CN103674189B CN201310596063.3A CN201310596063A CN103674189B CN 103674189 B CN103674189 B CN 103674189B CN 201310596063 A CN201310596063 A CN 201310596063A CN 103674189 B CN103674189 B CN 103674189B
Authority
CN
China
Prior art keywords
under meter
fault
parameter
flow
high pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310596063.3A
Other languages
Chinese (zh)
Other versions
CN103674189A (en
Inventor
李政
蒋晓隆
刘培
仲晓波
朱泓逻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
Original Assignee
Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University filed Critical Tsinghua University
Priority to CN201310596063.3A priority Critical patent/CN103674189B/en
Publication of CN103674189A publication Critical patent/CN103674189A/en
Application granted granted Critical
Publication of CN103674189B publication Critical patent/CN103674189B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

A kind of turbine system under meter fault monitoring method, belongs to steam turbine on-line monitoring field. This method utilizes data coordinating method, and fault under meter is carried out detection and Identification. Concrete technological step comprises: 1) utilize steady state condition take off data, and the uncertainty and system restriction equation according to measuring parameter observed value carries out data harmonization calculating; 2) compare the size of data harmonization minimum target functional value and failure determination threshold value, judge whether under meter fault; 3) if detection outflow rate meter generation fault, then one by one under meter is carried out fault identification, the measuring parameter of its correspondence is used as unmeasured parameter, recalculate data harmonization minimum target functional value; Relatively new minimum target functional value and failure determination threshold value, thus identify fault under meter. The method can effectively utilize the flow measurement information of redundancy in turbine system, carries out the detection and indentification of under meter fault, and method simply is easy to realize, and has the advantage of high efficiency, low cost.

Description

A kind of turbine system under meter fault monitoring method
Technical field
The present invention relates to a kind of turbine system under meter fault monitoring method, belong to steam turbine on-line monitoring field.
Background technology
Flow measurement is one of the most important parameter of steam turbine on-line measurement. The online flow measurement of current steam turbine adopts orifice plate or nozzle flow meter usually. Turbine system in operational process, due to washing away and the effect such as corrosion of working medium, it is possible under meter fault occurs. But due to following two aspect reasons, the malfunction monitoring of orifice plate or nozzle flow meter is had difficulties: the installation space that 1) under meter needs is relatively big, usually cannot install multiple under meter by same position in turbine system; Therefore, the method for routine measurement equipment redundancy can not be adopted to carry out under meter malfunction monitoring; 2) under meter is installed and unloading process complexity, it is difficult to it carries out periodic calibrating and verification. Therefore, for the under meter that steam turbine on-line measurement uses, also lack effective malfunction monitoring means at present.
Summary of the invention
It is an object of the invention to provide a kind of turbine system under meter fault monitoring method, it is possible to the fault state of under meter in on-line monitoring turbine system, it is to increase the reliability of on-line monitoring system.
The technical scheme of the present invention is:
A kind of turbine system under meter fault monitoring method, is characterized in that the method includes following steps:
1) gathering the pressure steady state condition, temperature and flow measurement parameter from power plant's online database, measuring parameter comprises: the pressure P of high pressure feed water heater extraction entrance1,P2,…PN, service pump outlet pressure PN+1, deoxygenator extraction entrance pressure PN+2, deoxygenator condensed water entrance pressure PN+3, wherein N is the number of high pressure feed water heater; The temperature T of high pressure feed water heater extraction entrance1,T2,…TN, high pressure feed water heater is to the temperature T of water outN+1,TN+2,…T2N, the hydrophobic outlet of high pressure feed water heater temperature T2N+1,T2N+2,…T3N, service pump outlet temperature T3N+1, deoxygenator extraction entrance temperature T3N+2, deoxygenator condensed water entrance temperature T3N+3;Final flow, the flow of service pump outlet and the flow D of deoxygenator condensed water entrance fed water1,D2,D3; Above-mentioned pressure, temperature and flow measurement parameter are designated as X successively1,X2,…Xn, the observed value of measuring parameter is designated as x1,x2,…xn, wherein n is the number of all measuring parameters;
2) according to the class of precision of pressure transmitter in turbine system, temperature sensor and under meter, the uncertainty of evaluation measuring parameter observed value, is designated as σ respectively12,…σn;
3) in system, unmeasured parameter comprises: the flow d that high pressure feed water heater draws gas1,d2,…dN, the hydrophobic flow d of high pressure feed water heaterN+1,dN+2,…d2N, the flow d that draws gas of deoxygenator2N+1, deaerator feedwater outlet flow d2N+2; Above-mentioned unmeasured parameter is designated as Y successively1,Y2,…Yp, wherein p is the number of all unmeasured parameters;
4) utilize mass balance and the energy balance relations of turbine system mesohigh feedwater heating apparatus, service pump and deoxygenator, and ignore the pressure drop of feedwater side and side of drawing gas in high pressure feed water heater, set up about measuring parameter X1,X2,…XnWith unmeasured parameter Y1,Y2,…YpConstrained equations fm, wherein m is the number of equation of constraint:
fm(X1,X2,…Xn,Y1,Y2,…Yp)=0 (1)
5) the observed value x of measuring parameter is utilized1,x2,…xn, observed value uncertainty σ12,…σnAnd Constrained equations fmCarry out data harmonization calculating so that data harmonization objective functionMinimum, and the coordination value of measuring parameterWith the estimated value y of unmeasured parameter1,y2,…ypMeet system restriction system of equations:
6) the data harmonization minimum target functional value obtained will be solvedWith under meter failure determination threshold valueCompare; Detection thresholdThe 1-α fractile of card side's distribution of to be degree of freedom be r; R is system redundancy, equals the number p that equation of constraint number m subtracts unmeasured parameter, r=m-p; α is the significance level of under meter failure testing; IfShow that fault does not occur under meter;
7) ifShow under meter generation fault, then one by one under meter is carried out fault identification; When jth under meter is carried out fault identification, by measuring parameter X corresponding for this under meterjIt is used as unmeasured parameter Yp+1, re-start data harmonization and calculate:
The new data harmonization minimum target functional value obtained will be solvedWith new under meter failure determination threshold valueCompare; IfShowing that fault does not occur other under meter except jth under meter, then identify and occur the flow of fault to count jth under meter, fault identification terminates; IfShow that other under meter except jth under meter still has fault, continue next under meter is carried out fault identification;
8) by step 7) when one by one under meter being carried out fault identification, if all recognition results areShow there is multiple under meter generation fault; Then first judge in first round fault identification processMinimum flow counts fault under meter, and by measuring parameter X corresponding for this under meterjIt is used as unmeasured parameter Yp+1, then by step 7) one by one all the other under meters are carried out next and take turns fault identification, wherein, R takes turns the failure determination threshold value of under meter fault identification and is
9) as the wheel number R=r-1 of the fault identification completed, under meter fault identification terminates.
Method of the present invention, it is characterised in that: data harmonization objective function is the observed value x of each measuring parameter1,x2,…xnWith coordination valueThe weighted quadratic of deviation and; Weighting coefficient is the inverse of the uncertainty square of measuring parameter observed value.
The present invention has the following advantages and the technique effect of giving prominence to property:
Instant invention overcomes the shortcoming that traditional method can not effectively monitor turbine system under meter fault, the flow parameter of redundancy in steam turbine on-line measurement system is utilized to measure the physics equation of constraint such as the mass balance in information and system and energy balance, carry out data harmonization calculating, and under meter fault is carried out detection and Identification effectively.Another advantage of the present invention is, it is not necessary to increase extras investment, method simple possible.
Accompanying drawing explanation
Fig. 1 provides the embodiment principle schematic of a kind of turbine system under meter fault monitoring method for the present invention.
In figure: 1-#1 high pressure feed water heater; 2-#2 high pressure feed water heater; 3-#3 high pressure feed water heater; 4-service pump; 5-deoxygenator; 6-under meter; 7-pressure transmitter; 8-temperature sensor.
Embodiment
Below in conjunction with accompanying drawing, the principle of the present invention and concrete enforcement are further described.
As shown in Figure 1, system comprises 1-#1 high pressure feed water heater; 2-#2 high pressure feed water heater; 3-#3 high pressure feed water heater; 4-service pump; 5-deoxygenator; 6-under meter; 7-pressure transmitter, 8-temperature sensor.
The present invention provides a kind of turbine system under meter fault monitoring method, it is characterized in that the method includes following steps:
1) ordinary method verification pressure transmitter and temperature sensor is adopted; Gathering the pressure steady state condition, temperature and flow measurement parameter from power plant's online database, measuring parameter comprises: the pressure P of high pressure feed water heater extraction entrance1,P2,P3, service pump outlet pressure P4, deoxygenator extraction entrance pressure P5, the pressure P of deoxygenator condensed water entrance6; The temperature T of high pressure feed water heater extraction entrance1,T2,T3, high pressure feed water heater is to the temperature T of water out4,T5,T6, the hydrophobic outlet of high pressure feed water heater temperature T7,T8,…T9, service pump outlet temperature T10, deoxygenator extraction entrance temperature T11, deoxygenator condensed water entrance temperature T12; Final flow, the flow of service pump outlet and the flow D of deoxygenator condensed water entrance fed water1,D2,D3; Above-mentioned pressure, temperature and flow measurement parameter are designated as X successively1,X2,…X21, the observed value of measuring parameter is designated as x1,x2,…x21, the number of measuring parameter is 21;
2) according to the class of precision of pressure transmitter in turbine system, temperature sensor and under meter, the uncertainty of evaluation measuring parameter observed value, is designated as σ respectively12,…σ21;
3) in system, unmeasured parameter comprises: the flow d that high pressure feed water heater draws gas1,d2,d3, the hydrophobic flow d of high pressure feed water heater4,d5,…d6, the flow d that draws gas of deoxygenator7With the flow d of deaerator feedwater outlet8; Above-mentioned unmeasured parameter is designated as Y successively1,Y2,…Y8, the number of unmeasured parameter is 8;
4) utilize mass balance and the energy balance relations of turbine system mesohigh feedwater heating apparatus, service pump and deoxygenator, and ignore the pressure drop of feedwater side and side of drawing gas in high pressure feed water heater, set up about measuring parameter X1,X2,…X21With unmeasured parameter Y1,Y2,…Y8Constrained equations f10, the number of equation of constraint is 10:
f10(X1,X2,…X21,Y1,Y2,…Y8)=0 (1)
5) the observed value x of measuring parameter is utilized1,x2,…x21, observed value uncertainty σ12,…σ21And Constrained equations f10Carry out data harmonization calculating so that data harmonization objective functionMinimum, and the coordination value of measuring parameterWith the estimated value y of unmeasured parameter1,y2,…y8Meet system restriction system of equations:
6) the data harmonization minimum target functional value obtained will be solvedWith under meter failure determination threshold valueCompare; Detection thresholdThe 1-α fractile of card side's distribution of to be degree of freedom be r; System redundancy is r=2, equals the number 8 that equation of constraint number 10 subtracts unmeasured parameter; The level of significance α of under meter failure testing gets 5%; Detection threshold isIfShow that fault does not occur under meter;
7) ifShow under meter generation fault, then one by one under meter is carried out fault identification;When jth under meter is carried out fault identification, by measuring parameter X corresponding for this under meterjIt is used as unmeasured parameter Y9, re-start data harmonization and calculate:
The new data harmonization minimum target functional value obtained will be solvedWith new under meter failure determination threshold valueCompare; IfShowing that fault does not occur other under meter except jth under meter, then identify and occur the flow of fault to count jth under meter, fault identification terminates; IfShow that other under meter except jth under meter still has fault, continue next under meter is carried out fault identification;
8) by step 7) when one by one under meter being carried out fault identification, if all recognition results areShow there is multiple under meter generation fault; Then first judge in first round fault identification processMinimum flow counts fault under meter, and by measuring parameter X corresponding for this under meterjIt is used as unmeasured parameter Yp+1, then by step 7) one by one all the other under meters are carried out next and take turns fault identification, wherein, R takes turns the failure determination threshold value of under meter fault identification and is
9) as the wheel number R=r-1=1 of the fault identification completed, under meter fault identification terminates.
Data harmonization objective function is the observed value x of each measuring parameter1,x2,…xnWith coordination valueThe weighted quadratic of deviation and; Weighting coefficient is the inverse of the uncertainty square of measuring parameter observed value.
Embodiment 1:
Below for a turbine high-pressure feedwater heating apparatus, service pump and deoxygenator system, the present invention will be described. The equipment that the present embodiment comprises is: three high pressure feed water heaters, is respectively #1 high pressure feed water heater, #2 high pressure feed water heater and #3 high pressure feed water heater; A service pump; A deoxygenator.
Pressure in system, temperature and flow measurement parameter are as shown in table 1. Measuring parameter is designated as X successively1,X2,…X21. Wherein, the number of measuring parameter is 21.
Table 1. measuring parameter, observed value, uncertainty of measurement and coordination value
The unmeasured parameter comprised in system is as shown in table 2. Unmeasured parameter is designated as Y successively1,Y2,…Y8. Wherein, the number of unmeasured parameter is 8.
The unmeasured parameter of table 2. and estimated value thereof
The equation of constraint that system comprises is mass balance and the energy-balance equation of #1 to #3 high pressure feed water heater, service pump and deoxygenator, specific as follows:
1) mass balance equation:
#1 high pressure feed water heater mass balance
d4-d1=0 (1)
#2 high pressure feed water heater mass balance
d5-d2-d4=0 (2)
#3 high pressure feed water heater mass balance
d6-d3-d5=0 (3)
Feedwater flow mass balance
D1-D2=0 (4)
Service pump mass balance
D2-d8=0 (5)
Deoxygenator mass balance
d8-d6-d7-D3=0 (6)
2) energy-balance equation
#1 high pressure feed water heater energy balance
D1h(p4,T4)+d4h(p1,T7)-D1h(p4,T5)-d1h(p1,T1)=0 (7)
#2 high pressure feed water heater energy balance
D1h(p4,T5)+d5h(p2,T8)-D1h(p4,T6)-d2h(p2,T2)-d4h(p1,T7)=0 (8)
#3 high pressure feed water heater energy balance
D1h(p4,T6)+d6h(p3,T9)-D1h(p4,T10)-d3h(p3,T3)-d5h(p2,T8)=0 (9)
Deoxygenator energy balance
d8hsat(p5)-D3h(p6,T12)-d7h(p5,T11)-d6h(p3,T9)=0 (10)
Equation of constraint is designated as f successively1,f2,…f10, the number of equation of constraint is 10. In equation of constraint, h (p, T) represents the enthalpy of water or the water vapor calculated according to pressure p and temperature T; hsatP () is the enthalpy of saturation water corresponding to pressure p.
Gather the observed value x of one group of measuring parameter from power plant's online database under steam turbine steady state condition1,x2,…x21As shown in table 1. Wherein, service pump rate of discharge original measurement value is 833.47kg/s. Present case is in order to illustrate the method for under meter Failure detection and identification, it is assumed that the under meter generation fault that service pump rate of discharge is corresponding, and causes its observed value to be extremely increased to 875.65kg/s.
Class of precision according to each pressure transmitter, temperature sensor and under meter in system, the uncertainty σ of evaluation measuring parameter observed value12,…σ21, result is as shown in table 1.
Utilize the measuring parameter observed value in table 1, the uncertainty of observed value and the equation of constraint of system, it is possible to build data harmonization problem, as follows:
The nonlinear optimization method of belt restraining is utilized to solve this data harmonization problem, the measuring parameter coordination value obtainedAs shown in table 1, unmeasured estimates of parameters y1,y2,…y8As shown in table 2.
Solve the data harmonization minimum target functional value obtained
In present case, the equation of constraint number of system is 10, and unmeasured number of parameters is 8, and system redundancy is 10-8=2. Therefore, under meter failure determination threshold valueTo be degree of freedom be 2 the 1-5% fractile of card side's distribution. Due to data harmonization minimum target functional valueIt is greater than under meter failure determination threshold valueShow that system has under meter generation fault, it is necessary to one by one under meter is carried out fault identification.
When jth under meter is carried out fault identification, measuring parameter corresponding for this under meter is used as unmeasured parameter; Now, the total unmeasured number of parameters of system is 9, and system redundancy is 10-9=1, and new under meter failure determination threshold value isTo be degree of freedom be 1 the 1-5% fractile of card side's distribution. Respectively the under meter that the flow parameter of the flow of final feedwater, the flow of service pump outlet and deoxygenator condensed water entrance is corresponding being carried out fault identification, process is as follows:
1) under meter that the flow of final feedwater is corresponding is carried out fault identification, the flow finally fed water is used as unmeasured parameter, obtains new data harmonization minimum target functional valueNew data harmonization minimum target functional value is greater than under meter failure determination threshold valueShow that other under meter still has fault; Therefore, can not judge that the flow that the flow of final feedwater is corresponding counts fault under meter, it is necessary to continue next under meter is carried out fault identification;
2) under meter that the flow of service pump outlet is corresponding is carried out fault identification, the flow that service pump exports is used as unmeasured parameter, obtains new data harmonization minimum target functional valueNew data harmonization minimum target functional value is less than under meter failure determination threshold valueShow that fault does not occur other under meter; Now, it is possible to judge that the flow that the flow of service pump outlet is corresponding counts fault under meter. Under meter fault identification terminates.

Claims (2)

1. a turbine system under meter fault monitoring method, it is characterised in that the method carries out as follows:
1) gathering the pressure steady state condition, temperature and flow measurement parameter from power plant's online database, measuring parameter comprises: the pressure P of high pressure feed water heater extraction entrance1,P2,…PN, service pump outlet pressure PN+1, deoxygenator extraction entrance pressure PN+2, deoxygenator condensed water entrance pressure PN+3, wherein N is the number of high pressure feed water heater; The temperature T of high pressure feed water heater extraction entrance1,T2,…TN, high pressure feed water heater is to the temperature T of water outN+1,TN+2,…T2N, the hydrophobic outlet of high pressure feed water heater temperature T2N+1,T2N+2,…T3N, service pump outlet temperature T3N+1, deoxygenator extraction entrance temperature T3N+2, deoxygenator condensed water entrance temperature T3N+3; Final flow, the flow of service pump outlet and the flow D of deoxygenator condensed water entrance fed water1,D2,D3; Above-mentioned pressure, temperature and flow measurement parameter are designated as X successively1,X2,…Xn, the observed value of measuring parameter is designated as x1,x2,…xn, wherein n is the number of all measuring parameters;
2) according to the class of precision of pressure transmitter in turbine system, temperature sensor and under meter, the uncertainty of evaluation measuring parameter observed value, is designated as σ respectively12,…σn;
3) in system, unmeasured parameter comprises: the flow d that high pressure feed water heater draws gas1,d2,…dN, the hydrophobic flow d of high pressure feed water heaterN+1,dN+2,…d2N, the flow d that draws gas of deoxygenator2N+1, deaerator feedwater outlet flow d2N+2; Above-mentioned unmeasured parameter is designated as Y successively1,Y2,…Yp, wherein p is the number of all unmeasured parameters;
4) utilize mass balance and the energy balance relations of turbine system mesohigh feedwater heating apparatus, service pump and deoxygenator, and ignore the pressure drop of feedwater side and side of drawing gas in high pressure feed water heater, set up about measuring parameter X1,X2,…XnWith unmeasured parameter Y1,Y2,…YpConstrained equations fm, wherein m is the number of equation of constraint:
fm(X1, X2... Xn, Y1, Y2... Yp)=0 (1)
5) the observed value x of measuring parameter is utilized1, x2... xn, observed value uncertainty σ1, σ2... σnAnd Constrained equations fmCarry out data harmonization calculating so that data harmonization objective functionMinimum, and the coordination value of measuring parameterWith the estimated value y of unmeasured parameter1, y2... ypMeet system restriction system of equations:
s . t . f m ( x ^ 1 , x ^ 2 , ... x ^ n , y 1 , y 2 , ... y p ) = 0
6) the data harmonization minimum target functional value obtained will be solvedWith under meter failure determination threshold valueCompare; Detection thresholdThe 1-α fractile of card side's distribution of to be degree of freedom be r; R is system redundancy, equals the number p that equation of constraint number m subtracts unmeasured parameter, r=m-p; α is the significance level of under meter failure testing; IfShow that fault does not occur under meter;
7) ifShow under meter generation fault, then one by one under meter is carried out fault identification; When jth under meter is carried out fault identification, by measuring parameter X corresponding for this under meterjIt is used as unmeasured parameter Yp+1, re-start data harmonization and calculate:
s . t . f m ( x ^ 1 , x ^ 2 , ... , x j - 1 , x j + 1 , ... , x ^ n , y 1 , y 2 , ... y p , y p + 1 ) = 0
The new data harmonization minimum target functional value obtained will be solvedWith new under meter failure determination threshold valueCompare; IfShowing that fault does not occur other under meter except jth under meter, then identify and occur the flow of fault to count jth under meter, fault identification terminates; IfShow that other under meter except jth under meter still has fault, continue next under meter is carried out fault identification;
8) by step 7) when one by one under meter being carried out fault identification, if all recognition results areShow there is multiple under meter generation fault; Then first judge in first round fault identification processMinimum flow counts fault under meter, and by measuring parameter X corresponding for this under meterjIt is used as unmeasured parameter Yp+1, then by step 7) one by one all the other under meters are carried out next and take turns fault identification, wherein, R takes turns the failure determination threshold value of under meter fault identification and is
9) as the wheel number R=r-1 of the fault identification completed, under meter fault identification terminates.
2. turbine system under meter fault monitoring method according to claim 1, it is characterised in that: data harmonization objective function is the observed value x of each measuring parameter1,x2,…xnWith coordination valueThe weighted quadratic of deviation and; Weighting coefficient is the inverse of the uncertainty square of measuring parameter observed value.
CN201310596063.3A 2013-11-21 2013-11-21 A kind of turbine system under meter fault monitoring method Active CN103674189B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310596063.3A CN103674189B (en) 2013-11-21 2013-11-21 A kind of turbine system under meter fault monitoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310596063.3A CN103674189B (en) 2013-11-21 2013-11-21 A kind of turbine system under meter fault monitoring method

Publications (2)

Publication Number Publication Date
CN103674189A CN103674189A (en) 2014-03-26
CN103674189B true CN103674189B (en) 2016-06-15

Family

ID=50312441

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310596063.3A Active CN103674189B (en) 2013-11-21 2013-11-21 A kind of turbine system under meter fault monitoring method

Country Status (1)

Country Link
CN (1) CN103674189B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105136234B (en) * 2015-05-05 2018-03-16 中国能源建设集团广东省电力设计研究院有限公司 The failure detector of heater water level detector
CN106199241B (en) * 2016-06-24 2019-01-29 清华大学 A kind of electric power station system Multiple faults diagnosis approach based on data harmonization and hypothesis testing
CN106097151B (en) * 2016-06-24 2019-09-20 清华大学 A method of the reduction power plant data uncertainty based on data harmonization
CN106289754B (en) * 2016-09-28 2018-10-30 清华大学 A kind of fired power generating unit component capabilities variation determination method based on Statistical Control Technique
CN111486802B (en) * 2020-04-07 2021-04-06 东南大学 Rotating shaft calibration method based on self-adaptive distance weighting

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2371869A (en) * 2001-01-31 2002-08-07 Abb Automation Ltd Flowmeter fault detection
CN1853098A (en) * 2003-07-18 2006-10-25 罗斯蒙德公司 Process diagnostics
CN1952590A (en) * 2006-11-10 2007-04-25 东北电力大学 On-line monitoring method for variation of through-flow gap of steam turbine
CN102635148A (en) * 2012-03-23 2012-08-15 刘金玉 Flowing time or/and flow-type fluid loss monitoring method and device
CN103256719A (en) * 2013-04-27 2013-08-21 深圳市佳运通电子有限公司 Furnace condition optimizing and monitoring device and method using same for optimizing

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2371869A (en) * 2001-01-31 2002-08-07 Abb Automation Ltd Flowmeter fault detection
CN1853098A (en) * 2003-07-18 2006-10-25 罗斯蒙德公司 Process diagnostics
CN1952590A (en) * 2006-11-10 2007-04-25 东北电力大学 On-line monitoring method for variation of through-flow gap of steam turbine
CN102635148A (en) * 2012-03-23 2012-08-15 刘金玉 Flowing time or/and flow-type fluid loss monitoring method and device
CN103256719A (en) * 2013-04-27 2013-08-21 深圳市佳运通电子有限公司 Furnace condition optimizing and monitoring device and method using same for optimizing

Also Published As

Publication number Publication date
CN103674189A (en) 2014-03-26

Similar Documents

Publication Publication Date Title
CN103674189B (en) A kind of turbine system under meter fault monitoring method
CN104048842B (en) A kind of thermal loss of steam turbine rate on-line monitoring method based on soft-measuring technique
CN201705397U (en) Steam turbine on-line heat rate monitoring device for thermal power plants
CN103440400B (en) Power system short-term risk determination method taking disaster factors into account
Jiang et al. Data reconciliation and gross error detection for operational data in power plants
CN103631681B (en) A kind of method of online reparation abnormal data of wind power plant
CN106053105B (en) A kind of method and system of nuclear power station bleeder heater energy efficiency monitoring and diagnosis
CN103646358A (en) Method for detecting planned maintenance cycle of power grid related to power equipment time-varying failure rate
CN102444885A (en) Method for preventing overtemperature tube explosion in power station boiler piping system furnace
CN104794544A (en) Intelligent algorithm based electricity-larceny-preventive monitoring method for distributed type photovoltaic power generation
CN103103570B (en) Based on the aluminium cell condition diagnostic method of pivot similarity measure
CN104050607A (en) Power distribution network operational risk evaluation method
Jiao et al. Data-driven evaluation for error states of standard electricity meters on automatic verification assembly line
CN106761967B (en) Pusher side steam parameter measured deviation consumes the appraisal procedure and system of coal cost to unit
CN101737311A (en) Method for measuring drainage pump output of low pressure heater system of thermal generator set based on energy balance
CN105160595A (en) Distributed photovoltaic electricity-stealing supervising method based on multi-time scale output estimation
CN104573340A (en) Method for calculating time-variable reliability of power transmission line in freezing weather
CN102928811A (en) Electric energy meter on-site detecting system based on optical fiber communication
CN105158002B (en) A kind of method for diagnosing faults of the Heat Exchanger in Circulating Water System based on vibration signal
CN107895194B (en) Fault diagnosis method for main coolant system of nuclear power plant
CN104459542A (en) Heat rate measurement method for reheating regeneration combined cycle unit
CN103217292A (en) Real-time monitoring method and monitoring system for thermal efficiency indices of generator set
CN104240778A (en) System, method and device for testing properties of condenser used for nuclear power plant
CN105205492A (en) Fuzzy nearest neighbor fusion diagnosis method of thermodynamic system fault
CN103134570B (en) Method for authenticating steam output and consumption in iron and steel enterprises

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant