A kind of sewage conduct is unloaded device
Technical field
Device is unloaded the present invention relates to one kind more particularly to a kind of sewage conduct is unloaded device.
Background technique
When being laid with to sewage conduct, people are needed to unload transport to the sewage conduct of suitable position, mesh
It is preceding that usual multiple people cooperate to carry out carrying to sewage conduct to unload, such people's large labor intensity when unloading sewage conduct, and
It unloads low efficiency, in order to improve efficiency of unloading, plank is tiltedly placed on place of unloading by people, and subsequent people push away sewage conduct in plank
On, it is slid downwards through plank, and when sewage conduct slides downwards, need people aside to help sewage conduct, so in sewage
Pipeline is fallen downwards at ground, is easy to injure by a crashing object people.
Summary of the invention
It unloads to overcome multiple people to cooperate to carry sewage conduct, such large labor intensity, and low efficiency of unloading
The shortcomings that, technical problem of the invention is: providing a kind of sewage conduct that can reduce labor intensity, can be improved efficiency of unloading
It unloads device.
A kind of sewage conduct is unloaded device, includes first support, sliding rail, the first sliding block, the first supporting plate, swinging frame, first
Strut, gag lever post, first rotating shaft, the first sprocket wheel, Oscillating handle, second support, third bracket, the second sprocket wheel, chain, convex block and swing
The left side of device, first support is embedded with sliding rail, and first support is L-shaped, and the first sliding block has been in sliding fit on sliding rail, and first is sliding
The left side of block is connected with the first supporting plate that can be ridden on transport vehicle, and swinging frame rotary type is connected to the right part of first support, the
One strut is set to the top of swinging frame left side, and the first strut is L-shaped, and the top left side of the first strut is fixed with gag lever post,
First rotating shaft rotary type is connected to the lower part of the first strut, and the rear end of first rotating shaft is fixed with the first sprocket wheel, before first rotating shaft
End, which is provided with, can make the first sprocket wheel rotate Oscillating handle, and third bracket is fixed on the bottom of swinging frame, third bracket and the first strut
Left side between be connected with second support, the second sprocket wheel rotary type is connected to the left part of third bracket, the second sprocket wheel and the first chain
The chain of transmission effect is wound between wheel, the top of chain right side is fixed with the convex block that pendulous device can be made to work, can be right
The pendulous device that pipeline is unloaded be it is multiple, be installed on swinging frame.
Optionally, pendulous device includes the second shaft, swings lever, is arc slip pipe, arc slide bar, the first spring, recessed
Type block, the first sliding sleeve, the first slide bar, baffle, second spring and idler wheel, rotary type is connected with multiple second shafts on swinging frame,
The rear and front end of second shaft, which is mounted on, to be connected with the swing lever that pipeline is limited, the front and rear sides of swinging frame
Multiple arcs slip pipe, arc slip pipe inner sliding type are equipped with arc slide bar, the top of the right end of arc slide bar and corresponding swing lever
Portion is affixed, is wound with the first spring on arc slide bar, and one end of the first spring and the top for swinging lever are affixed, the first spring it is another
One end is connect with the right side of arc slip pipe, and the left end that front side swings lever is provided with concave block that can be fixed to pipeline, and second
Multiple first sliding sleeves are embedded on bracket, the first sliding sleeve inner sliding type is equipped with the first slide bar, and the right part of the first slide bar is connected with baffle,
Second spring is cased on first slide bar, the right end of second spring and the left side of baffle are affixed, the left end of second spring and first
The right side of sliding sleeve connects, and the left end of the first slide bar is equipped with idler wheel, idler wheel and bump contact.
It optionally, further include having the second sliding block, third spring, clamping plate, the second strut, nut, screw rod and turntable, second is sliding
Block slidingtype is arranged on the slide rail, and third spring is connected between the top of the second sliding block and the bottom of the first sliding block, and second is sliding
The left side of block is provided with clamping plate that can be fixed by the present invention, and the second strut is set to the left side of first support, the second strut
Positioned at the downside of sliding rail, the left end of the second strut is fixed with nut, and being equipped with threadably in nut can be to clamping plate position
The screw rod being adjusted is set, the bottom end of screw rod is fixed with the turntable that screw rod can be made to rotate.
It optionally, further include having rack gear, the second supporting plate, motor and gear, the top left side in first support is provided with groove,
The left side of swinging frame, which is equipped with, to be located at the upside of the first strut, the second supporting plate to the rack gear that swinging frame is adjusted, rack gear
Be fixed on the top center in first support, the trailing flank right part of the second supporting plate be equipped with can the rotation of sliding tooth wheel motor, electricity
Gear, wheel and rack engagement are fixed on the output shaft of machine.
It optionally, further include having third strut, the second sliding sleeve, the second slide bar, poke rod, fixture block and the 4th spring, rack gear
Left side top be provided with the card slot of fixed function, third strut is set to the left side top in first support, third branch
The right end of bar is connected with the second sliding sleeve that the second slide bar can be made to slide up and down, and the second sliding bar formula is located in the second sliding sleeve, the
The bottom end of two slide bars is connected with the poke rod that the second slide bar can be made to move up and down, and the top of the second slide bar is fixed with can be solid to rack gear
Fixed fixture block, the top of fixture block and the outside face contact of rack gear, the 4th spring pocket on the second slide bar, the top of the 4th spring with
The bottom of fixture block is affixed, and the bottom end of the 4th spring is connect with the top of the second sliding sleeve.
Compared with prior art, the present invention has the advantage that the present invention can be to facilitating user couple by pendulous device
Sewage conduct is unloaded, be so not required to user with hand to sewage conduct carry out carry unload, so as to reduce the labor of user
Fatigue resistance, and can be improved the efficiency of unloading of sewage conduct;Screw rod move up can make clamping plate move up to the present invention into
Row is fixed, and can so be prevented when unloading sewage conduct, and mobile unload to sewage conduct of the present invention counteracts;Make
Fixture block is caught in card slot upwards, and so rack gear can be fixed, so as to prevent when unloading sewage conduct,
Swinging frame automatic moving is unloaded to sewage conduct to bring inconvenience.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the invention.
Fig. 2 is the schematic view of the front view of pendulous device of the present invention.
Fig. 3 is the first part enlarged structure schematic diagram of the invention.
Fig. 4 is second of part enlarged structure schematic diagram of the invention.
Fig. 5 is the third part enlarged structure schematic diagram of the invention.
In figure: 1, first support, 2, sliding rail, the 3, first sliding block, the 4, first supporting plate, 5, swinging frame, the 6, first strut, 7, limit
Position bar, 8, first rotating shaft, the 9, first sprocket wheel, 10, Oscillating handles, 11, second support, 12, third bracket, the 13, second sprocket wheel, 14, chain
Item, 15, convex block, 16, pendulous device, the 161, second shaft, 162, swing lever, 163, arc slip pipe, 164, arc slide bar,
165, the first spring, 166, concave block, the 167, first sliding sleeve, the 168, first slide bar, 169, baffle, 1610, second spring,
1611, idler wheel, the 17, second sliding block, 18, third spring, 19, clamping plate, the 20, second strut, 21, nut, 22, screw rod, 23, turn
Disk, 24, groove, 25, rack gear, the 26, second supporting plate, 27, motor, 28, gear, 29, card slot, 30, third strut, 31, second is sliding
Set, the 32, second slide bar, 33, poke rod, 34, fixture block, the 35, the 4th spring.
Specific embodiment
The technical scheme in the embodiments of the invention will be clearly and completely described below, it is clear that described implementation
Example is only a part of the embodiments of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common
Technical staff's all other embodiment obtained without making creative work belongs to the model that the present invention protects
It encloses.
Embodiment 1
A kind of sewage conduct is unloaded device, as shown in Figs. 1-2, include first support 1, sliding rail 2, the first sliding block 3, the first supporting plate 4,
Swinging frame 5, the first strut 6, gag lever post 7, first rotating shaft 8,9, Oscillating handle 10 of the first sprocket wheel, second support 11, third bracket 12,
The left side of two sprocket wheels 13, chain 14, convex block 15 and pendulous device 16, first support 1 is embedded with sliding rail 2, and first support 1 is L-shaped,
The first sliding block 3 is in sliding fit on sliding rail 2, the left side of the first sliding block 3 is connected with the first supporting plate that can be ridden on transport vehicle
4, the first sliding block 3 is connect with the first supporting plate 4 by bolted connection, and 5 rotary type of swinging frame is connected to the right side of first support 1
Portion, the first strut 6 are set to the top of 5 left side of swinging frame, and the first strut 6 is connected by way of welded connecting with swinging frame 5
It connects, the first strut 6 is L-shaped, and the top left side of the first strut 6 is fixed with gag lever post 7, and 8 rotary type of first rotating shaft is connected to first
The lower part of strut 6, the rear end of first rotating shaft 8 are fixed with the first sprocket wheel 9, and the front end of first rotating shaft 8, which is provided with, can make the first sprocket wheel 9
Rotation Oscillating handle 10, first rotating shaft 8 is connect by way of welded connecting Yu Oscillating handle 10, and third bracket 12 is fixed on swinging frame 5
Bottom, third bracket 12 connect with swinging frame 5 by bolted connection, the left side of third bracket 12 and the first strut 6
Between be connected with second support 11,13 rotary type of the second sprocket wheel is connected to the left part of third bracket 12, the second sprocket wheel 13 and first
The chain 14 of transmission effect is wound between sprocket wheel 9, the top of 14 right side of chain, which is fixed with, can make the work of pendulous device 16
Convex block 15, can to the pendulous device 16 that pipeline is unloaded be it is multiple, be installed on swinging frame 5.
Embodiment 2
A kind of sewage conduct is unloaded device, as shown in Figs. 1-2, include first support 1, sliding rail 2, the first sliding block 3, the first supporting plate 4,
Swinging frame 5, the first strut 6, gag lever post 7, first rotating shaft 8,9, Oscillating handle 10 of the first sprocket wheel, second support 11, third bracket 12,
The left side of two sprocket wheels 13, chain 14, convex block 15 and pendulous device 16, first support 1 is embedded with sliding rail 2, and first support 1 is L-shaped,
The first sliding block 3 is in sliding fit on sliding rail 2, the left side of the first sliding block 3 is connected with the first supporting plate that can be ridden on transport vehicle
4,5 rotary type of swinging frame is connected to the right part of first support 1, and the first strut 6 is set to the top of 5 left side of swinging frame, and first
Strut 6 is L-shaped, and the top left side of the first strut 6 is fixed with gag lever post 7, and 8 rotary type of first rotating shaft is connected to the first strut 6
Lower part, the rear end of first rotating shaft 8 are fixed with the first sprocket wheel 9, and the front end of first rotating shaft 8, which is provided with, can make the rotation of the first sprocket wheel 9
Oscillating handle 10, third bracket 12 are fixed on the bottom of swinging frame 5, and is connected between third bracket 12 and the left side of the first strut 6
Two brackets 11,13 rotary type of the second sprocket wheel are connected to the left part of third bracket 12, are wound between the second sprocket wheel 13 and the first sprocket wheel 9
The chain 14 of transmission effect is played, the top of 14 right side of chain is fixed with the convex block 15 that pendulous device 16 can be made to work, can be to pipe
The pendulous device 16 that road is unloaded be it is multiple, be installed on swinging frame 5.
Pendulous device 16 includes the second shaft 161, swings lever 162, arc slip pipe 163, arc slide bar 164, first
Spring 165, concave block 166, the first sliding sleeve 167, the first slide bar 168, baffle 169, second spring 1610 and idler wheel 1611 are swung
Rotary type is connected with multiple second shafts 161 on frame 5, and the rear and front end of the second shaft 161 is mounted on and can limit pipeline
The swing lever 162 of position, the front and rear sides of swinging frame 5 are connected with multiple arcs slip pipe 163, and swinging frame 5 is bolted
Mode connect with arc slip pipe 163,163 inner sliding type of arc slip pipe be equipped with arc slide bar 164, the right end of arc slide bar 164
Affixed with the corresponding top for swinging lever 162, arc slide bar 164 is connect by way of welded connecting with swing lever 162,
The first spring 165 is wound on arc slide bar 164, one end of the first spring 165 and the top for swinging lever 162 are affixed, the first bullet
The other end of spring 165 is connect with the right side of arc slip pipe 163, and the left end that front side swings lever 162 is provided with can be solid to pipeline
Fixed concave block 166 swings lever 162 and is connect by way of welded connecting with concave block 166, embedded with more in second support 11
A first sliding sleeve 167,167 inner sliding type of the first sliding sleeve are equipped with the first slide bar 168, and the right part of the first slide bar 168 is connected with baffle
169, second spring 1610 is cased on the first slide bar 168, the left side of the right end and baffle 169 of second spring 1610 is affixed, and
The left end of two springs 1610 is connect with the right side of the first sliding sleeve 167, and the left end of the first slide bar 168 is equipped with idler wheel 1611, rolling
Wheel 1611 is contacted with convex block 15.
Embodiment 3
A kind of sewage conduct is unloaded device, as shown in Figure 1-3, include first support 1, sliding rail 2, the first sliding block 3, the first supporting plate 4,
Swinging frame 5, the first strut 6, gag lever post 7, first rotating shaft 8,9, Oscillating handle 10 of the first sprocket wheel, second support 11, third bracket 12,
The left side of two sprocket wheels 13, chain 14, convex block 15 and pendulous device 16, first support 1 is embedded with sliding rail 2, and first support 1 is L-shaped,
The first sliding block 3 is in sliding fit on sliding rail 2, the left side of the first sliding block 3 is connected with the first supporting plate that can be ridden on transport vehicle
4,5 rotary type of swinging frame is connected to the right part of first support 1, and the first strut 6 is set to the top of 5 left side of swinging frame, and first
Strut 6 is L-shaped, and the top left side of the first strut 6 is fixed with gag lever post 7, and 8 rotary type of first rotating shaft is connected to the first strut 6
Lower part, the rear end of first rotating shaft 8 are fixed with the first sprocket wheel 9, and the front end of first rotating shaft 8, which is provided with, can make the rotation of the first sprocket wheel 9
Oscillating handle 10, third bracket 12 are fixed on the bottom of swinging frame 5, and is connected between third bracket 12 and the left side of the first strut 6
Two brackets 11,13 rotary type of the second sprocket wheel are connected to the left part of third bracket 12, are wound between the second sprocket wheel 13 and the first sprocket wheel 9
The chain 14 of transmission effect is played, the top of 14 right side of chain is fixed with the convex block 15 that pendulous device 16 can be made to work, can be to pipe
The pendulous device 16 that road is unloaded be it is multiple, be installed on swinging frame 5.
Pendulous device 16 includes the second shaft 161, swings lever 162, arc slip pipe 163, arc slide bar 164, first
Spring 165, concave block 166, the first sliding sleeve 167, the first slide bar 168, baffle 169, second spring 1610 and idler wheel 1611 are swung
Rotary type is connected with multiple second shafts 161 on frame 5, and the rear and front end of the second shaft 161 is mounted on and can limit pipeline
The swing lever 162 of position, the front and rear sides of swinging frame 5 are connected with multiple arcs slip pipe 163,163 inner sliding type of arc slip pipe
Equipped with arc slide bar 164, the right end of arc slide bar 164 and the corresponding top for swinging lever 162 are affixed, on arc slide bar 164
It is wound with the first spring 165, one end of the first spring 165 and the top for swinging lever 162 are affixed, the other end of the first spring 165
It being connect with the right side of arc slip pipe 163, the left end that front side swings lever 162 is provided with concave block 166 that can be fixed to pipeline,
Multiple first sliding sleeves 167 are embedded in second support 11,167 inner sliding type of the first sliding sleeve is equipped with the first slide bar 168, the first slide bar
168 right part is connected with baffle 169, and second spring 1610, the right end and baffle of second spring 1610 are cased on the first slide bar 168
169 left side is affixed, and the left end of second spring 1610 is connect with the right side of the first sliding sleeve 167, the left end of the first slide bar 168
Idler wheel 1611 is installed, idler wheel 1611 is contacted with convex block 15.
It further include having the second sliding block 17, third spring 18, clamping plate 19, the second strut 20, nut 21, screw rod 22 and turntable
23,17 slidingtype of the second sliding block is arranged on sliding rail 2, is connected between the top of the second sliding block 17 and the bottom of the first sliding block 3
Third spring 18, the left side of the second sliding block 17 are provided with clamping plate 19 that can be fixed by the present invention, and the second sliding block 17 passes through bolt
The mode of connection is connect with clamping plate 19, and the second strut 20 is set to the left side of first support 1, and the second strut 20 is connected by welding
The mode connect is connect with first support 1, and the second strut 20 is located at the downside of sliding rail 2, and the left end of the second strut 20 is fixed with nut
21, the second strut 20 is connect by way of welded connecting with nut 21, and being equipped with threadably in nut 21 can be right
The screw rod 22 that 19 position of clamping plate is adjusted, the bottom end of screw rod 22 are fixed with the turntable 23 that screw rod 22 can be made to rotate.
Embodiment 4
A kind of sewage conduct is unloaded device, as shown in Figs 1-4, include first support 1, sliding rail 2, the first sliding block 3, the first supporting plate 4,
Swinging frame 5, the first strut 6, gag lever post 7, first rotating shaft 8,9, Oscillating handle 10 of the first sprocket wheel, second support 11, third bracket 12,
The left side of two sprocket wheels 13, chain 14, convex block 15 and pendulous device 16, first support 1 is embedded with sliding rail 2, and first support 1 is L-shaped,
The first sliding block 3 is in sliding fit on sliding rail 2, the left side of the first sliding block 3 is connected with the first supporting plate that can be ridden on transport vehicle
4,5 rotary type of swinging frame is connected to the right part of first support 1, and the first strut 6 is set to the top of 5 left side of swinging frame, and first
Strut 6 is L-shaped, and the top left side of the first strut 6 is fixed with gag lever post 7, and 8 rotary type of first rotating shaft is connected to the first strut 6
Lower part, the rear end of first rotating shaft 8 are fixed with the first sprocket wheel 9, and the front end of first rotating shaft 8, which is provided with, can make the rotation of the first sprocket wheel 9
Oscillating handle 10, third bracket 12 are fixed on the bottom of swinging frame 5, and is connected between third bracket 12 and the left side of the first strut 6
Two brackets 11,13 rotary type of the second sprocket wheel are connected to the left part of third bracket 12, are wound between the second sprocket wheel 13 and the first sprocket wheel 9
The chain 14 of transmission effect is played, the top of 14 right side of chain is fixed with the convex block 15 that pendulous device 16 can be made to work, can be to pipe
The pendulous device 16 that road is unloaded be it is multiple, be installed on swinging frame 5.
Pendulous device 16 includes the second shaft 161, swings lever 162, arc slip pipe 163, arc slide bar 164, first
Spring 165, concave block 166, the first sliding sleeve 167, the first slide bar 168, baffle 169, second spring 1610 and idler wheel 1611 are swung
Rotary type is connected with multiple second shafts 161 on frame 5, and the rear and front end of the second shaft 161 is mounted on and can limit pipeline
The swing lever 162 of position, the front and rear sides of swinging frame 5 are connected with multiple arcs slip pipe 163,163 inner sliding type of arc slip pipe
Equipped with arc slide bar 164, the right end of arc slide bar 164 and the corresponding top for swinging lever 162 are affixed, on arc slide bar 164
It is wound with the first spring 165, one end of the first spring 165 and the top for swinging lever 162 are affixed, the other end of the first spring 165
It being connect with the right side of arc slip pipe 163, the left end that front side swings lever 162 is provided with concave block 166 that can be fixed to pipeline,
Multiple first sliding sleeves 167 are embedded in second support 11,167 inner sliding type of the first sliding sleeve is equipped with the first slide bar 168, the first slide bar
168 right part is connected with baffle 169, and second spring 1610, the right end and baffle of second spring 1610 are cased on the first slide bar 168
169 left side is affixed, and the left end of second spring 1610 is connect with the right side of the first sliding sleeve 167, the left end of the first slide bar 168
Idler wheel 1611 is installed, idler wheel 1611 is contacted with convex block 15.
It further include having the second sliding block 17, third spring 18, clamping plate 19, the second strut 20, nut 21, screw rod 22 and turntable
23,17 slidingtype of the second sliding block is arranged on sliding rail 2, is connected between the top of the second sliding block 17 and the bottom of the first sliding block 3
Third spring 18, the left side of the second sliding block 17 are provided with clamping plate 19 that can be fixed by the present invention, and the second strut 20 be set to the
The left side of one bracket 1, the second strut 20 are located at the downside of sliding rail 2, and the left end of the second strut 20 is fixed with nut 21, nut 21
Inside being equipped with threadably can be to the screw rod 22 that 19 position of clamping plate is adjusted, and the bottom end of screw rod 22, which is fixed with, can make spiral shell
The turntable 23 that bar 22 rotates.
It further include having rack gear 25, the second supporting plate 26, motor 27 and gear 28, the top left side in first support 1 is provided with recessed
Slot 24, the left side of swinging frame 5 are equipped with the side that can pass through welded connecting to the rack gear 25 that swinging frame 5 is adjusted, swinging frame 5
Formula is connect with rack gear 25, and rack gear 25 is located at the upside of the first strut 6, and the second supporting plate 26 is fixed in the top in first support 1
Between, the second supporting plate 26 is connect with first support 1 by bolted connection, and the trailing flank right part of the second supporting plate 26 is equipped with can
The motor 27 for driving gear 28 to rotate, the second supporting plate 26 are connect with motor 27 by bolted connection, the output of motor 27
Gear 28 is fixed on axis, gear 28 is engaged with rack gear 25.
Embodiment 5
A kind of sewage conduct is unloaded device, as shown in Figs. 1-5, include first support 1, sliding rail 2, the first sliding block 3, the first supporting plate 4,
Swinging frame 5, the first strut 6, gag lever post 7, first rotating shaft 8,9, Oscillating handle 10 of the first sprocket wheel, second support 11, third bracket 12,
The left side of two sprocket wheels 13, chain 14, convex block 15 and pendulous device 16, first support 1 is embedded with sliding rail 2, and first support 1 is L-shaped,
The first sliding block 3 is in sliding fit on sliding rail 2, the left side of the first sliding block 3 is connected with the first supporting plate that can be ridden on transport vehicle
4,5 rotary type of swinging frame is connected to the right part of first support 1, and the first strut 6 is set to the top of 5 left side of swinging frame, and first
Strut 6 is L-shaped, and the top left side of the first strut 6 is fixed with gag lever post 7, and 8 rotary type of first rotating shaft is connected to the first strut 6
Lower part, the rear end of first rotating shaft 8 are fixed with the first sprocket wheel 9, and the front end of first rotating shaft 8, which is provided with, can make the rotation of the first sprocket wheel 9
Oscillating handle 10, third bracket 12 are fixed on the bottom of swinging frame 5, and is connected between third bracket 12 and the left side of the first strut 6
Two brackets 11,13 rotary type of the second sprocket wheel are connected to the left part of third bracket 12, are wound between the second sprocket wheel 13 and the first sprocket wheel 9
The chain 14 of transmission effect is played, the top of 14 right side of chain is fixed with the convex block 15 that pendulous device 16 can be made to work, can be to pipe
The pendulous device 16 that road is unloaded be it is multiple, be installed on swinging frame 5.
Pendulous device 16 includes the second shaft 161, swings lever 162, arc slip pipe 163, arc slide bar 164, first
Spring 165, concave block 166, the first sliding sleeve 167, the first slide bar 168, baffle 169, second spring 1610 and idler wheel 1611 are swung
Rotary type is connected with multiple second shafts 161 on frame 5, and the rear and front end of the second shaft 161 is mounted on and can limit pipeline
The swing lever 162 of position, the front and rear sides of swinging frame 5 are connected with multiple arcs slip pipe 163,163 inner sliding type of arc slip pipe
Equipped with arc slide bar 164, the right end of arc slide bar 164 and the corresponding top for swinging lever 162 are affixed, on arc slide bar 164
It is wound with the first spring 165, one end of the first spring 165 and the top for swinging lever 162 are affixed, the other end of the first spring 165
It being connect with the right side of arc slip pipe 163, the left end that front side swings lever 162 is provided with concave block 166 that can be fixed to pipeline,
Multiple first sliding sleeves 167 are embedded in second support 11,167 inner sliding type of the first sliding sleeve is equipped with the first slide bar 168, the first slide bar
168 right part is connected with baffle 169, and second spring 1610, the right end and baffle of second spring 1610 are cased on the first slide bar 168
169 left side is affixed, and the left end of second spring 1610 is connect with the right side of the first sliding sleeve 167, the left end of the first slide bar 168
Idler wheel 1611 is installed, idler wheel 1611 is contacted with convex block 15.
It further include having the second sliding block 17, third spring 18, clamping plate 19, the second strut 20, nut 21, screw rod 22 and turntable
23,17 slidingtype of the second sliding block is arranged on sliding rail 2, is connected between the top of the second sliding block 17 and the bottom of the first sliding block 3
Third spring 18, the left side of the second sliding block 17 are provided with clamping plate 19 that can be fixed by the present invention, and the second strut 20 be set to the
The left side of one bracket 1, the second strut 20 are located at the downside of sliding rail 2, and the left end of the second strut 20 is fixed with nut 21, nut 21
Inside being equipped with threadably can be to the screw rod 22 that 19 position of clamping plate is adjusted, and the bottom end of screw rod 22, which is fixed with, can make spiral shell
The turntable 23 that bar 22 rotates.
It further include having rack gear 25, the second supporting plate 26, motor 27 and gear 28, the top left side in first support 1 is provided with recessed
Slot 24, the left side of swinging frame 5, which is equipped with, to be located at the upper of the first strut 6 to the rack gear 25 that swinging frame 5 is adjusted, rack gear 25
Side, the second supporting plate 26 are fixed on the top center in first support 1, and the trailing flank right part of the second supporting plate 26 is equipped with can sliding tooth
The motor 27 of 28 rotations is taken turns, is fixed with gear 28 on the output shaft of motor 27, gear 28 is engaged with rack gear 25.
It further include having third strut 30, the second sliding sleeve 31, the second slide bar 32, poke rod 33, fixture block 34 and the 4th spring 35,
The left side top of rack gear 25 has been provided with the card slot 29 of fixed function, and third strut 30 is set to the left side in first support 1
Top, third strut 30 are connect by way of welded connecting with first support 1, and the right end of third strut 30, which is connected with, can make
The second sliding sleeve 31 that two slide bars 32 slide up and down, third strut 30 are connect by way of welded connecting with the second sliding sleeve 31, the
Two slide bars, 32 slidingtype is located in the second sliding sleeve 31, and the bottom end of the second slide bar 32, which is connected with, can be such that the second slide bar 32 moves up and down
Poke rod 33, the second slide bar 32 are connect by way of welded connecting with poke rod 33, and the top of the second slide bar 32 is fixed with can
To the fixture block 34 that rack gear 25 is fixed, the top of fixture block 34 and the outside face contact of rack gear 25, the 4th 35 sets of spring is in the second slide bar
On 32, the top of the 4th spring 35 and the bottom of fixture block 34 are affixed, and the bottom end of the 4th spring 35 and the top of the second sliding sleeve 31 connect
It connects.
In use, the present invention is moved to suitable position by user, the first supporting plate 4 is ridden over the sweep of transport vehicle by subsequent user
On, so that transport vehicle is moved to the left suitable position, the gradient to swinging frame 5 can so be adjusted, user will
Sewage conduct, which scrolls right, to be fallen on the pendulous device 16 of upside, and then user Wo lives in Oscillating handle 10 makes the first sprocket wheel 9 clockwise
Rotation, the first sprocket wheel 9 is rotated clockwise can be such that the second sprocket wheel 13 rotates clockwise by chain 14, such as+this can make chain
14 rotate clockwise, and chain 14, which rotates clockwise, drives convex block 15 to move down, and convex block 15, which moves down, can make top side
Pendulous device 16 works, and so that sewage conduct is conveyed downwards by pendulous device 16 and fall in next swing dress
It sets on 16, when convex block 15 moves down, and next pendulous device 16 is made to work, can so make next pendulous device 16 dirty
Waterpipe is fallen downwards, so that convex block 15 is constantly moved down and can be unloaded sewage conduct, from without user
It is unloaded with hand sewage conduct carrying, and then can reduce the labor intensity of user, and can be improved unloading for sewage conduct
Vehicle efficiency, when needing to unload to next sewage conduct, user Ni hour hands Zhuan Dong Oscillating handle 10, so can convex block 15 to
It is upper it is mobile reset, then constantly repeat to unload to sewage conduct, after the completion of whole sewage conducts is unloaded, user is by the
One supporting plate 4 is removed from the sweep of transport vehicle.
When convex block 15 moves down, can squeezing roller 1611 be moved to the left, idler wheel 1611 is moved to the left drive first
Slide bar 168 is moved to the left, and the first slide bar 168, which is moved to the left, can be such that baffle 169 is moved to the left, and second spring 1610 is pressed therewith
Contracting, can so release the fixation to concave block 166, while can make to swing lever 162 under the action of sewage conduct gravity
To lower swing, swinging lever 162 can be such that arc slide bar 164 removes in arc slip pipe 163 to lower swing, the first spring 165 with
Extension, after sewage conduct is fallen downwards on the swing lever 162 of downside, energy under the action of the first 165 elastic force of spring
Swing lever 162 is enough set to be swung up reset, when the removal of convex block 15 is not contacted with the idler wheel 1611 of upside, in second spring
Can make under the action of 1610 elastic force the first slide bar 168 move right reset concave block 166 is fixed, so pass through convex block
15 constantly move down and can unload sewage conduct.
When needing for the present invention to be fixed on transport vehicle, user makes the sweep of transport vehicle be located at the first supporting plate 4 and clamping plate
Between 19, subsequent user, which rotates turntable 23, moves up screw rod 22, and screw rod 22, which moves up, can be such that clamping plate 19 moves up,
Clamping plate 19, which moves up, drives the second sliding block 17 to move up, and third spring 18 compresses therewith, when clamping plate 19 is moved up to this
After invention is fixed, user stops operating turntable 23, and when needing to release to fixation of the invention, user, which rotates turntable 23, makes screw rod
22 move down, and clamping plate 19 can be made to move down reset under the action of third 18 elastic force of spring, can so release to this
The fixation of invention, so as to prevent when unloading sewage conduct, mobile unload to sewage conduct of the present invention causes to hamper
Hinder, clamping plate 19 can be moved up and down and be oriented to by the cooperation of the second sliding block 17 and sliding rail 2.
When needing the gradient to swinging frame 5 to be adjusted, user, which starts motor 27, rotates counterclockwise gear 28, tooth
Wheel 28, which rotates counterclockwise, can be such that rack gear 25 removes in groove 24 to the right, and rack gear 25, which moves right, can be such that swinging frame 5 puts to the right
Dynamic, after swinging frame 5 is rocked to suitable position to the right, user closes motor 27, can so facilitate user to sewage conduct into
Row is unloaded, and when not needing to unload to sewage conduct using the present invention, user, which starts motor 27, rotates clockwise gear 28, tooth
Wheel 28, which rotates clockwise, can be such that rack gear 25 is moved to the left in immigration groove 24, and swinging frame 5 can so be made to swing reset to the left,
Subsequent user closes motor 27, so as to reduce space hold of the invention.
When initial, the 4th spring 35 is in compressive state, after rack gear 25 moves right to suitable position, in the 4th spring
Fixture block 34 can be made to be caught in card slot 29 upwards under the action of 35 elastic force, rack gear 25 can be so fixed, so as to
It prevents when unloading sewage conduct, 5 automatic moving of swinging frame is unloaded to sewage conduct to bring inconvenience, when needs make to swing
When frame 5 swings reset to the left, user pulls downward on poke rod 33, and poke rod 33, which moves down, can make the second slide bar 32 to moving down
Dynamic, the second slide bar 32, which moves down, can make in the downward out card slot 29 of fixture block 34, and the 4th spring 35 compresses therewith, so can
The fixation to rack gear 25 is released, so as to the user-friendly present invention.
It should be appreciated that above description is used only for exemplary purpose, it is not intended to limit the present invention.The skill of this field
Art personnel will be understood that variant of the invention form will be included in scope of the claims herein.