CN103326809B - A kind of Notification Method and device of Physical Uplink Control Channel Power Control signaling - Google Patents
A kind of Notification Method and device of Physical Uplink Control Channel Power Control signaling Download PDFInfo
- Publication number
- CN103326809B CN103326809B CN201210077715.8A CN201210077715A CN103326809B CN 103326809 B CN103326809 B CN 103326809B CN 201210077715 A CN201210077715 A CN 201210077715A CN 103326809 B CN103326809 B CN 103326809B
- Authority
- CN
- China
- Prior art keywords
- user
- downlink control
- control channel
- information
- signaling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
Method, base station and the user equipment of the Power Control signaling of the invention for providing a kind of Notification Method of the Power Control signaling of ascending control channel, handling ascending control channel, the Notification Method include:Base station prestores the mapping relations of dynamic instruction information and the Power Control signaling of more set Physical Uplink Control Channel, and the dynamic instruction information includes the configuration information and/or Downlink Control Information parameter of ascending control information;The Power Control signaling for covering alternative Physical Uplink Control Channel more is issued to user equipment by the proprietary and/or public high-level signaling of user;The dynamic instruction information for the user equipment is issued to the user equipment, indicates a set of Power Control signaling as user equipment actual use in the alternative Power Control signaling of more sets.By the present invention can base station side and end side the Power Control signaling that indicates and use reach unification.
Description
Technical field
The present invention relates to the communications field, in particular to a kind of Physical Uplink Control Channel (Physical Uplink
Control Channel, abbreviation PUCCH) Power Control signaling Notification Method and device.
Background technology
Long evolving system (Long Term Evolution, abbreviation LTE) defines PDCCH (Physical
Downlink control channel, Physical Downlink Control Channel) dispatching distribution and other control information are carried, each
PDCCH is made up of several CCE (Control Channel Element, control channel unit), the CCE numbers of each subframe
Determined by PDCCH quantity and downlink bandwidth.
UE (user equipment) by search space blind Detecting obtain PDCCH, search space is divided into public search space
With UE dedicated search space, public search space refers to the region that all UE can be searched, and what this space carried is cell
Proprietary Information.Dedicated search space is the spatial dimension that single UE can be searched, and multiple UE dedicated search space is possible to weight
Folded, simply general initial searching position is different.Before blind check, UE mode of operations are notified and for PDCCH's by high-level signaling
Radio Network Temporary Identifier (the Radio of CRC (Cyclic Redundancy Check, abbreviation CRC) scrambling
Network Temporary Identity, abbreviation RNTI) type.
Search spaceWith aggregation level L and candidate's PDCCH quantity M(L)Between relation be shown in Table 1.Aggregation level is PDCCH
CCE number of occupancy.When carrying out blind Detecting in user's dedicated search space, user equipment identifies (UE ID) according to user first
Blind check initial position Y is calculated with subframe numbers etc.k, then detected in search space, oneself given until detecting
Untill PDCCH.
Table 1.PDCCH Candidate Sets
The correspondence of relative position of the first control channel unit of aggregation level and PDCCH in user's dedicated search space
Relation is shown in Table 2.Relative position of the first control channel unit of PDCCH in user's dedicated search space refers to PDCCH occupancy
First CCE indexes nCCEWith blind check initial position YkRelative position, use n hereinCCE, offsetRepresent, nCCE, offset=nCCE-
Yk, nCCE, offsetSpan be 0~6,8,10.
The aggregation level of table 2 and the corresponding relation of first CCE position
Aggregation level | Relative positions of first CCE in user's dedicated search space |
L=1 | nCCE, offset=0/1/2/3/4/5 |
L=2 | nCCE, offset=0/2/4/6/8/10 |
L=3 | nCCE, offset=0/4 |
L=4 | nCCE, offset=0/8 |
LTE uplink physical channel include Physical Random Access Channel (Physical Random Access Channel,
Abbreviation PRACH), Physical Shared Channel (Physical uplink shared channel, abbreviation PUSCH), physical uplink control
Channel (Physical Uplink Control Channel, abbreviation PUCCH) processed.
In LTE R8/R9/R10 protocol versions, PUCCH channel formats can be divided into three major types, totally seven kinds:The first kind includes
Three kinds of forms, i.e. format1, format1a, format1b, the second class equally also include three kinds of forms, i.e. format2,
Format2a, format2b, the 3rd class include a kind of form format3.First kind PUCCH asks for transmitting and scheduling
(Scheduling Request, abbreviation SR) and confirm (Acknowledgement, abbreviation ACK)/non-acknowledgement (Negative
Acknowledgement, abbreviation NACK) signaling.Second class PUCCH is mainly used in transmitting channel state information (Channel
State Information, abbreviation CSI).3rd class PUCCH is mainly used in transmitting multiple ACK/NACK under carrier aggregation scene
Signaling.
In LTE R8/R9/R10 protocol versions, the corresponding PUCCH channel of a user equipment, believe for PUCCH
Road, different UE can be carried out by the mode of code division multiplexing (Code Division Multiplexing, abbreviation CDM) in cell
Multiplexing, i.e., using different cyclically shifted sequences (CS) or different orthogonal code (OC).Here different cyclically shifted sequences refer to
Be different cyclic shifts corresponding to same root sequence.Root sequence is the CG-CAZAC (Computer- of length=12
Generated Constant Amplitude Zero Auto-Correlation, the constant amplitude zero auto-correlation of computer generation)
Sequence, it is orthogonal between the different cyclic shifts of same root sequence, it is nonopiate between different root sequences.According to current PUCCH signalings
Collocation method, PUCCH sequence group # are determined by cell ID, therefore PUCCH root sequence corresponds with cell ID.Cause
This, achievable orthogonal between the PUCCH in same cell, when cell ID is different, minizone PUCCH is nonopiate.
In Rel-10 version LTE protocols, uplink power control be mainly used in compensate channel path loss (Path Loss,
Abbreviation PL) and shadow fading, and for suppressing inter-cell interference.When subframe i sends PUCCH to serving cell c, transmit power
Control process formula is:
The unit of above formula is dBm, wherein,
PCMAX, c(i):The maximum allowable transmit power determined by UE power grade.
h(nCQI, nHARQ, nSR) it is the value related to PUCCH format, determined by the PUCCH specifying information bit numbers carried.
PO_PUCCH:Represent to meet that channel passes when considering path loss impacts (assuming that in base station side UE) on this carrier wave
Defeated UE when requiring minimum emissive power, PO_PUCCH=PO_NOMINAL_PUCCH+PO_UE_PUCCH, wherein,
PO_NOMINAL_PUCCH:It is the parameter proprietary for determining the cell of UE minimum emissive powers, to institute in same cell
There is UE that identical value is set, by proprietary (cell-specific) RRC of cell (Radio Resource Control, wireless money
Source controls) signal, span:[- 127, -96];It is the amount (cell specific) related to cell, to same
All UE set identical value in cell, and scope is [- 126,24] dBm, and granularity is 1dB, it is possible to is represented with 8bit.
PO_UE_PUCCH:It is the parameter proprietary for determining the user of UE minimum emissive powers, by the proprietary (UE- of user
Specific) RRC signaling notifies, span:[- 8,7].
ΔF_PUCCH(F):It is the bias relative with PUCCH format 1a, is notified by the proprietary RRC signaling of cell, it is right
Answer different PUCCH formats to have different values, configured by high level.
ΔTxD(F’):Notified by the proprietary RRC signaling of user whether launched by PUCCH using transmitting diversity mode
The parameter value of decision;
G (i) is UE close-loop power control parameters, according to RRC and TPC (Transmission Power Control, transmission
Power Control) synthesis obtain, have accumulation and current absolute value two types, this parameter is closed-loop power control and minizone in cell
The synthesis result of power control.
PLcIt is the downlink path loss value calculated on this carrier wave, is lost and estimates for up path.UE is descending by measuring
Path loss obtains.Pilot signal power and base station that UE is received by calculating are indicated to UE pilot transmission work(by signaling
The difference of rate can be obtained by downlink path loss value, and the above-mentioned path loss values being calculated are used as into upward signal power
Path loss compensation during control.
Path loss estimation formula can be expressed as:
PL=referenceSignalPower-higher layer filtered RSRP,
Wherein, referenceSignalPower is the cell common reference signal power configured by high-level signaling;
Higher layer filtered RSRP are the connecing by high-rise filtered reference signal that UE terminations receive
Receive power (Reference Signal Received Power, abbreviation RSRP).
Cooperative multipoint transmission (Coordinated Multi Point Transmission/Reception, abbreviation CoMP)
Technology is to realize at cell edge the higher capacity of Radio Link and reliable using the transmitting antenna cooperation transmission of multiple cells
Transmission, can effectively solve cell edge interference problem.CoMP technologies are divided into DL CoMP (down collaboration multi-point) and UL
CoMP (uplink coordinated multicast communication) technology, it both can largely improve the average spectral efficiency (ase) and cell of cell
The service quality of edge customer.
Under CoMP scenes, up-downgoing node can be selected independently, wherein, descendant node selects according to receiving power,
Downlink reception quality can be ensured, upstream node is selected according to path loss, and such UE can save power overhead, therefore is existed upper
The inconsistent situation of descendant node, and upstream node may be transparent to UE, will cause the ginseng according to the transmission of descending sending node
It is not larger to the PL value differences between UE to examine the uplink receiving node of PL values that signal estimates and reality, uses downlink estimation
PL values out compensate come the transmit power of the UE sides signal to up-link, will result in UE end signal transmission powers and estimate
Inaccurate, the waste UE transmission powers of meter, increase UE battery losses, influence the reception of UE upward signal and increase to other use
The interference at family.Meanwhile under CoMP scenes, upstream node may be in multiple minizone switching at runtime, therefore ascending power also needs
Dynamically to adjust.
In existing Rel-10 standards, power adjustment can be carried out according to TPC, but because this is a kind of fine setting means, it is adjusted
Synchronizing length is shorter, it is necessary to which base station repeatedly issues closed loop power control command instruction UE is adjusted just up path can be lost
Error compensation is returned, and expense is larger, and the time is longer so that UE is sent out in longer period of time with inappropriate power
Penetrate, UE ascending power cannot be utilized rationally, and increase the interference to other users.
In view of the above-mentioned problems, each company proposes several schemes at present:
Scheme one, proprietary path loss biasing (pathloss offset) PL of useroffset, i.e.,
PPUCCH(i)=min { PCMAX, c(i), P0_PUCCH+PLc+PLoffset+h(nCQI, nHARQ, nSR)+ΔF_PUCCH(F)+ΔTxD
(F’)+g(i)}[dBm];
Scheme two, the proprietary road loss compensation factor α for PUCCH of user, i.e.,
PPUCCH(i)=min { PCMAX, c(i), P0_PUCCH+αPLc+h(nCQI, nHARQ, nSR)+ΔF_PUCCH(F)+ΔTxD(F’)+g
(i)}[dBm];
Scheme three, the P of enhancingO_PUCCH, that is, expand PO_PUCCHSpan;
Scheme four, the proprietary reference signal power of user (referenceSignalPower), i.e.,:
Path loss:PLc=UE-specific referenceSignalPower-higher layer filtered
RSRP;
Scheme five, the proprietary power offset parameter of user (Poweroffset), i.e.,
Path loss:PLc=referenceSignalPower-higher layer filtered RSRP+
Poweroffset。
Meanwhile the UE that up-downgoing node is inconsistent, the parameter according to descendant node is sent into PUCCH, if up-downgoing
The cell ID (cell ID) of node is different, nonopiate between the PUCCH in the PUCCH and upstream node of transmission, between each other
Interfere, influence receptivity.Have at present with the solution of proposition, scheme one, the scheme of multiple resource areas, for example,
The inconsistent UE of up-downgoing node is configured in a newly-increased resource area, other UE are put into traditional resource region.It is newly-increased
Resource area can be biased by UE-specific resourceTo realize, even resource indexScheme two, UE-specific roots sequence and CS hopping schemes, can be by setting
UE-specific virtual subdistricts ID is put to realize, such as sets the cell ID that virtual subdistrict ID is equal to upstream node, makes up-downgoing section
The inconsistent UE's of point is calculated PUCCH using virtual subdistrict ID and sends parameter, can thus realize with upstream node
Other UE between it is orthogonal;Scheme three, the combination of the first two scheme, i.e., the user device configuration that needs strengthen to newly spending more money on
Source region, while to the user equipment distribution virtual subdistrict ID in newly-increased region, the user equipment in newly-increased region is allowed using virtual small
Area ID be calculated PUCCH send parameter, so can both ensure enhancing UE between orthogonality, can ensure again enhancing UE and
Orthogonality between the UE not strengthened.
The UE inconsistent to up-downgoing node, PUCCH enhanced scheme and the enhanced scheme of PUCCH power controls can be combined
Consider, in addition, during using above-mentioned PUCCH power controls enhanced scheme, required parameter is notified to UE, mesh using what kind of signaling method
It is preceding also without certain standardization.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of Notification Method of the Power Control signaling of ascending control channel,
Method, base station and the user equipment of the Power Control signaling of ascending control channel are handled, to cause base station side and end side to indicate
And the Power Control signaling used reaches unification.
In order to solve the above-mentioned technical problem, the invention provides a kind of Power Control signaling of Physical Uplink Control Channel
Notification Method, including:
Base station prestores the mapping relations of dynamic instruction information and the Power Control signaling of more set Physical Uplink Control Channel,
The dynamic instruction information includes the configuration information and/or Downlink Control Information parameter of ascending control information;
The base station issues more sets alternatively physically by the proprietary and/or public high-level signaling of user to user equipment
The Power Control signaling of row control channel;
The base station issues the dynamic instruction information for the user equipment to the user equipment, indicates more sets
A set of Power Control signaling as user equipment actual use in alternative Power Control signaling.
Further, the above method also has following feature:The Power Control signaling bag of the Physical Uplink Control Channel
Include the one or more of following information:
The proprietary road loss compensation factor for Physical Uplink Control Channel of user;
The proprietary path loss bias of user;
The proprietary reference signal power of cell;
The proprietary reference signal power of user;
The proprietary power offset parameter of user;
The proprietary parameter of user for determining user's minimum emissive power;
Enhancing be used for determine the proprietary parameter of the user of user's minimum emissive power;
The proprietary parameter of cell for determining user's minimum emissive power.
Further, the above method also has following feature:The configuration information of the ascending control information includes:
The resource area that user is assigned to, or
Whether user is identified using virtual subdistrict.
Further, the above method also has following feature:The Downlink Control Information parameter is included in following parameter
It is one or more:
The aggregation level of Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space;
First of Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space
Relative position of the control channel unit in user's dedicated search space;
The son where Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space
Frame number;
Where Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space is
System frame number;
Added bits position in Downlink Control Information;
The solicited message of measuring reference signals in Downlink Control Information;
High 1 or high 2 of resource block assignment information in Downlink Control Information;
High 1 or high 2 of modulation coding mode and redundancy versions configured information in Downlink Control Information;
The configured information for being not enabled on modulation coding mode corresponding to transmission block and redundancy versions in Downlink Control Information.
Further, the above method also has following feature:
The Downlink Control Information is carried on Physical Downlink Control Channel or enhanced Physical Downlink Control Channel, the thing
Reason down control channel or enhanced Physical Downlink Control Channel are carried in user's dedicated search space.
Further, the above method also has following feature:The form of the Downlink Control Information includes following one kind
It is or a variety of:
Descending control information format (DCI format) 1, DCI format 1a, DCI format1b, DCIformat1c,
DCI format1d, DCI format2, DCI format2a, DCI format2b and DCIformat2c.
In order to solve the above problems, present invention also offers a kind of base station, including:
First module, for prestoring dynamic instruction information and the Power Control signaling of more set Physical Uplink Control Channel
Mapping relations, the dynamic instruction information include the configuration information and/or Downlink Control Information parameter of ascending control information;
Second module, for issuing cover alternatively to user equipment by the proprietary and/or public high-level signaling of user more
The Power Control signaling of Physical Uplink Control Channel;
3rd module, for issuing the dynamic instruction information for the user equipment to the user equipment, indicate institute
State a set of Power Control signaling as user equipment actual use covered more in alternative Power Control signaling.
Further, above-mentioned base station also has following feature:The Power Control signaling bag of the Physical Uplink Control Channel
Include the one or more of following information:
The proprietary road loss compensation factor for Physical Uplink Control Channel of user;
The proprietary path loss bias of user;
The proprietary reference signal power of cell;
The proprietary reference signal power of user;
The proprietary power offset parameter of user;
The proprietary parameter of user for determining user's minimum emissive power;
Enhancing be used for determine the proprietary parameter of the user of user's minimum emissive power;
The proprietary parameter of cell for determining user's minimum emissive power.
Further, above-mentioned base station also has following feature:The configuration information of the ascending control information includes:
The resource area that user is assigned to, or
Whether user is identified using virtual subdistrict.
Further, above-mentioned base station also has following feature:The Downlink Control Information parameter is included in following parameter
It is one or more:
The aggregation level of Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space;
First of Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space
Relative position of the control channel unit in user's dedicated search space;
The son where Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space
Frame number;
Where Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space is
System frame number;
Added bits position in Downlink Control Information;
The solicited message of measuring reference signals in Downlink Control Information;
High 1 or high 2 of resource block assignment information in Downlink Control Information;
High 1 or high 2 of modulation coding mode and redundancy versions configured information in Downlink Control Information;
The configured information for being not enabled on modulation coding mode corresponding to transmission block and redundancy versions in Downlink Control Information.
Further, above-mentioned base station also has following feature:
The Downlink Control Information is carried on Physical Downlink Control Channel or enhanced Physical Downlink Control Channel, the thing
Reason down control channel or enhanced Physical Downlink Control Channel are carried in user's dedicated search space;
The form of the Downlink Control Information includes following one or more:
Descending control information format (DCI format) 1, DCI format 1a, DCI format1b, DCIformat1c,
DCI format1d, DCI format2, DCI format2a, DCI format2b and DCIformat2c.
In order to solve the above problems, present invention also offers a kind of Power Control signaling for handling Physical Uplink Control Channel
Method, including:
User equipment prestores the mapping of dynamic instruction information and the Power Control signaling of more set Physical Uplink Control Channel
Relation, the dynamic instruction information include the configuration information and/or Downlink Control Information parameter of ascending control information;
The user equipment receives the Power Control signaling of the alternative Physical Uplink Control Channel of more sets that base station issues simultaneously
Storage;
After the user equipment receives the dynamic instruction information that the base station is sent, according to the mapping relations, it is determined that
The Power Control signaling of a set of alternative Physical Uplink Control Channel corresponding with the dynamic instruction information is efficient signaling, and
The transmission power of the Physical Uplink Control Channel is calculated according to the efficient signaling.
Further, the above method also has following feature:
The Power Control signaling of the Physical Uplink Control Channel includes the one or more of following information:
The proprietary road loss compensation factor for Physical Uplink Control Channel of user;
The proprietary path loss bias of user;
The proprietary reference signal power of cell;
The proprietary reference signal power of user;
The proprietary power offset parameter of user;
The proprietary parameter of user for determining user's minimum emissive power;
Enhancing be used for determine the proprietary parameter of the user of user's minimum emissive power;
The proprietary parameter of cell for determining user's minimum emissive power.
Further, the above method also has following feature:The configuration information of the ascending control information includes:
The resource area that user is assigned to, or
Whether user is identified using virtual subdistrict.
Further, the above method also has following feature:The Downlink Control Information parameter is included in following parameter
It is one or more:
The aggregation level of Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space;
First of Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space
Relative position of the control channel unit in user's dedicated search space;
The son where Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space
Frame number;
Where Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space is
System frame number;
Added bits position in Downlink Control Information;
The solicited message of measuring reference signals in Downlink Control Information;
High 1 or high 2 of resource block assignment information in Downlink Control Information;
High 1 or high 2 of modulation coding mode and redundancy versions configured information in Downlink Control Information;
The configured information for being not enabled on modulation coding mode corresponding to transmission block and redundancy versions in Downlink Control Information.
In order to solve the above problems, present invention also offers a kind of user equipment, including:
First module, for prestoring dynamic instruction information and the Power Control signaling of more set Physical Uplink Control Channel
Mapping relations, the dynamic instruction information include the configuration information and/or Downlink Control Information parameter of ascending control information;
Second module, for receiving the Power Control signaling of the alternative Physical Uplink Control Channel of more sets that base station issues simultaneously
Storage;
3rd module, after the dynamic instruction information sent for receiving the base station, according to the mapping relations, it is determined that
The Power Control signaling of a set of alternative Physical Uplink Control Channel corresponding with the dynamic instruction information is efficient signaling, and
The transmission power of the Physical Uplink Control Channel is calculated according to the efficient signaling.
Further, above-mentioned user equipment also has following feature:The Power Control letter of the Physical Uplink Control Channel
Order includes the one or more of following information:
The proprietary road loss compensation factor for Physical Uplink Control Channel of user;
The proprietary path loss bias of user;
The proprietary reference signal power of cell;
The proprietary reference signal power of user;
The proprietary power offset parameter of user;
The proprietary parameter of user for determining user's minimum emissive power;
Enhancing be used for determine the proprietary parameter of the user of user's minimum emissive power;
The proprietary parameter of cell for determining user's minimum emissive power.
Further, above-mentioned user equipment also has following feature:The configuration information of the ascending control information includes:
The resource area that user is assigned to, or
Whether user is identified using virtual subdistrict.
Further, above-mentioned user equipment also has following feature:The Downlink Control Information parameter includes following parameter
In one or more:
The aggregation level of Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space;
First of Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space
Relative position of the control channel unit in user's dedicated search space;
The son where Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space
Frame number;
Where Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space is
System frame number;
Added bits position in Downlink Control Information;
The solicited message of measuring reference signals in Downlink Control Information;
High 1 or high 2 of resource block assignment information in Downlink Control Information;
High 1 or high 2 of modulation coding mode and redundancy versions configured information in Downlink Control Information;
The configured information for being not enabled on modulation coding mode corresponding to transmission block and redundancy versions in Downlink Control Information.
The present invention provides a kind of Notification Method of the Power Control signaling of ascending control channel, handles ascending control channel
Method, base station and the user equipment of Power Control signaling, to cause base station side and end side instruction and the Power Control used to believe
Unification is reached in order.
Brief description of the drawings
Fig. 1 is the flow chart of the Notification Method of the Power Control signaling of the ascending control channel of the embodiment of the present invention;
Fig. 2 is the schematic diagram of the base station of the embodiment of the present invention;
Fig. 3 is a kind of flow chart of the method for the Power Control signaling of processing ascending control channel of the embodiment of the present invention;
Fig. 4 is the schematic diagram of the user equipment of the embodiment of the present invention.
Embodiment
In view of this, it is a primary object of the present invention to a kind of notice for the Power Control signaling for providing ascending control channel
Method, to indicate the parameter of the Power Control signaling of ascending control channel so that unification is reached in base station side and end side.
Fig. 1 be the embodiment of the present invention ascending control channel Power Control signaling Notification Method flow chart, such as Fig. 1
Shown, the method for the present embodiment includes below step:
S11, base station prestore the mapping of dynamic instruction information and the Power Control signaling of more set Physical Uplink Control Channel
Relation, the dynamic instruction information include the configuration information or Downlink Control Information parameter of ascending control information;
S12, base station are proprietary and/public high-level signaling issues to user equipment and covers alternative physical uplink more by user
The Power Control signaling of control channel;
S13, base station issue dynamic instruction information for the user equipment to the user equipment, indicate described cover more
A set of Power Control signaling as user equipment actual use in alternative Power Control signaling.
The Power Control signaling of the ascending control information can include the one or more of following information:
The proprietary road loss compensation factor α for PUCCH of user;
The proprietary path loss bias PL of useroffset;
Cell it is proprietary/the proprietary referenceSignalPower of user;
The proprietary power offset parameter Poweroffset of user;
PO_UE_PUCCH, that is, it is used for the P for determining the proprietary parameter of the user of user's minimum emissive power or enhancingO_UE_PUCCH;
PO_NOMINAL_PUCCH, that is, it is used to determine the proprietary parameter of the cell of user's minimum emissive power.
Wherein, the configuration information of the ascending control information includes:The resource area that user is assigned to, or user is
It is no to be identified using virtual subdistrict.
Wherein, the Downlink Control Information parameter includes the one or more in following parameter:
The aggregation level of Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space;
First of Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space
Relative position of the control channel unit in user's dedicated search space;
The son where Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space
Frame number;
Where Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space is
System frame number;
Added bits position in Downlink Control Information;
The solicited message of measuring reference signals in Downlink Control Information;
High 1 or high 2 of resource block assignment information in Downlink Control Information;
High 1 or high 2 of modulation coding mode and redundancy versions configured information in Downlink Control Information;
The configured information for being not enabled on modulation coding mode corresponding to transmission block and redundancy versions in Downlink Control Information.
The Downlink Control Information is carried on Physical Downlink Control Channel (PDCCH) or enhanced Physical Downlink Control Channel
(Enhanced Physical Downlink Control Channel, abbreviation ePDCCH), the Physical Downlink Control Channel
Or enhanced Physical Downlink Control Channel is carried in user's dedicated search space.
The Downlink Control Information may include following one or more:Descending control information format DCIformat1, DCI
Format1a, DCI format1b, DCI format1c, DCI format1d, DCI format2, DCI format2a, DCI
Format2b, DCI format2c.
Fig. 2 is the schematic diagram of the base station of the embodiment of the present invention, as shown in Fig. 2 the base station of the present embodiment includes:
First module, for prestoring dynamic instruction information and the Power Control signaling of more set Physical Uplink Control Channel
Mapping relations, the dynamic instruction information include the configuration information or Downlink Control Information parameter of ascending control information;
Second module, for issuing cover alternatively to user equipment by the proprietary and/or public high-level signaling of user more
The Power Control signaling of Physical Uplink Control Channel;
3rd module, for issuing the dynamic instruction information for the user equipment to the user equipment, indicate institute
State a set of Power Control signaling as user equipment actual use covered more in alternative Power Control signaling.
Wherein, the configuration information of the ascending control information includes:
The resource area that user is assigned to, or
Whether user is identified using virtual subdistrict.
Wherein, the Downlink Control Information parameter includes the one or more in following parameter:
The aggregation level of Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space;
First of Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space
Relative position of the control channel unit in user's dedicated search space;
The son where Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space
Frame number;
Where Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space is
System frame number;
Added bits position in Downlink Control Information;
The solicited message of measuring reference signals in Downlink Control Information;
High 1 or high 2 of resource block assignment information in Downlink Control Information;
High 1 or high 2 of modulation coding mode and redundancy versions configured information in Downlink Control Information;
The configured information for being not enabled on modulation coding mode corresponding to transmission block and redundancy versions in Downlink Control Information.
Fig. 3 is a kind of flow chart of the method for the Power Control signaling of processing ascending control channel of the embodiment of the present invention,
As shown in figure 3, including below step:
The mapping that S21, UE prestore dynamic instruction information and the Power Control signaling of more set Physical Uplink Control Channel is closed
System, the dynamic instruction information include the configuration information or Downlink Control Information parameter of ascending control information;
S22, UE receive the Power Control signaling of the alternative Physical Uplink Control Channel of more sets for issuing of base station and stored;
After S23, UE receive the dynamic instruction information that the base station is sent, according to the mapping relations, it is determined that with it is described
The Power Control signaling of Physical Uplink Control Channel corresponding to dynamic instruction information is efficient signaling, and according to the efficient signaling
Calculate the transmission power of the Physical Uplink Control Channel.
Fig. 4 is the UE of embodiment of the present invention schematic diagram, as shown in figure 4, the UE of the present embodiment includes:
First module, for prestoring dynamic instruction information and the Power Control signaling of more set Physical Uplink Control Channel
Mapping relations, the dynamic instruction information include the configuration information or Downlink Control Information parameter of ascending control information;
Second module, for being believed according to the Power Control for receiving the alternative Physical Uplink Control Channel of more sets for issuing of base station
Make and store;
3rd module, after the dynamic instruction information sent for receiving the base station, according to the mapping relations, it is determined that
The Power Control signaling of Physical Uplink Control Channel corresponding with the dynamic instruction information is efficient signaling, and is had according to described
Imitate the transmission power that signaling calculates the Physical Uplink Control Channel.
It is by the following examples and referring to the drawings, right for the object, technical solutions and advantages of the present invention are more clearly understood
The present invention is further described.It should be noted that in the case where not conflicting, in the embodiment and embodiment in the application
Feature can be mutually combined.
Embodiment 1
Base station and UE are previously stored with the configuration information and/or Downlink Control Information parameter and more sets of ascending control information
The mapping relations of the Power Control signaling of Physical Uplink Control Channel;
Base station notifies the Power Control of more set ascending control informations by the proprietary and/or public high-level signaling of user to UE
Signaling, and which of more set signalings of use are indicated by ascending control information configuration.For example, base station is proprietary by user
High-level signaling send the proprietary path loss bias PL of 2 users to UEoffset, respectively PLOffset, 1And PLOffset, 2;
UE is stored after receiving the Power Control signaling of more set ascending control informations of base station configuration, passes through upload control
Resource in information configuration signaling is biased to determine to select which set in more set signalings, such as the resource when ascending control information
When biasing is equal to 0 or this resource biasing (representing that UE has been assigned to traditional PUCCH regions) is not received by, selects first set letter
Make parameter PLOffset, 1, when the resource bias in ascending control information configuration signal is not equal to 0, (UE has been assigned to newly-increased
PUCCH regions), select second set of signaling parameter PLOffset, 2, UE is according to the signaling parameter calculating PUCCH transmission powers selected.
Embodiment 2
Base station and UE are previously stored with the configuration information and/or Downlink Control Information parameter and more sets of ascending control information
The mapping relations of the Power Control signaling of Physical Uplink Control Channel;
Base station notifies the Power Control of more set ascending control informations by the proprietary and/or public high-level signaling of user to UE
Signaling, and which of more set signalings of use are indicated by ascending control information configuration.For example, base station is proprietary by user
High-level signaling send the proprietary path loss bias PL of 2 users to UEoffset, respectively PLOffset, 1And PLOffset, 2;
UE is stored after receiving the Power Control signaling of more set ascending control informations of base station configuration, according to upload control
Whether information determines to select which set in more set signalings using virtual subdistrict ID, for example, during using actual cell ID, choosing
Select first set signaling parameter PLOffset, 1, when UE uses virtual subdistrict ID, select second set of signaling parameter PLOffset, 2, UE roots
PUCCH transmission powers are calculated according to the signaling parameter selected.
High level configuration more set ascending control informations Power Control signaling remove above example in path loss bias it
Outside, it can also be any one or a few of following information:
The proprietary road loss compensation factor α for PUCCH of user;
The proprietary path loss bias PL of useroffset;
Cell it is proprietary/the proprietary referenceSignalPower of user;
The proprietary power offset parameter Poweroffset of user;
PO_UE_PUCCH, that is, it is used to determine the proprietary parameter of the user of user's minimum emissive power;
The P of enhancingO_UE_PUCCH;
PO_NOMINAL_PUCCH, that is, it is used to determine proprietary parameter of the cell of user's minimum emissive power etc..
In the examples below, base station is selected in more set signalings by Downlink Control Information dynamic state of parameters instruction user equipment
It is a set of as user equipment actual use signaling parameter.
Embodiment 3
Base station and UE are previously stored with the configuration information and/or Downlink Control Information parameter and more sets of ascending control information
The mapping relations of the Power Control signaling of Physical Uplink Control Channel;
Base station notifies the Power Control of more set ascending control informations by the proprietary and/or public high-level signaling of user to UE
Signaling, and which of more set signalings of use are indicated by Downlink Control Information.For example, base station passes through the proprietary height of user
Layer signaling sends the proprietary path loss bias PL of 2 users to UEoffset, respectively PLOffset, 1And PLOffset, 2;
User equipment is stored after receiving the Power Control signaling of more set ascending control informations of base station configuration.User sets
It is standby that the Downlink Control Information parameter, such as first CCE of Downlink Control Information position and aggregation level are obtained according to blind check,
Accordingly come determine using base station configuration more set ascending control informations Power Control signaling in which set.Such as:
As aggregation level L=1 and first CCE positions nCCE, offset=0/1/2, or L=2 and nCCE, offset=2/4/6/
8, or L=4 and nCCE, offset=0, or L=8 and nCCE, offset=0, select first set signaling PLOffset, 1;As L=1 and
nCCE, offset=3/4/5, or L=2 and nCCE, offset=0/10, or L=4 and nCCE, offset=4, or L=8 and nCCE, offset=
8, select second set of signaling PLOffset, 2.UE calculates PUCCH transmission powers according to the signaling parameter selected.
Embodiment 4
Base station and UE are previously stored with the configuration information and/or Downlink Control Information parameter and more sets of ascending control information
The mapping relations of the Power Control signaling of Physical Uplink Control Channel;
Base station notifies the Power Control of more set ascending control informations by the proprietary and/or public high-level signaling of user to UE
Signaling, and which set used in more set signalings is indicated by Downlink Control Information.Such as base station passes through.High-level signaling is to UE
Send 4 users proprietary power offset parameter Poweroffset, respectively Poweroffset1, Poweroffset2,
Poweroffset3, Poweroffset4, while send 4 cells it is proprietary/user is proprietary
ReferenceSignalPower, respectively referenceSignalPower1, referenceSignalPower2,
ReferenceSignalPower3, referenceSignalPower4.
User equipment is stored after receiving the Power Control signaling of more set ascending control informations of base station configuration.User sets
It is standby that the Downlink Control Information parameter is obtained according to blind check, for example, first CCE of Downlink Control Information position and polymer grade
Not, which set in the Power Control signaling using more set ascending control informations of base station configuration is determined accordingly.Such as:
As aggregation level L=1 and first CCE positions nCCE, offset=0/4, or L=2 and nCCE, offset=4, or L=4
And nCCE, offsetWhen=0, first set signaling Poweroffset is selected1And referenceSignalPower1;As L=1 and
nCCE, offset=1/5, or L=2 and nCCE, offset=6, or L=4 and nCCE, offset=4, select second set of signaling
Poweroffset2And referenceSignalPower2;As L=1 and nCCE, offset=2, or L=2 and nCCE, offset=0/8,
Or L=8 and nCCE, offset=0, select the 3rd set of signaling Poweroffset3And referenceSignalPower3;As L=1 and
nCCE, offset=3, or L=2 and nCCE, offset=2/10, or L=8 and nCCE, offset=8, select the 4th set of signaling
Poweroffset4And referenceSignalPower4.UE calculates PUCCH transmission powers according to the signaling parameter selected.
Embodiment 5
Base station and UE are previously stored with the configuration information and/or Downlink Control Information parameter and more sets of ascending control information
The mapping relations of the Power Control signaling of Physical Uplink Control Channel;
Base station notifies the Power Control of more set ascending control informations by the proprietary and/or public high-level signaling of user to UE
Signaling, and which of more set signalings of use are indicated by Downlink Control Information.Such as base station passes through the proprietary height of user
Layer signaling sends the proprietary P of 4 users to UE0UE_PUCCHThe P of the proprietary enhancing of/user0_UE_PUCCH, respectively P0_UE_PUCCH, 1,
P0_UE_PUCCH, 2, P0_UE_PUCCH, 3, P0_UE_PUCCH, 4。
User equipment is stored after receiving the Power Control signaling of more set ascending control informations of base station configuration.User sets
It is standby that the Downlink Control Information parameter is obtained according to blind check, for example, first CCE of Downlink Control Information position and aggregation level
With the configured information for being not enabled on modulation coding mode corresponding to transmission block and redundancy versions, accordingly come determine using base station configuration
Which set in the Power Control signaling of more set ascending control informations.Such as:
As aggregation level L=1 and first CCE positions nCCE, offset=0/2/4, or L=2 and nCCE, offset=0/4/8,
Or L=4 and nCCE, offset=0, or L=8 and nCCE, offset=0, and it is not enabled on modulation coding mode corresponding to transmission block and redundancy
When high 1 of the configured information of version is 1, first set signaling P is selected0_UE_PUCCH, 1;As aggregation level L=1 and first CCE
Position nCCE, offset=0/2/4, or L=2 and nCCE, offset=0/4/8, or L=4 and nCCE, offset=0, or L=8 and
nCCE, offset=0, and when to be not enabled on high 1 of the configured information of modulation coding mode corresponding to transmission block and redundancy versions be 0,
Select second set of signaling P0_UE_PUCCH, 2.As aggregation level L=1 and first CCE positions nCCE, offset=1/3/5, or L=2 and
nCCE, offset=2/6/10, or L=4 and nCCE, offset=4, or L=8 and nCCE, offset=8, and be not enabled on corresponding to transmission block
When high 1 of the configured information of modulation coding mode and redundancy versions is 1, the 3rd set of signaling P is selected0_UE_PUCCH, 3;Work as polymer grade
Other L=1 and first CCE position nCCE, offset=1/3/5, or L=2 and nCCE, offset=2/6/10, or L=4 and nCCE, offset
=4, or L=8 and nCCE, offset=8, and it is not enabled on the configured information of modulation coding mode corresponding to transmission block and redundancy versions
High 1 be 1 when, select the 4th set of signaling P0_UE_PUCCH, 4。
UE calculates PUCCH transmission powers according to the signaling parameter selected.
Embodiment 6
Base station and UE are previously stored with the configuration information and/or Downlink Control Information parameter and more sets of ascending control information
The mapping relations of the Power Control signaling of Physical Uplink Control Channel;
Base station notifies the Power Control of more set ascending control informations by the proprietary and/or public high-level signaling of user to UE
Signaling, and which set used in more set signalings is indicated by Downlink Control Information.Such as base station passes through the proprietary height of user
Layer signaling sends the proprietary path loss bias PL of 8 users to UEoffset;
User equipment is stored after receiving the Power Control signaling of more set ascending control informations of base station configuration.User sets
It is standby that the Downlink Control Information parameter, such as first CCE of Downlink Control Information position and aggregation level are obtained according to blind check
With the configured information for being not enabled on modulation coding mode corresponding to transmission block and redundancy versions, accordingly come determine using base station configuration
Which set in the Power Control signaling of more set ascending control informations.Such as:
As aggregation level L=1 and first CCE positions nCCE, offset=0/4, or L=2 and nCCE, offset=4, or L=4
And nCCE, offsetWhen=0, and be not enabled on the configured information of modulation coding mode corresponding to transmission block and redundancy versions high 1 is
When 1, first set signaling is selected;As aggregation level L=1 and first CCE positions nCCE, offset=0/4, or L=2 and nCCE, offset
=4, or L=4 and nCCE, offsetWhen=0, and it is not enabled on the instruction letter of modulation coding mode corresponding to transmission block and redundancy versions
When high 1 of breath is 0, second set of signaling is selected;As L=1 and nCCE, offset=1/5, or L=2 and nCCE, offset=6, or L=4
And nCCE, offset=4, and be not enabled on the configured information of modulation coding mode corresponding to transmission block and redundancy versions high 1 is 1
When, select the 3rd set of signaling;As L=1 and nCCE, offset=1/5, or L=2 and nCCE, offset=6, or L=4 and nCCE, offset=
4, and when to be not enabled on high 1 of the configured information of modulation coding mode corresponding to transmission block and redundancy versions be 0, select the 4th set
Signaling.
As L=1 and nCCE, offset=2, or L=2 and nCCE, offset=0/8, or L=8 and nCCE, offset=0, and be not enabled on
When high 1 of the configured information of modulation coding mode corresponding to transmission block and redundancy versions is 1, the 5th set of signaling is selected;Work as L=
1 and nCCE, offset=2, or L=2 and nCCE, offset=0/8, or L=8 and nCCE, offset=0, and be not enabled on corresponding to transmission block
When high 1 of the configured information of modulation coding mode and redundancy versions is 0, the 6th set of signaling is selected;As L=1 and nCCE, offset
=3, or L=2 and nCCE, offset=2/10, or L=8 and nCCE, offset=8, and it is not enabled on modulating-coding side corresponding to transmission block
When high 1 of formula and the configured information of redundancy versions is 1, the 7th set of signaling is selected;As L=1 and nCCE, offset=3, or L=2
And nCCE, offset=2/10, or L=8 and nCCE, offset=8, and it is not enabled on modulation coding mode corresponding to transmission block and redundancy version
When high 1 of this configured information is 0, the 8th set of signaling is selected.
UE calculates PUCCH transmission powers according to the signaling parameter selected.
Embodiment 7
Base station and UE are previously stored with the configuration information and/or Downlink Control Information parameter and more sets of ascending control information
The mapping relations of the Power Control signaling of Physical Uplink Control Channel;
Base station notifies the Power Control of more set ascending control informations by the proprietary and/or public high-level signaling of user to UE
Signaling, and which of more set signalings of use are indicated by Downlink Control Information.
User equipment is stored after receiving the Power Control signaling of more set ascending control informations of base station configuration.User sets
It is standby that the Downlink Control Information parameter, such as first CCE of Downlink Control Information position and aggregation level are obtained according to blind check
And subframe numbers, accordingly come determine using base station configuration more set ascending control informations Power Control signaling in which set.Example
Such as:
Odd numbered sub-frames number and L=1 and nCCE, offset=0/1/2, or odd numbered sub-frames number and L=2 and nCCE, offset=2/4/
6/8, or odd numbered sub-frames number and or L=4 and nCCE, offset=0, or odd numbered sub-frames number and or L=8 and nCCE, offset=0, or
Person's even subframe number and L=1 and nCCE, offset=3/4/5, or even subframe number and L=2 and nCCE, offset=0/10, or
Even subframe number and L=4 and nCCE, offset=4, or even subframe number and L=8 and nCCE, offset=8, select first set letter
Order;Even subframe number and L=1 and nCCE, offset=0/1/2, or even subframe number and L=2 and nCCE, offset=2/4/6/8,
Or even subframe number and or L=4 and nCCE, offset=0, or even subframe number and or L=8 and nCCE, offset=0, Huo Zheqi
Number subframe numbers and L=1 and nCCE, offset=3/4/5, or odd numbered sub-frames number and L=2 and nCCE, offset=0/10, or odd number
Subframe numbers and L=4 and nCCE, offset=4, or odd numbered sub-frames number and L=8 and nCCE, offset=8, select second set of signaling;
UE calculates PUCCH transmission powers according to the signaling parameter selected.
Embodiment 8
Base station and UE are previously stored with the configuration information and/or Downlink Control Information parameter and more sets of ascending control information
The mapping relations of the Power Control signaling of Physical Uplink Control Channel;
Base station notifies the Power Control of more set ascending control informations by the proprietary and/or public high-level signaling of user to UE
Signaling, and which of more set signalings of use are indicated by Downlink Control Information.
User equipment is stored after receiving the Power Control signaling of more set ascending control informations of base station configuration.User sets
It is standby that the Downlink Control Information parameter, such as first CCE of Downlink Control Information position and aggregation level are obtained according to blind check
With added bits position, accordingly come determine using base station configuration more set ascending control informations Power Control signaling in which
Set.Such as:
As aggregation level L=1 and first CCE positions nCCE, offset=0/2/4, or L=2 and nCCE, offset=0/4/8,
Or L=4 and nCCE, offset=0, or L=8 and nCCE, offset=0, and high 1 of added bits position be 1 when, select first set letter
Order;As aggregation level L=1 and first CCE positions nCCE, offset=0/2/4, or L=2 and nCCE, offset=0/4/8, or L=4
And nCCE, offset=0, or L=8 and nCCE, offset=0, and high 1 of added bits position be 0 when, select second set of signaling.When poly-
Close rank L=1 and first CCE positions nCCE, offset=1/3/5, or L=2 and nCCE, offset=2/6/10, or L=4 and
nCCE, offset=4, or L=8 and nCCE, offset=8, and high 1 of added bits position be 1 when, select the 3rd set of signaling;Work as polymerization
Rank L=1 and first CCE positions nCCE, offset=1/3/5, or L=2 and nCCE, offset=2/6/10, or L=4 and
nCCE, offset=4, or L=8 and nCCE, offset=8, and high 1 of added bits position be 1 when, select the 4th set of signaling.
UE calculates PUCCH transmission powers according to the signaling parameter selected.
Embodiment 9
Base station and UE are previously stored with the configuration information and/or Downlink Control Information parameter and more sets of ascending control information
The mapping relations of the Power Control signaling of Physical Uplink Control Channel;
Base station notifies the Power Control of more set ascending control informations by the proprietary and/or public high-level signaling of user to UE
Signaling, and which set used in more set signalings is indicated by Downlink Control Information.
User equipment is stored after receiving the Power Control signaling of more set ascending control informations of base station configuration.User sets
It is standby that the Downlink Control Information parameter is obtained according to blind check, to determine the power control of more set ascending control informations using base station configuration
Which set in signaling processed.
For example, high 1 progress dynamic instruction of the resource block assignment information using Downlink Control Information, such as:Descending control
When high 1 of the resource block assignment information of information processed is 1, first set signaling is selected;The resource block distribution letter of Downlink Control Information
When high 1 of breath is 0, second set of signaling is selected.
Or dynamic instruction is carried out using the solicited message of the measuring reference signals (SRS) of Downlink Control Information, such as:
When the state of the solicited message of the measuring reference signals (SRS) of Downlink Control Information is 1, first set signaling is selected;Descending control
When the state of the solicited message of the measuring reference signals (SRS) of information is 0, second set of signaling is selected.
Or dynamic instruction is carried out using the newly-increased K bit of Downlink Control Information, such as:The newly-increased K of Downlink Control Information
When high 1 of bit is 1, first set signaling is selected;When high 1 of the newly-increased K bit of Downlink Control Information is 0, second is selected
Cover signaling.
Or enter Mobile state using the modulation coding mode of Downlink Control Information and high 1 of redundancy versions configured information and refer to
Show, such as:When the modulation coding mode of Downlink Control Information and high 1 of redundancy versions configured information are 1, first set letter is selected
Order;When the modulation coding mode of Downlink Control Information and high 1 of redundancy versions configured information are 0, second set of signaling is selected;
Or the instruction for being not enabled on modulation coding mode corresponding to transmission block and redundancy versions using Downlink Control Information
Information carries out dynamic instruction, such as:Downlink Control Information is not enabled on modulation coding mode corresponding to transmission block and redundancy versions
High 1 of configured information when being 1, select first set signaling;The modulation corresponding to transmission block that is not enabled on of Downlink Control Information is compiled
When high 1 of configured information of code mode and redundancy versions is 0, second set of signaling is selected;
UE calculates PUCCH transmission powers according to the signaling parameter selected.
Embodiment 10
Base station and UE are previously stored with the configuration information and/or Downlink Control Information parameter and more sets of ascending control information
The mapping relations of the Power Control signaling of Physical Uplink Control Channel;
Base station notifies the Power Control of more set ascending control informations by the proprietary and/or public high-level signaling of user to UE
Signaling, and which set used in more set signalings is indicated by Downlink Control Information.
User equipment is stored after receiving the Power Control signaling of more set ascending control informations of base station configuration.User sets
It is standby that the Downlink Control Information parameter is obtained according to blind check, to determine the power control of more set ascending control informations using base station configuration
Which set in signaling processed.
For example with high 2 progress dynamic instruction of the resource block assignment information of Downlink Control Information.Such as:Descending control
When high 2 of the resource block assignment information of information are 00, first set signaling is selected, high 2 then select second set of signaling when being 01,
High 2 then select the 3rd set of signaling when being 10, high 2 then select the 4th set of signaling when being 11.
Or dynamic instruction is carried out using the newly-increased K bit of Downlink Control Information, such as:The newly-increased K of Downlink Control Information
When high 2 of bit are 00, first set signaling is selected, high 2 then select second set of signaling when being 01, high 2 are then selected when being 10
The 3rd set of signaling is selected, high 2 then select the 4th set of signaling when being 11.
Or enter Mobile state using the modulation coding mode of Downlink Control Information and high 2 of redundancy versions configured information and refer to
Show, such as:When the modulation coding mode of Downlink Control Information and high 2 of redundancy versions configured information are 00, first set is selected
Signaling, high 2 then select second set of signaling when being 01, high 2 then select the 3rd set of signaling when being 10, high 2 are then selected when being 11
Select the 4th set of signaling.
Or the instruction for being not enabled on modulation coding mode corresponding to transmission block and redundancy versions using Downlink Control Information
Information carries out dynamic instruction, such as:Downlink Control Information is not enabled on modulation coding mode corresponding to transmission block and redundancy versions
High 2 of configured information when being 00, select first set signaling, high 2 then select second set of signaling when being 01, high 2 are 10
When then select the 3rd set of signaling, high 2 then select the 4th set of signaling when being 11.
UE calculates PUCCH transmission powers according to the signaling parameter selected.
In addition to above example, the various combinations of the Downlink Control Information can be used to be used for dynamic instruction and use cover more
Which set in the Power Control signaling of ascending control information, will not enumerate here.
In addition to above example, the mapping relations between dynamic instruction information and more set signalings have various permutation and combination,
Here do not enumerate.
One of ordinary skill in the art will appreciate that all or part of step in the above method can be instructed by program
Related hardware is completed, and described program can be stored in computer-readable recording medium, such as read-only storage, disk or CD
Deng.Alternatively, all or part of step of above-described embodiment can also be realized using one or more integrated circuits.Accordingly
Ground, each module/unit in above-described embodiment can be realized in the form of hardware, can also use the shape of software function module
Formula is realized.The present invention is not restricted to the combination of the hardware and software of any particular form.
The preferred embodiments of the present invention are these are only, certainly, the present invention can also there are other various embodiments, without departing substantially from this
In the case of spirit and its essence, those skilled in the art work as can make various corresponding changes according to the present invention
And deformation, but these corresponding changes and deformation should all belong to the protection domain of appended claims of the invention.
Claims (19)
1. a kind of Notification Method of the Power Control signaling of Physical Uplink Control Channel,
Base station prestores the mapping relations of dynamic instruction information and the Power Control signaling of more set Physical Uplink Control Channel, described
Dynamic instruction information includes the configuration information and/or Downlink Control Information parameter of ascending control information;
The base station is issued by the proprietary and/or public high-level signaling of user to user equipment covers alternative physical uplink control more
The Power Control signaling of channel processed;
The base station issues the dynamic instruction information for the user equipment to the user equipment, indicates that more sets are alternative
Power Control signaling in it is a set of as the user equipment actual use Power Control signaling.
2. the method as described in claim 1, it is characterised in that:The Power Control signaling of the Physical Uplink Control Channel includes
The one or more of following information:
The proprietary road loss compensation factor for Physical Uplink Control Channel of user;
The proprietary path loss bias of user;
The proprietary reference signal power of cell;
The proprietary reference signal power of user;
The proprietary power offset parameter of user;
The proprietary parameter of user for determining user's minimum emissive power;
Enhancing be used for determine the proprietary parameter of the user of user's minimum emissive power;
The proprietary parameter of cell for determining user's minimum emissive power.
3. the method as described in claim 1, it is characterised in that:The configuration information of the ascending control information includes:
The resource area that user is assigned to, or
Whether user is identified using virtual subdistrict.
4. the method as described in claim 1, it is characterised in that:The Downlink Control Information parameter includes one in following parameter
Kind is a variety of:
The aggregation level of Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space;
First control of Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space
Relative position of the Channel Elements in user's dedicated search space;
The subframe numbers where Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space;
The system-frame where Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space
Number;
Added bits position in Downlink Control Information;
The solicited message of measuring reference signals in Downlink Control Information;
High 1 or high 2 of resource block assignment information in Downlink Control Information;
High 1 or high 2 of modulation coding mode and redundancy versions configured information in Downlink Control Information;
The configured information for being not enabled on modulation coding mode corresponding to transmission block and redundancy versions in Downlink Control Information.
5. the method as described in claim 1, it is characterised in that:
The Downlink Control Information is carried on Physical Downlink Control Channel or enhanced Physical Downlink Control Channel, under the physics
Row control channel or enhanced Physical Downlink Control Channel are carried in user's dedicated search space.
6. the method as described in claim any one of 1-5, it is characterised in that:The form of the Downlink Control Information includes following
One or more:
Descending control information format (DCI format) 1, DCI format 1a, DCI format1b, DCIformat1c, DCI
Format1d, DCI format2, DCI format2a, DCI format2b and DCIformat2c.
7. a kind of base station, including:
First module, for prestoring the mapping of dynamic instruction information and the Power Control signaling of more set Physical Uplink Control Channel
Relation, the dynamic instruction information include the configuration information and/or Downlink Control Information parameter of ascending control information;
Second module, cover alternative physics for being issued by the proprietary and/or public high-level signaling of user to user equipment more
The Power Control signaling of ascending control channel;
3rd module, for issuing the dynamic instruction information for the user equipment to the user equipment, indicate described more
Cover a set of Power Control signaling as user equipment actual use in alternative Power Control signaling.
8. base station as claimed in claim 7, it is characterised in that:The Power Control signaling of the Physical Uplink Control Channel includes
The one or more of following information:
The proprietary road loss compensation factor for Physical Uplink Control Channel of user;
The proprietary path loss bias of user;
The proprietary reference signal power of cell;
The proprietary reference signal power of user;
The proprietary power offset parameter of user;
The proprietary parameter of user for determining user's minimum emissive power;
Enhancing be used for determine the proprietary parameter of the user of user's minimum emissive power;
The proprietary parameter of cell for determining user's minimum emissive power.
9. base station as claimed in claim 7, it is characterised in that:The configuration information of the ascending control information includes:
The resource area that user is assigned to, or
Whether user is identified using virtual subdistrict.
10. base station as claimed in claim 7, it is characterised in that:The Downlink Control Information parameter is included in following parameter
It is one or more:
The aggregation level of Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space;
First control of Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space
Relative position of the Channel Elements in user's dedicated search space;
The subframe numbers where Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space;
The system-frame where Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space
Number;
Added bits position in Downlink Control Information;
The solicited message of measuring reference signals in Downlink Control Information;
High 1 or high 2 of resource block assignment information in Downlink Control Information;
High 1 or high 2 of modulation coding mode and redundancy versions configured information in Downlink Control Information;
The configured information for being not enabled on modulation coding mode corresponding to transmission block and redundancy versions in Downlink Control Information.
11. the base station as described in claim any one of 7-10, it is characterised in that:
The Downlink Control Information is carried on Physical Downlink Control Channel or enhanced Physical Downlink Control Channel, under the physics
Row control channel or enhanced Physical Downlink Control Channel are carried in user's dedicated search space;
The form of the Downlink Control Information includes following one or more:
Descending control information format (DCI format) 1, DCI format 1a, DCI format1b, DCIformat1c, DCI
Format1d, DCI format2, DCI format2a, DCI format2b and DCIformat2c.
12. a kind of method for the Power Control signaling for handling Physical Uplink Control Channel, including:
User equipment prestores the mapping relations of dynamic instruction information and the Power Control signaling of more set Physical Uplink Control Channel,
The dynamic instruction information includes the configuration information and/or Downlink Control Information parameter of ascending control information;
The user equipment receives the Power Control signaling of the alternative Physical Uplink Control Channel of more sets that base station issues and stored;
After the user equipment receives the dynamic instruction information that the base station is sent, according to the mapping relations, it is determined that and institute
The Power Control signaling for stating a set of alternative Physical Uplink Control Channel corresponding to dynamic instruction information is efficient signaling, and according to
The efficient signaling calculates the transmission power of the Physical Uplink Control Channel.
13. method as claimed in claim 12, it is characterised in that:The Power Control signaling bag of the Physical Uplink Control Channel
Include the one or more of following information:
The proprietary road loss compensation factor for Physical Uplink Control Channel of user;
The proprietary path loss bias of user;
The proprietary reference signal power of cell;
The proprietary reference signal power of user;
The proprietary power offset parameter of user;
The proprietary parameter of user for determining user's minimum emissive power;
Enhancing be used for determine the proprietary parameter of the user of user's minimum emissive power;
The proprietary parameter of cell for determining user's minimum emissive power.
14. the method as described in claim 12 or 13, it is characterised in that:The configuration information of the ascending control information includes:
The resource area that user is assigned to, or
Whether user is identified using virtual subdistrict.
15. the method as described in claim 12 or 13, it is characterised in that:The Downlink Control Information parameter includes following parameter
In one or more:
The aggregation level of Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space;
First control of Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space
Relative position of the Channel Elements in user's dedicated search space;
The subframe numbers where Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space;
The system-frame where Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space
Number;
Added bits position in Downlink Control Information;
The solicited message of measuring reference signals in Downlink Control Information;
High 1 or high 2 of resource block assignment information in Downlink Control Information;
High 1 or high 2 of modulation coding mode and redundancy versions configured information in Downlink Control Information;
The configured information for being not enabled on modulation coding mode corresponding to transmission block and redundancy versions in Downlink Control Information.
16. a kind of user equipment, including:
First module, for prestoring the mapping of dynamic instruction information and the Power Control signaling of more set Physical Uplink Control Channel
Relation, the dynamic instruction information include the configuration information and/or Downlink Control Information parameter of ascending control information;
Second module, for receiving the Power Control signaling of the alternative Physical Uplink Control Channel of more sets that base station issues and depositing
Storage;
3rd module, after the dynamic instruction information sent for receiving the base station, according to the mapping relations, it is determined that and institute
The Power Control signaling for stating a set of alternative Physical Uplink Control Channel corresponding to dynamic instruction information is efficient signaling, and according to
The efficient signaling calculates the transmission power of the Physical Uplink Control Channel.
17. user equipment as claimed in claim 16, it is characterised in that:The Power Control letter of the Physical Uplink Control Channel
Order includes the one or more of following information:
The proprietary road loss compensation factor for Physical Uplink Control Channel of user;
The proprietary path loss bias of user;
The proprietary reference signal power of cell;
The proprietary reference signal power of user;
The proprietary power offset parameter of user;
The proprietary parameter of user for determining user's minimum emissive power;
Enhancing be used for determine the proprietary parameter of the user of user's minimum emissive power;
The proprietary parameter of cell for determining user's minimum emissive power.
18. the user equipment as described in claim 16 or 17, it is characterised in that:The configuration information bag of the ascending control information
Include:
The resource area that user is assigned to, or
Whether user is identified using virtual subdistrict.
19. the user equipment as described in claim 16 or 17, it is characterised in that:The Downlink Control Information parameter includes following
One or more in parameter:
The aggregation level of Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space;
First control of Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space
Relative position of the Channel Elements in user's dedicated search space;
The subframe numbers where Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space;
The system-frame where Physical Downlink Control Channel or enhanced Physical Downlink Control Channel in user's dedicated search space
Number;
Added bits position in Downlink Control Information;
The solicited message of measuring reference signals in Downlink Control Information;
High 1 or high 2 of resource block assignment information in Downlink Control Information;
High 1 or high 2 of modulation coding mode and redundancy versions configured information in Downlink Control Information;
The configured information for being not enabled on modulation coding mode corresponding to transmission block and redundancy versions in Downlink Control Information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210077715.8A CN103326809B (en) | 2012-03-22 | 2012-03-22 | A kind of Notification Method and device of Physical Uplink Control Channel Power Control signaling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210077715.8A CN103326809B (en) | 2012-03-22 | 2012-03-22 | A kind of Notification Method and device of Physical Uplink Control Channel Power Control signaling |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103326809A CN103326809A (en) | 2013-09-25 |
CN103326809B true CN103326809B (en) | 2017-11-28 |
Family
ID=49195362
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210077715.8A Expired - Fee Related CN103326809B (en) | 2012-03-22 | 2012-03-22 | A kind of Notification Method and device of Physical Uplink Control Channel Power Control signaling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103326809B (en) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104703212B (en) * | 2013-12-06 | 2019-07-23 | 索尼公司 | Device, wireless communication system and method in wireless communication system |
CN106162851B (en) * | 2015-03-27 | 2019-07-26 | 上海朗帛通信技术有限公司 | A kind of communication means and device of multi-user's superposition |
CN106304298A (en) * | 2015-05-14 | 2017-01-04 | 中兴通讯股份有限公司 | A kind of unauthorized resource ascending power control method, terminal, base station and system |
WO2018127100A1 (en) * | 2017-01-06 | 2018-07-12 | 华为技术有限公司 | Uplink power control method and communication apparatus |
CN108282856B (en) * | 2017-01-06 | 2023-05-16 | 华为技术有限公司 | Uplink power control method and communication equipment |
CN108990139B (en) * | 2017-06-02 | 2021-01-12 | 维沃移动通信有限公司 | Transmission power calculation method, related equipment and system |
CN109151973B (en) * | 2017-06-16 | 2023-09-08 | 华为技术有限公司 | Power control method and device |
CN109151810B (en) * | 2017-06-16 | 2023-02-03 | 北京三星通信技术研究有限公司 | Method for reporting and processing user capability, user equipment and base station |
CN109391351B (en) * | 2017-08-10 | 2021-04-02 | 电信科学技术研究院 | Power control method and base station of Physical Uplink Control Channel (PUCCH) |
CN109462856A (en) * | 2017-09-06 | 2019-03-12 | 中国移动通信有限公司研究院 | Obtain the method and network side equipment of RSRP |
CN110139352B (en) * | 2018-02-09 | 2021-03-23 | 华为技术有限公司 | Method and communication device for power control |
CN110167126B (en) * | 2018-02-13 | 2020-07-03 | 电信科学技术研究院有限公司 | Control method and device for PUCCH power during multi-beam transmission |
CN110858801B (en) * | 2018-08-24 | 2021-02-12 | 华为技术有限公司 | Information receiving and sending method and device |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101154989A (en) * | 2006-09-27 | 2008-04-02 | 大唐移动通信设备有限公司 | Transmission method for reinforcing ascending control channel |
CN101720122A (en) * | 2009-12-28 | 2010-06-02 | 中兴通讯股份有限公司 | Method, base station and terminal for controlling power of physical uplink control channel |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9036564B2 (en) * | 2008-03-28 | 2015-05-19 | Qualcomm Incorporated | Dynamic assignment of ACK resource in a wireless communication system |
-
2012
- 2012-03-22 CN CN201210077715.8A patent/CN103326809B/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101154989A (en) * | 2006-09-27 | 2008-04-02 | 大唐移动通信设备有限公司 | Transmission method for reinforcing ascending control channel |
CN101720122A (en) * | 2009-12-28 | 2010-06-02 | 中兴通讯股份有限公司 | Method, base station and terminal for controlling power of physical uplink control channel |
Also Published As
Publication number | Publication date |
---|---|
CN103326809A (en) | 2013-09-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103326809B (en) | A kind of Notification Method and device of Physical Uplink Control Channel Power Control signaling | |
US10681680B2 (en) | Method and device for communicating device-to-device | |
US9807697B2 (en) | Method and apparatus for controlling transmit power in wireless communication system | |
CN104272820B (en) | Terminal installation, communication means and base station apparatus | |
JP6586091B2 (en) | Terminal apparatus and method | |
US8995385B2 (en) | Apparatus and method for UE-specific demodulation reference signal scrambling | |
CN103748913B (en) | Communication system, terminal and base station | |
US9456421B2 (en) | Uplink power control method, device and system | |
CN103718622B (en) | Communication system, terminal and base station | |
JP6523278B2 (en) | Terminal device, base station device, and communication method | |
JP6671173B2 (en) | Terminal device, base station device, communication method, and integrated circuit | |
JP2016163357A (en) | Method for adjusting modulation encoding scheme, user equipment and base station | |
CN104322124A (en) | Terminal, base station, communication method, and integrated circuit | |
CN103718623A (en) | Terminal, communication system, and communication method | |
CN103718598A (en) | Communication system, terminal, base station, and communication method | |
JP2013187819A (en) | Base station, terminal, communication method and integrated circuit | |
CN103037489B (en) | uplink signal power control method and device | |
CN110392418A (en) | Poewr control method and device, base station, terminal, computer readable storage medium | |
CN106068634A (en) | Method and the terminal thereof of downlink power are set with higher order modulation schemes | |
JP6587612B2 (en) | Terminal apparatus, base station apparatus, and communication method | |
JP6656150B2 (en) | Terminal device, base station device, and communication method | |
CN108810964A (en) | The report method and device of power headroom | |
CN103249147A (en) | Physical uplink control channel resource allocation method and system | |
US20210289451A1 (en) | Power headroom report method and apparatus | |
JP2013197783A (en) | Base station, terminal, communication method and integrated circuit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171128 |
|
CF01 | Termination of patent right due to non-payment of annual fee |