Nothing Special   »   [go: up one dir, main page]

CN110306392A - U turn overpass structure - Google Patents

U turn overpass structure Download PDF

Info

Publication number
CN110306392A
CN110306392A CN201910369035.5A CN201910369035A CN110306392A CN 110306392 A CN110306392 A CN 110306392A CN 201910369035 A CN201910369035 A CN 201910369035A CN 110306392 A CN110306392 A CN 110306392A
Authority
CN
China
Prior art keywords
turn
lane
main roads
structure according
road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910369035.5A
Other languages
Chinese (zh)
Inventor
翟俊
孙泽宇
代鹏飞
任敬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou University
Original Assignee
Suzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou University filed Critical Suzhou University
Priority to CN201910369035.5A priority Critical patent/CN110306392A/en
Publication of CN110306392A publication Critical patent/CN110306392A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C1/00Design or layout of roads, e.g. for noise abatement, for gas absorption
    • E01C1/04Road crossings on different levels; Interconnections between roads on different levels

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Traffic Control Systems (AREA)

Abstract

The present invention relates to a kind of u turn overpass structures, u turn is introduced into traffic interchange, realize that all directions vehicle is turned right by the direct-connected right turn ramp in setting inside, and left turn traffic is far guided to intersection downstream road section, u-turn is carried out by the turning roadway being arranged on lane center dividing strip and realizes.The grade separation form of u turn, in the uninterrupted operation for guaranteeing all kinds of traffic such as straight trip between intersecting roads, right-hand rotation and left-hand rotation, while reducing the waiting time of various types of vehicles and reduce the accident rate of intersection, the occupied area of grade separation is reduced to the greatest extent, in the long run, the universal of the following pilotless automobile can be better adapted to.

Description

U turn overpass structure
Technical field
The present invention relates to a kind of u turn grade separations, belong to the highway layout field of urban road intersection.
Background technique
In City road traffic system, intersection affects the efficiency and vehicle service efficiency of entire road network.It hands over Prong is the place that the traffic flow of different directions converges, shunts, and traffic conditions are complicated, the intertexture and conflict of motor vehicle and motor vehicle Cause very big traffic pressure.The problem of traffic interchange very good solution traffic conflict, but due to land occupation, cost etc. is asked Topic, is rarely applied to urban inner road.
Summary of the invention
In view of the above-mentioned problems, the present invention proposes a kind of u turn overpass structure, u turn is introduced into traffic interchange In the middle, it realizes that all directions vehicle is turned right by the direct-connected right turn ramp in setting inside, and left turn traffic is far guided under intersection Section is swum, u-turn is carried out by the turning roadway being arranged on lane center dividing strip and realizes.The grade separation shape of u turn Formula reduces various types of vehicles in the uninterrupted operation for guaranteeing all kinds of traffic such as straight trip between intersecting roads, right-hand rotation and left-hand rotation Waiting time and reduce the accident rate of intersection while reduces the occupied area of grade separation to the greatest extent and is built into This.
In order to achieve the above object, the present invention is achieved through the following technical solutions:
A kind of u turn overpass structure, including main roads, secondary road;There are intersection constructions with secondary road for main roads; The main roads and secondary road are all not provided with left turn lane;In the intersection construction, main roads are located on secondary road Side;The main roads are equipped with bidirectional turn lane.
In the present invention, the main roads and secondary road are all arranged right-turn lane, in the intersection construction, right-turn lane For ring road structure;Right-hand rotation can fast and safely pass through Lothrus apterus point between through vehicles, all directions vehicle.
In the present invention, secondary road is equipped with bidirectional turn lane.Bidirectional turn lane is conventional noun, and effect is so that two The driving vehicle in a direction can respectively turn around.
In the present invention, on main roads and secondary road, reversing end for end length of the switch area in lane apart from intersection construction is 130 ~170 meters, utilize right-turning vehicles lane change required distance and the needs shorter as far as possible around row distance, preferably 150 meters.
In the present invention, on main roads, the switch area for reversing end for end lane is equipped with elevating lever;Elevating lever itself and installation, control It is made as the prior art, the opening and closing of switch area can control by the design of elevating lever, if encountering the big situation of wagon flow, Ke Yitong The closure u-turn of rise elevating lever is crossed, guide car continues to move ahead without reversing end for end, and avoid lane change from causing safety problem or blockage problem, The vehicle for needing to reverse end for end can arrive safety u-turn at front signal light;This structure is emergency design.
In the present invention, the intersection construction is equipped with wagon flow statistic device;Wagon flow statistic device and its installation, using for show There is technology, it is conventional to buy, it may be mounted at the isolation of two-way lane, for example on isolated column, on headlamp, can unite The wagon flow situation at intersection construction is counted, administrative department's visual reference on the one hand can be given, on the other hand can be controlled to elevating lever Personnel provide information.
In the present invention, the main roads are equipped with isolation strip;On main roads, the switch area for reversing end for end lane is equipped with feeling of stress Answer lamp.Normally isolating two-way lane has the forms such as isolation strip, shielding wire, isolated column, and wherein isolation strip has one fixed width, both may be used With the u-turn space certain to head end operation, holding areas can also be provided, is conducive to guarantee safety;Pressure sensitive lamp and its installation For the prior art, purpose has vehicle u-turn to inform other vehicles herein by the flashing of pressure sensitive lamp, avoids safety problem, It is appreciated that the pressure sensitive device of pressure sensitive lamp is mounted on and turns around to locate bottom surface, can be pressed by vehicle to provide pressure.
In the present invention, on main roads, the switch area for reversing end for end lane is not provided with right of way signal lamp, i.e., no traffic lights can Smooth degree is communicated to improve.
In the present invention, main roads and secondary road determines according to actual conditions, the switch area of main roads defined above Design, can quickly through in the case where guarantee traffic safety, secondary road is similarly designed and is reversed end for end after turning right Structure, but can be as main roads for the design of switch area, it can also be different, such as can be on secondary road Isolation strip is set, isolated column or shielding wire also can be set, although u-turn space is small, since secondary road wagon flow is few, to row Vehicle security implication very little.
In U-shaped grade separation structure of the invention, main roads and secondary road intersect, in main roads and secondary road Between be respectively equipped with a right-hand rotation ring road in four quadrants being formed, turn right and use the direct-connected ring road connection in inside;Also set up four Item reverses end for end bend, and the upstream and downstream lane center of main roads and secondary road is arranged in u-turn bend (switch area in u-turn lane) On dividing strip, at the 150m of intersection, turn left then by wagon flow far being guided to intersection downstream road section, by being arranged in vehicle The mode that turning roadway on road central strip band is reversed end for end realizes left-hand rotation.
Compared with the prior art, the beneficial effects of the present invention are:
Land occupation less, building height, project cost it is low;Traffic form is simple, is easy to tissue traffic;Straight trip, the right side between intersecting roads Turn and turn left etc. all kinds of traffic uninterrupted operation, with unmanned technology cooperate, vehicle operational efficiency will be greatly improved.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of one u turn overpass structure of embodiment;
Fig. 2 is the prevailing state of one u turn overpass structure of embodiment with reference to figure;
Fig. 3 is the structural schematic diagram of two u turn overpass structure of embodiment;
Fig. 4 is the structural schematic diagram of three u turn overpass structure of embodiment;
Fig. 5 is the structural schematic diagram of example IV u turn overpass structure;
Wherein, main roads 1, secondary road 2, intersection construction 3, isolation strip 4, switch area 5, right-turn lane 6, elevating lever 7, wagon flow Statistic device 8, pressure sensitive lamp 9, pressure sensitive device 91.
Specific embodiment
Embodiment one
Referring to Fig.1:
A kind of u turn overpass structure, including main roads 1, secondary road 2;There are cross knots with secondary road for main roads Structure 3;Main roads and secondary road are all not provided with left turn lane;In intersection construction, main roads are located above secondary road, tool Body is that frame height is arranged on ground main roads along the north-south direction, and secondary road is arranged on ground along east-west direction to be located at Under the main roads;Main roads, secondary road are designed with isolation strip 4, and switch area 5(is only marked at one, can at excess-three Undoubted determination) it is all located on isolation strip;The switch area in u-turn lane is not provided with right of way signal lamp.
Main roads are equipped with bidirectional turn lane, and reversing end for end length of the switch area in lane apart from intersection construction is 150 meters;It is secondary Road is wanted to be equipped with bidirectional turn lane, reversing end for end length of the switch area in lane apart from intersection construction is 150 meters.Switch area distance is handed over The length of fork structure refers to switch area to the distance between the edge of intersection construction.
Main roads and secondary road are all arranged right-turn lane 6(and only mark at one, can undoubtedly really at excess-three Calmly), in intersection construction, right-turn lane is ring road structure.
Referring to attached drawing 2, the prevailing state on the basis of being Fig. 1 is with reference to figure;Shape between the main roads and secondary road of intersection At four quadrants in be respectively equipped with right-hand rotation ring road A, B, C, a D;U-shaped grade separation structure, which further includes four, can be realized a left side The upstream and downstream lane center of the main roads and secondary road is arranged in u-turn bend E, F, G, H of rotating function, u-turn bend On dividing strip, at the 150m of intersection;Across secondary road on main roads, turns right and use the direct-connected ring road connection in inside, it is left Turning is carried out then by wagon flow far being guided to intersection downstream road section by the turning roadway being arranged on lane center dividing strip The mode of u-turn realizes left-hand rotation.The travel route that vehicle is respectively exported in overpass structure is as shown in the table:
From above-described embodiment as can be seen that present invention has an advantage that land occupation, building height, project cost are low;Traffic form letter It is single, it is easy to tissue traffic;The uninterrupted operation of all kinds of traffic such as straight trip, right-hand rotation and left-hand rotation between intersecting roads.It is existing main On road, the time that a left-hand rotation vehicle averagely passes through crossing is 150s, during which there is the through vehicles waiting time;Using the present invention Intersection construction forms crossing (embodiment one), and by calculating, the time that a left-hand rotation vehicle averagely passes through crossing is 95s or so, phase Between be not present the through vehicles waiting time, thoroughly solve the congestion of existing main crossroads.If will reverse end for end the switch area in lane away from Length adjustment from intersection construction is 200 meters, will increase transit time, and can be close with downstream road junction, it is unfavorable to pass through to it; If will reverse end for end length adjustment of the switch area in lane apart from intersection construction is 100 meters, u-turn difficulty (being related to lane change) will increase, And can be close with right-hand rotation ring road mouth, it is unfavorable to pass through to it.
Embodiment two
On the basis of example 1, on main roads, the switch area for reversing end for end lane is equipped with elevating lever 7, referring to attached drawing 3;Pass through Conventional method is mounted on the switch area ground in u-turn lane.It can control the opening and closing of switch area by the design of elevating lever, such as Fruit encounters the big situation of wagon flow, can be by rising elevating lever closure u-turn, and guide car continues to move ahead without reversing end for end, and avoids lane change Cause safety problem or blockage problem, the vehicle for needing to reverse end for end can arrive safety u-turn at front signal light;This structure is to answer Anxious design.
Embodiment three
On the basis of example 2, intersection construction is equipped with existing wagon flow statistic device 8 and pacifies by conventional method referring to attached drawing 4 In the isolation strip of main roads, the wagon flow situation at intersection construction can be counted, it on the one hand can be straight to administrative department Reference is seen, on the other hand can provide information to elevating lever controllers;The specifically used and information of wagon flow statistic device passes Defeated is the prior art.
Example IV
On the basis of example 1, on main roads, the switch area for reversing end for end lane is equipped with pressure sensitive lamp 9, pressure sensitive lamp Pressure sensitive device 91 be mounted on and turn around to locate bottom surface, referring to attached drawing 5, can be pressed by vehicle to provide pressure, purpose in order to Informing other vehicles herein by the flashing of pressure sensitive lamp has vehicle u-turn, avoids safety problem.
Specific embodiments of the present invention are described in detail above, but the present invention is not restricted to tool described above Body embodiment, it is merely an example.To those skilled in the art, any equivalent modifications and substitution are also all in the present invention Scope among.Therefore, made equal transformation and modification without departing from the spirit and scope of the invention, should all cover In the scope of the present invention.

Claims (10)

1. a kind of u turn overpass structure, including main roads, secondary road;There are cross knots with secondary road for main roads Structure;The main roads and secondary road are all not provided with left turn lane;In the intersection construction, main roads are located at secondary road Top;The main roads are equipped with bidirectional turn lane.
2. u turn overpass structure according to claim 1, it is characterised in that: the main roads and secondary road are all set Set right-turn lane.
3. u turn overpass structure according to claim 2, it is characterised in that: in the intersection construction, right-turn lane is circle Road structure.
4. u turn overpass structure according to claim 1, it is characterised in that: on main roads, reverse end for end the switch area in lane Length apart from intersection construction is 130~170 meters.
5. u turn overpass structure according to claim 1, it is characterised in that: the secondary road is equipped with bidirectional turn vehicle Road, on secondary road, reversing end for end length of the switch area in lane apart from intersection construction is 130~170 meters.
6. u turn overpass structure according to claim 1, it is characterised in that: on main roads, reverse end for end the switch area in lane Equipped with elevating lever.
7. u turn overpass structure according to claim 1, it is characterised in that: the intersection construction is equipped with wagon flow statistics dress It sets.
8. u turn overpass structure according to claim 1, it is characterised in that: the main roads are equipped with isolation strip.
9. u turn overpass structure according to claim 1, it is characterised in that: on main roads, reverse end for end the switch area in lane Equipped with pressure sensitive lamp.
10. u turn overpass structure according to claim 1, it is characterised in that: on main roads, reverse end for end the u-turn in lane Place is not provided with right of way signal lamp.
CN201910369035.5A 2019-05-05 2019-05-05 U turn overpass structure Pending CN110306392A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910369035.5A CN110306392A (en) 2019-05-05 2019-05-05 U turn overpass structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910369035.5A CN110306392A (en) 2019-05-05 2019-05-05 U turn overpass structure

Publications (1)

Publication Number Publication Date
CN110306392A true CN110306392A (en) 2019-10-08

Family

ID=68075368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910369035.5A Pending CN110306392A (en) 2019-05-05 2019-05-05 U turn overpass structure

Country Status (1)

Country Link
CN (1) CN110306392A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101545233A (en) * 2008-03-27 2009-09-30 周智昂 Traffic light-free viaduct for three-way intersection
WO2010064834A2 (en) * 2008-12-05 2010-06-10 Chi Hong Yeo A nonstop traffic system using half (1/2) cloverleaf and traffic method applied with the same
CN202187259U (en) * 2011-02-01 2012-04-11 张书锋 Intersection without traffic lights
CN102637372A (en) * 2012-04-10 2012-08-15 张佳俊 Intelligent signal measuring and controlling system of vehicle
CN103590292A (en) * 2013-11-29 2014-02-19 郑勤民 Unblocked overpass at intersection
CN204417942U (en) * 2015-01-20 2015-06-24 吕雅南 The two arch bridge of a kind of overhead pedestrian crossing and crossroad
CN105844924A (en) * 2016-04-22 2016-08-10 深圳美亚美科技有限公司 Intelligent traffic road management method and system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101545233A (en) * 2008-03-27 2009-09-30 周智昂 Traffic light-free viaduct for three-way intersection
WO2010064834A2 (en) * 2008-12-05 2010-06-10 Chi Hong Yeo A nonstop traffic system using half (1/2) cloverleaf and traffic method applied with the same
CN202187259U (en) * 2011-02-01 2012-04-11 张书锋 Intersection without traffic lights
CN102637372A (en) * 2012-04-10 2012-08-15 张佳俊 Intelligent signal measuring and controlling system of vehicle
CN103590292A (en) * 2013-11-29 2014-02-19 郑勤民 Unblocked overpass at intersection
CN204417942U (en) * 2015-01-20 2015-06-24 吕雅南 The two arch bridge of a kind of overhead pedestrian crossing and crossroad
CN105844924A (en) * 2016-04-22 2016-08-10 深圳美亚美科技有限公司 Intelligent traffic road management method and system

Similar Documents

Publication Publication Date Title
WO2016061902A1 (en) Traffic diversion method and system for level crossing
CN105070080A (en) Plane road intersection dispersion system without left turn conflict
WO2014173028A1 (en) Level intersection crisscross interactive pedestrian-car-bus convenience anti-bottleneck mode traffic
US20040184879A1 (en) Roadway system interchange
US20020076276A1 (en) Butzek-troemel roundabout or "spiralabout"
CN107881870B (en) Six-lane intersection canalization system
CN105970753A (en) Method for eliminating left-turn phase at traffic intersection
CN101351598A (en) Quick traffic turning system
Montella et al. Proposals for improvement of the Italian roundabout geometric design standard
CN110158510A (en) A kind of pedestrains safety crossing facilities and control method
CN202187259U (en) Intersection without traffic lights
CN201305801Y (en) No-wait road without traffic light
KR100512408B1 (en) crossroad system
CN110306392A (en) U turn overpass structure
CN110016844B (en) Narrow road design concept-based reduced lane and setting method thereof
CN208594446U (en) Planar traffic system and Traffic Systems with it
CN103031789A (en) Planar traffic system
CN202000230U (en) Motor vehicle and non-motorized vehicle conflict-free facility of urban ramp bridge
KR101074508B1 (en) U-turn system at a narrow crossroad
CN103215866B (en) Highway intersection with anti-congestion function
CN114277627A (en) Ground intersection structure and signal control system for rapidly evacuating lower elevated ramp
CN106223147A (en) A kind of six limit formula viaducts
CN211142674U (en) Straight-through intersection
Thai Van et al. Design of roundabouts in France: Historical context and state of the art
CN214245163U (en) Crossing traffic command system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191008

RJ01 Rejection of invention patent application after publication