CN110083119A - A kind of the visual power system machine room monitoring system and method twin based on number - Google Patents
A kind of the visual power system machine room monitoring system and method twin based on number Download PDFInfo
- Publication number
- CN110083119A CN110083119A CN201910379544.6A CN201910379544A CN110083119A CN 110083119 A CN110083119 A CN 110083119A CN 201910379544 A CN201910379544 A CN 201910379544A CN 110083119 A CN110083119 A CN 110083119A
- Authority
- CN
- China
- Prior art keywords
- computer room
- electric power
- equipment
- data
- room
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/05—Programmable logic controllers, e.g. simulating logic interconnections of signals according to ladder diagrams or function charts
- G05B19/054—Input/output
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/10—Plc systems
- G05B2219/14—Plc safety
- G05B2219/14006—Safety, monitoring in general
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Computer Graphics (AREA)
- Geometry (AREA)
- Software Systems (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
A kind of visual power system machine room monitoring system twin based on number of the invention, for managing at least one computer room, and it is suitable for entire multiple department's main body computer rooms, to manage company's main body or the monitoring system across company's main body, it include: computer room visualization building memory module, computer room visualization building memory module provides at least one user input computer room information relevant to above-mentioned multiple computer rooms, each computer room information corresponds to department's main body, which includes the electric power computer room emulation platform proportionally to convert with computer room scene.The present invention is by the way that using the three-dimensional visualization data of electric power calculator room equipment as references object, the twin model of the number of establishment high integration and degrees of fusion realizes the operation troubles prediction of equipment, reduces the possibility that equipment fault occurs, improve the adaptability to changes of computer room safety.
Description
Technical field
The invention belongs to device intelligences and digitizing technique field, and in particular to a kind of visualization twin based on number
Electric system machine room monitoring system and method.
Background technique
Number it is twin refer to make full use of the data such as physical model, sensor, history run, integrate multidisciplinary, multiple dimensioned
Simulation process, as, to the mirror image of physical product, reflecting the full life of corresponding physical entity product in Virtual Space
Periodic process.
The twin essence of number is the twin model by creating physical entity, and is carried out by basic model of twin model
Emulation reflects the true operation conditions of physical entity in real time, and is joined by the operation of the feedback regulation physical entity of twin model
Number, has the function that optimization.There are two outstanding features for twin model tool: twin model and its object to be reflected are in appearance
It is basic in (geometric dimension and shape), content (structure composition and its macroscopic view/microphysics characteristic) and property (function and performance)
It is identical;Allow through modes such as emulation come the true operation conditions/state of mirror image/reflection.
Number at this stage is twin still to deposit many problem and shortage in actual application, such as: lacking the number of system
Twin theory/technical support and Applied criteria guidance;The comparative advantages that the application of the twin driving of number generates are unknown;It is raw in product
The application for ordering cycle stages is not comprehensive, and for the big power industry of the more data volumes of domestic service, it is twin that current shortage introduces number
Raw technical application is researched and analysed.
Summary of the invention
In view of the above existing problems in the prior art, the present invention provides a kind of visual power systems twin based on number
System machine room monitoring system for managing at least one computer room, and is suitable for entire multiple department's main body computer rooms, to manage a public affairs
Take charge of main body or the monitoring system across company's main body, comprising:
Computer room visualization building memory module, the computer room visualization building memory module provide at least one user input with
The relevant computer room information of above-mentioned multiple computer rooms, the corresponding department's main body of each computer room information, the computer room information include and machine
The electric power computer room emulation platform that room scene is proportionally converted;
Visual power computer room control module, for receiving showing for electric power computer room field device and electric power computer room emulation platform
Field actual operating data, while the real time data for receiving various sensors acquisitions;For realizing the visualization of electric power computer room
Transparent monitoring is associated with dummy model and practice model in computer room, is referred to by lower transmission control system by electric power computer room three-dimensional artificial intelligence
It enables and being acquired with the data in computer room, realize that electric power computer room visualizes;
Communication module, for establishing electric power computer room material object equipment, computer room visualization building memory module, visual power machine
Communication network between room control module.
As advanced optimizing for above scheme, the computer room visualization building memory module includes building electric power computer room to imitate
True platform and realization electric power computer room visualization model, wherein build electric power computer room emulation platform and include the following steps:
(11) in kind based on electric power computer room, dummy model is associated with mock-up, using simulation software to electric power computer room
Digitization modeling is carried out, Digital Twin technology is based on, establishes uplink information channel and downlink command channel, building visualization
Electric power computer room;Communication and soft, hard PLC asynchronous periodicity based on soft, hard PLC are synchronous, carry out the control of visual power computer room;
(12) be based on electric power calculator room equipment and its layout scenarios, to electric power calculator room equipment carry out three-dimensional modeling, moving part with not
Moving part classification model construction carries out whole line Virtual assemble on three-dimensional visualization platform, constructs the static modelling of electric power computer room;
(13) control action based on equipment and equipment in electric power computer room works out the control script of the equipment in computer room,
Realize the long-range control operation of computer room.The full view of realization electric system computer room, across granularity monitoring, for emergency event in computer room
Response processing, carry out all kinds of performance evaluations of equipment and executing optimization in computer room.
As advanced optimizing for above scheme, step (12) is constructed in the static modelling of electric power computer room:
A1 creates geometrical model and finite element model based on physical message, simulates the geometry or load of true physical equipment
Lotus operating condition;Extract equipment factory data constructs the material properties model influenced vulnerable to building environment variation;Environment based on material
Ability to bear provides accurate regulation and controlling of information for environment monitoring equipment;
A2 extracts the complete period historical data of communication and second power equipment, is run based on equipment in the case of environmental change
Rule constructs device running model;And the various dimensions probability situation of equipment fault is analyzed, building is based on different faults kind
The damage evolution model of class;Accurate information is provided for plant maintenance;
A3 constructs the static modelling of electric power computer room, based on number using the nearly physical simulation monitor supervision platform of the three-dimensional of data-driven
The twin technology of word establishes uplink information channel and downlink command channel, constructs visual power computer room.
As advanced optimizing for above scheme, the data of the sensor detection include:
The relevant operating data of the physical performance index of productivity account assets, including position, model, weight and carrying
Power;
The environment or external data of influence physical asset operation, including ambient temperature, atmospheric pressure and air are wet
Degree, the detection data are shielded digital information using coder transitions, and the digital information transmission is imitative to electric power computer room
True platform.
As advanced optimizing for above scheme, realize that electric power computer room visualization model includes:
(B1) to the place general picture of electric power computer room, the electrical through connections road of equipment arrangement and equipment room is carried out detailed in computer room
Fine tuning is ground, the position of layout, equipment based on electric power computer room and relevant configuration, provide it is a set of it is corresponding with actual arrangement in proportion
Reduce layout;
(B2) the equipment three-dimensional modeling in computer room is imported threedimensional model in simulation software using 3 d modeling software,
In conjunction with the scaled layout in step B1, corresponding equipment threedimensional model is corresponded in simulation software,
Construct three-dimensional electric power machine room layout;
(B3) property for the dynamic design extremely motion mode that electric power computer room threedimensional model is acted in simulation software
It can planning;Script compilation is carried out to equipment threedimensional model in simulation software with realize in step B2 the movement of equipment threedimensional model and
Movement, using the deploying to ensure effective monitoring and control of illegal activities of sensor, the acquisition of the design of control logic, computer room information data completion to three-dimensional production line
Virtual digital control;
(B4) equipment single machine threedimensional model or whole line equitable subsection sub-module are partitioned into digitized, are established virtually with this
The digital model of whole line;Using equipment three-dimensional digitalization model as object, algorithm is write, in computer room under the control instruction of equipment
The upload with facility information in computer room is passed, data interaction is realized between enforcement engine and simulation software;
(B5) classification is carried out to electric power computer room scene real time data and makes corresponding data sheet, make data in electric power computer room
Emulation platform obtains three-dimensional visualization presentation.
As advanced optimizing for above scheme, the management control method of visual power computer room control module includes as follows
Step:
(C1) it is based on electric power computer room Visualization Platform, based on PLC control and network communication, establishes three-dimensional artificial, equipment mould
Communication channel in type and computer room between material object PLC realizes interconnecting for data, instruction and information;With the twin skill of number
Art, using the sensing data in system, the live Real-time data drive simulation model of mock-up feedback, simulation computer room operation
Actual conditions, the equipment in computer room is mapped one by one with the corresponding model of monitor supervision platform.
(C2) build and establish data synchronous communication based on electric power computer room monitor supervision platform, realize instruction assign and scene
The acquisition and feedback of real time data, electric power computer room transparence monitor supervision platform is to various kinds of equipment real-time traffic information and state in computer room
It is tracked;
(C3) electric power computer room scene real time data is conveyed to three-dimensional artificial software, handles in software inhouse data,
The equipment operation information report in electric power computer room is worked out, realizes that, to power computer room situation, equipment operation condition, equipment fault situation is real
When data three-dimensional visualization present, realize computer room data visualization monitoring and management.
The invention also discloses a kind of visual power system computer room monitoring methods twin based on number, including walk as follows
It is rapid:
(11) in kind based on electric power computer room, dummy model is associated with mock-up, using simulation software to electric power computer room
Digitization modeling is carried out, Digital Twin technology is based on, establishes uplink information channel and downlink command channel, building visualization
Electric power computer room;Communication and soft, hard PLC asynchronous periodicity based on soft, hard PLC are synchronous, carry out the control of visual power computer room;
(12) be based on electric power calculator room equipment and its layout scenarios, to electric power calculator room equipment carry out three-dimensional modeling, moving part with not
Moving part classification model construction carries out whole line Virtual assemble on three-dimensional visualization platform, constructs the static modelling of electric power computer room;
(13) control action based on equipment and equipment in electric power computer room works out the control script of the equipment in computer room,
Realize the long-range control operation of computer room.
As advanced optimizing for above scheme, realize that the visualization of electric power computer room includes the following steps:
(B1) to the place general picture of electric power computer room, the electrical through connections road of equipment arrangement and equipment room is carried out detailed in computer room
Fine tuning is ground, the position of layout, equipment based on electric power computer room and relevant configuration, provide it is a set of it is corresponding with actual arrangement in proportion
Reduce layout;
(B2) the equipment three-dimensional modeling in computer room is imported threedimensional model in simulation software using 3 d modeling software,
In conjunction with the scaled layout in step B1, corresponding equipment threedimensional model is corresponded in simulation software,
Construct three-dimensional electric power machine room layout;
(B3) property for the dynamic design extremely motion mode that electric power computer room threedimensional model is acted in simulation software
It can planning;Script compilation is carried out to equipment threedimensional model in simulation software with realize in step B2 the movement of equipment threedimensional model and
Movement, using the deploying to ensure effective monitoring and control of illegal activities of sensor, the acquisition of the design of control logic, computer room information data completion to three-dimensional production line
Virtual digital control;
(B4) equipment single machine threedimensional model or whole line equitable subsection sub-module are partitioned into digitized, are established virtually with this
The digital model of whole line;Using equipment three-dimensional digitalization model as object, algorithm is write, in computer room under the control instruction of equipment
The upload with facility information in computer room is passed, data interaction is realized between enforcement engine and simulation software;
(B5) classification is carried out to electric power computer room scene real time data and makes corresponding data sheet, make data in electric power computer room
Emulation platform obtains three-dimensional visualization presentation.
As advanced optimizing for above scheme, the management control method of visual power computer room control module includes as follows
Step:
(C1) it is based on electric power computer room Visualization Platform, based on PLC control and network communication, establishes three-dimensional artificial, equipment mould
Communication channel in type and computer room between material object PLC realizes interconnecting for data, instruction and information;With the twin skill of number
Art, using the sensing data in system, the live Real-time data drive simulation model of mock-up feedback, simulation computer room operation
Actual conditions, the equipment in computer room is mapped one by one with the corresponding model of monitor supervision platform.
(C2) build and establish data synchronous communication based on electric power computer room monitor supervision platform, realize instruction assign and scene
The acquisition and feedback of real time data, electric power computer room transparence monitor supervision platform is to various kinds of equipment real-time traffic information and state in computer room
It is tracked;
(C3) electric power computer room scene real time data is conveyed to three-dimensional artificial software, handles in software inhouse data,
The equipment operation information report in electric power computer room is worked out, realizes that, to power computer room situation, equipment operation condition, equipment fault situation is real
When data three-dimensional visualization present, realize computer room data visualization monitoring and management.
The invention also discloses a kind of computer readable storage mediums for being stored with computer program, which is characterized in that should
A kind of visual power system twin based on number as described in claim 7-9 is any is realized when program is executed by processor
Center monitoring method.
The present invention is by adopting the above technical scheme, compared with prior art, of the invention a kind of based on twin visual of number
Change electric system machine room monitoring system and method, has the advantages that
1. the twin modeling method of number and system of a kind of computer room of the invention, by with the three of electric power computer room secondary device
Visualized data is tieed up as references object, sets up the twin model of number of high integration and degrees of fusion, actual situation is realized in building connection
The interaction of information data, and according to the fusion and analytic process of model, it can effectively realize the operation troubles prediction of equipment, reduce
The possibility that equipment fault occurs, improves the adaptability to changes of computer room safety.
2. the twin modeling method of number and system of a kind of computer room of the invention, by realizing with the twin technology of number
Calculator room equipment monitoring, tracking, behavior prediction and control, health forecast and management are retrospect, the service of calculator room equipment running quality
Device fail-safe analysis provides accurate model and data source, promotes the safety and stability of electric power computer room.
3. the twin modeling method of number and system of a kind of computer room of the invention, by reuse to the twin model of number and
It improves and updates, by dynamic sensing, storage and the configuration information that product lifecycle is presented, so as to realize product configuration
Management, tracking and the consistency maintenance of data realize visualization and transparence of the product configuration in lifecycle process.
Detailed description of the invention
Fig. 1 is a kind of structural block diagram of visual power system machine room monitoring system twin based on number of the invention.
Fig. 2 is a kind of architecture diagram of visual power system computer room monitor supervision platform twin based on number of the invention.
Fig. 3 is a kind of flow chart of visual power system computer room monitoring method twin based on number of the invention.
Fig. 4 is the structural block diagram of the realization visual flowage structure schematic diagram of electric power computer room of the invention.
Fig. 5 is the structural block diagram of the realization visual flowage structure schematic diagram of electric power computer room of the invention.
Specific embodiment
In order to make the objectives, technical solutions and advantages of the present invention clearer, right below by attached drawing and embodiment
The present invention is further elaborated.However, it should be understood that specific embodiment described herein is only used to explain this hair
Range that is bright, being not intended to restrict the invention.
Referring to a kind of visual power system machine room monitoring system twin based on number of Fig. 1-Fig. 2, for managing at least
One computer room, and it is suitable for entire multiple department's main body computer rooms, to manage company's main body or across the monitoring system of company's main body
System, comprising:
Computer room visualization building memory module, the computer room visualization building memory module provide at least one user input with
The relevant computer room information of above-mentioned multiple computer rooms, the corresponding department's main body of each computer room information, the computer room information include and machine
The electric power computer room emulation platform that room scene is proportionally converted;
Visual power computer room control module, for receiving showing for electric power computer room field device and electric power computer room emulation platform
Field actual operating data, while the real time data for receiving various sensors acquisitions;For realizing the visualization of electric power computer room
Transparent monitoring is associated with dummy model and practice model in computer room, is referred to by lower transmission control system by electric power computer room three-dimensional artificial intelligence
It enables and being acquired with the data in computer room, realize that electric power computer room visualizes;
Communication module, for establishing electric power computer room material object equipment, computer room visualization building memory module, visual power machine
Communication network between room control module.
As advanced optimizing for above scheme, the computer room visualization building memory module includes building electric power computer room to imitate
True platform and realization electric power computer room visualization model, wherein build electric power computer room emulation platform and include the following steps:
(11) in kind based on electric power computer room, dummy model is associated with mock-up, using simulation software to electric power computer room
Digitization modeling is carried out, Digital Twin technology is based on, establishes uplink information channel and downlink command channel, building visualization
Electric power computer room;Communication and soft, hard PLC asynchronous periodicity based on soft, hard PLC are synchronous, carry out the control of visual power computer room;
(12) be based on electric power calculator room equipment and its layout scenarios, to electric power calculator room equipment carry out three-dimensional modeling, moving part with not
Moving part classification model construction carries out whole line Virtual assemble on three-dimensional visualization platform, constructs the static modelling of electric power computer room;
(13) control action based on equipment and equipment in electric power computer room works out the control script of the equipment in computer room,
Realize the long-range control operation of computer room.The full view of realization electric system computer room, across granularity monitoring, for emergency event in computer room
Response processing, carry out all kinds of performance evaluations of equipment and executing optimization in computer room.
As advanced optimizing for above scheme, step (12) is constructed in the static modelling of electric power computer room:
A1 creates geometrical model and finite element model based on physical message, simulates the geometry or load of true physical equipment
Lotus operating condition;Extract equipment factory data constructs the material properties model influenced vulnerable to building environment variation;Environment based on material
Ability to bear provides accurate regulation and controlling of information for environment monitoring equipment;
A2 extracts the complete period historical data of communication and second power equipment, is run based on equipment in the case of environmental change
Rule constructs device running model;And the various dimensions probability situation of equipment fault is analyzed, building is based on different faults kind
The damage evolution model of class;Accurate information is provided for plant maintenance;
A3 constructs the static modelling of electric power computer room, based on number using the nearly physical simulation monitor supervision platform of the three-dimensional of data-driven
The twin technology of word establishes uplink information channel and downlink command channel, constructs visual power computer room.
As advanced optimizing for above scheme, the data of the sensor detection include:
The relevant operating data of the physical performance index of productivity account assets, including position, model, weight and carrying
Power;
The environment or external data of influence physical asset operation, including ambient temperature, atmospheric pressure and air are wet
Degree, the detection data are shielded digital information using coder transitions, and the digital information transmission is imitative to electric power computer room
True platform.
As advanced optimizing for above scheme, realize that electric power computer room visualization model includes:
(B1) to the place general picture of electric power computer room, the electrical through connections road of equipment arrangement and equipment room is carried out detailed in computer room
Fine tuning is ground, the position of layout, equipment based on electric power computer room and relevant configuration, provide it is a set of it is corresponding with actual arrangement in proportion
Reduce layout;
(B2) the equipment three-dimensional modeling in computer room is imported threedimensional model in simulation software using 3 d modeling software,
In conjunction with the scaled layout in step B1, corresponding equipment threedimensional model is corresponded in simulation software,
Construct three-dimensional electric power machine room layout;
(B3) property for the dynamic design extremely motion mode that electric power computer room threedimensional model is acted in simulation software
It can planning;Script compilation is carried out to equipment threedimensional model in simulation software with realize in step B2 the movement of equipment threedimensional model and
Movement, using the deploying to ensure effective monitoring and control of illegal activities of sensor, the acquisition of the design of control logic, computer room information data completion to three-dimensional production line
Virtual digital control;
(B4) equipment single machine threedimensional model or whole line equitable subsection sub-module are partitioned into digitized, are established virtually with this
The digital model of whole line;Using equipment three-dimensional digitalization model as object, algorithm is write, in computer room under the control instruction of equipment
The upload with facility information in computer room is passed, data interaction is realized between enforcement engine and simulation software;
(B5) classification is carried out to electric power computer room scene real time data and makes corresponding data sheet, make data in electric power computer room
Emulation platform obtains three-dimensional visualization presentation.
As advanced optimizing for above scheme, the management control method of visual power computer room control module includes as follows
Step:
(C1) it is based on electric power computer room Visualization Platform, based on PLC control and network communication, establishes three-dimensional artificial, equipment mould
Communication channel in type and computer room between material object PLC realizes interconnecting for data, instruction and information;With the twin skill of number
Art, using the sensing data in system, the live Real-time data drive simulation model of mock-up feedback, simulation computer room operation
Actual conditions, the equipment in computer room is mapped one by one with the corresponding model of monitor supervision platform.
(C2) build and establish data synchronous communication based on electric power computer room monitor supervision platform, realize instruction assign and scene
The acquisition and feedback of real time data, electric power computer room transparence monitor supervision platform is to various kinds of equipment real-time traffic information and state in computer room
It is tracked;
(C3) electric power computer room scene real time data is conveyed to three-dimensional artificial software, handles in software inhouse data,
The equipment operation information report in electric power computer room is worked out, realizes that, to power computer room situation, equipment operation condition, equipment fault situation is real
When data three-dimensional visualization present, realize computer room data visualization monitoring and management.
Referring to Fig. 3-Fig. 5, the invention also discloses a kind of visual power system computer room monitoring sides twin based on number
Method includes the following steps:
(11) in kind based on electric power computer room, dummy model is associated with mock-up, using simulation software to electric power computer room
Digitization modeling is carried out, Digital Twin technology is based on, establishes uplink information channel and downlink command channel, building visualization
Electric power computer room;Communication and soft, hard PLC asynchronous periodicity based on soft, hard PLC are synchronous, carry out the control of visual power computer room;
(12) be based on electric power calculator room equipment and its layout scenarios, to electric power calculator room equipment carry out three-dimensional modeling, moving part with not
Moving part classification model construction carries out whole line Virtual assemble on three-dimensional visualization platform, constructs the static modelling of electric power computer room;
(13) control action based on equipment and equipment in electric power computer room works out the control script of the equipment in computer room,
Realize the long-range control operation of computer room.
As advanced optimizing for above scheme, realize that the visualization of electric power computer room includes the following steps:
(B1) to the place general picture of electric power computer room, the electrical through connections road of equipment arrangement and equipment room is carried out detailed in computer room
Fine tuning is ground, the position of layout, equipment based on electric power computer room and relevant configuration, provide it is a set of it is corresponding with actual arrangement in proportion
Reduce layout;
(B2) the equipment three-dimensional modeling in computer room is imported threedimensional model in simulation software using 3 d modeling software,
In conjunction with the scaled layout in step B1, corresponding equipment threedimensional model is corresponded in simulation software,
Construct three-dimensional electric power machine room layout;
(B3) property for the dynamic design extremely motion mode that electric power computer room threedimensional model is acted in simulation software
It can planning;Script compilation is carried out to equipment threedimensional model in simulation software with realize in step B2 the movement of equipment threedimensional model and
Movement, using the deploying to ensure effective monitoring and control of illegal activities of sensor, the acquisition of the design of control logic, computer room information data completion to three-dimensional production line
Virtual digital control;
(B4) equipment single machine threedimensional model or whole line equitable subsection sub-module are partitioned into digitized, are established virtually with this
The digital model of whole line;Using equipment three-dimensional digitalization model as object, algorithm is write, in computer room under the control instruction of equipment
The upload with facility information in computer room is passed, data interaction is realized between enforcement engine and simulation software;
(B5) classification is carried out to electric power computer room scene real time data and makes corresponding data sheet, make data in electric power computer room
Emulation platform obtains three-dimensional visualization presentation.
As advanced optimizing for above scheme, the management control method of visual power computer room control module includes as follows
Step:
(C1) it is based on electric power computer room Visualization Platform, based on PLC control and network communication, establishes three-dimensional artificial, equipment mould
Communication channel in type and computer room between material object PLC realizes interconnecting for data, instruction and information;With the twin skill of number
Art, using the sensing data in system, the live Real-time data drive simulation model of mock-up feedback, simulation computer room operation
Actual conditions, the equipment in computer room is mapped one by one with the corresponding model of monitor supervision platform.
(C2) build and establish data synchronous communication based on electric power computer room monitor supervision platform, realize instruction assign and scene
The acquisition and feedback of real time data, electric power computer room transparence monitor supervision platform is to various kinds of equipment real-time traffic information and state in computer room
It is tracked;
(C3) electric power computer room scene real time data is conveyed to three-dimensional artificial software, handles in software inhouse data,
The equipment operation information report in electric power computer room is worked out, realizes that, to power computer room situation, equipment operation condition, equipment fault situation is real
When data three-dimensional visualization present, realize computer room data visualization monitoring and management.
The invention also discloses a kind of computer readable storage mediums for being stored with computer program, which is characterized in that should
A kind of visual power system twin based on number as described in claim 7-9 is any is realized when program is executed by processor
Center monitoring method.
The twin modeling method of number and system of a kind of computer room of the invention, create geometrical model based on physical message with
Finite element model simulates the geometry or load working condition of true physical equipment;Extract equipment factory data is constructed vulnerable to building environment
Change the material properties model influenced, the environment ability to bear of research material provides accurate regulation and controlling of information for environment monitoring equipment;
The complete period historical data of communication and second power equipment is extracted, research environment situation of change divides into standby moving law, and building is set
Standby moving model;And the various dimensions probability situation of equipment fault is analyzed, damage of the building based on different faults type is drilled
Change model, provides accurate information for plant maintenance;The dummy model of constructing environment regulation device, it is common to set up high integration and melt
The right twin model of number.The present invention by using the three-dimensional visualization data of electric power computer room secondary device as references object,
The twin model of number for setting up high integration and degrees of fusion realizes the operation troubles prediction of equipment, reduces what equipment fault occurred
May, improve the adaptability to changes of computer room safety;By realizing that calculator room equipment monitoring, tracking, behavior are pre- with the twin technology of number
Survey and control, health forecast and management are analyzed for the retrospect of calculator room equipment running quality, server reliability and are provided accurately
Model and data source promote the safety and stability of electric power computer room.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiments being understood that.
Claims (10)
1. a kind of visual power system machine room monitoring system twin based on number, it is characterised in that: for managing at least one
A computer room, and it is suitable for entire multiple department's main body computer rooms, to manage company's main body or the monitoring system across company's main body,
Include:
Computer room visualization building memory module, the computer room visualization building memory module provide at least one user input with it is above-mentioned
The relevant computer room information of multiple computer rooms, the corresponding department's main body of each computer room information, the computer room information include existing with computer room
The electric power computer room emulation platform that field is proportionally converted;
Visual power computer room control module, the scene for receiving electric power computer room field device and electric power computer room emulation platform are real
Border operation data, while the real time data for receiving various sensor acquisitions;Visualization for realizing electric power computer room is transparent
Monitoring is associated with dummy model and practice model in computer room by electric power computer room three-dimensional artificial intelligence, passed under control instruction with
Data acquisition in computer room, realizes that electric power computer room visualizes;
Communication module, for establishing electric power computer room material object equipment, computer room visualization building memory module, visual power computer room control
Communication network between molding block.
2. a kind of visual power system machine room monitoring system twin based on number according to claim 1, feature
It is, the computer room visualization building memory module includes building electric power computer room emulation platform and realization electric power computer room visualization mould
Block, wherein build electric power computer room emulation platform and include the following steps:
(11) in kind based on electric power computer room, dummy model is associated with mock-up, is carried out using simulation software to electric power computer room
Digitization modeling is based on Digital Twin technology, establishes uplink information channel and downlink command channel, constructs visual power
Computer room;Communication and soft, hard PLC asynchronous periodicity based on soft, hard PLC are synchronous, carry out the control of visual power computer room;
(12) electric power calculator room equipment and its layout scenarios are based on, three-dimensional modeling, moving part and not moving part are carried out to electric power calculator room equipment
Classification model construction carries out whole line Virtual assemble on three-dimensional visualization platform, constructs the static modelling of electric power computer room;
(13) control action based on equipment and equipment in electric power computer room works out the control script of the equipment in computer room, realizes
The long-range control of computer room is run.
3. a kind of visual power system machine room monitoring system twin based on number according to claim 2, feature
It is, step (12) constructs in the static modelling of electric power computer room:
A1 creates geometrical model and finite element model based on physical message, simulates the geometry or load work of true physical equipment
Condition;Extract equipment factory data constructs the material properties model influenced vulnerable to building environment variation;
A2 extracts the complete period historical data of communication and second power equipment, is based on equipment moving law in the case of environmental change,
Construct device running model;And the various dimensions probability situation of equipment fault is analyzed, it constructs based on different faults type
Damage evolution model;
A3 constructs the static modelling of electric power computer room using the nearly physical simulation monitor supervision platform of the three-dimensional of data-driven, twin based on number
Raw technology, establishes uplink information channel and downlink command channel, constructs visual power computer room.
4. a kind of visual power system machine room monitoring system twin based on number according to claim 1, feature
It is, the data of the sensor detection include:
The relevant operating data of the physical performance index of productivity account assets, including position, model, weight and bearing capacity;
Influence the environment or external data of physical asset operation, including ambient temperature, atmospheric pressure and air humidity, institute
The detection data stated is shielded digital information using coder transitions, and the digital information transmission is flat to the emulation of electric power computer room
Platform.
5. a kind of visual power system machine room monitoring system twin based on number according to claim 2, feature
It is, realizes that electric power computer room visualization model includes:
(B1) to the place general picture of electric power computer room, the electrical through connections road of equipment arrangement and equipment room is adjusted in detail in computer room
It grinds, the position of layout, equipment based on electric power computer room and relevant configuration, provides a set of corresponding with actual arrangement scaled
Layout;
(B2) the equipment three-dimensional modeling in computer room is imported threedimensional model in simulation software using 3 d modeling software, in conjunction with
Scaled layout in step B1 corresponds corresponding equipment threedimensional model in simulation software, is constructed
Three-dimensional electric power machine room layout;
(B3) the performance rule for the dynamic design extremely motion mode that electric power computer room threedimensional model is acted in simulation software
It draws;Carrying out script compilation to equipment threedimensional model in simulation software, equipment threedimensional model is acted and is transported in step B2 to realize
It is dynamic, the void to three-dimensional production line is completed using the deploying to ensure effective monitoring and control of illegal activities of sensor, the acquisition of the design of control logic, computer room information data
Quasi- Digital Control;
(B4) equipment single machine threedimensional model or whole line equitable subsection sub-module are partitioned into digitized, virtual whole line is established with this
Digital model;Using equipment three-dimensional digitalization model as object, write algorithm, in computer room the biography down of the control instruction of equipment and
The upload of facility information, realizes data interaction in computer room between enforcement engine and simulation software;
(B5) classification is carried out to electric power computer room scene real time data and makes corresponding data sheet, emulate data in electric power computer room
Platform obtains three-dimensional visualization presentation.
6. a kind of visual power system machine room monitoring system twin based on number according to claim 2, feature
It is, the management control method of visual power computer room control module includes the following steps:
(C1) be based on electric power computer room Visualization Platform, based on PLC control and network communication, establish three-dimensional artificial, device model with
Communication channel in computer room between material object PLC realizes interconnecting for data, instruction and information;With the twin technology of number, benefit
With the sensing data in system, the live Real-time data drive simulation model of mock-up feedback, the reality of simulation computer room operation
Border situation is mapped the equipment in computer room with the corresponding model of monitor supervision platform one by one.
(C2) data synchronous communication is built and is established based on electric power computer room monitor supervision platform, realize that assigning for instruction is real-time with scene
The acquisition and feedback of data, electric power computer room transparence monitor supervision platform carry out various kinds of equipment real-time traffic information in computer room and state
Tracking;
(C3) electric power computer room scene real time data is conveyed to three-dimensional artificial software, handles in software inhouse data, establishment
Equipment operation information report in electric power computer room realizes that equipment fault situation is real-time to electric power computer room situation, equipment operation condition
The three-dimensional visualization of data is presented, and realizes the data visualization monitoring and management of computer room.
7. a kind of visual power system computer room monitoring method twin based on number, which comprises the steps of:
(11) in kind based on electric power computer room, dummy model is associated with mock-up, is carried out using simulation software to electric power computer room
Digitization modeling is based on Digital Twin technology, establishes uplink information channel and downlink command channel, constructs visual power
Computer room;Communication and soft, hard PLC asynchronous periodicity based on soft, hard PLC are synchronous, carry out the control of visual power computer room;
(12) electric power calculator room equipment and its layout scenarios are based on, three-dimensional modeling, moving part and not moving part are carried out to electric power calculator room equipment
Classification model construction carries out whole line Virtual assemble on three-dimensional visualization platform, constructs the static modelling of electric power computer room;
(13) control action based on equipment and equipment in electric power computer room works out the control script of the equipment in computer room, realizes
The long-range control of computer room is run.
8. based on a kind of visual power system computer room monitoring method twin based on number as claimed in claim 7, feature
It is, realizes that the visualization of electric power computer room includes the following steps:
(B1) to the place general picture of electric power computer room, the electrical through connections road of equipment arrangement and equipment room is adjusted in detail in computer room
It grinds, the position of layout, equipment based on electric power computer room and relevant configuration, provides a set of corresponding with actual arrangement scaled
Layout;
(B2) the equipment three-dimensional modeling in computer room is imported threedimensional model in simulation software using 3 d modeling software, in conjunction with
Scaled layout in step B1 corresponds corresponding equipment threedimensional model in simulation software, is constructed
Three-dimensional electric power machine room layout;
(B3) the performance rule for the dynamic design extremely motion mode that electric power computer room threedimensional model is acted in simulation software
It draws;Carrying out script compilation to equipment threedimensional model in simulation software, equipment threedimensional model is acted and is transported in step B2 to realize
It is dynamic, the void to three-dimensional production line is completed using the deploying to ensure effective monitoring and control of illegal activities of sensor, the acquisition of the design of control logic, computer room information data
Quasi- Digital Control;
(B4) equipment single machine threedimensional model or whole line equitable subsection sub-module are partitioned into digitized, virtual whole line is established with this
Digital model;Using equipment three-dimensional digitalization model as object, write algorithm, in computer room the biography down of the control instruction of equipment and
The upload of facility information, realizes data interaction in computer room between enforcement engine and simulation software;
(B5) classification is carried out to electric power computer room scene real time data and makes corresponding data sheet, emulate data in electric power computer room
Platform obtains three-dimensional visualization presentation.
9. a kind of visual power system computer room monitoring method twin based on number according to claim 7, feature
It is, the management control method of visual power computer room control module includes the following steps:
(C1) be based on electric power computer room Visualization Platform, based on PLC control and network communication, establish three-dimensional artificial, device model with
Communication channel in computer room between material object PLC realizes interconnecting for data, instruction and information;With the twin technology of number, benefit
With the sensing data in system, the live Real-time data drive simulation model of mock-up feedback, the reality of simulation computer room operation
Border situation is mapped the equipment in computer room with the corresponding model of monitor supervision platform one by one.
(C2) data synchronous communication is built and is established based on electric power computer room monitor supervision platform, realize that assigning for instruction is real-time with scene
The acquisition and feedback of data, electric power computer room transparence monitor supervision platform carry out various kinds of equipment real-time traffic information in computer room and state
Tracking;
(C3) electric power computer room scene real time data is conveyed to three-dimensional artificial software, handles in software inhouse data, establishment
Equipment operation information report in electric power computer room realizes that equipment fault situation is real-time to electric power computer room situation, equipment operation condition
The three-dimensional visualization of data is presented, and realizes the data visualization monitoring and management of computer room.
10. a kind of computer readable storage medium for being stored with computer program, which is characterized in that the program is executed by processor
A kind of any visual power system computer room monitoring method twin based on number of Shi Shixian such as claim 7-9.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910379544.6A CN110083119A (en) | 2019-05-08 | 2019-05-08 | A kind of the visual power system machine room monitoring system and method twin based on number |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910379544.6A CN110083119A (en) | 2019-05-08 | 2019-05-08 | A kind of the visual power system machine room monitoring system and method twin based on number |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110083119A true CN110083119A (en) | 2019-08-02 |
Family
ID=67419192
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910379544.6A Pending CN110083119A (en) | 2019-05-08 | 2019-05-08 | A kind of the visual power system machine room monitoring system and method twin based on number |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110083119A (en) |
Cited By (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110523782A (en) * | 2019-08-20 | 2019-12-03 | 北京科技大学 | A kind of rail rolling production line real-time monitoring system and method |
CN110826201A (en) * | 2019-10-24 | 2020-02-21 | 深圳供电局有限公司 | Three-dimensional visualization platform for operation and maintenance management system of data center |
CN111161410A (en) * | 2019-12-30 | 2020-05-15 | 中国矿业大学(北京) | Mine digital twinning model and construction method thereof |
CN111210359A (en) * | 2019-12-30 | 2020-05-29 | 中国矿业大学(北京) | Intelligent mine scene oriented digital twin evolution mechanism and method |
CN111208759A (en) * | 2019-12-30 | 2020-05-29 | 中国矿业大学(北京) | Digital twin intelligent monitoring system for unmanned fully mechanized coal mining face of mine |
CN111338300A (en) * | 2020-02-27 | 2020-06-26 | 广东工业大学 | Physical simulation method and system of production line based on digital twins |
CN111565123A (en) * | 2020-05-07 | 2020-08-21 | 联桥网云信息科技(长沙)有限公司 | Real-time representation visualization method for 3D model of running state of Internet of things equipment |
CN111698468A (en) * | 2020-05-14 | 2020-09-22 | 中国电力工程顾问集团西南电力设计院有限公司 | Method for automatically monitoring three-dimensional scene based on power transmission line |
CN111859509A (en) * | 2020-07-27 | 2020-10-30 | 北京优锘科技有限公司 | Machine room capacity management system and method based on data center |
CN111931347A (en) * | 2020-07-14 | 2020-11-13 | 中国船舶重工集团公司第七一五研究所 | System and method for dynamically inverting electromechanical device based on characteristic data |
CN111966068A (en) * | 2020-08-27 | 2020-11-20 | 上海电机系统节能工程技术研究中心有限公司 | Augmented reality monitoring method and device for motor production line, electronic equipment and storage medium |
CN112002401A (en) * | 2020-08-25 | 2020-11-27 | 上海至数企业发展有限公司 | Space environment monitoring method and system based on digital twin and storage medium |
CN112069247A (en) * | 2020-09-09 | 2020-12-11 | 广东电网有限责任公司中山供电局 | Power system operation data visualization system and method based on digital twin technology |
CN112128624A (en) * | 2020-06-08 | 2020-12-25 | 广东希睿数字科技有限公司 | Gas digital twin 3D visual intelligent operation and maintenance system |
CN112200491A (en) * | 2020-10-30 | 2021-01-08 | 傲林科技有限公司 | Digital twin model construction method and device and storage medium |
CN112382293A (en) * | 2020-11-11 | 2021-02-19 | 广东电网有限责任公司 | Intelligent voice interaction method and system for power Internet of things |
CN112382064A (en) * | 2020-11-12 | 2021-02-19 | 广东电网有限责任公司 | Power Internet of things fault early warning method and system based on digital twin technology |
CN112698632A (en) * | 2020-12-25 | 2021-04-23 | 深圳华龙讯达信息技术股份有限公司 | Full-automatic production line digital twinning system, method and equipment |
CN112907109A (en) * | 2021-03-15 | 2021-06-04 | 广东电网有限责任公司 | Machine room asset management system and method |
US11067970B1 (en) | 2020-02-27 | 2021-07-20 | Guangdong University Of Technology | Method for designing production line based on digital twin |
CN113162240A (en) * | 2021-05-12 | 2021-07-23 | 泰瑞数创科技(北京)有限公司 | Power line carrier intelligent monitoring method and system of city information model |
CN113189892A (en) * | 2021-03-29 | 2021-07-30 | 湖南中南智能装备有限公司 | Digital twin data bidirectional interaction method |
CN113254311A (en) * | 2021-05-31 | 2021-08-13 | 广州衡昊数据科技有限公司 | Monitoring system and monitoring method of distributed power supply system |
CN113835460A (en) * | 2021-11-23 | 2021-12-24 | 中铁建设集团有限公司 | Data computer lab intelligence environmental control system based on hydrodynamics analog digital twin |
CN114237135A (en) * | 2021-11-30 | 2022-03-25 | 国网辽宁省电力有限公司信息通信分公司 | Information communication machine room 3D visualization method and system based on digital twin technology |
CN114341814A (en) * | 2019-08-28 | 2022-04-12 | 西门子股份公司 | Efficient fault analysis by simulating faults in digital twinning |
CN114356029A (en) * | 2022-01-05 | 2022-04-15 | 数字孪生(无锡)技术有限公司 | Three-dimensional visual editing system based on digital twins |
CN114820996A (en) * | 2022-02-18 | 2022-07-29 | 成都飞机工业(集团)有限责任公司 | Assembly fixture real-time monitoring method based on CATIA secondary development |
CN115100353A (en) * | 2022-06-17 | 2022-09-23 | 重庆长安汽车股份有限公司 | Method, system, electronic device and storage medium for generating digital twin instances |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201682528U (en) * | 2010-04-02 | 2010-12-22 | 北京梅泰诺通信技术股份有限公司 | Communication tower remote monitoring system |
CN102509367A (en) * | 2011-10-28 | 2012-06-20 | 江苏省电力公司常州供电公司 | Three-dimensional (3D) simulation polling system of electric power automation motor room |
CN103048965A (en) * | 2012-12-17 | 2013-04-17 | 江苏省电力公司 | Visual centralized monitoring system for loading videos of dynamic machine rooms |
CN104077428A (en) * | 2014-02-26 | 2014-10-01 | 浙江工业大学 | Remote finite element analysis method serving for industry alliance |
US20170286572A1 (en) * | 2016-03-31 | 2017-10-05 | General Electric Company | Digital twin of twinned physical system |
CN107870600A (en) * | 2017-10-17 | 2018-04-03 | 广东工业大学 | A kind of transparent monitoring method in intelligent workshop and system |
CN208126425U (en) * | 2018-05-15 | 2018-11-20 | 国网安徽省电力有限公司宣城供电公司 | A kind of electric power computer room grid equipment monitoring management system |
CN109462637A (en) * | 2018-10-17 | 2019-03-12 | 广东电网有限责任公司 | MR expert's remote collaboration method and system based on power equipment 3D model library |
-
2019
- 2019-05-08 CN CN201910379544.6A patent/CN110083119A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201682528U (en) * | 2010-04-02 | 2010-12-22 | 北京梅泰诺通信技术股份有限公司 | Communication tower remote monitoring system |
CN102509367A (en) * | 2011-10-28 | 2012-06-20 | 江苏省电力公司常州供电公司 | Three-dimensional (3D) simulation polling system of electric power automation motor room |
CN103048965A (en) * | 2012-12-17 | 2013-04-17 | 江苏省电力公司 | Visual centralized monitoring system for loading videos of dynamic machine rooms |
CN104077428A (en) * | 2014-02-26 | 2014-10-01 | 浙江工业大学 | Remote finite element analysis method serving for industry alliance |
US20170286572A1 (en) * | 2016-03-31 | 2017-10-05 | General Electric Company | Digital twin of twinned physical system |
CN107870600A (en) * | 2017-10-17 | 2018-04-03 | 广东工业大学 | A kind of transparent monitoring method in intelligent workshop and system |
CN208126425U (en) * | 2018-05-15 | 2018-11-20 | 国网安徽省电力有限公司宣城供电公司 | A kind of electric power computer room grid equipment monitoring management system |
CN109462637A (en) * | 2018-10-17 | 2019-03-12 | 广东电网有限责任公司 | MR expert's remote collaboration method and system based on power equipment 3D model library |
Cited By (42)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110523782A (en) * | 2019-08-20 | 2019-12-03 | 北京科技大学 | A kind of rail rolling production line real-time monitoring system and method |
CN114341814A (en) * | 2019-08-28 | 2022-04-12 | 西门子股份公司 | Efficient fault analysis by simulating faults in digital twinning |
US11567489B2 (en) | 2019-08-28 | 2023-01-31 | Siemens Aktiengesellschaft | Method and device for efficient fault analysis through simulated faults in a digital twin |
CN110826201A (en) * | 2019-10-24 | 2020-02-21 | 深圳供电局有限公司 | Three-dimensional visualization platform for operation and maintenance management system of data center |
CN110826201B (en) * | 2019-10-24 | 2023-11-03 | 深圳供电局有限公司 | Three-dimensional visualization platform for operation and maintenance management system of data center |
CN111208759B (en) * | 2019-12-30 | 2021-02-02 | 中国矿业大学(北京) | Digital twin intelligent monitoring system for unmanned fully mechanized coal mining face of mine |
CN111208759A (en) * | 2019-12-30 | 2020-05-29 | 中国矿业大学(北京) | Digital twin intelligent monitoring system for unmanned fully mechanized coal mining face of mine |
CN111161410B (en) * | 2019-12-30 | 2021-10-12 | 中国矿业大学(北京) | Mine digital twinning model and construction method thereof |
CN111210359B (en) * | 2019-12-30 | 2022-01-28 | 中国矿业大学(北京) | Intelligent mine scene oriented digital twin evolution mechanism and method |
CN111161410A (en) * | 2019-12-30 | 2020-05-15 | 中国矿业大学(北京) | Mine digital twinning model and construction method thereof |
CN111210359A (en) * | 2019-12-30 | 2020-05-29 | 中国矿业大学(北京) | Intelligent mine scene oriented digital twin evolution mechanism and method |
WO2021169598A1 (en) * | 2020-02-27 | 2021-09-02 | 广东工业大学 | Digital twinning-based physical simulation method for production line and system thereof |
CN111338300A (en) * | 2020-02-27 | 2020-06-26 | 广东工业大学 | Physical simulation method and system of production line based on digital twins |
US11067970B1 (en) | 2020-02-27 | 2021-07-20 | Guangdong University Of Technology | Method for designing production line based on digital twin |
CN111565123A (en) * | 2020-05-07 | 2020-08-21 | 联桥网云信息科技(长沙)有限公司 | Real-time representation visualization method for 3D model of running state of Internet of things equipment |
CN111565123B (en) * | 2020-05-07 | 2022-10-04 | 联桥网云信息科技(长沙)有限公司 | Real-time representation visualization method for 3D model of running state of Internet of things equipment |
CN111698468A (en) * | 2020-05-14 | 2020-09-22 | 中国电力工程顾问集团西南电力设计院有限公司 | Method for automatically monitoring three-dimensional scene based on power transmission line |
CN112128624A (en) * | 2020-06-08 | 2020-12-25 | 广东希睿数字科技有限公司 | Gas digital twin 3D visual intelligent operation and maintenance system |
CN111931347A (en) * | 2020-07-14 | 2020-11-13 | 中国船舶重工集团公司第七一五研究所 | System and method for dynamically inverting electromechanical device based on characteristic data |
CN111859509A (en) * | 2020-07-27 | 2020-10-30 | 北京优锘科技有限公司 | Machine room capacity management system and method based on data center |
CN112002401A (en) * | 2020-08-25 | 2020-11-27 | 上海至数企业发展有限公司 | Space environment monitoring method and system based on digital twin and storage medium |
CN111966068A (en) * | 2020-08-27 | 2020-11-20 | 上海电机系统节能工程技术研究中心有限公司 | Augmented reality monitoring method and device for motor production line, electronic equipment and storage medium |
CN112069247A (en) * | 2020-09-09 | 2020-12-11 | 广东电网有限责任公司中山供电局 | Power system operation data visualization system and method based on digital twin technology |
CN112069247B (en) * | 2020-09-09 | 2023-01-24 | 广东电网有限责任公司中山供电局 | Power system operation data visualization system and method based on digital twin technology |
CN112200491B (en) * | 2020-10-30 | 2024-04-16 | 傲林科技有限公司 | Digital twin model construction method, device and storage medium |
CN112200491A (en) * | 2020-10-30 | 2021-01-08 | 傲林科技有限公司 | Digital twin model construction method and device and storage medium |
CN112382293A (en) * | 2020-11-11 | 2021-02-19 | 广东电网有限责任公司 | Intelligent voice interaction method and system for power Internet of things |
CN112382064A (en) * | 2020-11-12 | 2021-02-19 | 广东电网有限责任公司 | Power Internet of things fault early warning method and system based on digital twin technology |
CN112698632A (en) * | 2020-12-25 | 2021-04-23 | 深圳华龙讯达信息技术股份有限公司 | Full-automatic production line digital twinning system, method and equipment |
CN112907109A (en) * | 2021-03-15 | 2021-06-04 | 广东电网有限责任公司 | Machine room asset management system and method |
CN113189892A (en) * | 2021-03-29 | 2021-07-30 | 湖南中南智能装备有限公司 | Digital twin data bidirectional interaction method |
CN113162240B (en) * | 2021-05-12 | 2022-04-12 | 泰瑞数创科技(北京)有限公司 | Power line carrier intelligent monitoring method and system of city information model |
CN113162240A (en) * | 2021-05-12 | 2021-07-23 | 泰瑞数创科技(北京)有限公司 | Power line carrier intelligent monitoring method and system of city information model |
CN113254311B (en) * | 2021-05-31 | 2022-12-13 | 广州衡昊数据科技有限公司 | Monitoring system and monitoring method of distributed power supply system |
CN113254311A (en) * | 2021-05-31 | 2021-08-13 | 广州衡昊数据科技有限公司 | Monitoring system and monitoring method of distributed power supply system |
CN113835460B (en) * | 2021-11-23 | 2022-05-03 | 中铁建设集团有限公司 | Data computer lab intelligence environmental control system based on hydrodynamics analog digital twin |
CN113835460A (en) * | 2021-11-23 | 2021-12-24 | 中铁建设集团有限公司 | Data computer lab intelligence environmental control system based on hydrodynamics analog digital twin |
CN114237135A (en) * | 2021-11-30 | 2022-03-25 | 国网辽宁省电力有限公司信息通信分公司 | Information communication machine room 3D visualization method and system based on digital twin technology |
CN114356029A (en) * | 2022-01-05 | 2022-04-15 | 数字孪生(无锡)技术有限公司 | Three-dimensional visual editing system based on digital twins |
CN114820996A (en) * | 2022-02-18 | 2022-07-29 | 成都飞机工业(集团)有限责任公司 | Assembly fixture real-time monitoring method based on CATIA secondary development |
CN115100353A (en) * | 2022-06-17 | 2022-09-23 | 重庆长安汽车股份有限公司 | Method, system, electronic device and storage medium for generating digital twin instances |
CN115100353B (en) * | 2022-06-17 | 2024-05-14 | 重庆长安汽车股份有限公司 | Method, system, electronic device and storage medium for generating digital twin instance |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110083119A (en) | A kind of the visual power system machine room monitoring system and method twin based on number | |
CN112528525B (en) | Visual industrial process management and control platform based on modeling technology | |
Wang et al. | BIM information integration based VR modeling in digital twins in industry 5.0 | |
Zhang et al. | Digital twins for construction sites: Concepts, LoD definition, and applications | |
JP7037204B2 (en) | Smart factory monitoring methods and systems | |
CN113887016A (en) | Ship digital workshop simulation method and system based on digital twinning | |
Lv | Digital twins in industry 5.0 | |
CN108022039B (en) | Transformer substation simulation training system based on augmented reality | |
CN111950066B (en) | Digital twin data driving system based on BIM and GIS technology | |
Ang et al. | Smart design for ships in a smart product through-life and industry 4.0 environment | |
Berwal et al. | Computer Applications in Engineering and Management | |
CN110276555A (en) | Residential housing entity Life cycle analysis method based on internet and BIM | |
KR102369358B1 (en) | Method, apparatus and system of managing lifecycle of 3 dimensional digital space and contents based on customer needs | |
Xia et al. | Construction and application of smart factory digital twin system based on DTME | |
CN106203784A (en) | A kind of wisdom building system based on BIM and management method thereof | |
CN115470707A (en) | City scene simulation system | |
Liu et al. | A review of digital twin capabilities, technologies, and applications based on the maturity model | |
Zhang et al. | Advanced informatic technologies for intelligent construction: A review | |
Wang et al. | Digital twin-based framework for green building maintenance system | |
Zhou et al. | Revisiting digital twins: Origins, fundamentals, and practices | |
CN117351521A (en) | Digital twinning-based power transmission line bird detection method, system, medium and equipment | |
Saraireh et al. | Understanding the conceptual of building information modeling: a literature review | |
Yan et al. | Digital twin in transportation infrastructure management: a systematic review | |
Xiao et al. | Manufacturing crisis and twin-oriented manufacturing | |
Ran et al. | Application of digital twins to flexible production management: taking a Shandong factory as an example |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190802 |
|
RJ01 | Rejection of invention patent application after publication |