net of protection, wherein described vertical The bottom of bar is respectively perpendicular on three sides for being fixed on the pedestal, passes through the horizon bar between adjacent upright bar level Lateral connection surrounds the U-shaped fence with two long sides and a short side on the top of the base, U-shaped encloses described One layer of close mesh safety net of protection is arranged in the outside on column, and forming the U-shaped fence with the pedestal has the described of openings at one side Accommodation space, the opening are the handling material mouth of the charging carriage.
6. a kind of discharging platform of automatic moving described in -5 according to claim 1, which is characterized in that support frame as described above is equipped with Stop block, the obstruction block is horizontally set on one end of the U-shaped slideway, for prevent the charging carriage to Forward It is dynamic.
7. a kind of discharging platform of automatic moving according to claim 6, which is characterized in that be additionally provided on support frame as described above Limiting device, the limiting device is located at the end of the external support frame as described above of the floor construction, and is located at the obstruction block Outside, the limiting device is for preventing the charging carriage to be displaced outwardly.
8. a kind of discharging platform of automatic moving according to claim 7, which is characterized in that the limiting device includes the One limit upright bar, the second limit upright bar, limit cross bar, wherein the bottom of the first limit upright bar is fixed on described first On support outrigger, the second limit bottom of upright rod is fixed on the second support frame outrigger, and the limit cross bar is laterally set It is placed between the first limit upright bar, the second limit upright bar, the both ends of the limit cross bar are limited with described first respectively Position upright bar, the second limit upright bar connection.
9. a kind of discharging platform of automatic moving described in -5 any one according to claim 1, which is characterized in that the support First railing and the second railing are set on frame, and first railing and second railing are respectively arranged at first support frame The outside of outrigger, the second support frame outrigger, for preventing the charging carriage from being gone out by U-shaped slideway two sides.
10. a kind of construction method of the discharging platform of automatic moving unloading of any of claims 1-9, feature exist In: including,
Architectural Structure Design drawing is used according to being intended that, is supported the design of frame and charging carriage, and carry out support frame as described above Safety analysis calculates;
According to the design of support frame as described above, the processing of corresponding prefabricated components is carried out, and carries out the assembly of each prefabricated components;
Support frame as described above is lifted to floor scene, consolidation process is carried out, concrete building is fixed in one end of support frame as described above On plate, the other end is extend out to outside floor construction;It is laid with outside lateral floor construction along floor construction on support frame as described above There is U-shaped slideway;
The processing of each prefabricated components of charging carriage is carried out according to the design of charging carriage, and carries out each prefabricated structure The assembly of part;
The charging carriage is placed into floor, the charging carriage by the directive wheel of bottom can in floor arbitrary region The collection of the turnover material of arbitrary region in floor is realized in interior movement, and the directive wheel of the charging carriage can be along the U Shape slideway direction is mobile, and after the charging carriage fills circulation material, the charging carriage is moved to support frame as described above On, the charging carriage is moved outwardly to the support frame other than floor structure along the U-shaped slideway, reaches predetermined position, realizes The transfer for the turnover material that the charging carriage is collected.
CN201910706695.8A 2019-08-01 2019-08-01 Self-moving discharging platform and construction method thereof Active CN110409845B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910706695.8A CN110409845B (en) 2019-08-01 2019-08-01 Self-moving discharging platform and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910706695.8A CN110409845B (en) 2019-08-01 2019-08-01 Self-moving discharging platform and construction method thereof

Publications (2)

Publication Number Publication Date
CN110409845A true CN110409845A (en) 2019-11-05
CN110409845B CN110409845B (en) 2024-05-28

Family

ID=68365220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910706695.8A Active CN110409845B (en) 2019-08-01 2019-08-01 Self-moving discharging platform and construction method thereof

Country Status (1)

Country Link
CN (1) CN110409845B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236662A (en) * 2020-03-26 2020-06-05 张延年 Rapid assembly unloading platform capable of protecting head
CN111424995A (en) * 2020-04-30 2020-07-17 中国十七冶集团有限公司 A discharge apparatus for building
CN111894281A (en) * 2020-08-05 2020-11-06 河北建设集团股份有限公司 Safe unloading platform for high-rise construction of hotel buildings and use method
CN111946072A (en) * 2020-09-04 2020-11-17 福建省燕城建设工程有限公司 High-rise building construction discharge apparatus
CN112576039A (en) * 2020-09-11 2021-03-30 北京市第五建筑工程集团有限公司 Construction method for replacing national emblems
CN112796530A (en) * 2021-01-27 2021-05-14 广西宏涛建筑机械制造有限公司 A hydraulic internal circulation balance strut type telescopic platform for construction
CN113047688A (en) * 2021-03-31 2021-06-29 九江职业技术学院 Automatic laying device of fender is enclosed in construction
CN116731493A (en) * 2023-05-05 2023-09-12 宁波旭日鸿宇科技有限公司 Impact-resistant PC material and preparation method thereof

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000145129A (en) * 1998-11-16 2000-05-26 Nippon Gijutsu Center:Kk Staging provided with load lifter
KR20120126673A (en) * 2011-05-12 2012-11-21 에스에이치공사 lifting heavy materials apparatus using pulley and method thereof
CN204876601U (en) * 2015-08-12 2015-12-16 上海宝冶集团有限公司 Pulley type platform of unloading of encorbelmenting
CN205955237U (en) * 2016-08-30 2017-02-15 浙江国泰建设集团有限公司 Plug -type platform of unloading of encorbelmenting
CN205955236U (en) * 2016-08-30 2017-02-15 浙江国泰建设集团有限公司 Container formula of taking pulley platform of unloading of encorbelmenting
CN206337831U (en) * 2016-12-26 2017-07-18 袁晓虎 A kind of discharging platform of construction
CN107288353A (en) * 2017-07-11 2017-10-24 中建局集团安装工程有限公司 Equipment hoisting transition supporting platform on ultrahigh building floor and construction method thereof
CN207513202U (en) * 2017-10-12 2018-06-19 重庆工程职业技术学院 Construction discharging platform
CN108643544A (en) * 2018-04-02 2018-10-12 中国十七冶集团有限公司 A kind of high-altitude overhanging operation platform strutting system and construction method
CN208137458U (en) * 2018-03-26 2018-11-23 黄河科技学院 Construction discharging platform
CN208137457U (en) * 2018-02-12 2018-11-23 日照大象房屋建设有限公司 Discharging platform is used in a kind of construction of assembled architecture
CN210713872U (en) * 2019-08-01 2020-06-09 舜元建设(集团)有限公司 Self-moving discharging platform and moving trolley thereof

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000145129A (en) * 1998-11-16 2000-05-26 Nippon Gijutsu Center:Kk Staging provided with load lifter
KR20120126673A (en) * 2011-05-12 2012-11-21 에스에이치공사 lifting heavy materials apparatus using pulley and method thereof
CN204876601U (en) * 2015-08-12 2015-12-16 上海宝冶集团有限公司 Pulley type platform of unloading of encorbelmenting
CN205955237U (en) * 2016-08-30 2017-02-15 浙江国泰建设集团有限公司 Plug -type platform of unloading of encorbelmenting
CN205955236U (en) * 2016-08-30 2017-02-15 浙江国泰建设集团有限公司 Container formula of taking pulley platform of unloading of encorbelmenting
CN206337831U (en) * 2016-12-26 2017-07-18 袁晓虎 A kind of discharging platform of construction
CN107288353A (en) * 2017-07-11 2017-10-24 中建局集团安装工程有限公司 Equipment hoisting transition supporting platform on ultrahigh building floor and construction method thereof
CN207513202U (en) * 2017-10-12 2018-06-19 重庆工程职业技术学院 Construction discharging platform
CN208137457U (en) * 2018-02-12 2018-11-23 日照大象房屋建设有限公司 Discharging platform is used in a kind of construction of assembled architecture
CN208137458U (en) * 2018-03-26 2018-11-23 黄河科技学院 Construction discharging platform
CN108643544A (en) * 2018-04-02 2018-10-12 中国十七冶集团有限公司 A kind of high-altitude overhanging operation platform strutting system and construction method
CN210713872U (en) * 2019-08-01 2020-06-09 舜元建设(集团)有限公司 Self-moving discharging platform and moving trolley thereof

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236662A (en) * 2020-03-26 2020-06-05 张延年 Rapid assembly unloading platform capable of protecting head
CN111236662B (en) * 2020-03-26 2025-01-21 张延年 A quick assembly unloading platform capable of protecting the head
CN111424995A (en) * 2020-04-30 2020-07-17 中国十七冶集团有限公司 A discharge apparatus for building
CN111894281A (en) * 2020-08-05 2020-11-06 河北建设集团股份有限公司 Safe unloading platform for high-rise construction of hotel buildings and use method
CN111894281B (en) * 2020-08-05 2021-08-24 河北建设集团股份有限公司 Safe unloading platform for high-rise construction of hotel buildings and use method
CN111946072A (en) * 2020-09-04 2020-11-17 福建省燕城建设工程有限公司 High-rise building construction discharge apparatus
CN111946072B (en) * 2020-09-04 2021-10-19 福建省燕城建设工程有限公司 High-rise building construction discharge apparatus
CN112576039A (en) * 2020-09-11 2021-03-30 北京市第五建筑工程集团有限公司 Construction method for replacing national emblems
CN112796530A (en) * 2021-01-27 2021-05-14 广西宏涛建筑机械制造有限公司 A hydraulic internal circulation balance strut type telescopic platform for construction
CN113047688A (en) * 2021-03-31 2021-06-29 九江职业技术学院 Automatic laying device of fender is enclosed in construction
CN113047688B (en) * 2021-03-31 2022-07-22 九江职业技术学院 Automatic laying device of fender is enclosed in construction
CN116731493A (en) * 2023-05-05 2023-09-12 宁波旭日鸿宇科技有限公司 Impact-resistant PC material and preparation method thereof

Also Published As

Publication number Publication date
CN110409845B (en) 2024-05-28

Similar Documents

Publication Publication Date Title
CN110409845A (en) A kind of discharging platform and its construction method of automatic moving
CN101831888B (en) 1200 tonner water conservancy aqueduct transportation and erection equipment
CN202706503U (en) Electric lifting discharging platform for main building construction
CN105952133A (en) Suspended large-span reinforced concrete structure construction steel platform and construction method
CN215252400U (en) Self-supporting synchronous hanger system for corrugated steel web construction
CN208137458U (en) Construction discharging platform
CN212609137U (en) L-shaped cantilever type gantry crane
CN109573851A (en) Arcuated roof internode steel truss hangs, fills integrated apparatus and docking hanging method
CN210713872U (en) Self-moving discharging platform and moving trolley thereof
CN206554524U (en) A kind of construction discharging platform
CN103643791B (en) For the traveling stage device of belt porch
CN210713752U (en) High-altitude operation construction hanging basket capable of moving in three-dimensional space
CN209308433U (en) A multifunctional trolley for binding and installing cast-in-place beam reinforcement cages
CN215591798U (en) Curtain wall plate traction transfer device for tower crane dismantling part
CN107902536B (en) Improved method and structure of lifting cage for building
CN216949583U (en) Discharging device for building
CN216098680U (en) Portable reinforcing bar installation appurtenance
CN106437047B (en) A kind of equipment transported for factory building roof plate with installing
CN212836599U (en) Rail-mounted moving platform car
CN210713871U (en) Self-moving support frame of discharging platform
CN204897102U (en) Electronic cat ladder of instrument formula
CN209817458U (en) Platform of unloading
CN111305063A (en) Construction method of self-adaptive gradient movable type bridge maintenance hanging basket
CN219261791U (en) Epitaxial material transportation platform for high-rise building construction
CN219508371U (en) External embedded part of highway bridge guardrail and pipeline mounting rack

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A self-propelled unloading platform and its construction method

Granted publication date: 20240528

Pledgee: China Construction Bank Corporation Shanghai Changning Branch

Pledgor: SUNYOUNG CONSTRUCTION GROUP Co.,Ltd.

Registration number: Y2024980035004

PE01 Entry into force of the registration of the contract for pledge of patent right