Nothing Special   »   [go: up one dir, main page]

CN103002466A - Traffic warning method and traffic warning device - Google Patents

Traffic warning method and traffic warning device Download PDF

Info

Publication number
CN103002466A
CN103002466A CN2011102692766A CN201110269276A CN103002466A CN 103002466 A CN103002466 A CN 103002466A CN 2011102692766 A CN2011102692766 A CN 2011102692766A CN 201110269276 A CN201110269276 A CN 201110269276A CN 103002466 A CN103002466 A CN 103002466A
Authority
CN
China
Prior art keywords
flow
information
connection
user
traffic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102692766A
Other languages
Chinese (zh)
Other versions
CN103002466B (en
Inventor
孟齐源
刘钊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tencent Technology Shenzhen Co Ltd
Original Assignee
Tencent Technology Shenzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tencent Technology Shenzhen Co Ltd filed Critical Tencent Technology Shenzhen Co Ltd
Priority to CN201110269276.6A priority Critical patent/CN103002466B/en
Publication of CN103002466A publication Critical patent/CN103002466A/en
Application granted granted Critical
Publication of CN103002466B publication Critical patent/CN103002466B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention discloses a traffic warning method and a traffic warning device. The method includes: determining current connection initiated by a user to be 3G (third-generation) connection and starting a 3G internet surfing traffic warning function; recording current connection traffic information in a preset local traffic log recording file, and computing total traffic in the current month according to the local traffic log recording file; and determining the computed total traffic in the current month to exceed a preset threshold value, and informing the user according to preset traffic warning policies. Applying the traffic warning method and the traffic warning device can provide traffic warning information for users and lower expenses of the users.

Description

A kind of method of early warning flow and device
Technical field
The present invention relates to computer communication technology, particularly a kind of method of early warning flow and device.
Background technology
Development along with computer communication technology and Internet technology, 3G (Third Generation) Moblie (3G, 3rd Generation) mobile Internet access has obtained using more and more widely, and obtaining relevant information by the 3G mobile internet more and more becomes an indispensable part in people's life and the work.At present, 3G monthly payment service on net has been released in the operation commercial cities such as movement, telecommunications, UNICOM, this 3G monthly payment service on net not only is applied on the smart mobile phone, simultaneously, be accompanied by the release of various 3G mobile Internet access card apparatus (3G card of surfing Internet), be widely applied on 3G net book, the notebook computer.
At present, most popular in the 3G monthly payment service that each large operator releases is the monthly package service of packet flow amount, the mode of packet flow amount is normally contracted fixing flow with fixing expense, should form the monthly package rated value by fixing flow, such as 1 Ji (G), 2G etc., fixing expense forms the monthly package expense, such as 5 yuan of corresponding 1G/ months, 10 yuan of corresponding 2G/ months etc., when the monthly package service of using the packet flow amount, if user's every month, the final flow that uses was less than or equal to the monthly package rated value, then only need the predetermined monthly package expense of payment, in case but the flow that the user finally uses per month exceeds the monthly package rated value, the flow that then exceeds monthly package rated value part just adopts by the excess flow charging, usually, this price that exceeds the flow of monthly package rated value part will far surpass the average discharge price of monthly package, and for example, the flow part that exceeds is carried out charging according to 50 yuan/G.
, the flow that reduces user's use needs the extra charge of payment for exceeding predetermined monthly package rated value, at present, some 3G card of surfing Internet equipment vendors are when providing the 3G card of surfing Internet to the user, simultaneously provide the subsidiary traffic statistics software surfing flow with counting user to the user, thereby early warning is carried out in the flow use to the user, this class traffic statistics software can counting user from dial-up connection is set up, use the flow of this connections online use between closing to dial-up connection, and this connects the flow that uses to inform the user by the mode of information or ejection dialog box when connection closed, so that the user understands the flow that current connection is used, about the relevant treatment flow process of traffic statistics software statistics flow, specifically can be referring to the correlation technique document.
In addition, some operators also can provide the flow inquiry service so that flow is carried out early warning, the user finishes required business in current connection after, close current connection before, the website (flow querying server) of the operator of flow inquiry service is provided by login, can check that the of that month each surfing flow that connects of user is detailed, and remaining flow in the of that month monthly package, thereby use is planned to flow, and reach the purpose of early warning.
By as seen above-mentioned, the method of existing early warning flow, the traffic statistics software that provides by 3G card of surfing Internet equipment vendor, can only when closing, each dial-up connection work as time flow of connection use by reminding user, but the statistics of this single surfing flow can not effectively allow the user recognize and current month altogether use how many flows, also can't allow the user be well understood to also to remain in the monthly package how many flows can continue to use, and just inform user's mode during this connection closed, the user can't be in upper network process, when the flow that uses during near the monthly package rated value, can't in time know, thereby make user's possibility because overtime online, so that the flow that uses surpasses the monthly package rated value and the outer expenses of surfing Internet of amount paid, the method also can't reach the early warning flow, reduce the purpose of user overhead information.
And the flow inquiry service that provides for operator, needing the user to sign in to provides the website of the operator of flow inquiry service, inquire about and obtain the flow operating position, this mode, on the one hand so that the user to understand of that month flow operating position very inconvenient, need to frequently login, also lack on the other hand the flow warning function, so that can't recognize fast whether present flow rate has arrived the monthly package rated value in the upper network process of user, be convenient to when reaching the monthly package rated value, can in time stop link, avoid the outer campus network of amount paid.
Summary of the invention
In view of this, main purpose of the present invention is to propose a kind of method of early warning flow, provides the flow early warning information to reduce user overhead information to the user.
Another object of the present invention is to propose a kind of device of early warning flow, provide the flow early warning information to reduce user overhead information to the user.
For achieving the above object, the invention provides a kind of method of early warning flow, the method comprises:
Determine that the current 3G of being connected to of Client-initiated connects, and starts 3G surfing flow warning function;
In the local flow log recording file that sets in advance, record current connection traffic information, and calculate of that month total flow according to local flow log recording file;
Determine that the of that month total flow that calculates surpasses the threshold value that sets in advance, and notifies the user according to the flow prediction policy that sets in advance.
The current 3G of being connected to of described definite Client-initiated connects and comprises:
The dial-up connection information of carrying in the Client-initiated dial-up connection request is extracted in monitor user ' online dial-up connection;
According to the dial-up connection information that the filtering rule coupling that sets in advance is extracted, if the match is successful, determine that the current 3G of being connected to connects.
Described dial-up connection information comprise dialing protocol information and/or, the dialing equipment name information.
Be provided with in the described filtering rule that sets in advance 3G protocol information that sign 3G connects and/or, 3G device name information.
Described startup 3G surfing flow warning function comprises:
Whether A11, inquiry 3G surfing flow warning function opened, if opened, and execution in step A12, if do not open, execution in step A13;
A12 arranges the early warning of startup 3G surfing flow;
A13 exports the information of opening 3G surfing flow warning function to the user;
A14 receives the user according to the flow early-warning parameters of the 3G flow warning function setup menu output of showing, arranges to start 3G surfing flow warning function.
Described flow early-warning parameters comprises: monthly package flow rated value, monthly package flow rated value threshold values, flow early warning threshold values and flow prediction policy.
The described threshold value that sets in advance comprises: flow early warning threshold values and monthly package flow rated value threshold values, and described flow prediction policy comprises:
When user's use traffic is not less than flow early warning threshold values, when closing connection, to user's output flow early warning information, comprise of that month remaining flow information in the described flow early warning information at every turn;
When user's use traffic surpasses monthly package flow rated value threshold values, export the rated value that the monthly package flow rated value of reminding user exhausted to the user in real time and exhaust early warning information;
When the user continues current connection after the amount of exports definite value exhausts early warning information, when connection closed, export super flow early warning information to the user, comprise the flow information that exceeded this month in the described super flow early warning information.
Described in the local flow log recording file that sets in advance the current connection traffic information of record, and calculate of that month total flow according to local flow log recording file and comprise:
B11, monitor current connection, current connection traffic information is write in the local flow log recording file that sets in advance;
The time cycle that B12, basis set in advance is calculated the current connection traffic information that writes in the local flow log recording file that sets in advance;
B13, obtain the flow information of other connections except current connection of storing in the local flow log recording file;
B14, according to the of that month total flow of the flow rate calculation of current connection traffic and other connections except current connection.
Described connection traffic information comprises: this connects flow information and the connection identifier information of using.
Described connection traffic information further comprises: this connects the time started, this connects the current time and this connects the concluding time.
Described step B13 further comprises: obtain the traffic statistics error correction values of storing in the local flow log recording file;
Described step B14 is: according to the of that month total flow of the flow rate calculation of traffic statistics error correction values, current connection traffic and other connections except current connection.
Obtaining described traffic statistics error correction values comprises:
B131, inquire about in the local flow log recording file and whether store the traffic statistics error correction values, be not more than the time threshold that sets in advance if store and store the temporal information of flow statistical error correction value and the time difference of current time information, execution in step B132, otherwise, execution in step B133;
B132 obtains this traffic statistics error correction values;
B133 triggers from carrier server corresponding to current dial-up connection and obtains the of that month connection traffic information of this user;
B134 calculates the difference of the flow sum of current connection traffic the of that month connection traffic that obtains from operator and the local flow log recording file and other connections except current the connection;
B135 stores described difference or with the traffic statistics error correction values of difference updated stored and obtain the traffic statistics error correction values of renewal.
A kind of device of early warning flow, this device comprises: 3G connection detection module, flow logger module, flow rate calculation module and flow warning module, wherein,
The 3G connection detection module is used for determining that the current 3G that is connected to of Client-initiated connects, and starts 3G surfing flow warning function;
The flow logger module is used for after starting 3G surfing flow warning function, the current connection traffic information of record in the local flow log recording file that sets in advance;
The flow rate calculation module is used for calculating of that month total flow according to local flow log recording file;
The flow warning module is used for determining that the of that month total flow that calculates surpasses the threshold value that sets in advance, and notifies the user according to the flow prediction policy that sets in advance.
Further comprise:
The flow correction module, be used for the query flows logger module and whether store the traffic statistics error correction values, if determine not store or to store and to store the time difference of the temporal information of flow statistical error correction value and current time information greater than the time threshold that sets in advance, triggering is obtained the of that month connection traffic information of this user from carrier server corresponding to current dial-up connection, the difference of the flow sum of current connection traffic and other connections except current connection the of that month connection traffic that calculating is obtained from operator and the flow logger module is stored this difference or with the traffic statistics error correction values of difference updated stored.
Described flow warning module comprises: flow early warning threshold unit and monthly package flow rated value threshold unit, wherein,
Flow early warning threshold unit is used for surpassing the flow early warning threshold values that sets in advance in the of that month total flow of determining to calculate, and closes when connecting to user's output flow early warning information current;
Monthly package flow rated value threshold unit is used for being equal to or greater than monthly package flow rated value threshold values in the of that month total flow of determining to calculate, and exhausts early warning information to user's amount of exports definite value in real time.
As seen from the above technical solutions, method and the device of a kind of early warning flow that the embodiment of the invention provides determine that the current 3G of being connected to of Client-initiated connects, and starts 3G surfing flow warning function; In the local flow log recording file that sets in advance, record current connection traffic information, and calculate of that month total flow according to local flow log recording file; Determine that the of that month total flow that calculates surpasses the threshold value that sets in advance, and notifies the user according to the flow prediction policy that sets in advance.Like this, the user can know in time whether present flow rate has reached the threshold value that sets in advance by the flow prediction policy that sets in advance in upper network process, avoids the super flow online of user, avoids the outer campus network of amount paid, thereby has reduced user overhead information.
Description of drawings
Fig. 1 is the method flow schematic diagram of embodiment of the invention early warning flow.
Fig. 2 is the method idiographic flow schematic diagram of embodiment of the invention early warning flow.
Fig. 3 is the apparatus structure schematic diagram of embodiment of the invention early warning flow.
Embodiment
For making the purpose, technical solutions and advantages of the present invention clearer, the present invention is described in further detail below in conjunction with the accompanying drawings and the specific embodiments.
In the embodiment of the invention, by monthly package rated value threshold values and flow early warning threshold values are set, when the flow of user's use reaches flow early warning threshold values, when connection closed, provide the flow early warning information of sign residual flow to the user; And when the flow that the user uses reaches monthly package rated value threshold values, provide the sign flow early warning information that flow has been finished using to the user in real time, thereby reduce the possibility of the outer campus network of user's amount paid.
Fig. 1 is the method flow schematic diagram of embodiment of the invention early warning flow.Referring to Fig. 1, this flow process comprises:
Step 101 determines that the current 3G of being connected to of Client-initiated connects, and starts 3G surfing flow warning function;
In this step, determine that the current 3G of the being connected to connection of Client-initiated comprises:
The dial-up connection information of carrying in the Client-initiated dial-up connection request is extracted in A1, monitor user ' online dial-up connection;
In this step, dial-up connection information comprise dialing protocol information and/or, the dialing equipment name information.The user is when carrying out dial-up connection, client will be according to dial-up connection information, inquire about each pre-stored dial-up connection and the mapping table of dialing protocol, obtain the dialing protocol information of current dial-up connection mapping, and/or, inquiry obtains carrying out the name information of the dialing equipment of this dial-up connection, and it is carried in the dial-up connection request.The flow warning module monitors user's dial-up connection of surfing the Net, and obtains Client-initiated dial-up connection request, extracts the dial-up connection information of carrying in the dial-up connection request.
The dial-up connection information that the filtering rule coupling that A2, basis set in advance is extracted if the match is successful, determines that the current 3G of being connected to connects.
In this step, be provided with in the filtering rule that sets in advance 3G protocol information that sign 3G connects and/or, 3G device name information.Filtering rule can issue or by the person skilled setting by server.
Mate by the dial-up connection information that will extract and the filtering rule that sets in advance, can determine whether the current connection of this Client-initiated is that 3G connects.For example, when the dialing protocol that carries in the connection request is one of 3G agreement of arranging in the filtering rule, determine that the current 3G of being connected to of this Client-initiated connects and/or, when the dialing equipment name of carrying in the connection request is called one of 3G device name of arranging in the filtering rule, determine that the current 3G of being connected to of this Client-initiated connects.
Preferably, when monitor user ' online dial-up connection, monitor simultaneously the newly-built and dial-up connection interrupt event of dial-up connection.
Starting 3G surfing flow warning function comprises:
Whether A11, inquiry 3G surfing flow warning function opened, if opened, and execution in step A12, if do not open, execution in step A13;
In this step, when the user initiated the 3G connection at every turn, by the local flow log recording file that inquiry sets in advance, if store the flow log information in the local flow log recording file, then definite 3G surfing flow warning function was opened; If local flow log recording file is empty, then determine not open 3G surfing flow warning function.
A12 arranges the early warning of startup 3G surfing flow;
A13 exports the information of opening 3G surfing flow warning function to the user;
In this step, client is determined the current 3G of the being connected to connection of user and was not opened 3G surfing flow warning function, exports information to the user, whether opens 3G surfing flow warning function with prompting user, if the user determines unlatching, then execution in step A14.
A14 receives the user according to the flow early-warning parameters of the 3G flow warning function setup menu output of showing, arranges to start 3G surfing flow warning function.
In this step, if the user determines to open 3G surfing flow warning function, then to user's output and displaying 3G flow warning function setup menu, trigger the user corresponding discharge early-warning parameters is set, for example, monthly package flow rated value, monthly package flow rated value threshold values, flow early warning threshold values and flow prediction policy are set, and the mode of setting can be to guide the user to arrange in the mode of progressively navigating.
Monthly package flow rated value is the flow value of operator's regulation in the monthly package of customization, for example, customization 5 yuan the monthly package of the 1G/ month, then monthly package flow rated value is 1G.
Flow early warning threshold values for the user arrange in order to carry out in real time the flow value of flow early warning, for example, for example, if user's monthly package flow rated value is 1G, then can set monthly package flow rated value threshold values is 99.9% of monthly package flow rated value, be 0.999G, flow early warning threshold values is 90% of monthly package flow rated value, i.e. 0.9G.Certainly, in the practical application, a plurality of flow early warning threshold values can be set also.
The mode in order to reminding user that the flow prediction policy arranges for the user, for example, when reaching flow early warning threshold values for user's use traffic, be arranged on and close when connecting to user's output flow early warning information at every turn, comprise in the flow early warning information: of that month remaining flow information; And when reaching monthly package flow rated value threshold values for user's use traffic, arrange in real time and to exhaust early warning information to user's amount of exports definite value and exhaust with the monthly package flow rated value of reminding user, be convenient to the user and determine whether to close current connection with the outer flow expense of savings.Certainly, in the practical application, the flow prediction policy of other modes can be set also, for example, when reaching flow early warning threshold values for user's use traffic, also can arrange every the time threshold that sets in advance to user's output flow early warning information; And when user's use traffic is slightly smaller than monthly package flow rated value, for example, 1,000,000, exhaust early warning information to user's amount of exports definite value in real time, subsequently, when the user continues current connection, export super flow early warning information to the user when being arranged on connection closed, comprise in the super flow early warning information: the flow information that exceeded this month further, can also comprise cost information corresponding to flow that exceeds.
In the embodiment of the invention, by setting in advance the filtering rule of information such as comprising dialing protocol, dialing equipment title, the card of surfing Internet that the user is used makes up filtration, with whether 3G online dial-up connection of identification user current network dial-up connection, if, adopt the method for the flow early warning of the embodiment of the invention, if other dial-up connection, for example, asymmetric digital subscriber line (ADSL, Asymmetric Digital Subscriber Line) the dial-up connection mode then adopts prior art.
In the practical application, filtering rule can push renewal by the website of operator, like this, can respond fast and support new 3G card of surfing Internet equipment.
By after detecting the Internet user and belonging to 3G card of surfing Internet mobile Internet access user, open 3G flow warning function to this class user reminding, after confirming that the user never opened 3G surfing flow warning function, prompting user is set 3G card of surfing Internet flow early-warning parameters, after the flow early-warning parameters is set, when the user adopts the online of 3G card of surfing Internet, recording user connection traffic information, detect in real time the also mechanism of early warning by historical traffic statistics in conjunction with current connection traffic, by the of that month bandwidth usage of information indicating user, the remaining bandwidth number, each use traffic etc. that connects, it is clear to allow the user grasp for the 3G surfing flow situation of oneself, thereby can not pay because exceeding the quata use traffic extra-pay.
Step 102 records current connection traffic information in the local flow log recording file that sets in advance, and calculates of that month total flow according to local flow log recording file;
This step specifically comprises:
B11, monitor current connection, current connection traffic information is write in the local flow log recording file that sets in advance;
In this step, connection traffic information comprises: this connects flow information, connection identifier (ID) information of using, certainly, in the practical application, for user's monthly payment situation of limit flow not in limited time, for example, 20 hours per month, 40 hours or 60 hours, can also record this and connect the information such as time started, this connection current time.
The time cycle that B12, basis set in advance is calculated the current connection traffic information that writes in the local flow log recording file that sets in advance;
In this step, the time cycle that sets in advance can be determined as required, for example, when user's use traffic does not reach flow early warning threshold values, current connection traffic information was calculated in setting every 30 minutes, 1 hour etc., namely this of up-to-date storage connects the flow information that uses in the read local flow log recording file.
B13, obtain the flow information of other connections except current connection of storing in the local flow log recording file;
In this step, if the user is carrying out having started 3G surfing flow warning function when 3G connects, then in the local flow log recording file of client, record the connection traffic information of each connection, client is added up the connection traffic information of the each connection before the current connection.
Certainly, in the practical application, in the local flow log recording file of client, also can arrange and store historical connection traffic information, the flow information that is used for other connections of statistics except current connection, behind current connection closed, current connection traffic information and historical connection traffic information carried out addition after, the historical connection traffic information of updated stored.Like this, when obtaining the flow information of other connections except current connection, the historical connection traffic information that only need to read storage gets final product.
B14, according to the of that month total flow of the flow rate calculation of current connection traffic and other connections except current connection.
In this step, current connection traffic is obtained of that month total flow with the flow addition of other connections except current the connection.Like this, when 3G flow warning function is moved, obtain the connection traffic information of of that month current connection by the historical record of storing in the local flow log recording file, and the connection traffic information used of each connection identifier except current connection of statistics, connection traffic with the current connection of real-time statistics adds the connection traffic that each connection identifier except current connection has used, calculates the of that month total flow of using.
In the practical application, because the 3G card of surfing Internet may be applied on the different clients by the user or not start 3G flow warning function between the 3G card of surfing Internet operating period, so that may there be certain deviation in the connection traffic information that records in the local flow log recording file with the actual use total flow that mobile operator provides, therefore, in the case, need to carry out the traffic statistics error correction processes.
The situation that causes the traffic statistics error to occur specifically comprises following three kinds of scenes:
One, user used this 3G card of surfing Internet accesses network, and used a part of flow this month before enabling 3G card of surfing Internet flow warning function.
Two, the user is after opening 3G card of surfing Internet flow warning function, the 3G card of surfing Internet flow warning function that the embodiment of the invention of stopping using for some time provides, and between this lay-off period, use this 3G card of surfing Internet to create dial-up connection, and used the subnetwork flow.
Three, the user is connected to other computer with this 3G card of surfing Internet, and produced the subnetwork flow after opening 3G card of surfing Internet flow warning function.
In above these situations, when these flows produced, for front two kinds of scenes, owing to do not start the flow warning function, connection traffic information was not written in the local flow log recording file; And for the third scene, the connection traffic information that produces is written to respectively in the local flow log recording file of different clients, thereby, cause the 3G surfing flow of cumulative calculation in the client terminal local flow log recording file and the statistic flow data that physical operator provides to have deviation.
Based on this, the embodiment of the invention provides traffic statistics value debugging functions, specifically comprises:
Among the step B13, further comprise:
B131, inquire about in the local flow log recording file and whether store the traffic statistics error correction values, be not more than the time threshold that sets in advance if store and store the temporal information of flow statistical error correction value and the time difference of current time information, execution in step B132, otherwise, execution in step B133;
In this step, time threshold can arrange as required, and for example, for the situation of the flow that uses less than flow early warning threshold values, what time threshold can be arranged was slightly longer, such as five days; And for the situation of the flow that uses greater than flow early warning threshold values, with time threshold arrange slightly short, such as one day etc.
B132 obtains this traffic statistics error correction values;
B133 triggers from carrier server corresponding to current dial-up connection and obtains the of that month connection traffic information of this user;
In this step, the user can obtain the traffic statistics data that provide by access respective operator server, i.e. the of that month connection traffic information of this user.
B134 calculates the difference of the flow sum of current connection traffic the of that month connection traffic that obtains from operator and the local flow log recording file and other connections except current the connection;
B135 is with the traffic statistics error correction values of difference updated stored and obtain the traffic statistics error correction values of renewal.
In this step, if do not store the traffic statistics error correction values in the local flow log recording file, this difference is stored, and the temporal information of record storage flow statistical error correction value; If store the traffic statistics error correction values in the local flow log recording file, then replace the traffic statistics error correction values of storage with this difference, and upgrade corresponding temporal information.
Step B14 is:
According to the of that month total flow of the flow rate calculation of the traffic statistics error correction values of obtaining, current connection traffic and other connections except current connection.
In this step, traffic statistics error correction values, current connection traffic are obtained of that month total flow with the flow addition of other connections except current the connection.Like this, flow by traffic statistics error correction values correction this month generation, and this correction value stored in this month traffic statistics data, guarantee that the cumulative data of each connection statistics that current connection is later can revise according to this correction value, with the calculating of guaranteeing of that month total flow effectively, accurately.
Step 103 determines that the of that month total flow that calculates surpasses the threshold value that sets in advance, and notifies the user according to the flow prediction policy that sets in advance.
In this step, the threshold value that sets in advance comprises: flow early warning threshold values and monthly package flow rated value threshold values.
Notify the user to comprise according to the flow prediction policy that sets in advance:
If the of that month total flow that calculates surpasses flow early warning threshold values, close when connecting to user's output flow early warning information current;
If the of that month total flow that calculates is equal to or greater than monthly package flow rated value threshold values, exhaust early warning information to user's amount of exports definite value in real time.
In the practical application, flow early warning information and rated value exhaust the mode reminding user that early warning information can eject by the lower right corner information dialog box, for example, the rated value that ejects exhaust early warning information in order to the current use traffic of reminding user near monthly package flow rated value, for avoiding producing extra campus network, the suggestion user is confirmed whether that residual flow uses in addition.
Like this, when the total flow of using in this month reaches flow early warning threshold values, when current connection closed, eject the flow early warning information with the flow of reminding user remaining bandwidth, allow the user obtain operating position to network traffics, and when the total flow of use in this month reaches monthly package flow rated value threshold values, exhaust early warning information to remind flow to use to user's amount of exports definite value in real time, determine whether close current connection with savings external flux expense thereby be convenient to the user.
Fig. 2 is the method idiographic flow schematic diagram of embodiment of the invention early warning flow.Referring to Fig. 2, this flow process comprises:
Step 201 determines that according to the filtering rule that sets in advance the current 3G of being connected to of Client-initiated connects;
Step 202 starts 3G surfing flow warning function;
Step 203 is loaded historical discharge record and this month traffic statistics error correction values;
In this step, historical discharge record is the discharge record information of other connections except current connection, all dial-up connection flows that disconnected that namely load this month from local flow log recording file use record, calculate historical flow, simultaneously according to the historical flow of this month traffic statistics error correction values correction order.
Step 204 is added up current connection traffic, and calculates of that month total flow;
In this step, read the flow operating position of current connection according to the time cycle that sets in advance, with the corrected historical flow that step 203 calculates, obtain the of that month flow that uses, i.e. of that month total flow.
Step 205 determines that the of that month total flow that calculates surpasses the threshold value that sets in advance, and exports information to the user;
In this step, this month total flow according to step 204 calculates in real time compares with the threshold value that sets in advance, and judges whether to surpass threshold values, if surpass threshold values, then exports information with reminding user to the user.
Threshold value comprises: flow early warning threshold values and monthly package flow rated value threshold values, accordingly, information comprises: flow early warning information and rated value exhaust early warning information.
Step 206 is confirmed current connection closed, preserves this connection traffic information.
In this step, after the user closed dial-up connection, the flow warning module was by monitoring connection closed event, and the flow operating position of this connection is recorded in local flow log recording file.
As seen by above-mentioned, the method for the early warning flow of the embodiment of the invention determines that the current 3G of being connected to of Client-initiated connects, and starts 3G surfing flow warning function; In the local flow log recording file that sets in advance, record current connection traffic information, and calculate of that month total flow according to local flow log recording file; Determine that the of that month total flow that calculates surpasses the threshold value that sets in advance, and notifies the user according to the flow prediction policy that sets in advance.Like this, the user is in upper network process, can know in time whether present flow rate has reached default monthly package rated value threshold value by the flow early warning information, so that when use traffic reaches monthly package rated value threshold value, can in time stop to connect, avoid the super flow online of user, avoid the outer campus network of amount paid, thereby reduce user overhead information.
Fig. 3 is the apparatus structure schematic diagram of embodiment of the invention early warning flow.Referring to Fig. 3, this device comprises: 3G connection detection module, flow logger module, flow rate calculation module and flow warning module, wherein,
The 3G connection detection module is used for determining that the current 3G that is connected to of Client-initiated connects, and starts 3G surfing flow warning function;
The flow logger module is used for after starting 3G surfing flow warning function, the current connection traffic information of record in the local flow log recording file that sets in advance;
The flow rate calculation module is used for calculating of that month total flow according to local flow log recording file;
The flow warning module is used for determining that the of that month total flow that calculates surpasses the threshold value that sets in advance, and notifies the user according to the flow prediction policy that sets in advance.
Preferably, further comprise:
The flow correction module, be used for the query flows logger module and whether store the traffic statistics error correction values, if determine not store or to store and to store the time difference of the temporal information of flow statistical error correction value and current time information greater than the time threshold that sets in advance, triggering is obtained the of that month connection traffic information of this user from carrier server corresponding to current dial-up connection, the difference of the flow sum of current connection traffic and other connections except current connection the of that month connection traffic that calculating is obtained from operator and the flow logger module is stored this difference or with the traffic statistics error correction values of difference updated stored.
The flow warning module comprises: flow early warning threshold unit and monthly package flow rated value threshold unit (not shown), wherein,
Flow early warning threshold unit is used for surpassing the flow early warning threshold values that sets in advance in the of that month total flow of determining to calculate, and closes when connecting to user's output flow early warning information current;
Monthly package flow rated value threshold unit is used for being equal to or greater than monthly package flow rated value threshold values in the of that month total flow of determining to calculate, and exhausts early warning information to user's amount of exports definite value in real time.
The above is preferred embodiment of the present invention only, is not for limiting protection scope of the present invention.Within the spirit and principles in the present invention all, any modification of doing, be equal to and replace and improvement etc., all should be included within protection scope of the present invention.

Claims (15)

1. the method for an early warning flow is characterized in that, the method comprises:
Determine that the current 3G of being connected to of Client-initiated connects, and starts 3G surfing flow warning function;
In the local flow log recording file that sets in advance, record current connection traffic information, and calculate of that month total flow according to local flow log recording file;
Determine that the of that month total flow that calculates surpasses the threshold value that sets in advance, and notifies the user according to the flow prediction policy that sets in advance.
2. the method for claim 1 is characterized in that, the current 3G of being connected to of described definite Client-initiated connects and comprises:
The dial-up connection information of carrying in the Client-initiated dial-up connection request is extracted in monitor user ' online dial-up connection;
According to the dial-up connection information that the filtering rule coupling that sets in advance is extracted, if the match is successful, determine that the current 3G of being connected to connects.
3. method as claimed in claim 2 is characterized in that, described dial-up connection information comprise dialing protocol information and/or, the dialing equipment name information.
4. method as claimed in claim 3 is characterized in that, be provided with in the described filtering rule that sets in advance 3G protocol information that sign 3G connects and/or, 3G device name information.
5. the method for claim 1 is characterized in that, described startup 3G surfing flow warning function comprises:
Whether A11, inquiry 3G surfing flow warning function opened, if opened, and execution in step A12, if do not open, execution in step A13;
A12 arranges the early warning of startup 3G surfing flow;
A13 exports the information of opening 3G surfing flow warning function to the user;
A14 receives the user according to the flow early-warning parameters of the 3G flow warning function setup menu output of showing, arranges to start 3G surfing flow warning function.
6. method as claimed in claim 5 is characterized in that, described flow early-warning parameters comprises: monthly package flow rated value, monthly package flow rated value threshold values, flow early warning threshold values and flow prediction policy.
7. method as claimed in claim 6 is characterized in that, the described threshold value that sets in advance comprises: flow early warning threshold values and monthly package flow rated value threshold values, and described flow prediction policy comprises:
When user's use traffic is not less than flow early warning threshold values, when closing connection, to user's output flow early warning information, comprise of that month remaining flow information in the described flow early warning information at every turn;
When user's use traffic surpasses monthly package flow rated value threshold values, export the rated value that the monthly package flow rated value of reminding user exhausted to the user in real time and exhaust early warning information;
When the user continues current connection after the amount of exports definite value exhausts early warning information, when connection closed, export super flow early warning information to the user, comprise the flow information that exceeded this month in the described super flow early warning information.
8. such as each described method of claim 1 to 7, it is characterized in that, described in the local flow log recording file that sets in advance the current connection traffic information of record, and calculate of that month total flow according to local flow log recording file and comprise:
B11, monitor current connection, current connection traffic information is write in the local flow log recording file that sets in advance;
The time cycle that B12, basis set in advance is calculated the current connection traffic information that writes in the local flow log recording file that sets in advance;
B13, obtain the flow information of other connections except current connection of storing in the local flow log recording file;
B14, according to the of that month total flow of the flow rate calculation of current connection traffic and other connections except current connection.
9. method as claimed in claim 8 is characterized in that, described connection traffic information comprises: this connects flow information and the connection identifier information of using.
10. method as claimed in claim 9 is characterized in that, described connection traffic information further comprises: this connects the time started, this connects the current time and this connects the concluding time.
11. method as claimed in claim 8 is characterized in that, described step B13 further comprises: obtain the traffic statistics error correction values of storing in the local flow log recording file;
Described step B14 is: according to the of that month total flow of the flow rate calculation of traffic statistics error correction values, current connection traffic and other connections except current connection.
12. method as claimed in claim 11 is characterized in that, obtains described traffic statistics error correction values and comprises:
B131, inquire about in the local flow log recording file and whether store the traffic statistics error correction values, be not more than the time threshold that sets in advance if store and store the temporal information of flow statistical error correction value and the time difference of current time information, execution in step B132, otherwise, execution in step B133;
B132 obtains this traffic statistics error correction values;
B133 triggers from carrier server corresponding to current dial-up connection and obtains the of that month connection traffic information of this user;
B134 calculates the difference of the flow sum of current connection traffic the of that month connection traffic that obtains from operator and the local flow log recording file and other connections except current the connection;
B135 stores described difference or with the traffic statistics error correction values of difference updated stored and obtain the traffic statistics error correction values of renewal.
13. the device of an early warning flow is characterized in that, this device comprises: 3G connection detection module, flow logger module, flow rate calculation module and flow warning module, wherein,
The 3G connection detection module is used for determining that the current 3G that is connected to of Client-initiated connects, and starts 3G surfing flow warning function;
The flow logger module is used for after starting 3G surfing flow warning function, the current connection traffic information of record in the local flow log recording file that sets in advance;
The flow rate calculation module is used for calculating of that month total flow according to local flow log recording file;
The flow warning module is used for determining that the of that month total flow that calculates surpasses the threshold value that sets in advance, and notifies the user according to the flow prediction policy that sets in advance.
14. device as claimed in claim 13 is characterized in that, further comprises:
The flow correction module, be used for the query flows logger module and whether store the traffic statistics error correction values, if determine not store or to store and to store the time difference of the temporal information of flow statistical error correction value and current time information greater than the time threshold that sets in advance, triggering is obtained the of that month connection traffic information of this user from carrier server corresponding to current dial-up connection, the difference of the flow sum of current connection traffic and other connections except current connection the of that month connection traffic that calculating is obtained from operator and the flow logger module is stored this difference or with the traffic statistics error correction values of difference updated stored.
15., it is characterized in that described flow warning module comprises such as claim 13 or 14 described devices: flow early warning threshold unit and monthly package flow rated value threshold unit, wherein,
Flow early warning threshold unit is used for surpassing the flow early warning threshold values that sets in advance in the of that month total flow of determining to calculate, and closes when connecting to user's output flow early warning information current;
Monthly package flow rated value threshold unit is used for being equal to or greater than monthly package flow rated value threshold values in the of that month total flow of determining to calculate, and exhausts early warning information to user's amount of exports definite value in real time.
CN201110269276.6A 2011-09-13 2011-09-13 Traffic warning method and traffic warning device Active CN103002466B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110269276.6A CN103002466B (en) 2011-09-13 2011-09-13 Traffic warning method and traffic warning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110269276.6A CN103002466B (en) 2011-09-13 2011-09-13 Traffic warning method and traffic warning device

Publications (2)

Publication Number Publication Date
CN103002466A true CN103002466A (en) 2013-03-27
CN103002466B CN103002466B (en) 2015-07-15

Family

ID=47930496

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110269276.6A Active CN103002466B (en) 2011-09-13 2011-09-13 Traffic warning method and traffic warning device

Country Status (1)

Country Link
CN (1) CN103002466B (en)

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103957500A (en) * 2014-05-08 2014-07-30 中国联合网络通信集团有限公司 Method and device for reminding user about traffic
CN104010281A (en) * 2014-05-30 2014-08-27 可牛网络技术(北京)有限公司 Hinting method and device of mobile equipment traffic
CN104023326A (en) * 2014-06-17 2014-09-03 北京奇虎科技有限公司 Flow excess reminding method and device
CN104105052A (en) * 2014-06-30 2014-10-15 联想(北京)有限公司 Information processing method and electronic equipment
CN104125600A (en) * 2013-04-27 2014-10-29 腾讯科技(深圳)有限公司 Traffic identification method and device of mobile terminal
WO2015014246A1 (en) * 2013-07-29 2015-02-05 Tencent Technology (Shenzhen) Company Limited Method and apparatus for monitoring service usage of a mobile terminal
CN104380769A (en) * 2014-04-18 2015-02-25 华为技术有限公司 Information reminding method, apparatus, and electronic terminal
CN104579794A (en) * 2015-01-27 2015-04-29 杭州华三通信技术有限公司 Query device fault detection method and device
CN104703163A (en) * 2013-12-06 2015-06-10 中国电信股份有限公司 Real-time monitoring method for remaining Internet surfing flow of terminal and flow monitoring server
CN104735699A (en) * 2015-03-10 2015-06-24 Tcl移动通信科技(宁波)有限公司 Data traffic monitoring method and system based on mobile terminal and mobile terminal
CN104936221A (en) * 2015-06-04 2015-09-23 北京奇虎科技有限公司 Method and device for monitoring data flow in mobile terminal
CN105101138A (en) * 2014-05-23 2015-11-25 宇龙计算机通信科技(深圳)有限公司 Method and system for controlling traffic, and terminal
CN105101302A (en) * 2014-04-30 2015-11-25 宇龙计算机通信科技(深圳)有限公司 Flow management method based on use habits of users and system thereof
CN105490822A (en) * 2014-10-10 2016-04-13 中国移动通信集团公司 Traffic charging method and device
CN105554713A (en) * 2015-12-11 2016-05-04 小米科技有限责任公司 Method and device for reminding flow
CN105848130A (en) * 2016-05-20 2016-08-10 深圳市金立通信设备有限公司 Data traffic management method and terminal
CN106211227A (en) * 2016-08-31 2016-12-07 迈普通信技术股份有限公司 Flow method for early warning and the network equipment
US9544203B2 (en) 2013-04-27 2017-01-10 Tencent Technology (Shenzhen) Company Limited Mobile terminal flow identification method and apparatus
CN107005869A (en) * 2014-10-17 2017-08-01 七网络有限责任公司 Coordinated management strategy on the mobile apparatus
CN107231651A (en) * 2017-07-28 2017-10-03 惠州Tcl移动通信有限公司 Traffic monitoring alarm method, storage device and the mobile terminal of a kind of mobile terminal
CN107295539A (en) * 2016-03-30 2017-10-24 中国移动通信集团江苏有限公司 A kind of surfing flow service condition method for pushing and device
CN108012258A (en) * 2017-11-29 2018-05-08 北京小米移动软件有限公司 Data flux management method, device, terminal and the server of virtual SIM card
CN108809744A (en) * 2017-05-03 2018-11-13 百度在线网络技术(北京)有限公司 Traffic monitoring management method and device
CN110852740A (en) * 2019-11-18 2020-02-28 中国银行股份有限公司 Payment amount early warning method for multi-currency capital pool and related device
CN111385149A (en) * 2020-03-07 2020-07-07 深圳市中天网景科技有限公司 Internet of things card early warning method, device, equipment and medium for connection management platform
CN112423288A (en) * 2020-10-28 2021-02-26 深圳市广和通无线股份有限公司 Dialing analysis method and device, computer equipment and storage medium
CN113641634A (en) * 2021-07-07 2021-11-12 荣耀终端有限公司 Method for controlling log flow and electronic equipment
CN114338930A (en) * 2021-12-30 2022-04-12 广州爱浦路网络技术有限公司 Ticket information processing method, computer device and storage medium
CN114554431A (en) * 2022-02-16 2022-05-27 济南宏腾信息科技有限公司 Big data-based short video traffic use early warning system and method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101854649A (en) * 2010-05-20 2010-10-06 中兴通讯股份有限公司 Mobile terminal and method and device for monitoring Internet surfing data traffic of mobile terminal
CN101977365A (en) * 2010-11-16 2011-02-16 北京瓦力网络科技有限公司 Method and system for indicating residual mobile phone Internet traffic
CN102006576A (en) * 2010-12-08 2011-04-06 东莞宇龙通信科技有限公司 Method and system for displaying surfing flow and mobile terminal

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101854649A (en) * 2010-05-20 2010-10-06 中兴通讯股份有限公司 Mobile terminal and method and device for monitoring Internet surfing data traffic of mobile terminal
CN101977365A (en) * 2010-11-16 2011-02-16 北京瓦力网络科技有限公司 Method and system for indicating residual mobile phone Internet traffic
CN102006576A (en) * 2010-12-08 2011-04-06 东莞宇龙通信科技有限公司 Method and system for displaying surfing flow and mobile terminal

Cited By (54)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104125600A (en) * 2013-04-27 2014-10-29 腾讯科技(深圳)有限公司 Traffic identification method and device of mobile terminal
US9544203B2 (en) 2013-04-27 2017-01-10 Tencent Technology (Shenzhen) Company Limited Mobile terminal flow identification method and apparatus
CN104125600B (en) * 2013-04-27 2016-03-02 腾讯科技(深圳)有限公司 The method for recognizing flux of mobile terminal and device
US9813927B2 (en) 2013-04-27 2017-11-07 Tencent Technology (Shenzhen) Company Limited Mobile terminal flow identification method and apparatus
WO2015014246A1 (en) * 2013-07-29 2015-02-05 Tencent Technology (Shenzhen) Company Limited Method and apparatus for monitoring service usage of a mobile terminal
CN104349340B (en) * 2013-07-29 2018-08-28 腾讯科技(深圳)有限公司 The surfing flow monitoring method and device of mobile terminal
CN104349340A (en) * 2013-07-29 2015-02-11 腾讯科技(深圳)有限公司 Traffic flow monitoring method and device for mobile terminal
US9357084B2 (en) 2013-07-29 2016-05-31 Tencent Technology (Shenzhen) Company Limited Method and apparatus for monitoring service usage of a mobile terminal
CN104703163B (en) * 2013-12-06 2018-05-29 中国电信股份有限公司 Terminal online residual flow method for real-time monitoring and traffic monitoring server
CN104703163A (en) * 2013-12-06 2015-06-10 中国电信股份有限公司 Real-time monitoring method for remaining Internet surfing flow of terminal and flow monitoring server
US10587761B2 (en) 2014-04-18 2020-03-10 Huawei Technologies Co., Ltd. Information reminding method and apparatus, and electronic terminal
EP3099098A1 (en) * 2014-04-18 2016-11-30 Huawei Technologies Co., Ltd Method, device and electronic terminal for information reminding
WO2015157984A1 (en) * 2014-04-18 2015-10-22 华为技术有限公司 Method, device and electronic terminal for information reminding
EP3099098A4 (en) * 2014-04-18 2017-04-05 Huawei Technologies Co., Ltd. Method, device and electronic terminal for information reminding
JP2017517172A (en) * 2014-04-18 2017-06-22 華為技術有限公司Huawei Technologies Co.,Ltd. Information recalling method and apparatus, and electronic terminal
US11146691B2 (en) 2014-04-18 2021-10-12 Huawei Technologies Co., Ltd. Information reminding method and apparatus, and electronic terminal
CN110324793A (en) * 2014-04-18 2019-10-11 华为技术有限公司 A kind of method, apparatus and electric terminal of information reminding
US11659098B2 (en) 2014-04-18 2023-05-23 Huawei Technologies Co., Ltd. Information reminding method and apparatus, and electronic terminal
CN104380769A (en) * 2014-04-18 2015-02-25 华为技术有限公司 Information reminding method, apparatus, and electronic terminal
CN104380769B (en) * 2014-04-18 2019-05-28 华为技术有限公司 A kind of method, apparatus and electric terminal of information reminding
CN105101302A (en) * 2014-04-30 2015-11-25 宇龙计算机通信科技(深圳)有限公司 Flow management method based on use habits of users and system thereof
CN105101302B (en) * 2014-04-30 2019-03-08 宇龙计算机通信科技(深圳)有限公司 Flow managing method and system based on user's use habit
CN103957500A (en) * 2014-05-08 2014-07-30 中国联合网络通信集团有限公司 Method and device for reminding user about traffic
CN105101138A (en) * 2014-05-23 2015-11-25 宇龙计算机通信科技(深圳)有限公司 Method and system for controlling traffic, and terminal
CN104010281A (en) * 2014-05-30 2014-08-27 可牛网络技术(北京)有限公司 Hinting method and device of mobile equipment traffic
CN104023326A (en) * 2014-06-17 2014-09-03 北京奇虎科技有限公司 Flow excess reminding method and device
CN104105052A (en) * 2014-06-30 2014-10-15 联想(北京)有限公司 Information processing method and electronic equipment
CN104105052B (en) * 2014-06-30 2017-09-29 联想(北京)有限公司 A kind of information processing method and electronic equipment
CN105490822B (en) * 2014-10-10 2019-08-02 中国移动通信集团公司 A kind of charging method and device of flow
CN105490822A (en) * 2014-10-10 2016-04-13 中国移动通信集团公司 Traffic charging method and device
CN107005869A (en) * 2014-10-17 2017-08-01 七网络有限责任公司 Coordinated management strategy on the mobile apparatus
CN104579794B (en) * 2015-01-27 2019-02-19 新华三技术有限公司 Query facility fault detection method and device
CN104579794A (en) * 2015-01-27 2015-04-29 杭州华三通信技术有限公司 Query device fault detection method and device
CN104735699A (en) * 2015-03-10 2015-06-24 Tcl移动通信科技(宁波)有限公司 Data traffic monitoring method and system based on mobile terminal and mobile terminal
CN104735699B (en) * 2015-03-10 2018-09-18 Tcl移动通信科技(宁波)有限公司 A kind of data traffic monitoring method, system and mobile terminal based on mobile terminal
CN104936221A (en) * 2015-06-04 2015-09-23 北京奇虎科技有限公司 Method and device for monitoring data flow in mobile terminal
CN105554713A (en) * 2015-12-11 2016-05-04 小米科技有限责任公司 Method and device for reminding flow
CN107295539A (en) * 2016-03-30 2017-10-24 中国移动通信集团江苏有限公司 A kind of surfing flow service condition method for pushing and device
CN105848130A (en) * 2016-05-20 2016-08-10 深圳市金立通信设备有限公司 Data traffic management method and terminal
CN106211227A (en) * 2016-08-31 2016-12-07 迈普通信技术股份有限公司 Flow method for early warning and the network equipment
CN108809744A (en) * 2017-05-03 2018-11-13 百度在线网络技术(北京)有限公司 Traffic monitoring management method and device
CN107231651A (en) * 2017-07-28 2017-10-03 惠州Tcl移动通信有限公司 Traffic monitoring alarm method, storage device and the mobile terminal of a kind of mobile terminal
CN107231651B (en) * 2017-07-28 2020-09-22 惠州Tcl移动通信有限公司 Traffic monitoring and alarming method of mobile terminal, storage device and mobile terminal
CN108012258A (en) * 2017-11-29 2018-05-08 北京小米移动软件有限公司 Data flux management method, device, terminal and the server of virtual SIM card
CN108012258B (en) * 2017-11-29 2021-02-09 北京小米移动软件有限公司 Data traffic management method and device for virtual SIM card, terminal and server
CN110852740A (en) * 2019-11-18 2020-02-28 中国银行股份有限公司 Payment amount early warning method for multi-currency capital pool and related device
CN111385149A (en) * 2020-03-07 2020-07-07 深圳市中天网景科技有限公司 Internet of things card early warning method, device, equipment and medium for connection management platform
CN112423288A (en) * 2020-10-28 2021-02-26 深圳市广和通无线股份有限公司 Dialing analysis method and device, computer equipment and storage medium
CN112423288B (en) * 2020-10-28 2024-03-15 深圳市广和通无线股份有限公司 Dialing analysis method, device, computer equipment and storage medium
CN113641634A (en) * 2021-07-07 2021-11-12 荣耀终端有限公司 Method for controlling log flow and electronic equipment
CN114338930A (en) * 2021-12-30 2022-04-12 广州爱浦路网络技术有限公司 Ticket information processing method, computer device and storage medium
CN114338930B (en) * 2021-12-30 2022-10-11 广州爱浦路网络技术有限公司 Ticket information processing method, computer device and storage medium
CN114554431A (en) * 2022-02-16 2022-05-27 济南宏腾信息科技有限公司 Big data-based short video traffic use early warning system and method
CN114554431B (en) * 2022-02-16 2024-02-06 武汉纵拓信息技术有限公司 Short video flow use early warning system and method based on big data

Also Published As

Publication number Publication date
CN103002466B (en) 2015-07-15

Similar Documents

Publication Publication Date Title
CN103002466A (en) Traffic warning method and traffic warning device
CN102668458B (en) System and method for reporting packet characteristics in a network environment
KR101439827B1 (en) Charging method selection for service data flows based on the data services being requested
CN101600186B (en) Method and device for traffic statistics and automatic computation of network charge
US9357084B2 (en) Method and apparatus for monitoring service usage of a mobile terminal
WO2007107112A1 (en) A method and system for ensuring the service quality and the service level agreement server
US7539901B2 (en) Data transmission management system, a mobile device and a server used therein
CN101883178A (en) Method and system for automatically timing and metering during surfing Internet with cell phone on basis of cell phone terminal
CN101627619A (en) A pre-biller in internet protocol multimedia subsystem (IMS) charging gateway function (CGF)
CN102739409A (en) Internet traffic charging device and method
US8588736B2 (en) System and method for capturing real time telecommunications usage data from mobile devices and comparing that data to life cycle telecommunications expense management (TEM) data
CN103843374A (en) SY based integrated policy and charging control
JP4146469B2 (en) Billing method in flat-rate communication system
CN111988749B (en) Dynamic tariff generation method and device
EP2590358A1 (en) Method, device and system for prepayment charging
WO2009062408A1 (en) Method for implementing value-added service and service control point
CN110060358B (en) Information processing method and related device
WO2010135881A1 (en) Realization method and system for real-time cumulative present prepaid intelligent network service
CN107770081B (en) Method and system for dynamically issuing service control strategy and service certificate management platform
WO2011144089A2 (en) Charge regranted method and device thereof
CN102421106B (en) A kind of by quantity monitoring method and system
CN108270580B (en) Reminding method, device and system for online charging
CN108090771A (en) Payment method, mobile terminal and storage medium
CN1681283B (en) Charging method of mobile intelligent net
CN107846288A (en) For realizing the methods, devices and systems of charging

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant