CN102708455A - Management system and management method for correcting and preventing problems - Google Patents
Management system and management method for correcting and preventing problems Download PDFInfo
- Publication number
- CN102708455A CN102708455A CN2012101499287A CN201210149928A CN102708455A CN 102708455 A CN102708455 A CN 102708455A CN 2012101499287 A CN2012101499287 A CN 2012101499287A CN 201210149928 A CN201210149928 A CN 201210149928A CN 102708455 A CN102708455 A CN 102708455A
- Authority
- CN
- China
- Prior art keywords
- correction
- measure
- executive measure
- proactive
- executive
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007726 management method Methods 0.000 title claims abstract description 49
- 230000008520 organization Effects 0.000 claims description 16
- 230000010354 integration Effects 0.000 claims description 7
- 230000008878 coupling Effects 0.000 claims description 6
- 238000010168 coupling process Methods 0.000 claims description 6
- 238000005859 coupling reaction Methods 0.000 claims description 6
- 230000000694 effects Effects 0.000 claims description 6
- 230000002265 prevention Effects 0.000 abstract 3
- 238000004519 manufacturing process Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 238000012163 sequencing technique Methods 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to a management system and a management method for correcting and preventing problems, which collect, classify and integrate the correction and prevention problems recorded by each department, match the execution measures for the correction and prevention problems from historical data and receive the correction of the execution measures by users, record the responsible department or responsible person of each part execution measure in the corrected execution measures, track and verify the execution conditions of each responsible department or responsible person on the corresponding part execution measures, collect the execution conditions of each part measure into the execution result of the whole measure, and update the historical data. The management system and the management method can be used for uniformly managing the correction and prevention problems and the related information thereof, and compared with a paper management method, the management system and the management method are convenient for users to operate and check and greatly improve the management efficiency.
Description
Technical field
The present invention relates to power system security production management technical field, particularly relate to the management system and the management method of a kind of correction and proactive problem.
Background technology
Correcting with preventing is the technical term in the safety in production risk management system; Its meaning is that the problem that does not meet safety in production that has taken place in the electric system is corrected; Contingent problem is prevented, and wherein, the problem that does not meet safety in production abbreviates as corrects and proactive problem.Correction in the electric system and proactive problem have a lot, and same problem possibly occur repeatedly, and possibly there is repetition in the problem that different departments find, like this, problem are managed the particularly necessity that seems.Traditional management method, be the staff with problem log on paper spare, and paper spare managed.This method obviously can not realize correcting the informationization with proactive problem, also with regard to the editor that is unfavorable for problem, preserve, check and manage concentratedly or the like.
Summary of the invention
Based on this, the present invention proposes the management system and the management method of a kind of correction and proactive problem, manage correcting with convenient with proactive problem, and the raising efficiency of management.
The management system of a kind of correction and proactive problem comprises:
Problem typing module is used to receive the correction and the proactive problem of user's typing;
Distribution module is formulated in measure; Be used for correcting and the proactive problem integration of classifying; Search database; Be the executive measure of current correction and proactive problem recommendation coupling, and upgrade the executive measure that the user finally confirms, the responsible organization or the responsible official of each several part executive measure in the final executive measure of confirming of recording user;
Feedback module is carried out in measure, is used to write down and report each responsible organization or the responsible official implementation status to the appropriate section executive measure;
The implementation effect authentication module is used to gather the implementation status of each several part executive measure, obtains the result of current correction and proactive problem;
Database is used to write down implementation status and the correction and the final result of proactive problem of correction and proactive problem and executive measure thereof, each several part executive measure.
The management method of a kind of correction and proactive problem comprises step:
Receive the correction and the proactive problem of user's typing;
To correcting and the proactive problem integration of classifying; Search historical data; Be the executive measure of current correction and proactive problem recommendation coupling, and upgrade the executive measure that the user finally confirms, the responsible organization or the responsible official of each several part executive measure in the final executive measure of confirming of recording user;
Write down and report each responsible organization or responsible official implementation status to the appropriate section executive measure;
The implementation status that gathers the each several part executive measure obtains the result of current correction and proactive problem;
The implementation status of correction and proactive problem and executive measure thereof, each several part executive measure and correction and the final result of proactive problem are preserved as historical data.
The management system of correction of the present invention and proactive problem and management method; To the integration that gathers and classify of the correction of all departments' typing and proactive problem; From historical data, mate executive measure and accept the correction of user executive measure for correcting with proactive problem; Write down the responsible organization or the responsible official of each several part executive measure in the revised executive measure, and collect the execution result of each responsible organization or responsible official's feedback, upgrade historical data simultaneously.Adopt this management system and management method, can carry out unified management, compare the method for paper spare management correction and proactive problem and relevant information thereof, the operation that has made things convenient for the user with check, improved the efficiency of management greatly.
Description of drawings
Fig. 1 is the structural representation of the management system of correction of the present invention and proactive problem;
Fig. 2 is the structural representation of one of them embodiment of management system of correction of the present invention and proactive problem;
Fig. 3 is the schematic flow sheet of the management method of correction of the present invention and proactive problem.
Embodiment
The management system of correction of the present invention and proactive problem and management method replace the management of paper spare, carry out information system management to correcting with proactive problem.Below in conjunction with accompanying drawing and the present invention of embodiment illustrated in detail.
The management system of correction of the present invention and proactive problem, as shown in Figure 1, comprising:
Problem typing module is used to receive the correction and the proactive problem of user's typing;
Distribution module is formulated in measure; Be used for correcting and the proactive problem integration of classifying; Search database; Be the executive measure of current correction and proactive problem recommendation coupling, and upgrade the executive measure that the user finally confirms, the responsible organization or the responsible official of each several part executive measure in the final executive measure of confirming of recording user;
Feedback module is carried out in measure, is used to write down and report each responsible organization or the responsible official implementation status to the appropriate section executive measure;
The implementation effect authentication module is used to gather the implementation status of each several part executive measure, obtains the result of current correction and proactive problem;
Database is used to write down implementation status and the correction and the final result of proactive problem of correction and proactive problem and executive measure thereof, each several part executive measure.
Can know that by above description and Fig. 1 distribution module is formulated in problem typing module, measure, measure is carried out feedback module and linked to each other successively with the implementation effect authentication module, and links to each other with database respectively, thereby has constituted this management system.Wherein, problem typing module is used to collect correction and the proactive problem that all departments find.Measure is formulated distribution module and then from database, is searched the executive measure of mating with current correction and proactive problem, recommends the user, and the user revises and confirm as final executive measure based on actual conditions to the executive measure of recommending.To carry out efficient and obtain best implementation effect in order to improve; The user classifies to executive measure and sorted each several part measure is distributed to this part work is good at or the most experienced department or people most, and the responsible organization or the responsible official of distribution module record each several part executive measure formulated in measure.Feedback module is carried out in measure, and then each responsible organization of real-time follow-up or responsible official are to the implementation status of institute's distribution portion measure, and the implementation effect authentication module is integrated into the implementation status of each several part executive measure implementation status, execution result and the deadline of total executive measure; Database is then all preserved the data that relate in the above module routine, so that call and check.
Because the user possibly relatively be concerned about kind, frequency and the measure thereof etc. that are gone wrong in a period of time; This management system also comprises problem statistical module and executive measure statistical module; As shown in Figure 2, the user can understand the statistics in the database through these two modules.Simultaneously; The user understands problem and measure for ease, and is as shown in Figure 2, and this management system also comprises problem enquiry module and executive measure enquiry module; Be respectively the user problem query window and executive measure query window are provided, and the Query Result from database is displayed.Preferably, statistics and Query Result are showed on the Web page through the FusionChart assembly.So, the user can understand interested correction and proactive problem and executive measure thereof through browser.
The management method of correction of the present invention and proactive problem, be and the corresponding method of above-mentioned management system, as shown in Figure 3, comprise step:
The correction and the proactive problem of step S1, reception user typing;
Step S2, to correcting and the proactive problem integration of classifying; Search historical data; Executive measure for current correction and proactive problem recommendation coupling; And upgrade the executive measure that the user finally confirms, the responsible organization or the responsible official of each several part executive measure in the executive measure that recording user is finally confirmed;
Step S3, write down and report each responsible organization or responsible official implementation status to the appropriate section executive measure;
Step S4, gather the implementation status of each several part executive measure, obtain the result of current correction and proactive problem;
Step S5, the implementation status of correction and proactive problem and executive measure thereof, each several part executive measure and correction and the final result of proactive problem are preserved as historical data.
As a preferred embodiment, this management method also comprises step:
Step S6, correction in the database and proactive problem are added up;
Step S7, the correction of from database, searching user's appointment and proactive problem;
Step S8, the executive measure in the database is added up;
Step S9, from database, search the executive measure of user's appointment.
Because step S6-S9 is not influence each other, so sequencing is adjustable arbitrarily.The result who is inquired about and the result of statistics preferably are illustrated on the Web page.
The above embodiment has only expressed several kinds of embodiments of the present invention, and it describes comparatively concrete and detailed, but can not therefore be interpreted as the restriction to claim of the present invention.Should be pointed out that for the person of ordinary skill of the art under the prerequisite that does not break away from the present invention's design, can also make some distortion and improvement, these all belong to protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be as the criterion with accompanying claims.
Claims (6)
1. the management system of correction and proactive problem is characterized in that, comprising:
Problem typing module is used to receive the correction and the proactive problem of user's typing;
Distribution module is formulated in measure; Be used for correcting and the proactive problem integration of classifying; Search database; Be the executive measure of current correction and proactive problem recommendation coupling, and upgrade the executive measure that the user finally confirms, the responsible organization or the responsible official of each several part executive measure in the final executive measure of confirming of recording user;
Feedback module is carried out in measure, is used to write down and report each responsible organization or the responsible official implementation status to the appropriate section executive measure;
The implementation effect authentication module is used to gather the implementation status of each several part executive measure, obtains the result of current correction and proactive problem;
Database is used to write down implementation status and the correction and the final result of proactive problem of correction and proactive problem and executive measure thereof, each several part executive measure.
2. the management system of correction according to claim 1 and proactive problem is characterized in that, also comprises:
The problem statistical module, the correction and the proactive problem that are used for database is write down are added up;
The problem enquiry module is used to the user problem query window is provided, from the correction of database calling and obtaining user selection and the historical data of proactive problem;
The executive measure statistical module is used for the executive measure that database writes down is added up;
The executive measure enquiry module is used to the user executive measure query window is provided, the historical data of the executive measure of selecting from the database calling and obtaining user.
3. the management system of correction according to claim 2 and proactive problem is characterized in that,
Said problem statistical module also is used for showing statistics through the Web page;
Said problem enquiry module also is used for showing Query Result through the Web page;
Said executive measure statistical module also is used for showing statistics through the Web page;
Said executive measure enquiry module also is used for showing Query Result through the Web page.
4. the management method of correction and proactive problem is characterized in that, comprises step:
Receive the correction and the proactive problem of user's typing;
To correcting and the proactive problem integration of classifying; Search historical data; Be the executive measure of current correction and proactive problem recommendation coupling, and upgrade the executive measure that the user finally confirms, the responsible organization or the responsible official of each several part executive measure in the final executive measure of confirming of recording user;
Write down and report each responsible organization or responsible official implementation status to the appropriate section executive measure;
The implementation status that gathers the each several part executive measure obtains the result of current correction and proactive problem;
The implementation status of correction and proactive problem and executive measure thereof, each several part executive measure and correction and the final result of proactive problem are preserved as historical data.
5. the management method of correction according to claim 4 and proactive problem is characterized in that, also comprises step:
Correction in the database and proactive problem are added up;
From database, search the correction and the proactive problem of user's appointment;
Executive measure in the database is added up;
From database, search the executive measure of user's appointment.
6. the management method of correction according to claim 5 and proactive problem is characterized in that Query Result and statistics are illustrated on the Web page.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012101499287A CN102708455A (en) | 2012-05-15 | 2012-05-15 | Management system and management method for correcting and preventing problems |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012101499287A CN102708455A (en) | 2012-05-15 | 2012-05-15 | Management system and management method for correcting and preventing problems |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102708455A true CN102708455A (en) | 2012-10-03 |
Family
ID=46901187
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012101499287A Pending CN102708455A (en) | 2012-05-15 | 2012-05-15 | Management system and management method for correcting and preventing problems |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102708455A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111222775A (en) * | 2019-12-31 | 2020-06-02 | 嘉兴太美医疗科技有限公司 | Problem management method, system and computer readable medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1221922A (en) * | 1997-12-30 | 1999-07-07 | 国际商业机器公司 | Case-based reasoning system and method for searching case database |
US20030135378A1 (en) * | 2002-01-11 | 2003-07-17 | Seh America, Inc. | Method and system for reporting, assigning, and tracking facilities incident reports |
US20070294098A1 (en) * | 2006-03-24 | 2007-12-20 | Tietjen Sonya A | System and Method For Implementing An Occurrence Reporting system |
CN101334792A (en) * | 2008-07-10 | 2008-12-31 | 中国科学院计算技术研究所 | Personalized service recommendation system and method |
-
2012
- 2012-05-15 CN CN2012101499287A patent/CN102708455A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1221922A (en) * | 1997-12-30 | 1999-07-07 | 国际商业机器公司 | Case-based reasoning system and method for searching case database |
US20030135378A1 (en) * | 2002-01-11 | 2003-07-17 | Seh America, Inc. | Method and system for reporting, assigning, and tracking facilities incident reports |
US20070294098A1 (en) * | 2006-03-24 | 2007-12-20 | Tietjen Sonya A | System and Method For Implementing An Occurrence Reporting system |
CN101334792A (en) * | 2008-07-10 | 2008-12-31 | 中国科学院计算技术研究所 | Personalized service recommendation system and method |
Non-Patent Citations (2)
Title |
---|
任红霞等: "有效实施纠正预防措施 促进质量体系持续改进", 《中国医药导报》, vol. 5, no. 9, 31 March 2008 (2008-03-31), pages 116 - 117 * |
广东电网公司: "广东电网公司地区供电局纠正与预防管理标准", 《百度文库》, 6 November 2010 (2010-11-06), pages 1 - 4 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111222775A (en) * | 2019-12-31 | 2020-06-02 | 嘉兴太美医疗科技有限公司 | Problem management method, system and computer readable medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20190134879A (en) | Method for cloud service based customized smart factory mes integrated service using ai and speech recognition | |
CN105373896A (en) | Project management system | |
WO2007019451A3 (en) | Method and system for monitoring for and reporting of lien distress events | |
CN105956151A (en) | Plan-based assistant decision-making method, tailing pond monitoring method and system | |
CN108364134B (en) | Building engineering cost management system based on BIM technology | |
CN104881462A (en) | Metadata management system | |
CN108038666A (en) | A kind of company information acquisition system based on internet | |
US20140129276A1 (en) | Method and system for supplier management | |
CN103617506A (en) | Training and learning management system of control center | |
CN104657823A (en) | KPI dynamic analysis method for improving decision accuracy of power supply enterprise | |
CN102708455A (en) | Management system and management method for correcting and preventing problems | |
CN105894093A (en) | Wind power converter health value and product tracing system and method based on WeChat platform | |
CN104346667A (en) | Door and window management system | |
CN117611187A (en) | RPA-based customer service and data monitoring management method and system | |
CN107247715A (en) | The synchronous method of WMS systems and ERP system | |
CN109146410A (en) | A kind of multimedia advertising design platform | |
CN107730081A (en) | A kind of data acquisition analysis method and system based on RFID technique | |
CN109974740B (en) | Mobile communication network agent maintenance path planning method | |
CN107943835A (en) | It is a kind of to report and submit data analysis and taxis system for electric system | |
Greenberg et al. | Managing sustainable production: A framework for integrating sustainability in the manufacturing sector. | |
Econometrics | Future UK Employment in the Offshore Wind Industry | |
CN106484405A (en) | A kind of framework of rapid build information system software | |
CN105096059A (en) | Production and management system for enterprises | |
Xu et al. | Case study on the Lean Six Sigma management for information technology service management project of G Commercial Bank | |
Lalla | The Effect of ISO 9001 on TQM Implementation in SME in Trinidad |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20121003 |