CN103243732A - Installing method of marine anemometer tower base structure - Google Patents
Installing method of marine anemometer tower base structure Download PDFInfo
- Publication number
- CN103243732A CN103243732A CN2012100220784A CN201210022078A CN103243732A CN 103243732 A CN103243732 A CN 103243732A CN 2012100220784 A CN2012100220784 A CN 2012100220784A CN 201210022078 A CN201210022078 A CN 201210022078A CN 103243732 A CN103243732 A CN 103243732A
- Authority
- CN
- China
- Prior art keywords
- anemometer tower
- pile
- marine
- driving frame
- steel tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Foundations (AREA)
Abstract
Provided is an installing method of a marine anemometer tower base structure. The marine anemometer tower base structure is a vertical marine anemometer tower base, a basic mode that three steel tube piles and a guiding frame are combined, the inclination of a guiding sleeve is the same to that of a anemometer tower pile foundation, the requirement for the pile foundation location degree is met, and columns of a pile driving frame are in welding connection with oblique support rods through horizontal connecting rods to form a steel truss structure. The three steel tube piles are sequentially driven through the guiding sleeve, datum planes of the piles are cut, the pile driving frame is recovered after piling operation is finished, a small basic platform is added and then the guiding frame is welded and installed onto the three steel tube piles in an aligning mode. By means of the method, the stress of steel tube pile foundations is definite, extreme condition resisting capacity is strong, and influence of seabed ocean currents on the steel tube pile foundations is small. In addition, the installing construction is convenient, a construction period is short, the construction cost is low, and the base structure is safe, reliable and long in service life.
Description
Technical field
What the present invention relates to is a kind of mounting method of marine anemometer tower foundation structure, and the mounting method especially for the marine anemometer tower foundation structure of leading truck is applicable to Oversea wind power generation.
Background technology
The wind-powered electricity generation resource is reproducible non-polluting energy sources, and China coastline is very long, compares the land wind-power electricity generation, the prospect of ocean wind-power electricity generation is more wide, wind energy on the sea aboundresources and stable, wind regime is better than land, and is subjected to soil utilization, noise pollution, Electromagnetic Interference less.Changing Pattern and the feature of the primary clear and definite greater coasting area wind of exploitation wind energy on the sea, offshore land wind speed that the weather station is surveyed is owing to be subjected to factor affecting such as surface roughness and atmospheric stability, with marine wind speed certain difference is arranged, can not directly be used for representing marine wind regime, the direct method of obtaining the sea turn resource data is to set up anemometer tower at sea.
The marine anemometer tower that present China has built up is fewer, marine anemometer tower is except bearing dead load, equipment self-weight, wind load, geological process, temperature load, icing load, installing the maintenance load, because its residing marine environment, also will bear wave load, morning and evening tides load, ocean current load and ship collision load, design conditions are more complicated than conventional land building.
Based on the complexity of marine anemometer tower load, China lacks in experience aspect the anemometer tower construction installation simultaneously, and cost and the duration of anemometer tower installation at present all are in higher level.
Summary of the invention
Main purpose of the present invention provides a kind of mounting method of marine anemometer tower foundation structure, and this mounting method easy construction, safe and reliable can improve efficiency of construction and quality effectively, reduces the construction cost cost simultaneously effectively.
The technical scheme that technical solution problem of the present invention adopts is, a kind of mounting method of marine anemometer tower foundation structure, anemometer tower foundation structure is marine self-supporting anemometer tower basis, adopt 3 base forms that steel pipe pile is combined with leading truck, the anemometer tower pile driving frame is formed by the leading truck structure of modification, namely increase up and down two-layer loudspeaker guiding in the column outside of correspondence by welding and form fairlead, the fairlead gradient is identical with anemometer tower pile foundation gradient, and meet the degree requirement of pile foundation position, each column of pile driving frame is welded to connect by horizontal brace rod and inclined support bar, forms the steel truss structure form.By respectively 3 steel pipe piles being squeezed into successively by fairlead, a cutting stake datum after piling work is finished, reclaims pile driving frame, adds behind the basic chain-wales leading truck by on contraposition welded and installed to 3 steel pipe pile.
The invention has the beneficial effects as follows steel pipe pile basic stress things to know, opposing extreme operating condition ability is stronger, and the seabed ocean current is less to the influence of steel pipe pile basis, this installation simultaneously is convenient, and construction period is shorter, and cost is lower, foundation structure is safe and reliable, and application life is longer.
Description of drawings
The present invention will be further described below in conjunction with drawings and Examples.
Fig. 1 pile driving frame structure elevation;
Fig. 2 a anemometer tower flow of installation-pile driving frame sinking figure;
Fig. 2 b anemometer tower flow of installation-first segment pitching pile figure;
Fig. 2 c anemometer tower flow of installation-first segment piling figure;
Fig. 2 d anemometer tower flow of installation-second joint pile extension figure;
Fig. 2 e anemometer tower flow of installation-second joint piling figure;
Fig. 2 f anemometer tower flow of installation-pile driving frame reclaims transformation map;
Fig. 2 g anemometer tower flow of installation-leading truck installation drawing.
1-fairlead wherein; 2-column; 3-horizontal brace rod; 4-inclined support bar; 5-pile driving barge; 6-crawler crane; 7-first segment steel pipe pile; 8-pile hammer; 9-the second joint steel pipe pile; 10-basic chain-wales.
The specific embodiment
Marine anemometer tower foundation structure is combined with leading truck by 3 steel pipe piles.As shown in Figure 1, the pile driving frame structure adds up and down two-layer loudspeaker guiding by column 2 outsides by welding and forms fairlead 1, fairlead 1 gradient is identical with anemometer tower pile foundation gradient, and meet the degree requirement of pile foundation position, each column 2 of pile driving frame is welded to connect by horizontal brace rod 3 and inclined support bar 4, forms the steel truss structure form.
Mounting method adopts the pile driving barge 5 that is equipped with pile hammer 8 to implement piling work shown in Fig. 2 a, and crawler crane 6 is placed in pile driving barge 5 deck front ends, pile driving barge 5 casts anchor to predetermined stake position, crawler crane 6 suspension hooks are connected with the pile driving frame suspension centre, carry out lifting operation, make the pile driving frame sinking in place.Shown in Fig. 2 b, utilize crawler crane 6 that first segment steel pipe pile 7 is inserted fairlead 1 successively.Shown in Fig. 2 c, utilize pile hammer 8 that first segment steel pipe pile 7 is squeezed into successively.Shown in Fig. 2 d, utilize crawler crane 6 that the second joint steel pipe pile 9 is carried out pile extension with first segment steel pipe pile 7 successively.Shown in Fig. 2 e, utilize pile hammer 8 that the second joint steel pipe pile 9 is squeezed into successively.Shown in Fig. 2 f, after piling is finished, cutting steel pipe pile datum, cutting fairlead 1 connects, and the rotation pile driving frame, utilizes crawler crane 6 to promote pile driving frame, after pile driving frame is reclaimed, adds basic chain-wales 10 on its top and makes it to be transformed into leading truck.Shown in Fig. 2 g, utilize crawler crane 6 with leading truck and steel pipe pile contraposition welding, and install.
Claims (2)
1. the mounting method of a marine anemometer tower foundation structure, this anemometer tower foundation structure is marine self-supporting anemometer tower basis, adopt 3 base forms that steel pipe pile is combined with leading truck, the fairlead gradient is identical with anemometer tower pile foundation gradient, and meet the degree requirement of pile foundation position, each column of pile driving frame is welded to connect by horizontal brace rod and inclined support bar, form the steel truss structure form, by respectively 3 steel pipe piles being squeezed into successively by fairlead, cutting stake datum, and the connection of cutting fairlead are after piling work is finished, pile driving frame is reclaimed, add behind the basic chain-wales leading truck by on contraposition welded and installed to 3 steel pipe pile.
2. according to the mounting method of a kind of marine anemometer tower foundation structure of claim 1, it is characterized in that pile driving frame is formed by the leading truck structure of modification, namely increase up and down two-layer loudspeaker guiding in the column outside of correspondence by welding and form fairlead.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100220784A CN103243732A (en) | 2012-02-01 | 2012-02-01 | Installing method of marine anemometer tower base structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100220784A CN103243732A (en) | 2012-02-01 | 2012-02-01 | Installing method of marine anemometer tower base structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103243732A true CN103243732A (en) | 2013-08-14 |
Family
ID=48923584
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012100220784A Pending CN103243732A (en) | 2012-02-01 | 2012-02-01 | Installing method of marine anemometer tower base structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103243732A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103541363A (en) * | 2013-11-15 | 2014-01-29 | 中交天航港湾建设工程有限公司 | Pile sinking device and pile sinking method based on shallow sea reclamation area inclined piles |
CN103556640A (en) * | 2013-11-15 | 2014-02-05 | 中交天航港湾建设工程有限公司 | Method for sinking vertical piles in shallow sea reclamation area |
CN106381870A (en) * | 2016-11-16 | 2017-02-08 | 中铁工程机械研究设计院有限公司 | Cement deep mixing pile frame system and pile forming method |
CN107882026A (en) * | 2016-09-29 | 2018-04-06 | 海洋能源科技股份有限公司 | Offshore wind generating steel-pipe pile sets method |
CN109469089A (en) * | 2018-12-03 | 2019-03-15 | 中交三航(上海)新能源工程有限公司 | A kind of interpolation type offshore wind farm jacket basis carrying steady pipe casing and construction method |
CN109577323A (en) * | 2018-12-18 | 2019-04-05 | 中交第三航务工程局有限公司宁波分公司 | Tubular pole reinforcing device and method |
CN110080274A (en) * | 2019-05-16 | 2019-08-02 | 福建省宏闽电力工程监理有限公司 | A kind of offshore wind farm cushion cap foundation construction method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1990008232A1 (en) * | 1989-01-11 | 1990-07-26 | Mærsk Olie Og Gas A/S | A method and a device for mounting the piles associated with the installation of a pile-founded offshore platform |
JP2006316495A (en) * | 2005-05-12 | 2006-11-24 | Kobe Steel Ltd | Foundation structure of bridge pier and its construction method |
CN101736751A (en) * | 2009-12-30 | 2010-06-16 | 上海勘测设计研究院 | Connecting structure between wind measurement tower and pile foundation of offshore wind power station |
CN201660899U (en) * | 2009-12-25 | 2010-12-01 | 利丰海洋工程(天津)有限公司 | Combined piling righting structure |
CN201952809U (en) * | 2010-12-02 | 2011-08-31 | 中国水电顾问集团华东勘测设计研究院 | Steel truss type offshore anemometer tower foundation structure |
-
2012
- 2012-02-01 CN CN2012100220784A patent/CN103243732A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1990008232A1 (en) * | 1989-01-11 | 1990-07-26 | Mærsk Olie Og Gas A/S | A method and a device for mounting the piles associated with the installation of a pile-founded offshore platform |
JP2006316495A (en) * | 2005-05-12 | 2006-11-24 | Kobe Steel Ltd | Foundation structure of bridge pier and its construction method |
CN201660899U (en) * | 2009-12-25 | 2010-12-01 | 利丰海洋工程(天津)有限公司 | Combined piling righting structure |
CN101736751A (en) * | 2009-12-30 | 2010-06-16 | 上海勘测设计研究院 | Connecting structure between wind measurement tower and pile foundation of offshore wind power station |
CN201952809U (en) * | 2010-12-02 | 2011-08-31 | 中国水电顾问集团华东勘测设计研究院 | Steel truss type offshore anemometer tower foundation structure |
Non-Patent Citations (1)
Title |
---|
杜瑞刚等: "打桩基盘的改进设计及施工控制", 《石油和化工设备》, vol. 13, no. 10, 31 October 2010 (2010-10-31) * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103541363A (en) * | 2013-11-15 | 2014-01-29 | 中交天航港湾建设工程有限公司 | Pile sinking device and pile sinking method based on shallow sea reclamation area inclined piles |
CN103556640A (en) * | 2013-11-15 | 2014-02-05 | 中交天航港湾建设工程有限公司 | Method for sinking vertical piles in shallow sea reclamation area |
CN103541363B (en) * | 2013-11-15 | 2015-07-22 | 中交天航港湾建设工程有限公司 | Pile sinking device and pile sinking method based on shallow sea reclamation area inclined piles |
CN103556640B (en) * | 2013-11-15 | 2015-11-25 | 中交天航港湾建设工程有限公司 | A kind of pile-sinking method based on shallow sea reclamation area soldier piles |
CN107882026A (en) * | 2016-09-29 | 2018-04-06 | 海洋能源科技股份有限公司 | Offshore wind generating steel-pipe pile sets method |
CN106381870A (en) * | 2016-11-16 | 2017-02-08 | 中铁工程机械研究设计院有限公司 | Cement deep mixing pile frame system and pile forming method |
CN106381870B (en) * | 2016-11-16 | 2018-06-12 | 中铁工程机械研究设计院有限公司 | A kind of deep concrete mixture ship pile frame system and pile making method |
CN109469089A (en) * | 2018-12-03 | 2019-03-15 | 中交三航(上海)新能源工程有限公司 | A kind of interpolation type offshore wind farm jacket basis carrying steady pipe casing and construction method |
CN109577323A (en) * | 2018-12-18 | 2019-04-05 | 中交第三航务工程局有限公司宁波分公司 | Tubular pole reinforcing device and method |
CN109577323B (en) * | 2018-12-18 | 2020-12-18 | 中交第三航务工程局有限公司宁波分公司 | Tubular pile reinforcing method |
CN110080274A (en) * | 2019-05-16 | 2019-08-02 | 福建省宏闽电力工程监理有限公司 | A kind of offshore wind farm cushion cap foundation construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Guo et al. | Review of integrated installation technologies for offshore wind turbines: Current progress and future development trends | |
CN112009635B (en) | Semi-submersible type wind power generation foundation platform and installation method thereof | |
CN201649118U (en) | Foundation structure of jacket-type offshore wind turbine | |
JP4575061B2 (en) | Construction method for offshore wind power generation facilities | |
CN101545462B (en) | A steel-concrete combined weight type offshore wind fan foundation structure | |
CN103243732A (en) | Installing method of marine anemometer tower base structure | |
CN102390495A (en) | Offshore combined floating wind power generation platform | |
EP2461031A2 (en) | Technology for combined offshore floating wind power generation | |
CN103015445A (en) | Transition-section-free single-pile foundation construction and fan equipment installation process for shallow sea area wind farm | |
CN102285429A (en) | Floating type supporting structure for marine windmill | |
CN113846665B (en) | Combined type offshore wind turbine foundation suitable for deepwater conditions and installation method thereof | |
CN113653601B (en) | Semi-submersible floating type fan device and system | |
CN201952809U (en) | Steel truss type offshore anemometer tower foundation structure | |
CN105862907A (en) | Annular combination type super-large diameter offshore wind power single pile foundation and construction technology thereof | |
CN203475459U (en) | Three-pile guide pipe frame foundation structure of offshore wind turbine | |
CN103556651A (en) | Precast concrete jacket type offshore wind turbine foundation | |
CN110453714B (en) | Offshore wind power jacket gravity type cylindrical foundation structure and construction method thereof | |
CN103423093B (en) | Platform floating type wind driven generator provided with suction caissons and used for sea surface of deep sea | |
CN202416341U (en) | Steel truss automatically-standing seaborne anemometer tower | |
CN201704699U (en) | Steel structure foundation system of offshore fan | |
CN107795438B (en) | A kind of construction method of assistance platform | |
CN201502064U (en) | Offshore wind turbine steel structural foundation | |
CN101538845B (en) | Construction method for constructing large offshore wind farm with water depth less than 2 m | |
CN201713827U (en) | Fan base structure of offshore wind power station | |
CN201599157U (en) | Offshore wind turbine infrastructure with multi-pile steel framework and without peripheral connecting pipes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C05 | Deemed withdrawal (patent law before 1993) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130814 |