CN110292487A - A kind of hospital's building passageway emergency isolating device - Google Patents
A kind of hospital's building passageway emergency isolating device Download PDFInfo
- Publication number
- CN110292487A CN110292487A CN201910611244.6A CN201910611244A CN110292487A CN 110292487 A CN110292487 A CN 110292487A CN 201910611244 A CN201910611244 A CN 201910611244A CN 110292487 A CN110292487 A CN 110292487A
- Authority
- CN
- China
- Prior art keywords
- electric pushrod
- block
- fixture block
- mobile sickbed
- guide rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- A—HUMAN NECESSITIES
- A61—MEDICAL OR VETERINARY SCIENCE; HYGIENE
- A61G—TRANSPORT, PERSONAL CONVEYANCES, OR ACCOMMODATION SPECIALLY ADAPTED FOR PATIENTS OR DISABLED PERSONS; OPERATING TABLES OR CHAIRS; CHAIRS FOR DENTISTRY; FUNERAL DEVICES
- A61G1/00—Stretchers
- A61G1/06—Supports for stretchers, e.g. to be placed in or on vehicles
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Animal Behavior & Ethology (AREA)
- General Health & Medical Sciences (AREA)
- Public Health (AREA)
- Veterinary Medicine (AREA)
- Invalid Beds And Related Equipment (AREA)
- Accommodation For Nursing Or Treatment Tables (AREA)
Abstract
The invention discloses a kind of hospital's building passageway emergency isolating devices, including Mobile sickbed, the upper end of Mobile sickbed is respectively arranged on the left side and the right side the first side fixture block and second side fixture block, and the first side ferrule block, the second sliding block, the second electric pushrod, the second guide rail, third electric pushrod and third sliding block form the right stretching structure on the right side of an electronic lifting Mobile sickbed;First sliding block, the first electric pushrod, the first guide rail, the 4th electric pushrod, Four-slider and second side ferrule block form the left stretching structure on the left of an electronic lifting Mobile sickbed, so that Mobile sickbed moves up.Mobile sickbed can be risen by upward electronic lifting and come liftoff one meter or so in the present invention, by the push-pull rod for pushing electric pushrod forward, in along guide rail moving process, the sufferer for encountering mobile inconvenience then allows sufferer to squat down, Mobile sickbed is from the sufferer crown row mistake, when suitable for hospital corridors passageway, longer and sufferer is more, be conducive to strive for rescue time for the patient on Mobile sickbed.
Description
Technical field
The present invention relates to the technical field of medical building instrument more particularly to a kind of hospital's building passageway emergency isolation dresses
It sets.
Background technique
Hospital refers to according to laws and regulations and industry standard, carries out necessary medical inspection, remedy measures, nursing for patient
The services such as technology, service of seeing and treating patients, rehabilitation equipment, treatment transport, with medical institutions as the main purpose of healing the wounded and rescue the dying.With population
Development, China's Aging Problem become increasingly conspicuous, and sufferer also just increases therewith relatively in hospital, and the design of Hospitals at Present building is in
Existing prolate, especially building in hospital, although being convenient for department management, are made with very long corridor passageway
With finding in the process, too long corridor is the larger problem of first-aid band, and especially many handicapped sufferers are in corridor mistake
It is difficult to avoid in time in road, the Mobile sickbed rapidly pushed has to stop to avoid the sufferer, is very easy to delay shifting
The rescue of sufferer on dynamic hospital bed, in view of this, being Mobile sickbed in order to when adapting to that hospital corridors passageway is longer and sufferer is more
On patient strive for rescue time, specially design such emergency isolating device, Mobile sickbed and corridor ground kept apart, it is real
The efficient movement of existing Mobile sickbed.
Summary of the invention
For the above existing problem, the present invention provides a kind of hospital's building passageway emergency isolating device, passes through a left side
Stretching structure and right stretching structure move synchronously, so that Mobile sickbed is got up by upward lifting, Mobile sickbed can be upward
Electronic lifting rises and comes liftoff one meter or so, and then multiple medical staff can push directly on the push-and-pull of four electric pushrods respectively
Bar is lifted along in guide rail moving process in Mobile sickbed, if encountering the sufferer of mobile inconvenience, sufferer can be allowed direct
It squats down, Mobile sickbed can be from the sufferer crown row mistake, and it is longer and when sufferer is more to be suitable for hospital corridors passageway, is conducive to
Strive for rescue time for the patient on Mobile sickbed.
Technical program of the present invention lies in:
The present invention provides a kind of hospital's building passageway emergency isolating device, including Mobile sickbed, the Mobile sickbed it is upper
End left and right sides center is fixedly installed the first side fixture block and second side fixture block, first side fixture block and second side fixture block respectively
Upper to be nested with the first side ferrule block and second side ferrule block respectively, the rear and front end of first side ferrule block is respectively arranged with perpendicular
The upper end of the second electric pushrod and third electric pushrod directly upwardly extended, second electric pushrod and third electric pushrod point
It is not fixedly installed the second sliding block and third sliding block, second sliding block and third sliding block are nested in second in tandem respectively
On guide rail;
The left side of second guide rail is coplanar to be provided with the first guide rail, nested in tandem on first guide rail
Have the first sliding block and a Four-slider, the lower end of first sliding block and Four-slider be fixedly installed respectively the first electric pushrod and
4th electric pushrod is provided between first electric pushrod and the lower end of the 4th electric pushrod and is nested on second side fixture block
Second side ferrule block;
First side ferrule block, the second sliding block, the second electric pushrod, the second guide rail, third electric pushrod and third are sliding
Block forms one can right stretching structure on the right side of electronic lifting Mobile sickbed;
First sliding block, the first electric pushrod, the first guide rail, the 4th electric pushrod, Four-slider and second side cutting ferrule
Block forms one can left stretching structure on the left of electronic lifting Mobile sickbed;
By moving synchronously for the left stretching structure and the right stretching structure, so that the Mobile sickbed is to moving up
It is dynamic.
Further, simultaneously screw thread connects for insertion from bottom to top respectively for the lower end of first side ferrule block and second side ferrule block
It is connected to the first puller bolt and the second puller bolt, the upper end of first puller bolt and the second puller bolt is born against
First side fixture block and second side fixture block are fastened on the first side respectively by the lower end of the first side fixture block and second side fixture block
In ferrule block and second side ferrule block, the opposite of the Mobile sickbed and the left stretching structure and the right stretching structure is completed
Fastening.
Further, first side fixture block and the rectangular plate structure of second side fixture block, and vertical portion difference is remote
The left and right sides from Mobile sickbed, in order to first side fixture block and second side fixture block respectively to first side ferrule block and
Second side ferrule block is embedded in.
Further, the Mobile sickbed includes bed body, supporting leg and universal wheel, and the supporting leg four and erects totally respectively
It is directly in distributed rectangular, the lower end of the supporting leg is equipped with universal wheel and upper end is equipped with bed body, the left and right sides center of the bed body
It is fixedly installed the first side fixture block and second side fixture block respectively.
Further, under first electric pushrod, the second electric pushrod, third electric pushrod and the 4th electric pushrod
End is the push-pull rod extended downwards, so that first electric pushrod, the second electric pushrod, third electric pushrod and
The push-pull rod of four electric pushrods is able to flexible up and down.
Further, first guide rail and the second guide rail are bolted respectively is fastened on the ceiling of passageway simultaneously edge
Passageway extend direction extend.
The present invention is allowed to specific positive beneficial effect compared with prior art due to using above-mentioned technology are as follows:
By moving synchronously for left stretching structure and right stretching structure, so that Mobile sickbed is got up by upward lifting, it is mobile
Hospital bed can be risen by upward electronic lifting and come liftoff one meter or so, and then multiple medical staff can push directly on four respectively
The push-pull rod of electric pushrod is lifted along in guide rail moving process in Mobile sickbed, moves inconvenient sufferer if encountered,
Sufferer can be allowed directly to squat down, Mobile sickbed can be from the sufferer crown row mistake, and sufferer longer suitable for hospital corridors passageway
When more, be conducive to strive for rescue time for the patient on Mobile sickbed.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is structural schematic diagram when not installing Mobile sickbed in the present invention;
Fig. 3 is the structural schematic diagram of Mobile sickbed in the present invention.
In figure: the first sliding block of 1-, the first electric pushrod of 2-, the first guide rail of 3-, the second guide rail of 4-, the second sliding block of 5-, 6-
Two electric pushrods, 7- bed body, 8- supporting leg, 9- universal wheel, the first side 10- fixture block, the first side 11- ferrule block, 12- first are held out against
Bolt, 13- push-pull rod, 14- third electric pushrod, 15- third sliding block, 16- second side fixture block, the 4th electric pushrod of 17-, 18-
Four-slider, 19- second side ferrule block, the first fixture nut of 20-, the second puller bolt of 21-, the second fixture nut of 22-, 23-
Passageway ceiling.
Specific embodiment
Embodiment one:
As shown in attached drawing 1- attached drawing 3, the present invention provides a kind of hospital's building passageway emergency isolating device, including mobile disease
The upper end left and right sides center of bed, Mobile sickbed is fixedly installed the first side fixture block 10 and second side fixture block 16, the first side respectively
The first side ferrule block 11 and second side ferrule block 19, the first side ferrule block 11 are nested on fixture block 10 and second side fixture block 16 respectively
Rear and front end be respectively arranged with the second electric pushrod 6 and third electric pushrod 14 extended straight up, the second electric pushrod 6
It is fixedly installed the second sliding block 5 and third sliding block 15, the second sliding block 5 and third sliding block respectively with the upper end of third electric pushrod 14
15 are nested in tandem respectively on the second guide rail 4;
The left side of second guide rail 4 is coplanar to be provided with the first guide rail 3, is nested on the first guide rail 3 in tandem
The lower end of one sliding block 1 and Four-slider 18, the first sliding block 1 and Four-slider 18 is fixedly installed 2 He of the first electric pushrod respectively
4th electric pushrod 17 is provided between first electric pushrod 2 and the lower end of the 4th electric pushrod 17 and is nested in second side fixture block
Second side ferrule block 19 on 16;
First side ferrule block 11, the second sliding block 5, the second electric pushrod 6, the second guide rail 4, third electric pushrod 14 and third
Sliding block 15 forms one can right stretching structure on the right side of electronic lifting Mobile sickbed;
First sliding block 1, the first electric pushrod 2, the first guide rail 3, the 4th electric pushrod 17, Four-slider 18 and second side card
Cover block 19 form one can left stretching structure on the left of electronic lifting Mobile sickbed;
By moving synchronously for left stretching structure and right stretching structure, so that Mobile sickbed is got up by upward lifting.
The lower end of first side ferrule block 11 and second side ferrule block 19 is embedded in from bottom to top respectively and is threaded with first
The upper end of puller bolt 12 and the second puller bolt 21, the first puller bolt 12 and the second puller bolt 21 is born against first
First side fixture block 10 and second side fixture block 16 are fastened on the first side cutting ferrule respectively by the lower end of side fixture block 10 and second side fixture block 16
In block 11 and second side ferrule block 19, the tightened relative of Mobile sickbed and left stretching structure and right stretching structure is completed.
First side fixture block 10 and the rectangular plate structure of second side fixture block 16, and vertical portion is respectively further from Mobile sickbed
The left and right sides, in order to which the first side fixture block 10 and second side fixture block 16 are respectively to the first side ferrule block 11 and second side ferrule block
19 are embedded in.
Mobile sickbed includes bed body 7, supporting leg 8 and universal wheel 9, and supporting leg 8 totally four and be respectively vertically in distributed rectangular,
The lower end of supporting leg 8 is equipped with universal wheel 9 and upper end is equipped with bed body 7, and the left and right sides center of bed body 7 is fixedly installed first respectively
Side fixture block 10 and second side fixture block 16.
First electric pushrod 2, the second electric pushrod 6, third electric pushrod 14 and the 4th electric pushrod 17 lower end be
The push-pull rod 13 extended downwards, so that the first electric pushrod 2, the second electric pushrod 6, third electric pushrod 14 and the 4th electricity
The push-pull rod 13 of dynamic push rod 17 is able to flexible up and down.
First guide rail 3 and the second guide rail 4 are bolted respectively to be fastened on passageway ceiling 23 and prolongs along passageway
The direction stretched extends.
When in use, in order to avoid corridor passageway is crowded, sometimes handicapped sufferer is caused to be difficult in time as rapidly
The problem of hospital bed of promotion is given way, and is caused hospital bed all standing and must not be not to wait for, respectively with holdfast on the ceiling in corridor passageway
Pre-fixed the first guide rail 3 and the second guide rail 4 extended in parallel of mode, using the first guide rail 3 and the second guide rail 4 as carrying
Then guide frame is nested with the first sliding block 1 and Four-slider 18, the second guide rail 4 in tandem respectively on the first guide rail 3
Upper to be nested with the second sliding block 5 and third sliding block 15 in tandem respectively, the lower end of four sliding blocks, which is corresponding in turn to, is welded with first
Electric pushrod 2, the second electric pushrod 6, third electric pushrod 14 and the 4th electric pushrod 17, four electric pushrods respectively vertically to
Lower extension, wherein the first side ferrule block 11 is welded between the second electric pushrod 6 and the lower end of third electric pushrod 14, the first electricity
Second side ferrule block 19, the first side ferrule block 11 and second side are welded between dynamic push rod 2 and the lower end of the 4th electric pushrod 17
19 opposite side of ferrule block is respectively equipped with the opening of channel steel shape, and the 7 two sides center of bed body of Mobile sickbed, which is respectively welded, to be correspondingly embedded in
The the first side fixture block 10 and second side fixture block 16 of 19 opposite side of first side ferrule block 11 and second side ferrule block, and the first side cutting ferrule
Block 11 and 19 lower end of second side ferrule block are fixedly installed the first fixture nut 20 and the second fixture nut 22 respectively, then utilize
It extends through and is threaded in the first puller bolt 12 and the second top in the first fixture nut 20 and the second fixture nut 22
Tight bolt 21, is fastened on the first side ferrule block 11 and second side ferrule block 19 for the first side fixture block 10 and second side fixture block 16 respectively
Interior, so that Mobile sickbed is risen by upward electronic lifting after coming liftoff one meter or so, electric pushrod cuts off self-lock, Mobile sickbed quilt
Lifting is locked in the height, until in order to put down Mobile sickbed, and be powered again to electric pushrod;
And after Mobile sickbed is lifted, multiple medical staff can push directly on pushing away for four electric pushrods respectively
Pull rod 13 is lifted in Mobile sickbed along in guide rail moving process, if encountering the sufferer of mobile inconvenience, can allow sufferer
It directly squats down, Mobile sickbed can be from the sufferer crown row mistake, and it is longer and when sufferer is more to be suitable for hospital corridors passageway, has
Strive for rescue time conducive to for the patient on Mobile sickbed.
Claims (6)
- The isolating device 1. a kind of hospital's building passageway is met an urgent need, including Mobile sickbed, it is characterised in that: the upper end of the Mobile sickbed Left and right sides center is fixedly installed the first side fixture block and second side fixture block respectively, on first side fixture block and second side fixture block It is nested with the first side ferrule block and second side ferrule block respectively, the rear and front end of first side ferrule block is respectively arranged with vertically Distinguish the upper end of the second electric pushrod and third electric pushrod upwardly extended, second electric pushrod and third electric pushrod It is fixedly installed the second sliding block and third sliding block, second sliding block and third sliding block are nested in second in tandem respectively and lead On rail;The left side of second guide rail is coplanar to be provided with the first guide rail, is nested on first guide rail in tandem The lower end of one sliding block and Four-slider, first sliding block and Four-slider is fixedly installed the first electric pushrod and the 4th respectively Electric pushrod is provided be nested on second side fixture block between first electric pushrod and the lower end of the 4th electric pushrod Two side ferrule blocks;First side ferrule block, the second sliding block, the second electric pushrod, the second guide rail, third electric pushrod and third sliding block shape It can right stretching structure on the right side of electronic lifting Mobile sickbed at one;First sliding block, the first electric pushrod, the first guide rail, the 4th electric pushrod, Four-slider and second side ferrule block shape It can left stretching structure on the left of electronic lifting Mobile sickbed at one;By moving synchronously for the left stretching structure and the right stretching structure, so that the Mobile sickbed moves up.
- The isolating device 2. a kind of hospital's building passageway according to claim 1 is met an urgent need, it is characterised in that: first side card The lower end of set block and second side ferrule block is embedded in from bottom to top respectively and is threaded with the first puller bolt and second and holds out against spiral shell The upper end of bolt, first puller bolt and the second puller bolt is born against under the first side fixture block and second side fixture block First side fixture block and second side fixture block, are fastened in the first side ferrule block and second side ferrule block by end respectively, complete At the tightened relative of the Mobile sickbed and the left stretching structure and the right stretching structure.
- The isolating device 3. a kind of hospital's building passageway according to claim 2 is met an urgent need, it is characterised in that: first side card Block and the rectangular plate structure of second side fixture block, and vertical portion is respectively further from the left and right sides of Mobile sickbed, in order to institute It states the first side fixture block and second side fixture block is embedded in first side ferrule block and second side ferrule block respectively.
- The isolating device 4. a kind of hospital's building passageway according to claim 3 is met an urgent need, it is characterised in that: the Mobile sickbed Including bed body, supporting leg and universal wheel, the supporting leg totally four and respectively vertically be in distributed rectangular, the lower end of the supporting leg Equipped with universal wheel and upper end is equipped with bed body, and the left and right sides center of the bed body is fixedly installed the first side fixture block and second respectively Side fixture block.
- The isolating device 5. a kind of hospital's building passageway according to claim 1 is met an urgent need, it is characterised in that: described first is electronic Push rod, the second electric pushrod, third electric pushrod and the 4th electric pushrod lower end be the push-pull rod extended downwards, make The push-pull rod for obtaining first electric pushrod, the second electric pushrod, third electric pushrod and the 4th electric pushrod is able to It is lower flexible.
- The isolating device 6. a kind of hospital's building passageway according to claim 1 is met an urgent need, it is characterised in that: first guide rail It is bolted respectively with the second guide rail and is fastened on the ceiling of passageway and extends along the direction that passageway extends.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910611244.6A CN110292487A (en) | 2019-07-08 | 2019-07-08 | A kind of hospital's building passageway emergency isolating device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910611244.6A CN110292487A (en) | 2019-07-08 | 2019-07-08 | A kind of hospital's building passageway emergency isolating device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110292487A true CN110292487A (en) | 2019-10-01 |
Family
ID=68030659
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910611244.6A Pending CN110292487A (en) | 2019-07-08 | 2019-07-08 | A kind of hospital's building passageway emergency isolating device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110292487A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3918446A1 (en) * | 1989-06-06 | 1990-12-20 | Heinz Erich Will | Lifting and transporting hospital bed - involves two parallel lifting frames with rails to receive bed |
JPH0873016A (en) * | 1994-07-07 | 1996-03-19 | Daisho Kogyo:Kk | Cover mounting/demounting device for ditch |
JPH11226061A (en) * | 1998-02-16 | 1999-08-24 | Marukyo Butsuryu:Kk | Carrying instrument for nursing and carrying system for nursing using the same |
KR20120103288A (en) * | 2011-03-10 | 2012-09-19 | 김태유 | Bed for patient |
CN106137569A (en) * | 2016-07-26 | 2016-11-23 | 张家港市协和医疗器械有限公司 | A kind of lift-on/lift-off type Multifunctional stretcher convertible into bed with wheels for downhole rescuing |
CN205802178U (en) * | 2016-03-29 | 2016-12-14 | 浙江吉利控股集团有限公司 | A kind of semi-automatic aerial conveying suspender |
-
2019
- 2019-07-08 CN CN201910611244.6A patent/CN110292487A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3918446A1 (en) * | 1989-06-06 | 1990-12-20 | Heinz Erich Will | Lifting and transporting hospital bed - involves two parallel lifting frames with rails to receive bed |
JPH0873016A (en) * | 1994-07-07 | 1996-03-19 | Daisho Kogyo:Kk | Cover mounting/demounting device for ditch |
JPH11226061A (en) * | 1998-02-16 | 1999-08-24 | Marukyo Butsuryu:Kk | Carrying instrument for nursing and carrying system for nursing using the same |
KR20120103288A (en) * | 2011-03-10 | 2012-09-19 | 김태유 | Bed for patient |
CN205802178U (en) * | 2016-03-29 | 2016-12-14 | 浙江吉利控股集团有限公司 | A kind of semi-automatic aerial conveying suspender |
CN106137569A (en) * | 2016-07-26 | 2016-11-23 | 张家港市协和医疗器械有限公司 | A kind of lift-on/lift-off type Multifunctional stretcher convertible into bed with wheels for downhole rescuing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201710562U (en) | Multifunctional emergency sickbed | |
CN107260202B (en) | Mammary gland imaging dragging device for improving mammary gland imaging effect | |
CN110292487A (en) | A kind of hospital's building passageway emergency isolating device | |
CN113081632A (en) | Novel clinical production of gynaecology and obstetrics is assisted device | |
CN107374860A (en) | A kind of paralytic is with multifunctional hospital bed | |
CN115414212B (en) | Head and neck fixing device suitable for cerebral vascular intervention operation | |
CN202920531U (en) | Manipulator for moving human body | |
CN205729702U (en) | Medical multifunctional thoracentesis treatment center | |
CN204562596U (en) | A kind of Medical flat vehicle | |
CN204964532U (en) | Full -automatic smear analytical equipment | |
CN208808959U (en) | A kind of gastroscope detection bed facilitating patient lying-on-side | |
CN204765926U (en) | Support is pull in disinfection of electron type | |
CN108703849B (en) | Multifunctional mechanical workbench for obstetrics and gynecology department | |
CN113558893A (en) | Intelligent multifunctional bed | |
CN203017220U (en) | Trolley for critical patients in radiology department | |
CN206275792U (en) | Medical multifunctional patient transport cart | |
CN214511703U (en) | Intelligent obstetrical nursing shielding device | |
CN214343033U (en) | Sickbed capable of detecting temperature at regular time | |
CN213489922U (en) | Gynaecology and obstetrics is with sick bed that has fixed knot to construct | |
CN214713063U (en) | Sick bed is transported in dismantlement of orthopedics nursing | |
CN213964142U (en) | Nursing pallet truck based on medical care of patient is aborted to gynaecology | |
CN208224630U (en) | A kind of CT orthopaedics piece hanger | |
CN205729953U (en) | A kind of Coronary Artery Disease Intervention Treatment seal wire traction apparatus | |
CN207041637U (en) | A kind of gynaecology and obstetrics operation auxiliary frame | |
CN215350337U (en) | Portable midwifery device for midwifery in delivery room |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191001 |
|
RJ01 | Rejection of invention patent application after publication |