CN103276831A - Inorganic composite A-class non-combustible insulation board wall thermal insulation system and construction method - Google Patents

Inorganic composite A-class non-combustible insulation board wall thermal insulation system and construction method Download PDF

Info

Publication number
CN103276831A
CN103276831A CN2013102648103A CN201310264810A CN103276831A CN 103276831 A CN103276831 A CN 103276831A CN 2013102648103 A CN2013102648103 A CN 2013102648103A CN 201310264810 A CN201310264810 A CN 201310264810A CN 103276831 A CN103276831 A CN 103276831A
Authority
CN
China
Prior art keywords
layer
mortar
level
plastering mortar
alkaline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102648103A
Other languages
Chinese (zh)
Other versions
CN103276831B (en
Inventor
蒋光树
王金荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
New Brigade Construction Group Co Ltd
Original Assignee
ANHUI ZHONGRUI DECORATION MATERIALS GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI ZHONGRUI DECORATION MATERIALS GROUP Co Ltd filed Critical ANHUI ZHONGRUI DECORATION MATERIALS GROUP Co Ltd
Priority to CN201310264810.3A priority Critical patent/CN103276831B/en
Publication of CN103276831A publication Critical patent/CN103276831A/en
Application granted granted Critical
Publication of CN103276831B publication Critical patent/CN103276831B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The invention discloses an inorganic composite A-class non-combustible insulation board wall thermal insulation system. The system comprises a base wall layer, an adhesive mortar layer, an inorganic composite A-class non-combustible insulation board layer, a bottom plastering mortar layer, an alkali-resistant screen cloth or steel mesh layer, a surface plastering mortar layer and a finishing layer from the inside to the outside. The inorganic composite A-class non-combustible insulation board layer comprises an insulation core material layer and an interface reinforcement layer which is arranged on the outer surface and the inner surface of the insulation core material layer respectively. The insulation core material layer is molded through stirring and casting of polymer mortar, polyphenyl granules and inorganic vitrified small balls. Each interface reinforcement layer is formed by polymer water-proof anti-crack mortar composite alkali-resistant screen cloth. The invention further discloses a construction method of the wall thermal insulation system. The system has the advantages of being good in water-proof and anti-crack performance, heat insulation performance, fire-proof and safety performance and environment-friendly performance, long in service life and applicable to thermal insulation of walls and roofs of buildings under various weather conditions. The construction method is simple and easy to implement, high in work efficiency and short in construction period.

Description

Inorganic compounding A level is not fired warming plate wall insulation system and job practices
Technical field
The present invention relates to building field, in particular inorganic compounding A level is not fired warming plate wall insulation system and job practices.
Background technology
At present, architectural energy consumption has become three big " big power consumers " of AND ENERGY RESOURCES CONSUMPTION IN CHINA side by side with industrial consumption energy, traffic power consumption.Especially architectural energy consumption is accompanied by the lifting of constantly riseing of building total amount and residence comfort, is the trend that sharply raises up.China's building not only power consumption is high, and efficiency of energy utilization is very low, and the unit building energy consumption exceeds 2~3 times than country under the equal weather conditions.Ubiquity space enclosing structure heat insulation property and poor air-tightness in China's present stage urban house building, the heat supplying air conditioning system effectiveness is hanged down inferior problem, be example with the housing construction that accounts for China's urban architecture gross area about 60%, cities and towns, the heating area area of residence has 4,000,000,000 square metres approximately, heating season in 2000 average energy consumption be about the 25kg coal/square metre, if having the energy-conservation of basis realization 50% now, then approximately can save 0.5 hundred million tons of standard coals every year.Therefore building energy conservation is the strategy of sustainable development that the Chinese government vigorously advocates in recent years, is the important state basic policy that helps energy-saving and emission-reduction, environmental protection, to building masonry wall be incubated, heat insulation processing is to implement one of important measures of building energy conservation.Present stage, the principal mode of external wall outer insulation had: organic heat-insulating plate (EPS/XPS/PU etc.) exterior wall heat-preserving system, inorganic heat insulation material (foam cement plate/kervit microbead insulated sand slurry) wall insulation system etc., all there is certain defective in above-mentioned several heat-insulation system, though organic plates class heat-insulation system thermal and insulating performance is better, its fireproof performance is poor, comburant toxicity becomes its weakness greatly; Though mineral-type heat-insulation system fireproof performance excellence, but because some shortcomings of heat insulating material self, as crisp, the easy efflorescence in surface, fall slag, adhesion strength is low, water absorption rate is big etc., and its heat-insulating property generally all is difficult to satisfy the requirement of building energy conservation 65%, has limited the scope of application of this type of heat insulating material greatly.
Summary of the invention
The objective of the invention is to overcome the deficiencies in the prior art, provide a kind of inorganic compounding A level simple in structure, that thermal and insulating performance good, fire savety is high not fire warming plate wall insulation system and job practices.
The present invention is achieved by the following technical solutions:
Inorganic compounding A level is not fired the warming plate wall insulation system; comprise basic unit's body of wall layer from inside to outside; the adhesive mortar layer; inorganic compounding A level is not fired the insulation flaggy; bottom plastering mortar layer; alkaline-resisting screen cloth or steel mesh layer; surface layer plastering mortar layer; finish coat; described inorganic compounding A level is not fired the interface enhancement layer that the insulation flaggy comprises the heat insulation core material layer and is located at heat insulation core material layer external surface and inner surface respectively; described heat insulation core material layer is by polymer mortar; granular polystyrene; inorganic glass bead is through stirring cast molding, and described interface enhancement layer is made up of the compound alkaline-resisting screen cloth of polymer water-proofing anticracking mortar.
As optimal way of the present invention, described adhesive mortar layer, bottom plastering mortar layer and surface layer plastering mortar layer are made of the polymer modification mortar.
As wherein a kind of optimal way of finish coat of the present invention, described finish coat is made of flexible waterproof putty and coating.
As the another kind of optimal way of finish coat of the present invention, described finish coat is made of face brick adhesive mortar, face brick and pointing stuff.
As optimal way of the present invention, described inorganic compounding A level is not fired the insulation flaggy and is fixed on basic unit's body of wall layer by anchoring piece.
Inorganic compounding A level is not fired the job practices of warming plate wall insulation system, comprises the steps:
(1) processing of basic unit's body of wall layer
A) when basic unit's body of wall layer is the sintered article masonry, interface processing can not be done on its surface, and its outside should arrange the waterproofing mortar leveling layer;
B) when basic unit's body of wall layer is concrete, its surface should the brushing boundary mortar, whitewashes the cement mortar screeding layer then;
C) when basic unit's body of wall layer is air-entrained concrete building block, aerated concrete outer wall plate, its surface should the brushing boundary mortar, whitewashes the waterproofing mortar leveling layer then;
(2) mortar of adhesive mortar layer, bottom plastering mortar layer and surface layer plastering mortar layer is made
Adhesive mortar layer, bottom plastering mortar layer and surface layer plastering mortar layer are made by the specialty polymer modified mortar, prepare the specialty polymer modified mortar in proportion, and carry out mechanical agitation, guarantee to stir, mixing time is no less than 5min after finishing from feeding intake, once prepare consumption and be advisable to use up in the 4h, the hot weather construction time should be controlled in 2h;
(3) inorganic compounding A level is not fired the paving of insulation flaggy
A) inorganic compounding A level is not fired and should do not removed its surperficial floating dust before the warming plate paving, in case of necessity should the brushing boundary mortar, and behind the boundary mortar surface drying, criticize again then and scrape the above-mentioned adhesive mortar of making;
B) inorganic compounding A level is not fired the stickup of insulation flaggy from the first floor, eject horizon and the aluminium alloys base bracket is set in distance ground 300mm eminence, along continuous straight runs is laterally pasted inorganic compounding A level and is not fired warming plate from bottom to top on the aluminium alloys base bracket, inorganic compounding A level does not fire warming plate and basic unit's body of wall layer stickup should be adopted full subsides method, during stickup, do not fire on the warming plate evenly every inorganic compounding A level and batch to scrape the adhesive mortar that a layer thickness is not less than 3mm and constitute the bonding mortar layer, bonding area should be greater than 95%, in time paste and be expressed on basic unit's body of wall layer, seam slit between plate and the plate must not be greater than 2mm, and it is long that the inorganic compounding A level between arranging is not up and down fired the vertical fissure of displacement 1/2 plate of warming plate;
(4) construction of bottom plastering mortar layer, alkaline-resisting screen cloth or steel mesh layer, surface layer plastering mortar layer
When finish coat is coating ornamental surface, the first road plastering mortar to be whitewashed inorganic compounding A level do not fire on the insulation flaggy, THICKNESS CONTROL strikes off with big thick stick earlier at 3~4mm, rubs with the hands with the plastics trowel and puts down, and forms bottom plastering mortar layer; Alkaline-resisting screen cloth is pressed in the bottom plastering mortar layer then, form alkaline-resisting scrim layer, first floor metope is answered the double-deck alkaline-resisting screen cloth of paving, the alkaline-resisting screen cloth paving of first floor should be adopted docking calculation, carry out the alkaline-resisting screen cloth paving of the second layer then, the alkaline-resisting screen cloth of remainder layer metope paving individual layer, lap width between the alkaline-resisting screen cloth plane is not less than 50mm, place, negative and positive angle also should press stubble overlap joint and lap width to be not less than 200mm, smooth, the corrugationless of screen cloth paving, the door and window hole place should increase along 45 ° of directions pastes one alkaline-resisting screen cloth reinforcement of 300mm * 400mm; After alkaline-resisting scrim layer is completed, outside alkaline-resisting scrim layer, insert anchoring piece to inorganic compounding A level do not fire the insulation flaggy fix; When bottom plastering mortar layer is most probably dry, outside alkaline-resisting scrim layer, smear the second road plastering mortar again, the second road plastering mortar THICKNESS CONTROL forms surface layer plastering mortar layer at 2~3mm;
When finish coat was decorating surface brick, bottom plastering mortar layer thickness was controlled at 2~3mm; After the bottom plastering mortar solidifies, carry out the paving of steel mesh layer, the mutual lap width in steel mesh limit is 40mm, overlapping part blocks steel mesh with the U-shaped clamp during construction with the distance that is not more than 300mm with galvanized iron wire with two net colligations together, makes it be close to bottom plastering mortar laminar surface, with crab-bolt steel mesh is anchored on basic unit's body of wall layer then, crab-bolt fixedly effective depth must not be less than 30mm, and local out-of-flatness place flattens with the U-shaped clamp; After the paving of steel mesh layer finishes, outside the steel mesh layer, insert anchoring piece to inorganic compounding A level do not fire the insulation flaggy fix; Smear the second road plastering mortar again outside the steel mesh layer, and with the steel mesh parcel, form surface layer plastering mortar layer, the gross thickness control of bottom plastering mortar layer, alkaline-resisting screen cloth or steel mesh layer and surface layer plastering mortar layer is at 7~9mm;
(5) outside surface layer plastering mortar layer, lay finish coat.
The present invention has the following advantages compared to existing technology:
The insulation layer of this heat-insulation system adopts by polymer mortar, granular polystyrene, inorganic glass bead and does not fire the insulation flaggy through the heat insulation core material layer of stirring cast molding and the inorganic compounding A level that the interface enhancement layer constitutes, its fireproof performance reaches the A level, overcome the defective of existing organic heat-insulating plate heat preserving system fireproof performance difference, the fire savety height; And its coefficient of thermal conductivity is low, site operation difficult quality control, the thermal and insulating performance that has overcome slurry class heat-insulation system do not reach standard, easily hollowing, come off, many hidden danger of quality such as cracking.In addition, this heat-insulation system weatherability, freeze thawing resistance, water resistance are good, have thoroughly solved fundamental issues such as external heat insulating wall hollowing, cracking.And its job practices is simple, and easy operating is easy to utilize.
Description of drawings
Fig. 1 is structural representation of the present invention.
The specific embodiment
Below embodiments of the invention are elaborated, present embodiment is being to implement under the prerequisite with the technical solution of the present invention, provided detailed embodiment and concrete operating process, but protection scope of the present invention is not limited to following embodiment.
Referring to Fig. 1, the inorganic compounding A level that present embodiment provides is not fired the warming plate wall insulation system, comprise that from inside to outside basic unit's body of wall layer 1, adhesive mortar layer 2, inorganic compounding A level do not fire insulation flaggy 3, bottom plastering mortar layer 4, alkaline-resisting screen cloth or steel mesh layer 5, surface layer plastering mortar layer 6, finish coat 7, inorganic compounding A level is not fired insulation flaggy 3 and is fixed on basic unit's body of wall layer 1 by anchoring piece 8.Inorganic compounding A level is not fired the interface enhancement layer that insulation flaggy 3 comprises the heat insulation core material layer and is located at heat insulation core material layer external surface and inner surface respectively; through stirring cast molding, be made up of the compound alkaline-resisting screen cloth of polymer water-proofing anticracking mortar by the interface enhancement layer by polymer mortar, granular polystyrene, inorganic glass bead for the heat insulation core material layer.Adhesive mortar layer 2, bottom plastering mortar layer 4 and surface layer plastering mortar layer 6 are made of the polymer modification mortar.Bottom plastering mortar layer 4, alkaline-resisting screen cloth or steel mesh layer 5, surface layer plastering mortar layer 6 common formation cracking resistance overcoat, protection inorganic compounding A level is not fired insulation flaggy 3.Finish coat 7 has two kinds of constituted modes, and a kind of is to be made of flexible waterproof putty and coating, and this kind finish coat 7 is selected alkaline-resisting scrim layer for use; Another kind is to be made of face brick adhesive mortar, face brick and pointing stuff, and this kind finish coat 7 is heavier, therefore selects the steel mesh layer for use.Owing to be provided with alkaline-resisting screen cloth or steel mesh layer 5, make finish coat 7 be not easy cracking, increase pulling force each other.
The material that above-mentioned formation inorganic compounding A level is not fired the heat insulation core material layer of insulation flaggy 3 comprises polymer mortar and insulation lightweight aggregate, and wherein polymer mortar adopts the cement-based mortar of polymer modification, has excellent cohesive strength and pliability; The insulation lightweight aggregate adopts inorganic glass bead and the low B1 level of coefficient of thermal conductivity not to fire primary foam polyphenyl particle, and wherein, granular polystyrene is to have that certain particle size, grating, coefficient of thermal conductivity are little, the insulation lightweight aggregate of flame retardant type; And inorganic glass bead is a kind of novel green inorganic material, nontoxic, Environmental Safety, inside is the inorganic particulate material of porous air cavity configuration, physicochemical property is very stable, ageing-resistant weatherability is strong, have excellent Jue Re ﹑ Fang Huo ﹑ sound absorption qualities, the material combustion performance is the A level, can be anti-high temperature more than 1000 degrees centigrade, in building material industry, with glass bead as aglite, can improve mortar with easy mobility and anti-certainly intensity, reduce the wood property shrinkage factor, improve the product combination property, reduce comprehensive cost of production; Make inorganic compounding A level not fire insulation flaggy 3 when reaching A level fireproof performance, greatly reduce the coefficient of thermal conductivity of warming plate, have good thermal and insulating performance.
The interface enhancement layer that above-mentioned formation inorganic compounding A level is not fired insulation flaggy 3 is formed by the compound alkaline-resisting screen cloth of polymer water-proofing anticracking mortar, polymer water-proofing anticracking mortar has that pliability is good, the characteristics of anti-cracking waterproof excellent performance, the interface enhancement layer of polymer water-proofing anticracking mortar and the compound formation heat insulation core material of alkaline-resisting screen cloth layer inner surface and external surface, for the heat insulation core material layer provides required shock resistance, waterproof impervious characteristic and cracking resistance, overcome the shortcoming that common inorganic heat preservation flaggy water proofing property is poor, surface strength is low.
The job practices that present embodiment also provides inorganic compounding A level not fire the warming plate wall insulation system comprises the steps:
(1) processing of basic unit's body of wall layer 1
A) when basic unit's body of wall layer 1 is the sintered article masonry, interface processing can not be done on its surface, and its outside should arrange the waterproofing mortar leveling layer;
B) when basic unit's body of wall layer 1 is concrete, its surface should the brushing boundary mortar, whitewashes the cement mortar screeding layer then;
C) when basic unit's body of wall layer 1 is air-entrained concrete building block, aerated concrete outer wall plate, its surface should the brushing boundary mortar, whitewashes the waterproofing mortar leveling layer then;
(2) mortar of adhesive mortar layer 2, bottom plastering mortar layer 4 and surface layer plastering mortar layer 6 is made
Adhesive mortar layer 2, bottom plastering mortar layer 4 and surface layer plastering mortar layer 6 are made by the specialty polymer modified mortar, prepare the specialty polymer modified mortar in proportion, and carry out mechanical agitation, guarantee to stir, mixing time is no less than 5min after finishing from feeding intake, once prepare consumption and be advisable to use up in the 4h, the hot weather construction time should be controlled in 2h;
(3) inorganic compounding A level is not fired the paving of insulation flaggy 3
A) inorganic compounding A level is not fired and should do not removed its surperficial floating dust before the warming plate paving, in case of necessity should the brushing boundary mortar, and behind the boundary mortar surface drying, criticize again then and scrape the above-mentioned adhesive mortar of making;
B) inorganic compounding A level is not fired 3 stickups of insulation flaggy from the first floor, eject horizon and the aluminium alloys base bracket is set in distance ground 300mm eminence, along continuous straight runs is laterally pasted inorganic compounding A level and is not fired warming plate from bottom to top on the aluminium alloys base bracket, inorganic compounding A level does not fire warming plate and 1 stickup of basic unit's body of wall layer should be adopted full subsides method, during stickup, do not fire on the warming plate evenly every inorganic compounding A level and batch to scrape the adhesive mortar that a layer thickness is not less than 3mm and constitute adhesive mortar layer 2, bonding area should be greater than 95%, in time paste and be expressed on basic unit's body of wall layer 1, seam slit between plate and the plate must not be greater than 2mm, and it is long that the inorganic compounding A level between arranging is not up and down fired the vertical fissure of displacement 1/2 plate of warming plate;
(4) construction of bottom plastering mortar layer 4, alkaline-resisting screen cloth or steel mesh layer 5, surface layer plastering mortar layer 6
When finish coat 7 is coating ornamental surface, the first road plastering mortar to be whitewashed inorganic compounding A level do not fire on the insulation flaggy 3, THICKNESS CONTROL strikes off with big thick stick earlier at 3~4mm, rubs with the hands with the plastics trowel and puts down, and forms bottom plastering mortar layer 4; With plasterer's trowel alkaline-resisting screen cloth is pressed in the bottom plastering mortar layer 4 then, form alkaline-resisting scrim layer, first floor metope is answered the double-deck alkaline-resisting screen cloth of paving, the alkaline-resisting screen cloth paving of first floor should be adopted docking calculation, carry out the alkaline-resisting screen cloth paving of the second layer then, the alkaline-resisting screen cloth of remainder layer metope paving individual layer, lap width between the alkaline-resisting screen cloth plane is not less than 50mm, place, negative and positive angle also should press stubble overlap joint and lap width to be not less than 200mm, smooth, the corrugationless of screen cloth paving, the door and window hole place should increase along 45 ° of directions pastes one alkaline-resisting screen cloth reinforcement of 300mm * 400mm; After alkaline-resisting scrim layer is completed, outside alkaline-resisting scrim layer, insert 8 couples of inorganic compounding A of anchoring piece level do not fire the insulation flaggy 3 fix, electricity consumption is drilled in the angle seam place punching that inorganic compounding A level is not fired insulation flaggy 3, anchoring piece 8 being inserted in the hole and the plane of plastic disc twisted is pressed onto in the bottom plastering mortar layer 4, and anchoring piece 8 with effective anchorage depth of basic unit's body of wall layer 1 is: concrete wall is not less than 30mm; Lightweight bodies of wall such as gas concrete are not less than 60mm, the building-block masonry should adopt back stubborn knotting type crab-bolt, and the metope height is below 20m, every square metre arranges 6 crab-bolts, and 20m is above, and every square metre arranges 7~9 crab-bolts; When bottom plastering mortar layer 4 eighty per cant drying, outside alkaline-resisting scrim layer, smear the second road plastering mortar again, the second road plastering mortar THICKNESS CONTROL forms surface layer plastering mortar layer 6 at 2~3mm;
When finish coat 7 was decorating surface brick, bottom plastering mortar layer 4 THICKNESS CONTROL were at 2~3mm; After the bottom plastering mortar solidifies, carry out the paving of steel mesh layer, the mutual lap width in steel mesh limit is 40mm, overlapping part with the distance that is not more than 300mm with galvanized iron wire with two net colligations together, negative and positive angle net should be pushed down butt joint net sheet.Steel meshes such as window side, parapet, settlement joint are received the head place, using the cement nail shimming is fixed on steel mesh on the agent structure, block steel mesh with the U-shaped clamp during construction, make it be close to bottom plastering mortar layer 4 surface, distributing by two-way 500mm plum blossom shape with crab-bolt then is anchored at steel mesh on basic unit's body of wall layer 1, and steel mesh should have reliable the connection with crab-bolt, and crab-bolt fixedly effective depth must not be less than 30mm, local out-of-flatness place flattens with the U-shaped clamp; After the paving of steel mesh layer finishes, outside the steel mesh layer, insert 8 couples of inorganic compounding A of anchoring piece level do not fire the insulation flaggy 3 fix, fixed form is same as above; Smear the second road plastering mortar again outside the steel mesh layer, and with the steel mesh parcel, form surface layer plastering mortar layer 6, the gross thickness control of bottom plastering mortar layer 4, steel mesh layer and surface layer plastering mortar layer 6 is at 7~9mm;
Outside surface layer plastering mortar layer 6, lay finish coat 7.
It is simple in structure that the inorganic compounding A level that this embodiment provides is not fired the warming plate wall insulation system, reasonable in design, take full advantage of inorganic compounding A level and do not fire the excellent properties of insulation flaggy 3, make entire system have excellent waterproof cracking resistance, thermal and insulating performance, fire safety performance and environmental-protecting performance simultaneously, long service life is applicable to body of wall and the roof heat insulation built under the various weather conditions.And its job practices is simple and convenient, easy operating, and the construction efficiency height, the construction period is short, and is easy to utilize.
The above only is preferred embodiment of the present invention, not in order to limiting the present invention, all any modifications of doing within the spirit and principles in the present invention, is equal to and replaces and improvement etc., all should be included within protection scope of the present invention.

Claims (6)

1. inorganic compounding A level is not fired the warming plate wall insulation system; it is characterized in that: comprise basic unit's body of wall layer from inside to outside; the adhesive mortar layer; inorganic compounding A level is not fired the insulation flaggy; bottom plastering mortar layer; alkaline-resisting screen cloth or steel mesh layer; surface layer plastering mortar layer; finish coat; described inorganic compounding A level is not fired the interface enhancement layer that the insulation flaggy comprises the heat insulation core material layer and is located at heat insulation core material layer external surface and inner surface respectively; described heat insulation core material layer is by polymer mortar; granular polystyrene; inorganic glass bead is through stirring cast molding, and described interface enhancement layer is made up of the compound alkaline-resisting screen cloth of polymer water-proofing anticracking mortar.
2. inorganic compounding A level as claimed in claim 1 is not fired the warming plate wall insulation system, it is characterized in that: described adhesive mortar layer, bottom plastering mortar layer and surface layer plastering mortar layer are made of the polymer modification mortar.
3. inorganic compounding A level as claimed in claim 1 is not fired the warming plate wall insulation system, it is characterized in that: described finish coat is made of flexible waterproof putty and coating.
4. inorganic compounding A level as claimed in claim 1 is not fired the warming plate wall insulation system, it is characterized in that: described finish coat is made of face brick adhesive mortar, face brick and pointing stuff.
5. inorganic compounding A level as claimed in claim 1 is not fired the warming plate wall insulation system, it is characterized in that: described inorganic compounding A level is not fired the insulation flaggy and is fixed on basic unit's body of wall layer by anchoring piece.
6. the job practices of not firing the warming plate wall insulation system as the arbitrary described inorganic compounding A level of claim 1 to 5 is characterized in that: comprise the steps:
(1) processing of basic unit's body of wall layer
A) when basic unit's body of wall layer is the sintered article masonry, interface processing can not be done on its surface, and its outside should arrange the waterproofing mortar leveling layer;
B) when basic unit's body of wall layer is concrete, its surface should the brushing boundary mortar, whitewashes the cement mortar screeding layer then;
C) when basic unit's body of wall layer is air-entrained concrete building block, aerated concrete outer wall plate, its surface should the brushing boundary mortar, whitewashes the waterproofing mortar leveling layer then;
(2) mortar of adhesive mortar layer, bottom plastering mortar layer and surface layer plastering mortar layer is made
Adhesive mortar layer, bottom plastering mortar layer and surface layer plastering mortar layer are made by the specialty polymer modified mortar, prepare the specialty polymer modified mortar in proportion, and carry out mechanical agitation, guarantee to stir, mixing time is no less than 5min after finishing from feeding intake, once prepare consumption and be advisable to use up in the 4h, the hot weather construction time should be controlled in 2h;
(3) inorganic compounding A level is not fired the paving of insulation flaggy
A) inorganic compounding A level is not fired and should do not removed its surperficial floating dust before the warming plate paving, in case of necessity should the brushing boundary mortar, and behind the boundary mortar surface drying, criticize again then and scrape the above-mentioned adhesive mortar of making;
B) inorganic compounding A level is not fired the stickup of insulation flaggy from the first floor, eject horizon and the aluminium alloys base bracket is set in distance ground 300mm eminence, along continuous straight runs is laterally pasted inorganic compounding A level and is not fired warming plate from bottom to top on the aluminium alloys base bracket, inorganic compounding A level does not fire warming plate and basic unit's body of wall layer stickup should be adopted full subsides method, during stickup, do not fire on the warming plate evenly every inorganic compounding A level and batch to scrape the adhesive mortar that a layer thickness is not less than 3mm and constitute the bonding mortar layer, bonding area should be greater than 95%, in time paste and be expressed on basic unit's body of wall layer, seam slit between plate and the plate must not be greater than 2mm, and it is long that the inorganic compounding A level between arranging is not up and down fired the vertical fissure of displacement 1/2 plate of warming plate;
(4) construction of bottom plastering mortar layer, alkaline-resisting screen cloth or steel mesh layer, surface layer plastering mortar layer
When finish coat is coating ornamental surface, the first road plastering mortar to be whitewashed inorganic compounding A level do not fire on the insulation flaggy, THICKNESS CONTROL strikes off with big thick stick earlier at 3~4mm, rubs with the hands with the plastics trowel and puts down, and forms bottom plastering mortar layer; Alkaline-resisting screen cloth is pressed in the bottom plastering mortar layer then, form alkaline-resisting scrim layer, first floor metope is answered the double-deck alkaline-resisting screen cloth of paving, the alkaline-resisting screen cloth paving of first floor should be adopted docking calculation, carry out the alkaline-resisting screen cloth paving of the second layer then, the alkaline-resisting screen cloth of remainder layer metope paving individual layer, lap width between the alkaline-resisting screen cloth plane is not less than 50mm, place, negative and positive angle also should press stubble overlap joint and lap width to be not less than 200mm, smooth, the corrugationless of screen cloth paving, the door and window hole place should increase along 45 ° of directions pastes one alkaline-resisting screen cloth reinforcement of 300mm * 400mm; After alkaline-resisting scrim layer is completed, outside alkaline-resisting scrim layer, insert anchoring piece to inorganic compounding A level do not fire the insulation flaggy fix; When bottom plastering mortar layer is most probably dry, outside alkaline-resisting scrim layer, smear the second road plastering mortar again, the second road plastering mortar THICKNESS CONTROL forms surface layer plastering mortar layer at 2~3mm;
When finish coat was decorating surface brick, bottom plastering mortar layer thickness was controlled at 2~3mm; After the bottom plastering mortar solidifies, carry out the paving of steel mesh layer, the mutual lap width in steel mesh limit is 40mm, overlapping part blocks steel mesh with the U-shaped clamp during construction with the distance that is not more than 300mm with galvanized iron wire with two net colligations together, makes it be close to bottom plastering mortar laminar surface, with crab-bolt steel mesh is anchored on basic unit's body of wall layer then, crab-bolt fixedly effective depth must not be less than 30mm, and local out-of-flatness place flattens with the U-shaped clamp; After the paving of steel mesh layer finishes, outside the steel mesh layer, insert anchoring piece to inorganic compounding A level do not fire the insulation flaggy fix; Smear the second road plastering mortar again outside the steel mesh layer, and with the steel mesh parcel, form surface layer plastering mortar layer, the gross thickness control of bottom plastering mortar layer, alkaline-resisting screen cloth or steel mesh layer and surface layer plastering mortar layer is at 7~9mm;
(5) outside surface layer plastering mortar layer, lay finish coat.
CN201310264810.3A 2013-06-28 2013-06-28 Inorganic compounding A level does not fire warming plate wall insulation system and construction method Expired - Fee Related CN103276831B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310264810.3A CN103276831B (en) 2013-06-28 2013-06-28 Inorganic compounding A level does not fire warming plate wall insulation system and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310264810.3A CN103276831B (en) 2013-06-28 2013-06-28 Inorganic compounding A level does not fire warming plate wall insulation system and construction method

Publications (2)

Publication Number Publication Date
CN103276831A true CN103276831A (en) 2013-09-04
CN103276831B CN103276831B (en) 2016-08-10

Family

ID=49059437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310264810.3A Expired - Fee Related CN103276831B (en) 2013-06-28 2013-06-28 Inorganic compounding A level does not fire warming plate wall insulation system and construction method

Country Status (1)

Country Link
CN (1) CN103276831B (en)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103452195A (en) * 2013-09-12 2013-12-18 安徽中瑞节能装饰材料集团有限公司 A-level flame-retardant modified polystyrene board heat-insulating system
CN103469927A (en) * 2013-09-12 2013-12-25 句容联众科技开发有限公司 Method for preparing anti-crack and sound-proof lightweight wall
CN103628647A (en) * 2013-12-09 2014-03-12 西安雅士特环保科技有限公司 Novel integral production board and manufacturing method thereof
CN103755287A (en) * 2014-01-28 2014-04-30 青岛环秀涂料有限公司 Grade-A fireproof self-heat-insulation wall body and manufacturing method thereof
CN104481039A (en) * 2014-12-19 2015-04-01 山西省第三建筑工程公司 Building outer wall heat insulation layer with surface simulation decoration effect and construction technology of building outer wall heat insulation layer
CN104963420A (en) * 2015-06-19 2015-10-07 三门峡职业技术学院 Construction method for building outer wall insulating layer
CN105421616A (en) * 2015-12-04 2016-03-23 吉林省豫王建能实业股份有限公司 Exterior wall water resisting and heat insulating integrated construction method
CN105569230A (en) * 2015-12-28 2016-05-11 江苏长达环保节能科技有限公司 Non-dismantling template integrating grade-A heat preservation and cast-in-situ concrete
CN106436943A (en) * 2016-11-11 2017-02-22 济南大学 Supporting-hanging type rock wool board/strip thin plastering external wall thermal-insulation system
CN107143359A (en) * 2017-07-19 2017-09-08 江苏东保装饰集团有限公司 A kind of passageway fire-proof plate construction technology
CN107892529A (en) * 2017-12-08 2018-04-10 中冶建筑研究总院有限公司 A kind of one-course concrete inner partition plate
CN108277894A (en) * 2017-01-05 2018-07-13 烟台政通节能建材设备制造有限公司 A kind of plate heat preserving formwork mounting process of concrete shear force wall
CN109372150A (en) * 2018-11-09 2019-02-22 江苏兴厦建设工程集团有限公司 A kind of external wall structure and its construction technology of fireproof heat insulating
CN111042361A (en) * 2019-12-30 2020-04-21 江苏建鸿环保材料科技有限公司 Gel non-combustible heat insulation plate external wall external heat insulation system and construction method
CN111305403A (en) * 2020-03-09 2020-06-19 湖南宝家云建筑工程管理有限公司 Wall body insulation structure
CN111926930A (en) * 2020-07-31 2020-11-13 山东华能保温材料有限公司 Fireproof external wall heat insulation system with composite polystyrene structure and preparation method thereof
CN113585521A (en) * 2021-08-11 2021-11-02 河南城源住宅工业有限公司 Prefabricated inorganic heat-insulating composite reinforced concrete outer wall
CN113833153A (en) * 2021-09-16 2021-12-24 东莞市金建达建筑有限公司 Building energy-saving heat-insulating wall structure and construction method thereof
CN114319619A (en) * 2021-11-19 2022-04-12 浙江绿城房屋服务系统有限公司 Method for manufacturing inner heat-insulating wall
CN114809337A (en) * 2022-04-14 2022-07-29 宁波甬坚建材有限公司 Inorganic light aggregate heat-insulation composite board and processing method and construction method thereof
CN115262803A (en) * 2022-08-10 2022-11-01 中建八局第三建设有限公司 Extruded gypsum composite board heat insulation structure and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2841796Y (en) * 2005-10-11 2006-11-29 于陵 Heat-preserving wall
CN101050665A (en) * 2007-04-24 2007-10-10 武汉理工大学 Self decoration composite silicate heat insulation plate
CN201891179U (en) * 2010-11-09 2011-07-06 东营市东源新型建材有限公司 Wall composite heat insulation system
CN102619287A (en) * 2012-04-11 2012-08-01 青岛凤翔化工有限公司 Inorganic heat-insulation fireproof plate
CN202430844U (en) * 2011-12-19 2012-09-12 福建欧诺漆科技有限公司 Heat insulating coating structure of composite heat insulating plate
CN203393863U (en) * 2013-06-28 2014-01-15 安徽中瑞节能装饰材料集团有限公司 Wall insulation system of inorganic compound A-level noncombustible insulation board

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2841796Y (en) * 2005-10-11 2006-11-29 于陵 Heat-preserving wall
CN101050665A (en) * 2007-04-24 2007-10-10 武汉理工大学 Self decoration composite silicate heat insulation plate
CN201891179U (en) * 2010-11-09 2011-07-06 东营市东源新型建材有限公司 Wall composite heat insulation system
CN202430844U (en) * 2011-12-19 2012-09-12 福建欧诺漆科技有限公司 Heat insulating coating structure of composite heat insulating plate
CN102619287A (en) * 2012-04-11 2012-08-01 青岛凤翔化工有限公司 Inorganic heat-insulation fireproof plate
CN203393863U (en) * 2013-06-28 2014-01-15 安徽中瑞节能装饰材料集团有限公司 Wall insulation system of inorganic compound A-level noncombustible insulation board

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
佟春玲: "STP超薄绝热板外墙外保温系统施工工艺", 《山西建筑》 *
周凯: "STP超薄绝热外墙保温施工技术", 《科技视界》 *

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469927A (en) * 2013-09-12 2013-12-25 句容联众科技开发有限公司 Method for preparing anti-crack and sound-proof lightweight wall
CN103452195A (en) * 2013-09-12 2013-12-18 安徽中瑞节能装饰材料集团有限公司 A-level flame-retardant modified polystyrene board heat-insulating system
CN103469927B (en) * 2013-09-12 2016-04-06 周建平 A kind of preparation method of cracking resistance sound-proof lightweight wall
CN103628647A (en) * 2013-12-09 2014-03-12 西安雅士特环保科技有限公司 Novel integral production board and manufacturing method thereof
CN103755287A (en) * 2014-01-28 2014-04-30 青岛环秀涂料有限公司 Grade-A fireproof self-heat-insulation wall body and manufacturing method thereof
CN104481039A (en) * 2014-12-19 2015-04-01 山西省第三建筑工程公司 Building outer wall heat insulation layer with surface simulation decoration effect and construction technology of building outer wall heat insulation layer
CN104963420B (en) * 2015-06-19 2017-08-29 三门峡职业技术学院 A kind of construction method of insulating layer of external wall of building
CN104963420A (en) * 2015-06-19 2015-10-07 三门峡职业技术学院 Construction method for building outer wall insulating layer
CN105421616A (en) * 2015-12-04 2016-03-23 吉林省豫王建能实业股份有限公司 Exterior wall water resisting and heat insulating integrated construction method
CN105569230A (en) * 2015-12-28 2016-05-11 江苏长达环保节能科技有限公司 Non-dismantling template integrating grade-A heat preservation and cast-in-situ concrete
CN105569230B (en) * 2015-12-28 2018-05-22 江苏长达环保节能科技有限公司 The non-dismantling formwork that a kind of A grades of heat preservation is integrated with Cast-in-place concrete
CN106436943A (en) * 2016-11-11 2017-02-22 济南大学 Supporting-hanging type rock wool board/strip thin plastering external wall thermal-insulation system
CN108277894A (en) * 2017-01-05 2018-07-13 烟台政通节能建材设备制造有限公司 A kind of plate heat preserving formwork mounting process of concrete shear force wall
CN107143359A (en) * 2017-07-19 2017-09-08 江苏东保装饰集团有限公司 A kind of passageway fire-proof plate construction technology
CN107892529A (en) * 2017-12-08 2018-04-10 中冶建筑研究总院有限公司 A kind of one-course concrete inner partition plate
CN109372150A (en) * 2018-11-09 2019-02-22 江苏兴厦建设工程集团有限公司 A kind of external wall structure and its construction technology of fireproof heat insulating
CN111042361A (en) * 2019-12-30 2020-04-21 江苏建鸿环保材料科技有限公司 Gel non-combustible heat insulation plate external wall external heat insulation system and construction method
CN111305403A (en) * 2020-03-09 2020-06-19 湖南宝家云建筑工程管理有限公司 Wall body insulation structure
CN111926930A (en) * 2020-07-31 2020-11-13 山东华能保温材料有限公司 Fireproof external wall heat insulation system with composite polystyrene structure and preparation method thereof
CN113585521A (en) * 2021-08-11 2021-11-02 河南城源住宅工业有限公司 Prefabricated inorganic heat-insulating composite reinforced concrete outer wall
CN113833153A (en) * 2021-09-16 2021-12-24 东莞市金建达建筑有限公司 Building energy-saving heat-insulating wall structure and construction method thereof
CN114319619A (en) * 2021-11-19 2022-04-12 浙江绿城房屋服务系统有限公司 Method for manufacturing inner heat-insulating wall
CN114809337A (en) * 2022-04-14 2022-07-29 宁波甬坚建材有限公司 Inorganic light aggregate heat-insulation composite board and processing method and construction method thereof
CN115262803A (en) * 2022-08-10 2022-11-01 中建八局第三建设有限公司 Extruded gypsum composite board heat insulation structure and construction method thereof

Also Published As

Publication number Publication date
CN103276831B (en) 2016-08-10

Similar Documents

Publication Publication Date Title
CN103276831A (en) Inorganic composite A-class non-combustible insulation board wall thermal insulation system and construction method
CN201284516Y (en) Wall heat-preserving system
CN201826405U (en) Environment-friendly wall insulating structure for prefabricated buildings
CN201883554U (en) Waterproof heat-insulting mortar layer
CN102011470A (en) Fire prevention, thermal insulation and decoration integrated board
CN101545286A (en) Method for constructing thermal insulation house
CN110616862A (en) Light safe heat-preservation and decoration integrated board and preparation method thereof
CN203393863U (en) Wall insulation system of inorganic compound A-level noncombustible insulation board
CN201190339Y (en) Insulation structure for outer wall of building
CN102797316B (en) Flat roof fireproof and thermal insulating brick
CN103850362A (en) GHB (Glazed Hollow Bead) heat preservation and heat insulation building wall body and construction technology
CN204112508U (en) A kind of in-situ concrete wall fire-retardant heat insulation structure
CN103979862B (en) A kind of energy-conserving and environment-protective material, preparation method and the application in building system thereof
CN103452195A (en) A-level flame-retardant modified polystyrene board heat-insulating system
CN102704583A (en) Compound heat preservation system
CN201539061U (en) Fireproofing isolating strip for exterior insulation system of construction exterior wall
CN208965756U (en) Keep the temperature integrated wall
CN202081520U (en) Composite heat insulating system
CN102704579A (en) Compound heat preservation system
CN203284898U (en) Film-coated rock wool board heat insulation system used for building curtain wall
CN203487650U (en) A-level flame-retardant modified polystyrene board heat-insulation system
CN103397713A (en) Self-insulation wall body structure
CN204435597U (en) Self-insulation wall structure
CN209163246U (en) A kind of Tenon bridging type solid string muscle rack composite plate
CN208168210U (en) A kind of composite thermal-insulating exterior formwork

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160620

Address after: Ancient Baihua No. 156 building, 230000 Hefei Road, Anhui province Shou Chun

Applicant after: HEFEI HUIZHONG INTELLECTUAL PROPERTY MANAGEMENT CO., LTD.

Address before: 230000, Anhui, Hefei New District, Tongling North Road and Ying River Road junction new station headquarters, A building, economic building

Applicant before: Anhui Zhongrui Decoration Materials Group Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20171208

Address after: The torch Park HII1201-217 No. 1789 Xinxiang 453600 Henan province high tech Zone Frestech Avenue (2109)

Patentee after: Henan plain public intellectual property operation and Management Co., Ltd.

Address before: The ancient building No. 156 Hefei Baihua Shouchun Road

Patentee before: HEFEI HUIZHONG INTELLECTUAL PROPERTY MANAGEMENT CO., LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180705

Address after: 330096 No. 899 torch five road, AI Sihu management office, Qingshan Lake District, Nanchang, Jiangxi

Patentee after: New brigade Construction Group Co., Ltd.

Address before: 453600 HII1201-217 (2109), torch Park, No. 1789, Xinfei Avenue, Xinxiang new high tech Zone, Henan.

Patentee before: Henan plain public intellectual property operation and Management Co., Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160810

Termination date: 20210628

CF01 Termination of patent right due to non-payment of annual fee