CN103274310A - 自提升式索道运输装置 - Google Patents
自提升式索道运输装置 Download PDFInfo
- Publication number
- CN103274310A CN103274310A CN2013102329269A CN201310232926A CN103274310A CN 103274310 A CN103274310 A CN 103274310A CN 2013102329269 A CN2013102329269 A CN 2013102329269A CN 201310232926 A CN201310232926 A CN 201310232926A CN 103274310 A CN103274310 A CN 103274310A
- Authority
- CN
- China
- Prior art keywords
- pulley
- yoke plate
- bracket
- cableway
- wheel group
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Types And Forms Of Lifts (AREA)
- Finish Polishing, Edge Sharpening, And Grinding By Specific Grinding Devices (AREA)
Abstract
自提升式索道运输装置,输送机械领域。本发明包括若干根横向布置的承载钢索、布置在承载钢索下方的牵引钢索、行走滑轮组及自提升装置。本发明设置有自提升装置,实现了索道运输的自装卸,提高了施工的安全性,提高工作效率,减少了操作人数,减小大型设备租用费;并且也解决了大型高备用起重设备无法到达索道起点的运输难题。
Description
技术领域
本发明属于输送机械领域,具体为一种自提升式索道运输装置。
背景技术
国家电网公司规划在“十二·五”期间建成“三纵三横”特高压交、直流骨干网架,形成大规模的“西电东送”、“北电南送” 能源配置格局,建成特高压电力高速公路。为了使电力高速公路绿色化,特高压电网的铁塔一般尽量避开城市,穿过山区架设。索道牵引装置成为特高压山区施工、运输必不可少的设备。
索道的起点一般设置在大型运输设备能够到达的地方(即主料场)。索道的终点就是铁塔所在的位置。索道起点安装一台索道牵引机和一座承载门架。由于门架上运载小车的高度一般在4米以上,一般采用大型起吊设备将铁塔构件吊起,通常人站在被吊件上将待运构件安装上运载小车。整个过程有一定的不安全性。
有时施工现场会出现一些尴尬的情况,例如主料场的地点位于两座山之间,起重设备根本无法到达,或者运输小车的起运点较高,无法利用起重设备将塔材安装在索道运输装置上。
发明内容
本发明的目的是提供一种能够自动进行塔材的提升安装的索道运输装置。
实现上述目的的技术方案是:自提升式索道运输装置,其特征在于:本发明包括若干根横向布置的承载钢索、布置在承载钢索下方的牵引钢索和行走滑轮组及自提升装置。
承载钢索上设置有两排纵向设置的行走滑轮组,两排纵向设置的行走滑轮组的下端分别连接有垂直设置的联板,两排纵向设置的行走滑轮组下端的联板分别通过一根水平设置的连杆连接成整体;两排纵向设置的行走滑轮组下端的连杆中心位置分别设置有过渡连接板,牵引钢索上与过渡连接板对应位置分别设置有一个抱索器,过渡连接板分别与对应的抱索器固定连接。
自提升装置包括提升钢索、机动绞磨、第一滑轮联板、第二滑轮联板、水平联板,第一滑轮联板和第二滑轮联板的下端分别设置有第一滑轮,第一滑轮联板和第二滑轮联板之间通过水平联板连接,第一滑轮联板的上端与其中一排纵向设置的行走滑轮组的连杆下端的过渡连接板可拆装连接,第二滑轮连接板的上端与另一排纵向设置的行走滑轮组的连杆下端的过渡连接板可拆装连接。
下支架设置在第一滑轮联板和第二滑轮联板下方的中心位置,所述下支架包括滑轮支架,滑轮支架的外侧端面的两侧分别对称安装有第二滑轮,滑轮支架的下端设置有用于承载重物的载重环。
提升钢索的一端固定在索道终点一端,并依此穿过靠近索道终点一侧的第二滑轮联板下端的第一滑轮、滑轮支架两侧的第二滑轮、靠近索道起点一侧的第一滑轮联板下端的第一滑轮,提升钢索的另一端固定并绕制在机动绞磨上。
优化地,上述下支架的滑轮支架的两端分别连接有拉环,拉环可以用于悬挂牵引拉绳,便于重物于就位;也可悬挂小件重物。
优化地,上述滑轮支架两侧第二滑轮的外侧分别对称设置有挡线滑轮,挡线滑轮可以用于控制提升钢索的出线方向,又可防止提升钢索脱落。
优化地,上述滑轮支架上安装装有配重块,配重块可以保证机动绞磨倒转时下支架会自动下落。
工作过程:
使用时,将本发明安装在主料场塔材上方,使机动绞磨倒转,让自提升装置的下支架在重力的作用下,降至工作高度,将塔材安装在下支架的载重环上。然后驱动机动绞磨正转,再将下支架及塔材提升到一定位置后,锁死机动绞磨,此时即可操作索道牵引机,驱动牵引索运动,带动滑轮在承载索上运动,进而带动重物运动,进行索道运输作业。
到达卸料场时,打开机动绞磨并倒转,放下作业对象。再提升下支架并锁住,使索下支架避开索道通道上的障碍物安全地回到主料场,准备进行下一个工作循环。
本发明的有益效果:实现索道运输的自装卸,提高了施工的安全性,提高工作效率,减少了操作人数,减小大型设备租用费;并且也解决了大型高备用起重设备无法到达索道起点的运输难题。
附图说明
图1为本发明的结构示意图;
图2为图1的俯视图;
图3为图1中A—A向剖视图。
具体实施方式
本发明包括四根横向布置的承载钢索1、布置在承载钢索1下方的牵引钢索2和自提升装置3;
四根承载钢索1上设置有两排纵向设置的行走滑轮组4、5,两排纵向设置的行走滑轮组4、5的下端分别连接有垂直设置的联板6,行走滑轮组4、5下端的联板6分别通过一根水平设置的连杆7连接成整体;行走滑轮组4、5的连杆7下端的中心位置分别设置有过渡连接板8,牵引钢索2上与过渡连接板8对应位置分别设置有一个抱索器9,过渡连接板8分别与对应的抱索器9固定连接。
自提升装置3包括提升钢索10、机动绞磨11、水平联板22,两块滑轮联板12、13和下支架14,两块滑轮联板12、13的下端分别设置有第一滑轮15、16,两块滑轮联板12、13之间通过水平联板22连接,滑轮连接板12的上端与行走滑轮组4的连杆7下端的过渡连接板8连接,滑轮连接板13的上端与行走滑轮组5的连杆7下端的过渡连接板8连接。
下支架14设置在两块滑轮联板12、13下方的中心位置,所述下支架14包括滑轮支架17,滑轮支架17上安装装有配重块23,滑轮支架17的外侧端面的两侧分别对称安装有第二滑轮18,滑轮支架17两侧第二滑轮18的外侧分别对称设置有挡线滑轮19,滑轮支架17的下端设置有用于承载重物的载重环20,滑轮支架17的两端分别连接有拉环21。
提升钢索10的一端固定在索道终点一端,并依此穿过靠近索道终点一侧的滑轮联板13下端的第一滑轮16、下支架14的滑轮支架17两侧的第二滑轮18、靠近索道起点一侧的滑轮联板12下端的第一滑轮15,提升钢索10的另一端固定并绕制在机动绞磨11上。
Claims (4)
1.自提升式索道运输装置,其特征在于:本发明包括若干根横向布置的承载钢索、布置在承载钢索下方的牵引钢索、行走滑轮组及自提升装置;
承载钢索上设置有两排纵向设置的行走滑轮组,两排纵向设置的行走滑轮组的下端分别连接有垂直设置的联板,两排纵向设置的行走滑轮组下端的联板分别通过一根水平设置的连杆连接成整体;两排纵向设置的行走滑轮组下端的连杆中心位置分别设置有过渡连接板,牵引钢索上与过渡连接板对应位置分别设置有一个抱索器,过渡连接板分别与对应的抱索器固定连接;
自提升装置包括提升钢索、机动绞磨、第一滑轮联板、第二滑轮联板、水平联板,第一滑轮联板和第二滑轮联板的下端分别设置有第一滑轮,第一滑轮联板和第二滑轮联板之间通过水平联板连接,第一滑轮联板的上端与其中一排纵向设置的行走滑轮组的连杆下端的过渡连接板可拆装连接,第二滑轮连接板的上端与另一排纵向设置的行走滑轮组的连杆下端的过渡连接板可拆装连接;
下支架设置在第一滑轮联板和第二滑轮联板下方的中心位置,所述下支架包括滑轮支架,滑轮支架的外侧端面的两侧分别对称安装有第二滑轮,滑轮支架的下端设置有用于承载重物的载重环;
提升钢索的一端固定在索道终点一端,并依此穿过靠近索道终点一侧的第二滑轮联板下端的第一滑轮、滑轮支架两侧的第二滑轮、靠近索道起点一侧的第一滑轮联板下端的第一滑轮,提升钢索的另一端固定并绕制在机动绞磨上。
2.根据权利要求1所述的可自提升式索道运输装置,其特征在于:下支架的滑轮支架的两端分别设置有拉环。
3.根据权利要求1或2所述的自提升式索道运输装置,其特征在于:滑轮支架两侧第二滑轮的外侧分别对称设置有挡线滑轮。
4.根据权利要求1所述的自提升装置,其特征在于:滑轮支架上安装装有配重块。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310232926.9A CN103274310B (zh) | 2013-06-13 | 2013-06-13 | 自提升式索道运输装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310232926.9A CN103274310B (zh) | 2013-06-13 | 2013-06-13 | 自提升式索道运输装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103274310A true CN103274310A (zh) | 2013-09-04 |
CN103274310B CN103274310B (zh) | 2015-04-08 |
Family
ID=49056973
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310232926.9A Active CN103274310B (zh) | 2013-06-13 | 2013-06-13 | 自提升式索道运输装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103274310B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106276628A (zh) * | 2016-10-18 | 2017-01-04 | 湖南省中南桥梁安装工程有限公司 | 一种轴铰式缆索起重机支索器结构及其安装方法 |
CN108298432A (zh) * | 2018-02-01 | 2018-07-20 | 湖北思泽新能源科技有限公司 | 一种改进的缆索吊机 |
CN109402870A (zh) * | 2018-09-14 | 2019-03-01 | 安徽建筑大学 | 一种棉被加工磨压装置 |
WO2020186618A1 (zh) * | 2019-03-16 | 2020-09-24 | 郭延巍 | 索道自行式运输设备 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2848803Y (zh) * | 2005-11-18 | 2006-12-20 | 厉保运 | 钢索起重机 |
CN2851227Y (zh) * | 2005-12-22 | 2006-12-27 | 郭金巨 | 闭口式水平游轮组滑车缆道 |
CN201309803Y (zh) * | 2008-11-04 | 2009-09-16 | 滕茂才 | 架空运输索道 |
CN101863423B (zh) * | 2010-06-23 | 2012-07-18 | 广东省长大公路工程有限公司 | 一种悬索桥施工用的钢箱梁缆载吊机 |
CN203373022U (zh) * | 2013-06-13 | 2014-01-01 | 扬州市振东电力器材有限公司 | 自提升式索道运输装置 |
-
2013
- 2013-06-13 CN CN201310232926.9A patent/CN103274310B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2848803Y (zh) * | 2005-11-18 | 2006-12-20 | 厉保运 | 钢索起重机 |
CN2851227Y (zh) * | 2005-12-22 | 2006-12-27 | 郭金巨 | 闭口式水平游轮组滑车缆道 |
CN201309803Y (zh) * | 2008-11-04 | 2009-09-16 | 滕茂才 | 架空运输索道 |
CN101863423B (zh) * | 2010-06-23 | 2012-07-18 | 广东省长大公路工程有限公司 | 一种悬索桥施工用的钢箱梁缆载吊机 |
CN203373022U (zh) * | 2013-06-13 | 2014-01-01 | 扬州市振东电力器材有限公司 | 自提升式索道运输装置 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106276628A (zh) * | 2016-10-18 | 2017-01-04 | 湖南省中南桥梁安装工程有限公司 | 一种轴铰式缆索起重机支索器结构及其安装方法 |
CN106276628B (zh) * | 2016-10-18 | 2017-11-14 | 湖南省中南桥梁安装工程有限公司 | 一种轴铰式缆索起重机支索器结构及其安装方法 |
CN108298432A (zh) * | 2018-02-01 | 2018-07-20 | 湖北思泽新能源科技有限公司 | 一种改进的缆索吊机 |
CN108298432B (zh) * | 2018-02-01 | 2019-03-12 | 湖北思泽新能源科技有限公司 | 一种改进的缆索吊机 |
CN109402870A (zh) * | 2018-09-14 | 2019-03-01 | 安徽建筑大学 | 一种棉被加工磨压装置 |
WO2020186618A1 (zh) * | 2019-03-16 | 2020-09-24 | 郭延巍 | 索道自行式运输设备 |
Also Published As
Publication number | Publication date |
---|---|
CN103274310B (zh) | 2015-04-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203373022U (zh) | 自提升式索道运输装置 | |
CN103274310B (zh) | 自提升式索道运输装置 | |
CN203699606U (zh) | 一种升降机和铁塔 | |
CN101920920A (zh) | 可移动小型模具起吊机 | |
CN206562264U (zh) | 一种用于超高层建筑外部运输的吊装设备 | |
CN201228216Y (zh) | 堆垛机 | |
CN201587828U (zh) | 龙门吊 | |
CN204958320U (zh) | 一种建筑重物提升机 | |
CN202226623U (zh) | 自动提升倾倒装置 | |
CN203255902U (zh) | 多滑轮组四机联动井架提升平台 | |
CN205183582U (zh) | 一种剪板机用过渡接料装置 | |
CN204324743U (zh) | 一种适用于吊运长状物品的门式起重机 | |
CN203402859U (zh) | 塔机标准节电动引进装置 | |
CN204251233U (zh) | 储罐内罐壁板吊装装置 | |
CN204497669U (zh) | 一种用于输电线路上的可行走式运输车 | |
CN202444194U (zh) | 一种隔离开关专用运输车 | |
CN203922508U (zh) | 一种便携式起重装置 | |
CN104929378A (zh) | 安全高效运输光伏板的自动升降靠梯 | |
CN204299159U (zh) | 中心吊升降脚手架绳轮系双柱转向装置 | |
CN204297575U (zh) | 输送升降一体机 | |
CN204417004U (zh) | 一种水泥电线杆起吊运输车 | |
CN218370089U (zh) | 一种自提升索道小车运输系统 | |
CN204702434U (zh) | 一种用于配电柜快速运输安装的装置 | |
CN204689566U (zh) | 一种用于配电柜快速运输安装的装置 | |
CN104444183A (zh) | 输送升降一体机 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |