CN103556641A - 一种既有地下室坑内地下连续墙成槽辅助方法 - Google Patents

一种既有地下室坑内地下连续墙成槽辅助方法 Download PDF

Info

Publication number
CN103556641A
CN103556641A CN201310470452.1A CN201310470452A CN103556641A CN 103556641 A CN103556641 A CN 103556641A CN 201310470452 A CN201310470452 A CN 201310470452A CN 103556641 A CN103556641 A CN 103556641A
Authority
CN
China
Prior art keywords
pile
underground
diaphragm wall
grooving
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310470452.1A
Other languages
English (en)
Inventor
周冠南
崔涛
李有德
赵立华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 13th Bureau Group Co Ltd
Original Assignee
China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 13th Bureau Group Co Ltd filed Critical China Railway 13th Bureau Group Co Ltd
Priority to CN201310470452.1A priority Critical patent/CN103556641A/zh
Publication of CN103556641A publication Critical patent/CN103556641A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

一种既有地下室坑内地下连续墙成槽辅助方法,通过拔桩回填水泥土,压密注浆,三轴搅拌桩槽壁,成槽前预降水加固相结合的方法,使地下连续墙成槽顺利进行;步骤一:根据现场实际水文地质情况,布置降水井,进行预降水施工,使地下水水头低于地下连续墙成槽时的泥浆面;步骤二:用水泥土回填拔桩后产生的孔洞;步骤三:在拔桩孔洞位置进行压密注浆;步骤四:对被拔桩位置侵入的地下连续墙两侧槽壁进行三轴搅拌桩加固;步骤五:进行地下连续墙施工。本发明的优点:适用于在既有地下室底板上施工的深基坑工程,确保地下连续墙成槽施工顺利进行,对工程质量以及施工安全等方面都有可观的价值,工艺成熟,施工效果好。

Description

一种既有地下室坑内地下连续墙成槽辅助方法
技术领域
本发明涉及基坑工程类,具体是涉及既有地下室坑内地下连续墙施工中的一种成槽辅助措施。
背景技术
随着城市地下空间的不断开发利用,出现了大量在原有建(构)筑物上改建的深基坑工程。该类型的深基坑工程施工前需对原有建(构)筑物进行拆除。对原有基坑工程的围护结构和桩基进行拔除会对土体产生严重的扰动,且在原有基坑底板上进行地下连续墙施工将面临地下水水头高于泥浆液面的问题。若不能解决上述问题,则地下连续墙将无法施工或施工质量极差。
经对现有技术的文献检索,发现尚未有以回填水泥土,压密注浆,三轴搅拌桩槽壁加固和成槽前预降水相结合的方法对既有地下室坑内地下连续墙成槽进行辅助的方法。
发明内容
本发明针对既有地下室坑内地下连续墙成槽施工的难点,提出了一系列措施相结合,对成槽施工进行辅助,目的是为了克服该类深基坑工程地下连续墙成槽施工中地下水水头高、原状土扰动大、土体不稳定等难点,使成槽顺利进行,提高地下连续墙施工质量及施工安全,特提供了一种既有地下室坑内地下连续墙成槽辅助方法。
本发明提供了一种既有地下室坑内地下连续墙成槽辅助方法,其特征在于:所述的既有地下室坑内地下连续墙成槽辅助方法,通过拔桩回填水泥土,压密注浆,三轴搅拌桩槽壁,成槽前预降水加固相结合的方法,使地下连续墙成槽顺利进行;
步骤一:根据现场实际水文地质情况,布置降水井,进行预降水施工,使地下水水头低于地下连续墙成槽时的泥浆面;
步骤二:用水泥土回填拔桩后产生的孔洞;
步骤三:在拔桩孔洞位置进行压密注浆;
步骤四:对被拔桩位置侵入的地下连续墙两侧槽壁进行三轴搅拌桩加固;
步骤五:进行地下连续墙施工。
所述的三轴搅拌桩平行紧贴于地下连续墙槽壁,并预留8~12cm;降水井井口高出地面0.3~0.5m,井壁外围采用粘土封填,其深度不小于2.0m;井管采用钢管,直径250~300mm;滤水管采用圆孔滤水管,直径250~300mm,外包60目尼龙滤网;砾料从井底向上至含水层顶以上1m围填中粗砂;沉淀管与滤水管同径,长度0.8~1.5m,沉淀管底部加盖封堵;水泥土土方选用不得有大于5cm以上的块体,不得有建筑垃圾掺合物,水泥采用32.5以上的普通硅酸盐水泥;水泥掺量控制在7~9%,强度为0.4~0.6MPa;压密注浆深度与拔除的桩基深度相同,浆液水灰比0.55,注浆压力0.2~0.3MPa,确保成孔、成槽质量;三轴搅拌桩槽壁加固采用Φ850600的型式,桩心偏位不超过40mm,垂直度误差不得超过1/200的桩长。
本发明的优点:
本发明所述的既有地下室坑内地下连续墙成槽辅助方法,适用于在既有地下室底板上施工的深基坑工程,克服该类深基坑工程地下连续墙成槽施工中地下水水头高、原状土扰动大、土体不稳定等难点,使成槽顺利进行,提高地下连续墙施工质量及施工安全。通过拔桩回填水泥土,压密注浆,三轴搅拌桩槽壁,成槽前预降水加固相结合的方法,确保地下连续墙成槽施工顺利进行,对工程质量以及施工安全等方面都有可观的价值,工艺成熟,施工效果好。
附图说明
下面结合附图及实施方式对本发明作进一步详细的说明:
图1是既有地下室坑内地下连续墙成槽辅助方法降水井布置示例图;
图2是既有地下室坑内地下连续墙成槽辅助方法三轴搅拌桩槽壁加固示例图;
图3是既有地下室坑内地下连续墙成槽辅助方法工序流程图。
具体实施方式
实施例1
本实施例提供了一种既有地下室坑内地下连续墙成槽辅助方法,其特征在于:所述的既有地下室坑内地下连续墙成槽辅助方法,通过拔桩回填水泥土,压密注浆,三轴搅拌桩槽壁,成槽前预降水加固相结合的方法,使地下连续墙成槽顺利进行;
步骤一:根据现场实际水文地质情况,布置降水井,进行预降水施工,使地下水水头低于地下连续墙成槽时的泥浆面;
步骤二:用水泥土回填拔桩后产生的孔洞;
步骤三:在拔桩孔洞位置进行压密注浆;
步骤四:对被拔桩位置侵入的地下连续墙两侧槽壁进行三轴搅拌桩加固;
步骤五:进行地下连续墙施工。
所述的三轴搅拌桩平行紧贴于地下连续墙槽壁,并预留8cm;降水井井口高出地面0.3m,井壁外围采用粘土封填,其深度不小于2.0m;井管采用钢管,直径250mm;滤水管采用圆孔滤水管,直径250mm,外包60目尼龙滤网;砾料从井底向上至含水层顶以上1m围填中粗砂;沉淀管与滤水管同径,长度0.8m,沉淀管底部加盖封堵;水泥土土方选用不得有大于5cm以上的块体,不得有建筑垃圾掺合物,水泥采用32.5以上的普通硅酸盐水泥;水泥掺量控制在7%,强度为0.4MPa;压密注浆深度与拔除的桩基深度相同,浆液水灰比0.55,注浆压力0.2MPa,确保成孔、成槽质量;三轴搅拌桩槽壁加固采用Φ850600的型式,桩心偏位不超过40mm,垂直度误差不得超过1/200的桩长。
实施例2
本实施例提供了一种既有地下室坑内地下连续墙成槽辅助方法,其特征在于:所述的既有地下室坑内地下连续墙成槽辅助方法,通过拔桩回填水泥土,压密注浆,三轴搅拌桩槽壁,成槽前预降水加固相结合的方法,使地下连续墙成槽顺利进行;
步骤一:根据现场实际水文地质情况,布置降水井,进行预降水施工,使地下水水头低于地下连续墙成槽时的泥浆面;
步骤二:用水泥土回填拔桩后产生的孔洞;
步骤三:在拔桩孔洞位置进行压密注浆;
步骤四:对被拔桩位置侵入的地下连续墙两侧槽壁进行三轴搅拌桩加固;
步骤五:进行地下连续墙施工。
所述的三轴搅拌桩平行紧贴于地下连续墙槽壁,并预留10cm;降水井井口高出地面0.4m,井壁外围采用粘土封填,其深度不小于2.0m;井管采用钢管,直径273mm;滤水管采用圆孔滤水管,直径273mm,外包60目尼龙滤网;砾料从井底向上至含水层顶以上1m围填中粗砂;沉淀管与滤水管同径,长度1m,沉淀管底部加盖封堵;水泥土土方选用不得有大于5cm以上的块体,不得有建筑垃圾掺合物,水泥采用32.5以上的普通硅酸盐水泥;水泥掺量控制在8%,强度为0.5MPa;压密注浆深度与拔除的桩基深度相同,浆液水灰比0.55,注浆压力0.25MPa,确保成孔、成槽质量;三轴搅拌桩槽壁加固采用Φ850600的型式,桩心偏位不超过40mm,垂直度误差不得超过1/200的桩长。
实施例3
本实施例提供了一种既有地下室坑内地下连续墙成槽辅助方法,其特征在于:所述的既有地下室坑内地下连续墙成槽辅助方法,通过拔桩回填水泥土,压密注浆,三轴搅拌桩槽壁,成槽前预降水加固相结合的方法,使地下连续墙成槽顺利进行;
步骤一:根据现场实际水文地质情况,布置降水井,进行预降水施工,使地下水水头低于地下连续墙成槽时的泥浆面;
步骤二:用水泥土回填拔桩后产生的孔洞;
步骤三:在拔桩孔洞位置进行压密注浆;
步骤四:对被拔桩位置侵入的地下连续墙两侧槽壁进行三轴搅拌桩加固;
步骤五:进行地下连续墙施工。
所述的三轴搅拌桩平行紧贴于地下连续墙槽壁,并预留12cm;降水井井口高出地面0.5m,井壁外围采用粘土封填,其深度不小于2.0m;井管采用钢管,直径300mm;滤水管采用圆孔滤水管,直径300mm,外包60目尼龙滤网;砾料从井底向上至含水层顶以上1m围填中粗砂;沉淀管与滤水管同径,长度1.5m,沉淀管底部加盖封堵;水泥土土方选用不得有大于5cm以上的块体,不得有建筑垃圾掺合物,水泥采用32.5以上的普通硅酸盐水泥;水泥掺量控制在9%,强度为0.6MPa;压密注浆深度与拔除的桩基深度相同,浆液水灰比0.55,注浆压力0.3MPa,确保成孔、成槽质量;三轴搅拌桩槽壁加固采用Φ850600的型式,桩心偏位不超过40mm,垂直度误差不得超过1/200的桩长。

Claims (2)

1.一种既有地下室坑内地下连续墙成槽辅助方法,其特征在于:所述的既有地下室坑内地下连续墙成槽辅助方法,通过拔桩回填水泥土,压密注浆,三轴搅拌桩槽壁,成槽前预降水加固相结合的方法,使地下连续墙成槽顺利进行;步骤一:根据现场实际水文地质情况,布置降水井,进行预降水施工,使地下水水头低于地下连续墙成槽时的泥浆面;步骤二:用水泥土回填拔桩后产生的孔洞;步骤三:在拔桩孔洞位置进行压密注浆;步骤四:对被拔桩位置侵入的地下连续墙两侧槽壁进行三轴搅拌桩加固;步骤五:进行地下连续墙施工。
2.按照权利要求1所述的既有地下室坑内地下连续墙成槽辅助方法,其特征在于:所述的三轴搅拌桩平行紧贴于地下连续墙槽壁,并预留8~12cm;降水井井口高出地面0.3~0.5m,井壁外围采用粘土封填,其深度不小于2.0m;井管采用钢管,直径250~300mm;滤水管采用圆孔滤水管,直径250~300mm,外包60目尼龙滤网;砾料从井底向上至含水层顶以上1m围填中粗砂;沉淀管与滤水管同径,长度0.8~1.5m,沉淀管底部加盖封堵;水泥土土方选用不得有大于5cm以上的块体,不得有建筑垃圾掺合物,水泥采用32.5以上的普通硅酸盐水泥;水泥掺量控制在7~9%,强度为0.4~0.6MPa;压密注浆深度与拔除的桩基深度相同,浆液水灰比0.55,注浆压力0.2~0.3MPa,确保成孔、成槽质量;三轴搅拌桩槽壁加固采用Φ850600的型式,桩心偏位不超过40mm,垂直度误差不得超过1/200的桩长。
CN201310470452.1A 2013-10-09 2013-10-09 一种既有地下室坑内地下连续墙成槽辅助方法 Pending CN103556641A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310470452.1A CN103556641A (zh) 2013-10-09 2013-10-09 一种既有地下室坑内地下连续墙成槽辅助方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310470452.1A CN103556641A (zh) 2013-10-09 2013-10-09 一种既有地下室坑内地下连续墙成槽辅助方法

Publications (1)

Publication Number Publication Date
CN103556641A true CN103556641A (zh) 2014-02-05

Family

ID=50010978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310470452.1A Pending CN103556641A (zh) 2013-10-09 2013-10-09 一种既有地下室坑内地下连续墙成槽辅助方法

Country Status (1)

Country Link
CN (1) CN103556641A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612179A (zh) * 2014-12-31 2015-05-13 上海市机械施工集团有限公司 贯穿超厚粉砂层的地下连续墙的施工方法
CN104831762A (zh) * 2015-04-30 2015-08-12 宁波大学 深基坑承压水降水动态监测系统及监测方法
CN105696550A (zh) * 2014-11-27 2016-06-22 五冶集团上海有限公司 一种辅助加固地下连续墙成槽的三轴搅拌桩施工方法
CN115595983A (zh) * 2022-11-11 2023-01-13 中建四局土木工程有限公司(Cn) 一种富水松软地质防塌成槽的施工改进方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11247168A (ja) * 1998-03-03 1999-09-14 Toto Denki Kogyo Kk スライムの試料採取装置
CN101070704A (zh) * 2007-06-04 2007-11-14 上海地矿工程勘察有限公司 可控式一井分层降水施工方法
CN101629421A (zh) * 2009-08-04 2010-01-20 上海隧道工程股份有限公司 利用全回转钻机拔除深桩基的方法
CN101736746A (zh) * 2009-12-04 2010-06-16 上海智平基础工程有限公司 振动沉管高压注浆托换拔桩的施工方法
CN101761083A (zh) * 2008-12-24 2010-06-30 上海市基础工程公司 穿越超厚障碍物的地下连续墙清障施工方法
CN101761069A (zh) * 2008-12-24 2010-06-30 上海市申江两岸开发建设投资(集团)有限公司 三墙合一地下连续墙施工方法
CN101886390A (zh) * 2010-06-12 2010-11-17 中铁十六局集团有限公司 狭小空间全套管静压拔桩技术

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11247168A (ja) * 1998-03-03 1999-09-14 Toto Denki Kogyo Kk スライムの試料採取装置
CN101070704A (zh) * 2007-06-04 2007-11-14 上海地矿工程勘察有限公司 可控式一井分层降水施工方法
CN101761083A (zh) * 2008-12-24 2010-06-30 上海市基础工程公司 穿越超厚障碍物的地下连续墙清障施工方法
CN101761069A (zh) * 2008-12-24 2010-06-30 上海市申江两岸开发建设投资(集团)有限公司 三墙合一地下连续墙施工方法
CN101629421A (zh) * 2009-08-04 2010-01-20 上海隧道工程股份有限公司 利用全回转钻机拔除深桩基的方法
CN101736746A (zh) * 2009-12-04 2010-06-16 上海智平基础工程有限公司 振动沉管高压注浆托换拔桩的施工方法
CN101886390A (zh) * 2010-06-12 2010-11-17 中铁十六局集团有限公司 狭小空间全套管静压拔桩技术

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中铁十七局集团有限公司上海轨道交通7号线12C标项目经理部: "春塘河处理方案", 《豆丁网》, 13 May 2011 (2011-05-13) *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696550A (zh) * 2014-11-27 2016-06-22 五冶集团上海有限公司 一种辅助加固地下连续墙成槽的三轴搅拌桩施工方法
CN105696550B (zh) * 2014-11-27 2017-08-25 五冶集团上海有限公司 一种辅助加固地下连续墙成槽的三轴搅拌桩施工方法
CN104612179A (zh) * 2014-12-31 2015-05-13 上海市机械施工集团有限公司 贯穿超厚粉砂层的地下连续墙的施工方法
CN104831762A (zh) * 2015-04-30 2015-08-12 宁波大学 深基坑承压水降水动态监测系统及监测方法
CN115595983A (zh) * 2022-11-11 2023-01-13 中建四局土木工程有限公司(Cn) 一种富水松软地质防塌成槽的施工改进方法

Similar Documents

Publication Publication Date Title
CN102051886B (zh) 一种轻型井点降水施工方法
CN103526766B (zh) 一种深基坑减压井封堵方法
CN104278667A (zh) 一种地下溶洞的充填处理方法
CN101070704A (zh) 可控式一井分层降水施工方法
CN102383412A (zh) 采用降水回灌控制深基坑周边沉降的施工方法
CN110735600B (zh) 一种用于喀斯特地质的机械成孔桩施工工艺
CN104963346A (zh) 复杂地质的深基坑围护施工方法
CN105714748A (zh) 一种碎石沙土层中的调压井开挖施工方法
CN103215945B (zh) 非均质场地软土地基立体式组合动力排水固结系统和方法
CN103556641A (zh) 一种既有地下室坑内地下连续墙成槽辅助方法
CN107794946A (zh) 一种深埋于软土中的地下综合管廊结构及其施工方法
CN104264653A (zh) 超高能级强夯与置换兼容施工工艺
CN108867673A (zh) 一种基于抽水帷幕的基坑中地下水治理方法
CN104711968A (zh) 一种负压立体导流扰动冲击固结吹填土方法
CN101591906A (zh) 一次插管、多遍真空井点降水动力固结的地基处理方法
CN108104144A (zh) 基于降压减渗的强透水地层深基坑地下水控制方法及结构
CN105971637A (zh) Wss工法在富水砂层盾构端头加固中的应用
CN101597903B (zh) 一种用于基坑支护的筒体浆芯桩施工方法
CN104141300A (zh) 一种基桩钻孔施工工艺
CN103898915B (zh) 建筑物小面积深基坑抗浮止水施工方法
CN101319501B (zh) 深基坑施工方法
CN107190709B (zh) 新近疏浚土吹填成陆围区内建设河道的方法
CN106869153B (zh) 一种井点降水快速处理软地基的方法
CN105040705A (zh) 多溶洞地质条件下地基基础处理施工工艺
CN203247575U (zh) 非均质场地软土地基立体式组合动力排水固结系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140205