CN103526721B - 一种透水桩基丁坝 - Google Patents

一种透水桩基丁坝 Download PDF

Info

Publication number
CN103526721B
CN103526721B CN201310521749.6A CN201310521749A CN103526721B CN 103526721 B CN103526721 B CN 103526721B CN 201310521749 A CN201310521749 A CN 201310521749A CN 103526721 B CN103526721 B CN 103526721B
Authority
CN
China
Prior art keywords
basis
groynes
antiscour
requires
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310521749.6A
Other languages
English (en)
Other versions
CN103526721A (zh
Inventor
雷运华
李家亮
郭建和
聂强
王小波
付峥
孙士国
程保根
魏丽琴
梁娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201310521749.6A priority Critical patent/CN103526721B/zh
Publication of CN103526721A publication Critical patent/CN103526721A/zh
Application granted granted Critical
Publication of CN103526721B publication Critical patent/CN103526721B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

本发明公开了一种桩基丁坝,尤其是公开了一种透水桩基丁坝,属于水利水电工程建筑物设计施工技术领域。提供一种能对不满足抗冲刷要求的基础进行有效加固,提高其抗冲刷能力的透水桩基丁坝。所述透水桩基丁坝,包括岸坡和与该岸坡的坡脚相连接的不满足抗冲刷要求的基础,还包括由至少三根加固桩构成的不连续加固桩群,所述不连续加固桩群的各根加固桩均沿竖直方向布置在所述的不满足抗冲刷要求的基础中。

Description

一种透水桩基丁坝
技术领域
本发明涉及一种桩基丁坝,尤其是涉及一种透水桩基丁坝,属于水利水电工程建筑物设计施工技术领域。
背景技术
目前在水利水电工程中,为了避免或减轻水流对岸坡及其坡脚或对其他建筑物及其基础的淘刷,需设置丁坝改变水流方向,但由于岸坡坡脚或其他建筑物基础抗冲刷能力较差,直接在该基础上抛填块石、码砌钢筋石笼、浇筑混凝土结构等形成的丁坝均易随着基础的淘刷而垮塌,达不到改变水流方向保护岸坡的目的,从而带来较严重的后果,如产生经济损失或相邻建筑物垮塌带来经济损失和社会负面影响等。因此,采用透水桩基丁坝,即可加固基础,改善该基础的抗冲刷能力,又可确保改变水流方向,达到防掏刷目的。
发明内容
本发明所要解决的技术问题是:提供一种能对不满足抗冲刷要求的基础进行有效加固,提高其抗冲刷能力的透水桩基丁坝。
为解决上述技术问题所采用的技术方案是:一种透水桩基丁坝,包括岸坡和与该岸坡的坡脚相连接的不满足抗冲刷要求的基础,还包括由至少三根加固桩构成的不连续加固桩群,所述不连续加固桩群的各根加固桩均沿竖直方向布置在所述的不满足抗冲刷要求的基础中。
进一步的是,所述的加固桩为通过机械设备压入所述的不满足抗冲刷要求的基础中的预制混凝土桩,或者为现浇在所述的不满足抗冲刷要求的基础中的灌浆桩。
进一步的是,所述透水桩基丁坝还包括混凝土坝面,所述不连续加固桩群的各根加固桩均具有一个伸出端,所述的伸出端向上伸出所述的不满足抗冲刷要求的基础的上表面,所述混凝土坝面支撑在所述伸出端的顶部。
进一步的是,所述混凝土坝面与所述的各根加固桩的伸出端现浇连接。
进一步的是,在所述混凝土坝面的上游侧还布置有挡水墙,在所述的挡水墙上设置有沿水流方向的过水孔。
进一步的是,所述挡水墙与所述的混凝土坝面为一体结构。
进一步的是,所述挡水墙的端部和所述的混凝土坝面的端部分别与对应部位的岸坡或岸坡坡脚连接。
本发明的有益效果是:由于在所述的不满足抗冲刷要求的基础中布置了由至少三根加固桩构成的不连续加固桩群,这样,通过所述的不连续加固桩群的各根加固柱,可以将所述的不满足抗冲刷要求的基础连接成一个牢固的整体,实现对所述的不满足抗冲刷要求的基础的有效加固,达到提高所述的不满足抗冲刷要求的基础的抗冲刷能力。
附图说明
图1为本发明一种透水桩基丁坝的平面布置图;
图2为图1的1-1剖视图;
图3为图2的2-2剖视图。
图中标记为:岸坡1、不满足抗冲刷要求的基础2、加固桩3、不连续加固桩群4、混凝土坝面5、伸出端6、挡水墙7、过水孔8。
具体实施方式
如图1、图2以及图3所示是本发明提供的一种能对不满足抗冲刷要求的基础进行有效加固,提高其抗冲刷能力的透水桩基丁坝。所述透水桩基丁坝包括岸坡1和与该岸坡1的坡脚相连接的不满足抗冲刷要求的基础2,还包括由至少三根加固桩3构成的不连续加固桩群4,所述不连续加固桩群4的各根加固桩3均沿竖直方向布置在所述的不满足抗冲刷要求的基础2中。由于在所述的不满足抗冲刷要求的基础2中布置了由至少三根加固桩3构成的不连续加固桩群4,这样,通过所述的不连续加固桩群4的各根加固柱3,可以将所述的不满足抗冲刷要求的基础2连接成一个牢固的整体,实现对所述的不满足抗冲刷要求的基础2的有效加固,达到提高所述的不满足抗冲刷要求的基础的抗冲刷能力。
上述实施方式中,为了能有效的改变水流的流向,以减轻水流对与所述岸坡1的坡脚相连接的不满足抗冲刷要求的基础2的冲刷程度,将所述不连续加固桩群4的各根加固桩3均设置一个伸出端6,并使所述的伸出端6向上伸出所述的不满足抗冲刷要求的基础2的上表面,然后再设置一个混凝土坝面5,使所述混凝土坝面5支撑在所述伸出端6的顶部;而且将所述混凝土坝面5与所述的各根加固桩3的伸出端6设置成现浇连接结构。这样,下部淘刷所述各根加固桩之间的不满足抗冲刷要求的基础2后的水流从所述不连续加固桩群之间通过,达到扰乱水流和损失水流能量的目的,从而保护岸坡及其坡脚或其他建筑物及其基础不被破坏。
进一步的,为了最大限度的提高所述透水桩基丁坝的扰乱水流和损失水流能量的能力,进而提高所述不满足抗冲刷要求的基础2的抗冲刷能力,以保护岸坡及其坡脚或其他建筑物及其基础不被破坏,在所述混凝土坝面5的上游侧还布置有挡水墙7,在所述的挡水墙7上设置有沿水流方向的过水孔8;并且将所述挡水墙7与所述的混凝土坝面5为一体结构;然后再将所述挡水墙7的端部和所述的混凝土坝面5的端部分别与对应部位的岸坡1或岸坡坡脚连接。同时,将所述的混凝土坝面5与所述的混凝土坝面5为一体结构,将所述挡水墙7的端部和所述的混凝土坝面5的端部分别与对应部位的岸坡1或岸坡坡脚连接,还可以有效的提高所述透水桩基丁坝自身的强度和抗冲击能力。
结合现有的岸坡加固结构技术,所述的加固桩3可以为通过机械设备压入所述的不满足抗冲刷要求的基础2中的预制混凝土桩,也可以为现浇在所述的不满足抗冲刷要求的基础2中的灌浆桩。

Claims (4)

1.一种透水桩基丁坝,包括岸坡(1)和与该岸坡(1)的坡脚相连接的不满足抗冲刷要求的基础(2),其特征在于:还包括由至少三根加固桩(3)构成的不连续加固桩群(4),所述不连续加固桩群(4)的各根加固桩(3)均沿竖直方向布置在所述的不满足抗冲刷要求的基础(2)中,所述透水桩基丁坝还包括混凝土坝面(5),所述不连续加固桩群(4)的各根加固桩(3)均具有一个伸出端(6),所述的伸出端(6)向上伸出所述的不满足抗冲刷要求的基础(2)的上表面,所述混凝土坝面(5)支撑在所述伸出端(6)的顶部,其特征在于:所述混凝土坝面(5)与所述的各根加固桩(3)的伸出端(6)现浇连接,在所述混凝土坝面(5)的上游侧还布置有挡水墙(7),在所述的挡水墙(7)上设置有沿水流方向的过水孔(8)。
2.根据权利要求1所述的一种透水桩基丁坝,其特征在于:所述的加固桩(3)为通过机械设备压入所述的不满足抗冲刷要求的基础(2)中的预制混凝土桩,或者为现浇在所述的不满足抗冲刷要求的基础(2)中的灌浆桩。
3.根据权利要求1所述的一种透水桩基丁坝,其特征在于:所述挡水墙(7)与所述的混凝土坝面(5)为一体结构。
4.根据权利要求3所述的一种透水桩基丁坝,其特征在于:所述挡水墙(7)的端部和所述的混凝土坝面(5)的端部分别与对应部位的岸坡(1)或岸坡坡脚连接。
CN201310521749.6A 2013-10-29 2013-10-29 一种透水桩基丁坝 Active CN103526721B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310521749.6A CN103526721B (zh) 2013-10-29 2013-10-29 一种透水桩基丁坝

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310521749.6A CN103526721B (zh) 2013-10-29 2013-10-29 一种透水桩基丁坝

Publications (2)

Publication Number Publication Date
CN103526721A CN103526721A (zh) 2014-01-22
CN103526721B true CN103526721B (zh) 2016-01-20

Family

ID=49929041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310521749.6A Active CN103526721B (zh) 2013-10-29 2013-10-29 一种透水桩基丁坝

Country Status (1)

Country Link
CN (1) CN103526721B (zh)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213586B (zh) * 2014-09-18 2016-08-24 东南大学 一种桩基冲刷防护措施方法
CN106120640A (zh) * 2016-06-29 2016-11-16 上海朗兆公路铁路养护工程技术有限公司 一种防治山区河流桥梁基础冲刷的施工方法
CN106677121B (zh) * 2016-12-30 2018-12-28 浙江海洋大学 防护海岸侵蚀的活动式透水丁坝结构及施工方法
CN106939579B (zh) * 2017-02-28 2019-07-12 河海大学 一种平行埋管型透水丁坝
CN106939580B (zh) * 2017-02-28 2019-07-12 河海大学 一种交错埋管型透水丁坝
CN109338986A (zh) * 2018-11-21 2019-02-15 交通运输部天津水运工程科学研究所 十字板桩生态型丁坝
CN109778774B (zh) * 2019-03-11 2020-07-28 交通运输部天津水运工程科学研究所 一种透水丁坝结构
CN113047331A (zh) * 2021-03-19 2021-06-29 中交第二航务工程勘察设计院有限公司 一种组合式防波堤堤头导航灯桩基础结构

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101775788A (zh) * 2010-02-10 2010-07-14 王军 一种块石-钢筋混凝土排桩复合型丁坝护岸结构
JP2012097433A (ja) * 2010-10-29 2012-05-24 Sumitomo Denko Steel Wire Kk コンクリート構造物の補強体、コンクリート構造物の補強構造、およびコンクリート構造物の補強方法
CN202430683U (zh) * 2011-12-21 2012-09-12 杨梦云 水下承台式护岸设施
CN102912762A (zh) * 2012-10-29 2013-02-06 长江航道规划设计研究院 桩群透水框架坝及其施工方法
CN103195077A (zh) * 2013-04-02 2013-07-10 中国水电顾问集团中南勘测设计研究院 一种坝基加固框架结构和坝基加固方法
CN203530921U (zh) * 2013-10-29 2014-04-09 中国水电顾问集团成都勘测设计研究院有限公司 一种透水桩基丁坝

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101775788A (zh) * 2010-02-10 2010-07-14 王军 一种块石-钢筋混凝土排桩复合型丁坝护岸结构
JP2012097433A (ja) * 2010-10-29 2012-05-24 Sumitomo Denko Steel Wire Kk コンクリート構造物の補強体、コンクリート構造物の補強構造、およびコンクリート構造物の補強方法
CN202430683U (zh) * 2011-12-21 2012-09-12 杨梦云 水下承台式护岸设施
CN102912762A (zh) * 2012-10-29 2013-02-06 长江航道规划设计研究院 桩群透水框架坝及其施工方法
CN103195077A (zh) * 2013-04-02 2013-07-10 中国水电顾问集团中南勘测设计研究院 一种坝基加固框架结构和坝基加固方法
CN203530921U (zh) * 2013-10-29 2014-04-09 中国水电顾问集团成都勘测设计研究院有限公司 一种透水桩基丁坝

Also Published As

Publication number Publication date
CN103526721A (zh) 2014-01-22

Similar Documents

Publication Publication Date Title
CN103526721B (zh) 一种透水桩基丁坝
CN204023501U (zh) 一种用于土石坝的除险加固防渗处理结构
CN103510528A (zh) 用于地下结构抗浮的盲沟排水结构
CN105220654A (zh) 一种土石坝的加固结构及其施工方法
CN203530921U (zh) 一种透水桩基丁坝
CN204898614U (zh) 用于泥石流河道防护的拦挡坝
CN106758624A (zh) 钢筋混凝土桩‑水泥土桩分区组合式复合地基
CN202730785U (zh) 用于地下结构抗浮的盲沟排水结构
CN107700434B (zh) 一种拱形格栅式钢筋混凝土泥石流拦挡坝及其建筑方法
CN104947631A (zh) 用于泥石流河道防护的拦挡坝及其施工方法
CN204112363U (zh) 一种砖体及其构成的挡墙、拦挡坝、河堤、排导槽
CN104695379A (zh) 生态河道护岸结构
CN203145027U (zh) 用于土石围堰的防冲结构
CN105421305A (zh) 一种桩板平面与立面交错组合的辅助消能工
CN106978796B (zh) 一种快速稳固大坝的方法
CN105019466A (zh) 一种土石围堰防渗体系的构筑方法及结构
CN104532798A (zh) 一种柔性拦渣坝结构及其施工方法
CN204212105U (zh) 柔性装配式护坡结构
CN205116201U (zh) 一种沉井施工装置
CN204715304U (zh) 一种围堰护坡结构
CN204174577U (zh) 水利工程用的组合式砌块墙
CN203603162U (zh) 一种位于基坑边的施工电梯荷载基础系统
CN205329634U (zh) 一种新型生态理砌石护坡
CN204238265U (zh) 地基结构
CN203855931U (zh) 立体插接式驳岸

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant after: Co., Ltd of Chengdu survey and design academy of electricity Jian group of China

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant before: Chengdu Hydroelectric Investigation & Design Institute of SPC

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC TO: CHINA POWER GROUP CHENGDU INVESTIGATION DESIGN + RESEARCH INSTITUTE CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant