Nothing Special   »   [go: up one dir, main page]

CN102708455A - Management system and management method for correcting and preventing problems - Google Patents

Management system and management method for correcting and preventing problems Download PDF

Info

Publication number
CN102708455A
CN102708455A CN2012101499287A CN201210149928A CN102708455A CN 102708455 A CN102708455 A CN 102708455A CN 2012101499287 A CN2012101499287 A CN 2012101499287A CN 201210149928 A CN201210149928 A CN 201210149928A CN 102708455 A CN102708455 A CN 102708455A
Authority
CN
China
Prior art keywords
correction
measure
executive measure
proactive
executive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101499287A
Other languages
Chinese (zh)
Inventor
张冲
林晓旋
余里程
邢国杰
符曦
胡飞
李亚松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Power Supply Co ltd
Shenzhen Comtop Information Technology Co Ltd
Original Assignee
Shenzhen Power Supply Co ltd
Shenzhen Comtop Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Power Supply Co ltd, Shenzhen Comtop Information Technology Co Ltd filed Critical Shenzhen Power Supply Co ltd
Priority to CN2012101499287A priority Critical patent/CN102708455A/en
Publication of CN102708455A publication Critical patent/CN102708455A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a management system and a management method for correcting and preventing problems, which collect, classify and integrate the correction and prevention problems recorded by each department, match the execution measures for the correction and prevention problems from historical data and receive the correction of the execution measures by users, record the responsible department or responsible person of each part execution measure in the corrected execution measures, track and verify the execution conditions of each responsible department or responsible person on the corresponding part execution measures, collect the execution conditions of each part measure into the execution result of the whole measure, and update the historical data. The management system and the management method can be used for uniformly managing the correction and prevention problems and the related information thereof, and compared with a paper management method, the management system and the management method are convenient for users to operate and check and greatly improve the management efficiency.

Description

Correct management system and management method with proactive problem
Technical field
The present invention relates to power system security production management technical field, particularly relate to the management system and the management method of a kind of correction and proactive problem.
Background technology
Correcting with preventing is the technical term in the safety in production risk management system; Its meaning is that the problem that does not meet safety in production that has taken place in the electric system is corrected; Contingent problem is prevented, and wherein, the problem that does not meet safety in production abbreviates as corrects and proactive problem.Correction in the electric system and proactive problem have a lot, and same problem possibly occur repeatedly, and possibly there is repetition in the problem that different departments find, like this, problem are managed the particularly necessity that seems.Traditional management method, be the staff with problem log on paper spare, and paper spare managed.This method obviously can not realize correcting the informationization with proactive problem, also with regard to the editor that is unfavorable for problem, preserve, check and manage concentratedly or the like.
Summary of the invention
Based on this, the present invention proposes the management system and the management method of a kind of correction and proactive problem, manage correcting with convenient with proactive problem, and the raising efficiency of management.
The management system of a kind of correction and proactive problem comprises:
Problem typing module is used to receive the correction and the proactive problem of user's typing;
Distribution module is formulated in measure; Be used for correcting and the proactive problem integration of classifying; Search database; Be the executive measure of current correction and proactive problem recommendation coupling, and upgrade the executive measure that the user finally confirms, the responsible organization or the responsible official of each several part executive measure in the final executive measure of confirming of recording user;
Feedback module is carried out in measure, is used to write down and report each responsible organization or the responsible official implementation status to the appropriate section executive measure;
The implementation effect authentication module is used to gather the implementation status of each several part executive measure, obtains the result of current correction and proactive problem;
Database is used to write down implementation status and the correction and the final result of proactive problem of correction and proactive problem and executive measure thereof, each several part executive measure.
The management method of a kind of correction and proactive problem comprises step:
Receive the correction and the proactive problem of user's typing;
To correcting and the proactive problem integration of classifying; Search historical data; Be the executive measure of current correction and proactive problem recommendation coupling, and upgrade the executive measure that the user finally confirms, the responsible organization or the responsible official of each several part executive measure in the final executive measure of confirming of recording user;
Write down and report each responsible organization or responsible official implementation status to the appropriate section executive measure;
The implementation status that gathers the each several part executive measure obtains the result of current correction and proactive problem;
The implementation status of correction and proactive problem and executive measure thereof, each several part executive measure and correction and the final result of proactive problem are preserved as historical data.
The management system of correction of the present invention and proactive problem and management method; To the integration that gathers and classify of the correction of all departments' typing and proactive problem; From historical data, mate executive measure and accept the correction of user executive measure for correcting with proactive problem; Write down the responsible organization or the responsible official of each several part executive measure in the revised executive measure, and collect the execution result of each responsible organization or responsible official's feedback, upgrade historical data simultaneously.Adopt this management system and management method, can carry out unified management, compare the method for paper spare management correction and proactive problem and relevant information thereof, the operation that has made things convenient for the user with check, improved the efficiency of management greatly.
Description of drawings
Fig. 1 is the structural representation of the management system of correction of the present invention and proactive problem;
Fig. 2 is the structural representation of one of them embodiment of management system of correction of the present invention and proactive problem;
Fig. 3 is the schematic flow sheet of the management method of correction of the present invention and proactive problem.
Embodiment
The management system of correction of the present invention and proactive problem and management method replace the management of paper spare, carry out information system management to correcting with proactive problem.Below in conjunction with accompanying drawing and the present invention of embodiment illustrated in detail.
The management system of correction of the present invention and proactive problem, as shown in Figure 1, comprising:
Problem typing module is used to receive the correction and the proactive problem of user's typing;
Distribution module is formulated in measure; Be used for correcting and the proactive problem integration of classifying; Search database; Be the executive measure of current correction and proactive problem recommendation coupling, and upgrade the executive measure that the user finally confirms, the responsible organization or the responsible official of each several part executive measure in the final executive measure of confirming of recording user;
Feedback module is carried out in measure, is used to write down and report each responsible organization or the responsible official implementation status to the appropriate section executive measure;
The implementation effect authentication module is used to gather the implementation status of each several part executive measure, obtains the result of current correction and proactive problem;
Database is used to write down implementation status and the correction and the final result of proactive problem of correction and proactive problem and executive measure thereof, each several part executive measure.
Can know that by above description and Fig. 1 distribution module is formulated in problem typing module, measure, measure is carried out feedback module and linked to each other successively with the implementation effect authentication module, and links to each other with database respectively, thereby has constituted this management system.Wherein, problem typing module is used to collect correction and the proactive problem that all departments find.Measure is formulated distribution module and then from database, is searched the executive measure of mating with current correction and proactive problem, recommends the user, and the user revises and confirm as final executive measure based on actual conditions to the executive measure of recommending.To carry out efficient and obtain best implementation effect in order to improve; The user classifies to executive measure and sorted each several part measure is distributed to this part work is good at or the most experienced department or people most, and the responsible organization or the responsible official of distribution module record each several part executive measure formulated in measure.Feedback module is carried out in measure, and then each responsible organization of real-time follow-up or responsible official are to the implementation status of institute's distribution portion measure, and the implementation effect authentication module is integrated into the implementation status of each several part executive measure implementation status, execution result and the deadline of total executive measure; Database is then all preserved the data that relate in the above module routine, so that call and check.
Because the user possibly relatively be concerned about kind, frequency and the measure thereof etc. that are gone wrong in a period of time; This management system also comprises problem statistical module and executive measure statistical module; As shown in Figure 2, the user can understand the statistics in the database through these two modules.Simultaneously; The user understands problem and measure for ease, and is as shown in Figure 2, and this management system also comprises problem enquiry module and executive measure enquiry module; Be respectively the user problem query window and executive measure query window are provided, and the Query Result from database is displayed.Preferably, statistics and Query Result are showed on the Web page through the FusionChart assembly.So, the user can understand interested correction and proactive problem and executive measure thereof through browser.
The management method of correction of the present invention and proactive problem, be and the corresponding method of above-mentioned management system, as shown in Figure 3, comprise step:
The correction and the proactive problem of step S1, reception user typing;
Step S2, to correcting and the proactive problem integration of classifying; Search historical data; Executive measure for current correction and proactive problem recommendation coupling; And upgrade the executive measure that the user finally confirms, the responsible organization or the responsible official of each several part executive measure in the executive measure that recording user is finally confirmed;
Step S3, write down and report each responsible organization or responsible official implementation status to the appropriate section executive measure;
Step S4, gather the implementation status of each several part executive measure, obtain the result of current correction and proactive problem;
Step S5, the implementation status of correction and proactive problem and executive measure thereof, each several part executive measure and correction and the final result of proactive problem are preserved as historical data.
As a preferred embodiment, this management method also comprises step:
Step S6, correction in the database and proactive problem are added up;
Step S7, the correction of from database, searching user's appointment and proactive problem;
Step S8, the executive measure in the database is added up;
Step S9, from database, search the executive measure of user's appointment.
Because step S6-S9 is not influence each other, so sequencing is adjustable arbitrarily.The result who is inquired about and the result of statistics preferably are illustrated on the Web page.
The above embodiment has only expressed several kinds of embodiments of the present invention, and it describes comparatively concrete and detailed, but can not therefore be interpreted as the restriction to claim of the present invention.Should be pointed out that for the person of ordinary skill of the art under the prerequisite that does not break away from the present invention's design, can also make some distortion and improvement, these all belong to protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be as the criterion with accompanying claims.

Claims (6)

1. the management system of correction and proactive problem is characterized in that, comprising:
Problem typing module is used to receive the correction and the proactive problem of user's typing;
Distribution module is formulated in measure; Be used for correcting and the proactive problem integration of classifying; Search database; Be the executive measure of current correction and proactive problem recommendation coupling, and upgrade the executive measure that the user finally confirms, the responsible organization or the responsible official of each several part executive measure in the final executive measure of confirming of recording user;
Feedback module is carried out in measure, is used to write down and report each responsible organization or the responsible official implementation status to the appropriate section executive measure;
The implementation effect authentication module is used to gather the implementation status of each several part executive measure, obtains the result of current correction and proactive problem;
Database is used to write down implementation status and the correction and the final result of proactive problem of correction and proactive problem and executive measure thereof, each several part executive measure.
2. the management system of correction according to claim 1 and proactive problem is characterized in that, also comprises:
The problem statistical module, the correction and the proactive problem that are used for database is write down are added up;
The problem enquiry module is used to the user problem query window is provided, from the correction of database calling and obtaining user selection and the historical data of proactive problem;
The executive measure statistical module is used for the executive measure that database writes down is added up;
The executive measure enquiry module is used to the user executive measure query window is provided, the historical data of the executive measure of selecting from the database calling and obtaining user.
3. the management system of correction according to claim 2 and proactive problem is characterized in that,
Said problem statistical module also is used for showing statistics through the Web page;
Said problem enquiry module also is used for showing Query Result through the Web page;
Said executive measure statistical module also is used for showing statistics through the Web page;
Said executive measure enquiry module also is used for showing Query Result through the Web page.
4. the management method of correction and proactive problem is characterized in that, comprises step:
Receive the correction and the proactive problem of user's typing;
To correcting and the proactive problem integration of classifying; Search historical data; Be the executive measure of current correction and proactive problem recommendation coupling, and upgrade the executive measure that the user finally confirms, the responsible organization or the responsible official of each several part executive measure in the final executive measure of confirming of recording user;
Write down and report each responsible organization or responsible official implementation status to the appropriate section executive measure;
The implementation status that gathers the each several part executive measure obtains the result of current correction and proactive problem;
The implementation status of correction and proactive problem and executive measure thereof, each several part executive measure and correction and the final result of proactive problem are preserved as historical data.
5. the management method of correction according to claim 4 and proactive problem is characterized in that, also comprises step:
Correction in the database and proactive problem are added up;
From database, search the correction and the proactive problem of user's appointment;
Executive measure in the database is added up;
From database, search the executive measure of user's appointment.
6. the management method of correction according to claim 5 and proactive problem is characterized in that Query Result and statistics are illustrated on the Web page.
CN2012101499287A 2012-05-15 2012-05-15 Management system and management method for correcting and preventing problems Pending CN102708455A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101499287A CN102708455A (en) 2012-05-15 2012-05-15 Management system and management method for correcting and preventing problems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101499287A CN102708455A (en) 2012-05-15 2012-05-15 Management system and management method for correcting and preventing problems

Publications (1)

Publication Number Publication Date
CN102708455A true CN102708455A (en) 2012-10-03

Family

ID=46901187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101499287A Pending CN102708455A (en) 2012-05-15 2012-05-15 Management system and management method for correcting and preventing problems

Country Status (1)

Country Link
CN (1) CN102708455A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111222775A (en) * 2019-12-31 2020-06-02 嘉兴太美医疗科技有限公司 Problem management method, system and computer readable medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1221922A (en) * 1997-12-30 1999-07-07 国际商业机器公司 Case-based reasoning system and method for searching case database
US20030135378A1 (en) * 2002-01-11 2003-07-17 Seh America, Inc. Method and system for reporting, assigning, and tracking facilities incident reports
US20070294098A1 (en) * 2006-03-24 2007-12-20 Tietjen Sonya A System and Method For Implementing An Occurrence Reporting system
CN101334792A (en) * 2008-07-10 2008-12-31 中国科学院计算技术研究所 Personalized service recommendation system and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1221922A (en) * 1997-12-30 1999-07-07 国际商业机器公司 Case-based reasoning system and method for searching case database
US20030135378A1 (en) * 2002-01-11 2003-07-17 Seh America, Inc. Method and system for reporting, assigning, and tracking facilities incident reports
US20070294098A1 (en) * 2006-03-24 2007-12-20 Tietjen Sonya A System and Method For Implementing An Occurrence Reporting system
CN101334792A (en) * 2008-07-10 2008-12-31 中国科学院计算技术研究所 Personalized service recommendation system and method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
任红霞等: "有效实施纠正预防措施 促进质量体系持续改进", 《中国医药导报》, vol. 5, no. 9, 31 March 2008 (2008-03-31), pages 116 - 117 *
广东电网公司: "广东电网公司地区供电局纠正与预防管理标准", 《百度文库》, 6 November 2010 (2010-11-06), pages 1 - 4 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111222775A (en) * 2019-12-31 2020-06-02 嘉兴太美医疗科技有限公司 Problem management method, system and computer readable medium

Similar Documents

Publication Publication Date Title
KR20190134879A (en) Method for cloud service based customized smart factory mes integrated service using ai and speech recognition
CN105373896A (en) Project management system
WO2007019451A3 (en) Method and system for monitoring for and reporting of lien distress events
CN105956151A (en) Plan-based assistant decision-making method, tailing pond monitoring method and system
CN108364134B (en) Building engineering cost management system based on BIM technology
CN104881462A (en) Metadata management system
CN108038666A (en) A kind of company information acquisition system based on internet
US20140129276A1 (en) Method and system for supplier management
CN103617506A (en) Training and learning management system of control center
CN104657823A (en) KPI dynamic analysis method for improving decision accuracy of power supply enterprise
CN102708455A (en) Management system and management method for correcting and preventing problems
CN105894093A (en) Wind power converter health value and product tracing system and method based on WeChat platform
CN104346667A (en) Door and window management system
CN117611187A (en) RPA-based customer service and data monitoring management method and system
CN107247715A (en) The synchronous method of WMS systems and ERP system
CN109146410A (en) A kind of multimedia advertising design platform
CN107730081A (en) A kind of data acquisition analysis method and system based on RFID technique
CN109974740B (en) Mobile communication network agent maintenance path planning method
CN107943835A (en) It is a kind of to report and submit data analysis and taxis system for electric system
Greenberg et al. Managing sustainable production: A framework for integrating sustainability in the manufacturing sector.
Econometrics Future UK Employment in the Offshore Wind Industry
CN106484405A (en) A kind of framework of rapid build information system software
CN105096059A (en) Production and management system for enterprises
Xu et al. Case study on the Lean Six Sigma management for information technology service management project of G Commercial Bank
Lalla The Effect of ISO 9001 on TQM Implementation in SME in Trinidad

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121003