Nothing Special   »   [go: up one dir, main page]

CN103222314B - The method and apparatus reducing power consumption of base station system - Google Patents

The method and apparatus reducing power consumption of base station system Download PDF

Info

Publication number
CN103222314B
CN103222314B CN201180001866.9A CN201180001866A CN103222314B CN 103222314 B CN103222314 B CN 103222314B CN 201180001866 A CN201180001866 A CN 201180001866A CN 103222314 B CN103222314 B CN 103222314B
Authority
CN
China
Prior art keywords
base station
station system
group
transmission channel
time period
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201180001866.9A
Other languages
Chinese (zh)
Other versions
CN103222314A (en
Inventor
谭利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Publication of CN103222314A publication Critical patent/CN103222314A/en
Application granted granted Critical
Publication of CN103222314B publication Critical patent/CN103222314B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/02Power saving arrangements
    • H04W52/0203Power saving arrangements in the radio access network or backbone network of wireless communication networks
    • H04W52/0206Power saving arrangements in the radio access network or backbone network of wireless communication networks in access points, e.g. base stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

A kind of method and apparatus reducing power consumption of base station system, relates to mobile communication technology field, it is possible to is not affecting in the case of base station system normally works, is saving the energy consumption of base station system.The method of the reduction power consumption of base station system of the embodiment of the present invention includes: in obtaining a upper cycle, actual user's quantity is less than number of users threshold value and/or the handling capacity time period less than throughput threshold value, the described time period at least included for the first sub-time period, the maximum number of user amount that described number of users threshold value can carry when opening one group of transmission channel less than or equal to described base station system, the maximum throughput that described throughput threshold value can carry when opening one group of transmission channel less than or equal to described base station system;When base station system works in the described first sub-time period in this cycle, open first group of transmission channel, and close other group transmission channels in addition to described first group of transmission channel.

Description

The method and apparatus reducing power consumption of base station system
Technical field
The present invention relates to mobile communication technology field, particularly relate to a kind of reduction power consumption of base station system Method and apparatus.
Background technology
Along with the extensive application of multi-antenna technology, MIMO (Multiple-Transmit Multiple-Receive, is called for short MTMR) multiple-input, multiple-output (Multiple-Input of mode Multiple-Output, is called for short MIMO) technology have also been obtained and promote widely and use.MIMO Technology uses multiple spatial channel transmission and receives data, it is possible to be greatly improved power system capacity, increases The area coverage of antenna.
For the MIMO carrier wave of MTMR mode, if certain period carrier wave is in, user is few, gulp down The time period that the amount of telling is low, still taking more time slot, this situation can cause bigger power wave Take, increased the weight of the loss of base station system.
Summary of the invention
Embodiments of the invention technical problem to be solved is that providing a kind of reduces base station system energy The method and apparatus of consumption, it is possible to reduce the energy consumption of MIMO base station system, saves the energy, has Effect extends the working life of the devices such as base station system sender.
For solving above-mentioned technical problem, embodiments of the invention adopt the following technical scheme that
A kind of method reducing power consumption of base station system, including:
In obtaining a upper cycle, actual user's quantity is less than less than number of users threshold value and/or handling capacity The time period of throughput threshold value, the described time period at least includes the first sub-time period, described user The maximum that number threshold value can carry when opening one group of transmission channel less than or equal to described base station system Number of users, described throughput threshold value is opened one group less than or equal to described base station system and is launched logical The maximum throughput that can carry during road;
When base station system works in the described first sub-time period in this cycle, open first group and send out Penetrate passage, and close other group transmission channels in addition to described first group of transmission channel.
A kind of method reducing power consumption of base station system, including:
When base station system works in the first default sub-time period in this cycle, open first group Transmission channel, and close other group transmission channels in addition to described first group of transmission channel;Wherein, When the first sub-time period described in described base station system was in a upper cycle, the reality of base station system carrying Border number of users opens, less than described base station system, the maximum number of user that one group of transmission channel can carry Amount and/or handling capacity open, less than described base station system, the maximum throughput that one group of transmission channel can carry Amount.
A kind of device reducing power consumption of base station system, including:
Acquiring unit, in being used for the cycle that obtains, actual user's quantity is less than number of users threshold value And/or handling capacity at least includes first period of the day from 11 p.m. to 1 a.m less than the time period of throughput threshold value, described time period Between section, described number of users threshold value less than or equal to described base station system open one group of transmission channel time The maximum number of user amount that can carry, described throughput threshold value is opened less than or equal to described base station system The maximum throughput that can carry when opening one group of transmission channel;
Control unit, is used for when base station system works in the described first sub-time period in this cycle, Open first group of transmission channel, and close other group transmittings in addition to described first group of transmission channel Passage.
A kind of device reducing power consumption of base station system, including:
Presetting unit, for preset time period, the described default time period at least includes the first son Time period;
Control unit, for working in the default first sub-time period when base station system in this cycle Time, open first group of transmission channel, simultaneously close off other in addition to described first group of transmission channel Group transmission channel;Wherein, when the first sub-time period described in described base station system was in a upper cycle, Actual user's quantity of base station system carrying opens one group of transmission channel energy less than described base station system Maximum number of user amount and/or the handling capacity of carrying open one group of transmission channel less than described base station system The maximum throughput that can carry.
The method and apparatus of the reduction power consumption of base station system of the embodiment of the present invention, by by base station system Transmission channel packet, and calculate only open one of which transmission channel time number of users threshold value and/or Throughput threshold value;Then in actual user's quantity less than described number of users threshold value and/or handling capacity Only open one group of transmission channel less than " idle period " of described throughput threshold value, do not affecting In the case of base station system normally works, save the energy consumption of base station system.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below by right In embodiment description, the required accompanying drawing used is briefly described, it should be apparent that, in describing below Accompanying drawing is only some embodiments of the present invention, for those of ordinary skill in the art, is not paying On the premise of creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 be the method reducing power consumption of base station system in the embodiment of the present invention schematic flow sheet it One;
Fig. 2 be the method reducing power consumption of base station system in the embodiment of the present invention schematic flow sheet it Two;
Fig. 3 be the method reducing power consumption of base station system in the embodiment of the present invention schematic flow sheet it Three;
Fig. 4 is the schematic diagram of base station system in the embodiment of the present invention;
Fig. 5 is one of schematic diagram of device reducing power consumption of base station system in the embodiment of the present invention;
Fig. 6 is the two of the schematic diagram of the device reducing power consumption of base station system in the embodiment of the present invention.
Description of reference numerals:
1, transmission channel 2, reception passage 3,4, first group of antenna are launched logical 5, second group of road transmission channel 6, the 3rd group of transmission channel 7, the 4th group of transmitting Passage
Detailed description of the invention
The embodiment of the present invention provides a kind of method and apparatus reducing power consumption of base station system, it is possible to joint The about energy consumption of base station system.
Below in conjunction with the accompanying drawings the embodiment of the present invention is described in detail.
Embodiment one
The present embodiment provides a kind of method reducing power consumption of base station system, as it is shown in figure 1, the party Method includes:
Step 101, obtain actual user's quantity in a upper cycle be less than number of users threshold value and/or Handling capacity at least included for the first sub-time less than the time period of throughput threshold value, described time period Section, when described number of users threshold value opens one group of transmission channel less than or equal to described base station system The maximum number of user amount that can carry, described throughput threshold value is less than or equal to described base station system The maximum throughput that can carry when opening one group of transmission channel.
Cycle in the present embodiment may refer to the time period being manually set, and such as, the cycle is permissible It it is one day or one week or one month.
In seven days of one week, due to the impact of various factors, the portfolio of every day is all different, And there is obvious gap.Research find, weekly on the same day in, such as the Monday before two weeks With one week before Monday in, portfolio is basicly stable, and gap is the least.Accordingly, as One of which preferred implementation, the present embodiment is chosen one week seven days as a cycle, is i.e. selected Take the on the same day as the reference of this week this day corresponding and real in calculating seven days last weeks of last week Border number of users is less than or equal to handling capacity door less than or equal to number of users threshold value and/or handling capacity The time period of limit value, we claim, and " number of users is less than less than number of users threshold value and/or handling capacity The time period of throughput threshold value " it is " idle period ".
When determining " idle period ", can be only with reference to number of users threshold value or only with reference to handling up Amount threshold value.
Preferably, in order to obtain more accurately " idle period ", the present embodiment with reference to Amount threshold value and throughput threshold value, will " number of users and handling capacity be respectively less than number of users door Limit value and the time period of throughput threshold value " conduct " idle period ", for example, it is computed, The morning of last Monday is in 2:00~6:00 and the morning 9:00~11:00, number of users and handling capacity Be respectively less than number of users threshold value and throughput threshold value, therefore, morning 2:00~6:00 and the morning 9:00~11:00 is " idle period " of last Monday, 2:00~6:00 can be referred to as first The sub-time period, 9:00~11:00 was referred to as the second sub-time period.
Alternatively, in order to calculate " idle period " more accurately, prevent because of accidentalia band The error come, it is also possible to the portfolio of the Monday before calculating two weeks further, before three weeks, and Take the meansigma methods of three.
As shown in Figure 4, wireless network signal is generally entered by mimo system by multiple antennas 3 Row synchronizes transmitting-receiving, to improve the speed of data transmission.Each antenna 3 is at least launched logical with one Road or reception passage are connected.
Further, the method for the present embodiment also includes: by average for the transmission channel of base station system It is divided into the some groups of transmission channels at least including first group of transmission channel and second group of transmission channel. As the one of which embodiment of the present invention, all transmittings of base station system are led to by the present embodiment Road is equally divided into 4 groups, and as shown in Figure 4,4 groups of transmission channels are respectively as follows: first group of transmission channel 4, second group of transmission channel 5, the 3rd group of transmission channel 6, the 4th group of transmission channel 7, often group is sent out Penetrating passage and include at least one transmission channel 1, wherein, the quantity often organizing transmission channel can be according to respectively The difference of the situations such as individual zone traffic amount is chosen, for example, somewhere was when one day 24 Interior average traffic is relatively big, i.e. the data of base station system transmitting-receiving are more, therefore, it can 3-6 Individual transmission channel is divided into one group.
Furthermore, it is necessary to explanation, in the present embodiment, all transmission channels of base station system are divided into Group number need to be more than or equal to 2.
As one embodiment of the present invention, on the basis of completing packet, calculate and only open When opening one group of transmission channel, during as only opened first group of transmission channel 4, base station system can carry Maximum number of user amount and maximum throughput, respectively as number of users threshold value and throughput threshold Value.Wherein, handling capacity refers to the data volume that base station system receives and launches.
Maximum number of user amount that one group of transmission channel can carry and is only opened in view of base station system Big handling capacity can be because of some uncertain factors, such as change, first device of base station system of weather The aging grade of part and change.Therefore, one group of transmission channel is only opened calculating base station system The number of users threshold value of the maximum number of user amount that can carry gulps down with the maximum throughput that can carry After the amount of telling threshold value, in addition it is also necessary to any one group of transmission channel, such as first group of transmission channel 4 Performance is tested, and sees that the maximum that base station system can carry when only opening this group transmission channel is used Amount amount and maximum throughput the most respectively with the above-mentioned number of users threshold value calculated and handling up The threshold value of amount matches, if unmatched word, could be according to test result to being calculated Number of users threshold value and throughput threshold value make suitable adjustment, so that base station system is only opened Can carry when opening one group of transmission channel the number of users threshold value after number of users and handling capacity and adjustment and Throughput threshold value matches.
Alternatively, in order to calculate " idle period " more accurately, prevent because of accidentalia band The error come, it is also possible to the portfolio of the Monday before calculating two weeks further, before three weeks, and take The meansigma methods of three.
Step 102, when base station system works in the described first sub-time period in this cycle, open First group of transmission channel, and it is logical to close other group transmittings in addition to described first group of transmission channel Road.
At the Monday of this week, when base station system worked in for the first sub-time period in this cycle, i.e. When working in 2:00 in morning~6:00, open first group of transmission channel 4, and close except first group is sent out Penetrate other group transmission channels beyond passage 4, both met the demand of user, and closed again idle Transmission channel, saved energy consumption.
Alternatively, the device in order to avoid bringing because of altofrequency same group of transmission channel of use damages Consumption, extends the life-span of base station system, and the present embodiment can be used alternatingly transmission channel group, it is, When base station system worked in for the second sub-time period, i.e. " idle period " 9:00 in the morning of Monday ~during 11:00, open second group of transmission channel 5, and close in addition to second group of transmission channel 5 Other transmission channels.
Assume that Tuesday and midweek " idle period " are also 2:00~6:00 and the morning in morning 9:00~11:00, for realizing recycling of transmission channel group, when base station system works in Tuesday 2:00~6:00 in morning time, can use the 3rd group of transmission channel 6, and close except the 3rd group of transmitting Other transmission channels beyond passage 6;When base station system works 9:00~11:00 in the morning on Tuesday Time, can use the 4th group of transmission channel 7, and close other in addition to the 4th group of transmission channel 7 Launch logical;When base station system works in midweek " idle period " 1:00 in morning~6:00, First group of transmission channel 4 can be used, the like.
Alternatively, when section At All Other Times beyond base station system is operated in " idle period ", All of transmission channel can be opened, to ensure the normal work of base station system.
Further, owing to receiving passage 2 the most not power consumption, therefore, originally In embodiment, the reception passage 2 of base station system is in opening, with maximized satisfied use Family demand.
Further, the base station system that the method for the present embodiment is suitable for is CDMA (Code Division Multiple Access, is called for short CDMA) base station system of network or WCDMA The base station of (Wideband Code Division Multiple Access is called for short WCDMA) network System or universal mobile communications (Universal Mobile Telecommunications System, letter Claiming UMTS) base station system of network or worldwide interoperability for microwave access (Worldwide Interoperability for Microwave Access, is called for short WiMAX) base station system of network Or the base station system of Long Term Evolution (Long Term Evolution is called for short LTE) network or time-division are together Step CDMA (Time Division-Synchronous Code Division Multiple Access, It is called for short TD-SCDMA) base station system of network.
The method of the reduction power consumption of base station system of the present embodiment, by leading to the transmitting of base station system Road is equally divided into some groups of transmission channels;Then calculation base station system only opens one group of transmission channel energy The number of users threshold value corresponding to maximum number of user amount of carrying and/or corresponding the gulping down of maximum throughput The amount of telling threshold value;When actual user's quantity is less than institute less than described number of users threshold value and/or handling capacity Only open one group of transmission channel when stating " idle period " of throughput threshold value, ensure base station system In the case of the normal work of system, save the energy consumption of base station system, additionally, the method for the present embodiment By using transmission channel group in " idle period " alternate cycles, reduce base station system components and parts Loss, extend the life-span of base station system.
Embodiment two
The present embodiment a kind of method reducing power consumption of base station system of offer, as shown in Figure 2 and Figure 4, The method includes:
Step 201, the transmission channel of base station system is equally divided at least includes that first group is launched logical Road and some groups of transmission channels of second group of transmission channel.
Can as one embodiment of the present invention, number of users threshold value and/or throughput threshold value Obtain by the way of default.Number of users threshold value and/or throughput threshold value are being preset Time, Rational choice can be carried out according to the difference of each zone traffic amount situation etc., for example, certain Area when one day 24 in average traffic relatively big, i.e. the data of base station system transmitting-receiving are more, Therefore, number of users threshold value and/or throughput threshold value suitably can be increased, to ensure following Step calculates reasonably " idle period ".
Preferably, in order to obtain " idle period " more accurately, the present embodiment is by " number of users Amount and handling capacity are respectively less than number of users threshold value and the time period of throughput threshold value " conduct " free time Period ".
After presetting number of users threshold value and throughput threshold value, can first each of primary Calculation Penetrate maximum number of user amount and maximum throughput that passage can carry, be grouped the most again, packet Criterion is:
The number of the maximum number of user amount that single transmission channel can carry × often organize transmission channel >=preset Number of users threshold value;
The number of the maximum throughput that single transmission channel can carry × often organize transmission channel >=default Throughput threshold value.
As the one of which embodiment of the present invention, the present embodiment is by all of base station system Penetrating passage 1 and be equally divided into four groups, as shown in Figure 4, four groups of transmission channels are respectively as follows: first group and send out Penetrate 4, second group of transmission channel 5 of passage, the 3rd group of transmission channel 6, the 4th group of transmission channel 7, Often group transmission channel includes at least one transmission channel 1.
Maximum number of user amount that one group of transmission channel can carry and is only opened in view of base station system Big handling capacity can be because some uncertain factors, including Changes in weather, base station system components and parts Aging grade and change.Therefore, it is also desirable to any one group of transmission channel, such as first group of transmitting The performance of passage 4 is tested, it is judged that base station system can carry when only opening this group transmission channel Maximum number of user amount and maximum throughput whether more than or equal to the number of users threshold value preset and Throughput threshold value matches, if it is judged that be no words, and can be according to test result to currently The packet situation of transmission channel makees suitable adjustment, so that base station system only opens one group of transmission channel Time the maximum number of user amount that can carry and maximum throughput is respectively greater than or equal to the number of users preset Threshold value and throughput threshold value.
Step 202, obtain actual user's quantity in a upper cycle be less than number of users threshold value and/or Handling capacity at least included for the first sub-time less than the time period of throughput threshold value, described time period Section, described number of users threshold value can when opening one group of transmission channel less than or equal to described base station system The maximum number of user amount of carrying, described throughput threshold value is opened less than or equal to described base station system The maximum throughput that can carry during one group of transmission channel.
In seven days of one week, due to the impact of various factors, the portfolio of every day is all different, And there is obvious gap.Research finds, weekly on the same day in, such as the Monday before two weeks and In Monday before one week, portfolio is basicly stable, and gap is the least.Accordingly, as wherein A kind of embodiment, the present embodiment is chosen one week seven days as a cycle, is i.e. chosen the same of last week Reference as this week this day corresponding in one day, and calculate in seven days last weeks actual user's quantity and Handling capacity is respectively less than number of users threshold value and the time period of throughput threshold value.
For example, it is computed, 2:00~6:00 and 9:00~11:00 in the morning in morning of last Monday In, number of users and handling capacity are respectively less than number of users threshold value and throughput threshold value, therefore, insult Morning 2:00~6:00 and " idle period " that 9:00~11:00 in the morning is last Monday, can be by 2:00~6:00 was referred to as the first sub-time period, 9:00~11:00 became the second sub-time period.
Alternatively, in order to calculate " idle period " more accurately, prevent because of accidentalia band The error come, it is also possible to the portfolio of the Monday before calculating two weeks further, before three weeks, and take The meansigma methods of three.
Step 203, when base station system works in the described first sub-time period in this cycle, open First group of transmission channel, and it is logical to close other group transmittings in addition to described first group of transmission channel Road.
At the Monday of this week, when base station system worked in for the first sub-time period in this cycle, i.e. When working in 2:00 in morning~6:00, open first group of transmission channel 4, and close except first group is sent out Penetrate other transmission channels beyond passage 4, both met the demand of user, and closed again idle Transmission channel, has saved energy consumption.
Alternatively, the device in order to avoid bringing because of altofrequency same group of transmission channel of use damages Consumption, extends the life-span of base station system, and the present embodiment can be used alternatingly transmission channel group, it is, When base station system worked in for the second sub-time period, i.e. " idle period " 9:00 in the morning of Monday ~during 11:00, open second group of transmission channel 5, and close in addition to second group of transmission channel 5 Other transmission channels.
Assume that Tuesday and midweek " idle period " are also 2:00~6:00 and the morning in morning 9:00~11:00, for realizing recycling of transmission channel group, when base station system works in Tuesday 2:00~6:00 in morning time, can use the 3rd group of transmission channel 6, and close except the 3rd group of transmitting Other transmission channels beyond passage 6;When base station system work in Tuesday the morning 9:00~ During 11:00, the 4th group of transmission channel 7 can be used, and close in addition to the 4th group of transmission channel 7 Other launch logical;When base station system works in midweek " idle period " 1:00~6:00 in morning Time, first group of transmission channel 4 can be used, the like.
Alternatively, when section At All Other Times beyond base station system is operated in " idle period ", All of transmission channel can be opened, to ensure the normal work of base station system.
Further, owing to receiving passage 2 the most not power consumption, therefore, originally In embodiment, the reception passage 2 of base station system is in opening, with maximized satisfied use Family demand.
Further, the base that base station system is cdma network that the method for the present embodiment is suitable for System of standing or the base station system of WCDMA network or the base station system of UMTS network or WiMAX The base station system of the base station system of network or the base station system of LTE network or TD-SCDMA network System.
The method of the reduction power consumption of base station system of the present embodiment, by pre-set user number threshold value and/ Or throughput threshold value, and in actual user's quantity less than described number of users threshold value and/or handling capacity One group of transmission channel is only opened during less than " idle period " of described throughput threshold value, it is achieved that In the case of ensureing that base station system normally works, save the energy consumption of base station system, additionally, this The method of embodiment, by using transmission channel group in " idle period " alternate cycles, reduces base The loss of system of standing components and parts, extends the life-span of base station system.
Embodiment three
The present embodiment a kind of method reducing power consumption of base station system of offer, as shown in Figure 3 and Figure 4, The method includes:
Step 301, when base station system works in the first default sub-time period in this cycle, open Open first group of transmission channel, and it is logical to close other group transmittings in addition to described first group of transmission channel Road;Wherein, when the first sub-time period described in described base station system was in a upper cycle, base station is Actual user's quantity of system carrying opens what one group of transmission channel can carry less than described base station system Maximum number of user amount and/or handling capacity are less than described maximum throughput.
When preset time period, can carry out rationally according to the difference of each zone traffic amount situation etc. Choose, for example, observe through long-term, somewhere Monday morning 2:00~6:00 and on In noon 9:00~11:00, portfolio is the least, therefore, morning 2:00~6:00 and 9:00 in the morning~ 11:00 is set to " idle period " of Monday, 2:00~6:00 can be referred to as the first sub-time Section, became for the second sub-time period by 9:00~11:00.
Cycle in the present embodiment refers to the time period being manually set, and such as, the cycle can be one It or one week or one month.As one of which preferred implementation, the present embodiment chooses one Zhou Qitian as a cycle, i.e. choose last week on the same day as the ginseng of this week this day corresponding Examine, and calculate the actual user in 2:00~6:00 in morning last Monday and the morning 9:00~11:00 Quantity and/or handling capacity.
When being grouped, can be only with reference to the actual user's quantity in the upper corresponding time period in cycle Or the actual user's quantity in the upper corresponding time period in cycle, it is possible to reference to the two number Value.
Preferably, in order to be grouped more accurately, the present embodiment is with reference to a upper cycle phase Answered the actual user's quantity in the time period and the actual user's quantity in the upper corresponding time period in cycle, Concrete method is: maximum number of user amount that the first each transmission channel of primary Calculation can carry and maximum Handling capacity, is grouped transmission channel the most again, and the criterion of packet is:
Number >=upper one of the maximum number of user amount that single transmission channel can carry × often organize transmission channel Actual user's quantity in the corresponding time period in cycle;
The number of the maximum throughput that single transmission channel can carry × often organize transmission channel >=upper one week Goodput in the phase corresponding time period.
Visible, a cycle can be carried when base station system after packet only opens one group of transmission channel Actual user's quantity in the described time period and handling capacity.
As the one of which embodiment of the present invention, the present embodiment is by all of base station system Penetrating passage 1 and be equally divided into four groups, as shown in Figure 4, four groups of transmission channels are respectively as follows: first group and send out Penetrate 4, second group of transmission channel 5 of passage, the 3rd group of transmission channel 6, the 4th group of transmission channel 7, Often group transmission channel includes at least one transmission channel 1.
Maximum number of user amount that one group of transmission channel can carry and is only opened in view of base station system Big handling capacity can be because some uncertain factors, including Changes in weather, base station system components and parts Aging grade and change.Therefore, the actual user in the time period described in the cycle on calculating After quantity and handling capacity, in addition it is also necessary to current any one group of transmission channel group, such as first group are launched logical The performance in road 4 is tested, it is judged that can hold when base station system only opens first group of transmission channel 4 Whether the maximum number of user amount carried and maximum throughput were respectively greater than or equal to time described in the upper cycle Between actual user's quantity in section and handling capacity match, if it is judged that be no words, Ke Yigen According to test result, the packet situation of current transmission channel is made suitable adjustment, so that base station system is only Open one group of transmission channel and just can carry the actual user's quantity in the time period described in the cycle And handling capacity.
At the Monday of this week, when base station system worked in for the first sub-time period in this cycle, i.e. When working in 2:00 in morning~6:00, open first group of transmission channel 4, and close except first group is sent out Penetrate other transmission channels beyond passage 4, both met the demand of user, and closed again idle Transmission channel, has saved energy consumption.
Step 302, preset time period, the described time period at least includes the first sub-time period and second The sub-time period, when base station system works in the described second sub-time period in this cycle, open second Group transmission channel, and close other group transmission channels in addition to described second group of transmission channel.
In order to avoid the device loss brought because of altofrequency same group of transmission channel of use, extend In the life-span of base station system, the present embodiment alternate turns uses transmission channel group, it is, work as base station When working in the second default sub-time period, i.e., during the 9:00~11:00 in the morning of Monday, open Second group of transmission channel 5, and close other transmission channels in addition to second group of transmission channel 5.
Assume that Tuesday and midweek " idle period " are also 2:00~6:00 and the morning in morning 9:00~11:00, for realizing recycling of transmission channel group, when base station system works in this cycle During the 2:00~6:00 in morning on Tuesday, the 3rd group of transmission channel 6 can be used, and close except the 3rd Other transmission channels beyond group transmission channel 6;When base station system works in Tuesday in this cycle During 9:00~11:00 in the morning, the 4th group of transmission channel 7 can be used, and close except the 4th group of transmitting Other beyond passage 7 are launched logical;When base station system works in 1:00 in midweek morning in this cycle ~during 6:00, first group of transmission channel 4 can be used, the like.
Alternatively, it is operated in the section At All Other Times beyond described " idle period " when base station system Time, all of transmission channel can be opened, to ensure the normal work of base station system.
The method of the reduction power consumption of base station system of the present embodiment, by preset time period, then exists Ensure often group transmission channel can carry an above-mentioned time period in cycle actual user's quantity and/or On the premise of handling capacity, the transmission channel of base station system is equally divided into some groups of transmission channels, and Only open one group of transmission channel when base station system works in the above-mentioned time period, just both ensure base station system Often in the case of work, save again the energy consumption of base station system, additionally, the method for the present embodiment is led to Cross and use transmission channel group in above-mentioned time period alternate cycles, reduce the damage of base station system components and parts Consumption, extends the life-span of base station system.
Embodiment four
The present embodiment provides a kind of device reducing power consumption of base station system, as it is shown in figure 5, include: Acquiring unit 81, control unit 82, wherein,
Acquiring unit 81, in being used for the cycle that obtains, actual user's quantity is less than number of users thresholding Value and/or handling capacity are less than the time period of throughput threshold value, and the described time period at least includes the first son Time period, described number of users threshold value opens one group of transmission channel less than or equal to described base station system Time the maximum number of user amount that can carry, described throughput threshold value is less than or equal to described base station system The maximum throughput that can carry when opening one group of transmission channel;
Control unit 82, for working in the described first sub-time period when base station system in this cycle Time, open first group of transmission channel, and close other groups in addition to described first group of transmission channel Transmission channel.
Further, the described time period can also include the second sub-time period, described control unit 82 can be also used for:
When base station system works in the described second sub-time period in this cycle, open second group and send out Penetrate passage, and close other group transmission channels in addition to described second group of transmission channel.
Further, the device of the present embodiment also includes grouped element 83, for by described base station The transmission channel of system is equally divided into and at least includes first group of transmission channel and second group of transmission channel Some groups of transmission channels.
The present embodiment reduces operation principle and the method for each unit of the device of power consumption of base station system Embodiment one is similar with embodiment two, does not repeats them here.
The device of the reduction power consumption of base station system of the present embodiment, first passes through grouped element by base station The transmission channel of system is equally divided into some groups of transmission channels;When actual user's quantity is less than described use When amount threshold value and/or handling capacity are less than " idle period " of described throughput threshold value, control Unit controls base station system and only opens one group of transmission channel, in the feelings ensureing that base station system normally works Under condition, save the energy consumption of base station system, additionally, the device of the present embodiment is by " time idle Section " alternate cycles use transmission channel group, reduce the loss of base station system components and parts, extend The life-span of base station system.
Embodiment five
The present embodiment a kind of device reducing power consumption of base station system of offer, as shown in Figure 6, including: Control unit 91 and default unit 93, wherein,
Presetting unit 93, for preset time period, the described default time period at least includes first The sub-time period;
Control unit 91, for working in the default first sub-time when base station system in this cycle Duan Shi, opens first group of transmission channel, and closes other in addition to described first group of transmission channel Group transmission channel;Wherein, when the first sub-time period described in described base station system was in a upper cycle, Actual user's quantity of base station system carrying opens one group of transmission channel energy less than described base station system Maximum number of user amount and/or the handling capacity of carrying open one group of transmission channel less than described base station system The maximum throughput that can carry.
Further, the device of the present embodiment also includes:
Grouped element 92, at least includes for being equally divided into by the transmission channel of described base station system First group of transmission channel and some groups of transmission channels of second group of transmission channel.
Additionally, preset unit 93, specifically for preset time period, the described time period at least includes First sub-time period and the second sub-time period, described control unit 91 is additionally operable to when base station system exists When this cycle works in the described second sub-time period, open second group of transmission channel, and close except institute State other group transmission channels beyond second group of transmission channel.
In the present embodiment, the operation principle of each unit is similar with embodiment of the method three, at this not Repeat again.
The device of the reduction power consumption of base station system of the present embodiment, by default unit preset time period, Then ensureing that often organizing transmission channel can carry actual user's number of an above-mentioned time period in cycle By grouped element, the transmission channel of base station system is equally divided on the premise of amount and/or handling capacity Some groups of transmission channels, and only open one group of transmitting when base station system works in the above-mentioned time period logical Road, it is achieved that in the case of ensureing that base station system normally works, saved the energy consumption of base station system, Additionally, the device of the present embodiment is by using transmission channel group in above-mentioned time period alternate cycles, subtract The little loss of base station system components and parts, extends the life-span of base station system.
Through the above description of the embodiments, those skilled in the art is it can be understood that arrive this Invention can add the mode of required common hardware by software and realize, naturally it is also possible to by hardware, but In the case of Hen Duo, the former is more preferably embodiment.Based on such understanding, technical scheme is originally The part contributed prior art in other words in matter can embody with the form of software product, should Computer software product is stored in the storage medium that can read, such as the floppy disk of computer, hard disk or CD Deng, including some instructions with so that computer equipment (can be personal computer, server, Or the network equipment etc.) perform the method described in each embodiment of the present invention.
The above, the only detailed description of the invention of the present invention, but protection scope of the present invention is also Being not limited to this, any those familiar with the art is at the technical scope that the invention discloses In, change can be readily occurred in or replace, all should contain within protection scope of the present invention.Therefore, Protection scope of the present invention should described be as the criterion with scope of the claims.

Claims (16)

1. the method reducing power consumption of base station system, it is characterised in that including:
In obtaining a upper cycle, actual user's quantity is less than less than number of users threshold value and/or handling capacity The time period of throughput threshold value, the described time period at least includes the first sub-time period, described user The maximum that number threshold value can carry when opening one group of transmission channel less than or equal to described base station system Number of users, described throughput threshold value is opened one group less than or equal to described base station system and is launched logical The maximum throughput that can carry during road, wherein, in described base station system, all transmission channels are divided into Group number more than or equal to 2;
When base station system works in the described first sub-time period in this cycle, open first group and send out Penetrate passage, and close other group transmission channels in addition to described first group of transmission channel.
The method of reduction power consumption of base station system the most according to claim 1, it is characterised in that The transmission channel of described base station system is equally divided into and at least includes first group of transmission channel and second Some groups of transmission channels of group transmission channel.
The method of reduction power consumption of base station system the most according to claim 2, it is characterised in that
The described time period also included for the second sub-time period, when base station system works in institute in this cycle When stating for the second sub-time period, open second group of transmission channel, and close except described second group is launched logical Other group transmission channels beyond road.
4. according to the method for the reduction power consumption of base station system described in claim 1-3 any one, It is characterized in that, described base station system be the base station system of CDMA network or wideband code division many The base station system of location network or the base station system of universal mobile communications network or worldwide interoperability for microwave connect Enter the base station system of network or the base station system of long-term evolving network or TD SDMA net The base station system of network.
5. the method reducing power consumption of base station system, it is characterised in that including:
When base station system works in the first default sub-time period in this cycle, open first group Transmission channel, and close other group transmission channels in addition to described first group of transmission channel;Wherein, When the first sub-time period described in described base station system was in a upper cycle, the reality of base station system carrying Border number of users opens, less than described base station system, the maximum number of user that one group of transmission channel can carry Amount and/or handling capacity open, less than described base station system, the maximum throughput that one group of transmission channel can carry Amount, wherein, the group number that in described base station system, all transmission channels are divided into is more than or equal to 2.
A kind of method reducing power consumption of base station system the most as claimed in claim 5, its feature exists In, also include:
The transmission channel of described base station system is equally divided at least include first group of transmission channel and Some groups of transmission channels of second group of transmission channel.
The method of reduction power consumption of base station system the most according to claim 6, it is characterised in that Also including: preset time period, the described time period at least includes the first sub-time period and the second sub-time Section, when base station system works in the described second sub-time period in this cycle, opens second group of transmitting Passage, and close other group transmission channels in addition to described second group of transmission channel.
8. according to the method for the reduction power consumption of base station system described in claim 5-7 any one, It is characterized in that, described base station system be the base station system of CDMA network or wideband code division many The base station system of location network or the base station system of universal mobile communications network or worldwide interoperability for microwave connect Enter the base station system of network or the base station system of long-term evolving network or TD SDMA net The base station system of network.
9. the device reducing power consumption of base station system, it is characterised in that including:
Acquiring unit, in being used for the cycle that obtains, actual user's quantity is less than number of users threshold value And/or handling capacity at least includes first period of the day from 11 p.m. to 1 a.m less than the time period of throughput threshold value, described time period Between section, described number of users threshold value less than or equal to described base station system open one group of transmission channel time The maximum number of user amount that can carry, described throughput threshold value is opened less than or equal to described base station system The maximum throughput that can carry when opening one group of transmission channel, wherein, in described base station system all Penetrate group number that passage is divided into more than or equal to 2;
Control unit, is used for when base station system works in the described first sub-time period in this cycle, Open first group of transmission channel, and close other group transmittings in addition to described first group of transmission channel Passage.
The device of reduction power consumption of base station system the most according to claim 9, its feature exists In, also include:
Grouped element, at least includes for being equally divided into by the transmission channel of described base station system One group of transmission channel and some groups of transmission channels of second group of transmission channel.
The device of 11. reduction power consumption of base station system according to claim 10, its feature exists In, described control unit is additionally operable to:
The described time period also included for the second sub-time period, when base station system works in institute in this cycle When stating for the second sub-time period, open second group of transmission channel, and close except described second group of transmitting Other group transmission channels beyond passage.
12. according to the device of the reduction power consumption of base station system described in claim 9-11 any one, It is characterized in that, described base station system be the base station system of CDMA network or wideband code division many The base station system of location network or the base station system of universal mobile communications network or worldwide interoperability for microwave connect Enter the base station system of network or the base station system of long-term evolving network or TD SDMA net The base station system of network.
13. 1 kinds of devices reducing power consumption of base station system, it is characterised in that including:
Presetting unit, for preset time period, the described default time period at least includes the first son Time period;
Control unit, for working in the default first sub-time period when base station system in this cycle Time, open first group of transmission channel, simultaneously close off other in addition to described first group of transmission channel Group transmission channel;Wherein, when the first sub-time period described in described base station system was in a upper cycle, Actual user's quantity of base station system carrying opens one group of transmission channel energy less than described base station system Maximum number of user amount and/or the handling capacity of carrying open one group of transmission channel less than described base station system The maximum throughput that can carry, wherein, the group that in described base station system, all transmission channels are divided into Number is more than or equal to 2.
The device of 14. reduction power consumption of base station system according to claim 13, its feature exists In, also include:
Grouped element, at least includes for being equally divided into by the transmission channel of described base station system One group of transmission channel and some groups of transmission channels of second group of transmission channel.
The device of 15. reduction power consumption of base station system according to claim 14, its feature exists In,
Described default unit, specifically for preset time period, the described time period at least includes first Sub-time period and the second sub-time period, when base station system works in described second period of the day from 11 p.m. to 1 a.m in this cycle Between section time, described control unit is additionally operable to open second group of transmission channel, and closes except described the Other group transmission channels beyond two groups of transmission channels.
16. according to the dress of the reduction power consumption of base station system described in claim 13-15 any one Put, it is characterised in that described base station system is base station system or the broadband code of CDMA network The base station system of point multi-access network or the base station system of universal mobile communications network or Worldwide Interoperability for Microwave are mutual The connection base station system of access network or the base station system of long-term evolving network or time division synchronous code division are many The base station system of location network.
CN201180001866.9A 2011-08-24 2011-08-24 The method and apparatus reducing power consumption of base station system Active CN103222314B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2011/078855 WO2012162962A1 (en) 2011-08-24 2011-08-24 Method and device for reducing power consumption of base station system

Publications (2)

Publication Number Publication Date
CN103222314A CN103222314A (en) 2013-07-24
CN103222314B true CN103222314B (en) 2016-09-28

Family

ID=47258302

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201180001866.9A Active CN103222314B (en) 2011-08-24 2011-08-24 The method and apparatus reducing power consumption of base station system

Country Status (2)

Country Link
CN (1) CN103222314B (en)
WO (1) WO2012162962A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104509178B (en) * 2013-07-23 2018-06-26 华为技术有限公司 Base station state processing method and processing device
CN111132174A (en) * 2019-12-06 2020-05-08 珠海格力电器股份有限公司 Resource setting method and device for base station
CN111885685B (en) * 2020-07-22 2023-04-25 中国联合网络通信集团有限公司 Energy-saving method and device for 5G base station, electronic equipment and storage medium
WO2024020786A1 (en) * 2022-07-26 2024-02-01 Oppo广东移动通信有限公司 Method for wireless communication, network device, and terminal device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101031129A (en) * 2006-03-01 2007-09-05 中兴通讯股份有限公司 Apparatus and method for inhibiting interference between wireless systems
CN101420790A (en) * 2008-11-24 2009-04-29 华为技术有限公司 Method, base station for reducing power consumption
CN101699904A (en) * 2009-10-27 2010-04-28 华为技术有限公司 Method for saving energy and system thereof
CN102131211A (en) * 2010-12-27 2011-07-20 大唐移动通信设备有限公司 Method and device for shutting off downlink service time slot in TD-SCDMA (Time Division-Synchronization Code Division Multiple Access) system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080248802A1 (en) * 2007-04-09 2008-10-09 Tzero Technologies, Inc. Antenna pattern selection within a wireless network

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101031129A (en) * 2006-03-01 2007-09-05 中兴通讯股份有限公司 Apparatus and method for inhibiting interference between wireless systems
CN101420790A (en) * 2008-11-24 2009-04-29 华为技术有限公司 Method, base station for reducing power consumption
CN101699904A (en) * 2009-10-27 2010-04-28 华为技术有限公司 Method for saving energy and system thereof
CN102131211A (en) * 2010-12-27 2011-07-20 大唐移动通信设备有限公司 Method and device for shutting off downlink service time slot in TD-SCDMA (Time Division-Synchronization Code Division Multiple Access) system

Also Published As

Publication number Publication date
CN103222314A (en) 2013-07-24
WO2012162962A1 (en) 2012-12-06

Similar Documents

Publication Publication Date Title
CN103391576B (en) Reporting method and device for reference signal receiving power
CN104584460B (en) The method and apparatus of downlink control channel is received in a wireless communication system
US8700039B2 (en) Method and apparatus for coordinated multiple point transmission and reception
CN104885506B (en) The method and device for the method for radio resource information are shared in multi-cell wireless communication system
CN103222314B (en) The method and apparatus reducing power consumption of base station system
CN102017682B (en) Downlink inter-cell interference coordination method and base station
CN105659690A (en) Method for transmitting uplink data in a dual connectivity and a device therefordure
CN105960816A (en) Secondary cell selection based on geographic signatures
CN107734706A (en) A kind of control information transmission method, equipment and communication system
CN102655486B (en) Pilot signal transmission method and channel estimation method, device and system
EP3148279B1 (en) Method and device for determining remote radio unit (rru)
EP2941039B1 (en) Method for selecting a working remote radio unit for a user equipment by a base station
CN106027113A (en) Method for improving stability of antenna and terminal
CN108023694A (en) Uplink reference signals sending method, device, base station and user equipment
CN105379339B (en) Processing method and processing device, the system of power headroom reporting (PHR)
CN106330345A (en) Method and device for detecting connection line sequence of electric tilt antennas
CN108282782A (en) A kind of uplink exempts from authorized user's activating detection method, device and base station
CN107888357A (en) The method and apparatus for transmitting information
EP2587687B1 (en) Method, device and base station for transmitting signal
CN105451340B (en) A kind of method, apparatus and terminal device of carrier wave polymerization
CN104126277B (en) The method of beam selection and base station
CN107113106B (en) Multi-antenna transmission method and base station under common cell network
CN101420703A (en) Method for implementing space division multiple access by TD-SCDMA indoor distribution system
CN102740441B (en) Method and system for power allocation among carriers of TD-SCDMA (Time Division-Synchronous Code Division Multiple Access) cells
CN103297113B (en) The radio receiver arrangement of cellular radio network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant